Round 2 Questions/Answers

Question: Please explain the King Fisher Batteries?

Answer: King Fisher Batteries are to be load tested prior to "Swapping" them. Then the higher value battery is to be placed on the bottom.

Question: What is the filter, fluid maintenance?

Answer: Filters, fluid changes are to be listed as a needed repair on the deficiency list to be issued on a delivery order, all waste is too disposed of properly at the recycle and hazardous waste points on the installation and Fuel will be ordered as a repair on a delivery order. We also stated for engine driven pumps that “topping off” of fluids is expected as part of normal maintenance similar to having a vehicle serviced and oil change.

Question: What is meant by the storage tanks and other items in the pump houses?

Answer: This contract does not provide inspection of the tanks typically. This could be a deficiency item as a repair however. Any leaks that occur may be issued as a repair, fill valves (altitude) are to be treated the same as relief valves, and backflow preventers are maintained by the privatized water contractor

QUESTION: On the bid schedule, is CLIN 0012 part of our final proposal amount?

Answer: Yes, CLIN 0012 needs to be included of your final proposal amount.