W91247-19-R-90001,_TE_3_-_Workload_Estimate.docx
DOCX document 13 KB Posted
- Attached to
- Fort Bragg Refuse and Recycle Services
- Solicitation number
- W9124719R0001
About this file
Technical Exhibit 3 - Workload Estimate
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 3
WORKLOAD ESTIMATES
SERVICE REQUIRED Remove, Transport, and Dispose of an estimated Average Annual Volume of 26,500 tons of Acceptable Municipal Solid Waste (MSW) from Fort Bragg to a Subtitle D landfill/Transfer station. The service required is based on the Historical Workload Data in TE 7. Technical Exhibit 7 data is based on the actual tonnage per month of MSW weighed at the landfill disposal site for the period Nov 2003 through Dec 2017. The average of the total annual tonnage for this 4-year period, having separated the outside cantonment area from the inside cantonment area, equals 26,500 tons.
| SERVICE |
| ESTIMATED QUANTITY |
| FREQUENCY |
Remove, Transport, & Dispose of Acceptable MSW
26,500 tons/year
Fluctuating monthly workload from an estimated low of 1,766.8 tons per month to an estimated high of 2,678.9 tons per month.
Daily, (Weekdays, except for New Year’s Day, Martin Luther Kin Jr.’s Birthday, President’s Day, Memorial Day, Labor Day, Columbus Day, Veteran’s Day, *Independence Day, Thanksgiving Day, and Christmas Day)
Disposal of Tires
| Estimated 10 Tons per year |
| Up to 4 times/year |
NOTE 1: Fort Bragg has established strategic goals in its Integrated Environmental Plan to reduce materials in the waste stream through programs such as recycling. Because of the implementation of these programs, the estimated annual workload total tonnage of MSW may be reduced as much as 2% for each option year.
File details come from the government source that posted it.