W91247-16-R-0006_Amend04.pdf

PDF 118 KB Posted

Attached to
Fort Bragg Construction MATOC
Solicitation number
W91247-16-R-0006
Issued by

About this file

Amendment 04

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment to address Questions and Answ ers received from industry.

1. CONTRACT ID CODE PAGE OF PAGES

1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Mar-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91247-16-R-0006

X 9B. DATED (SEE ITEM 11)

30-Jan-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Mar-2017

CODE

MICC CENTER - FORT BRAGG

MICC - FORT BRAGG

2175 REILLY ROAD STOP A

FORT BRAGG NC 28310-5000

W91247 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91247-16-R-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The Issued By organization below has been deleted:

MICC CENTER - FORT BRAGG

MICC - FORT BRAGG

2175 REILLY ROAD STOP A

FORT BRAGG NC 28310-5000

SECTION H - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

H.1. INSURANCE - WORK ON A GOVERNMENT INSTALLATION

INSURANCE SCHEDULE (IAW FAR 28.310(a)): In accordance with clause 52.228-5, "Insurance--Work on a Government Installation" incorporated in Section I herein, the Contractor shall secure, pay the premiums for and keep in force until the expiration of this contract, and any renewal thereof, adequate insurance required by this contract. The Contractor shall maintain the following types of insurance, minimum amount, and coverage listed below at all times, not just when there is an active Task Order.:

KIND AMOUNTS (FAR 28.307-2)

Workmen’s Compensation $100,000

Comprehensive General Liability $500,000 per occurrence for bodily injury

Comprehensive Automobile Liability $200,000 per person and $500,000 per accident for bodily injury and $20,000 for property damage

NOTE: Issuance certificates shall reference individual task order number and project name.

H.2. APPLICABLE WAGE DETERMINATIONS: Applicable Davis-Bacon wage rates or Service Contract Act wages will be identified for all Task Orders issued under this contract current as of the time of award of the Task Order. Contractors shall comply with the applicable Acts and related clauses at the Task Order level with each individual Task Order.

Wage Determinations may be found for Davis-Bacon at: http://www.gpo.gov/davisbacon/MI.html and;

Wage Determinations may be found for Service Contract Act at: http://www.wdol.gov/sca.aspx

H. 3. DAVIS-BACON-SECONDARY SITE OF THE WORK: In accordance with FAR 52.222-5, this provision will apply at the Task Order level.

H.4. BID BONDS. Unless otherwise stated in the Request for Task Order Proposal (RTOP), Bid Bonds are required.

H.5. PERFORMANCE AND PAYMENT BONDS AND ALTERNATIVE PAYMENT PROTECTIONS

FOR CONSTRUCTION CONTRACTS

a. Performance and payment bonds shall be required, and the penal sum established, by each Task Order.

b. Payment Bond: (a) If an individual Task Order is priced at $30,000 or greater, penal sum shall be one hundred percent (100%) of order price.

c. Performance Bond: The penal sum of each Performance Bond shall equal one hundred percent (100%) of the price of each Task Order exceeding $100,000 placed hereunder.

d. Bonds and other payment protections shall be provided within 10 calendar days of award of a Task Order.

e. Notice to Proceed will not be issued until the Contractor provides sufficient bonding to cover the work being performed.

f. Reference Contract Clause 52.228-15, Performance and Payment Bonds. Applicability will be defined in individual Task Orders.

H.6. FEDERAL HOLIDAYS

The following days are legally recognized holidays:

New Year's Day 1 January Martin Luther King Jr.'s Birthday 3rd Monday in January President's day 3rd Monday in February Memorial Day Last Monday in May Independence Day 4th of July Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran's Day 11th of November Thanksgiving Day 4th Thursday in November Christmas Day 25 th December

When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the proceeding Friday is observed as a legal holiday. This list of holidays relates to Government duty days and is not intended to supplement or otherwise alter the provisions of any Wage Determination regarding applicable paid holidays.

In addition to the days designated as holidays, the Government observes the following days:

– Any other day designated by federal statute

– Any other day designated by Executive Order

– Any other day designated by Presidential Proclamation

It is understood and agreed between the Government and the Contractor that observance of such days by Government personnel shall not be a reason for an additional period of performance, or entitlement of compensation except as set forth within the contract.

NOTE: Individual task orders will be more specific if work is allowable on federal holidays.

H.7. ORDERING PROCEDURES FOR TASK ORDERS

a. Authority to Place Task Orders: The Mission and Installation Contracting Command Center-Fort Bragg (MICC Center-FB) is hereby delegated authority to award and administer task orders under this procurement. We reserve the right to delegate authority to other contracting centers.

b. Fair Opportunity: In accordance with FAR 16.505(b) the Contracting Officer will give all awardees a “fair opportunity” to be considered for each order.

c. Unauthorized Work: The Contractor is not authorized to commence task order performance without a signed task order or direction by a Contracting Officer. Notwithstanding any of the other provisions of this contract, a Contracting Officer shall be the only individual authorized on behalf of the Government to:

– Accept nonconforming work;

– Waive any requirement of the task order; or,

– Modify any term or condition of the task order.

Only the Contracting Officer is authorized to waive or modify any term or condition of the contract.

d. Request for Task Order Proposals (RTOP) or similar requests, will be used by the Government when requesting responses to Task Order requirements. Oral requests may be issued when the requirements are urgent. The RTOP will include submission requirements, evaluation criteria, and other information specific to the requirement.

e. Evaluations at the Task Order Level: Task Orders may be evaluated using any evaluation approach consistent with Federal Acquisition Regulation (FAR) procedures. The RTOP will identify the evaluation approach; with most being on a lowest price basis. Projects that include design-build orders will be evaluated utilizing the policies and procedures in FAR subpart 36.3.

H.8. ADDITIONAL TERMS AND CONDITIONS: Additional terms and conditions will be included at the task order level.

H.9. IDIQ OMBUDSMAN: The Task Order Contracting Officer (TOCO) should be the first point of contact for industry seeking resolution of issues. The IDIQ ombudsman required by FAR 16.505(b) is the MICC Center-FB Task Order Ombudsman. The ombudsman represents an impartial authority outside of the task order-contracting office and has ultimate authority to review and adjudicate issues regarding task order awards under this contract.

Telephone number for requests for information, or questions from the IDIQ Ombudsman is (757) 788-5855. A formal letter will be sent to all awardees in the event that the IDIQ Ombudsman’s contact information changes.

H.10. SITE VISIT: In accordance with FAR 52.236-27, an organized site visit shall be scheduled for each proposed individual Task Order.

H.11. ADDITIVE/DEDUCTIVE ITEMS: In accordance with DFARS 252.236-7007, Mission and Installation Contracting Center- Fort Bragg (MICC Center-FB) reserves the right to utilize this prescription at the Task Order level.

H. 12. LOCAL CLAUSE 5152.203-4000, DOD IMPLEMENTATION OF THE DISCLOSURE REQUIREMENT

UNDER FAR CLAUSE 52.203-13 (OCT 2015)

FAR Clause, 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015), mandates that a Contractor shall timely disclose, in writing, to the agency Office of the Inspector General (OIG), with a copy to the contracting officer, certain violations of criminal law, violations of the civil False Claims Act, or a significant overpayment.

Within the DoD, the designated "agency Office of the Inspector General" is the DoD OIG at the following address:

Office of the Inspector General United States Department of Defense Investigative Policy and Oversight Contractor Disclosure Program 400 Army Navy Drive, Suite 1037 Arlington VA 22202-4704 Toll Free Telephone: 866-429-8011

(End of clause)

H.13. 5152.209-4000 DOD LEVEL I ANTITERRORISM (AT) STANDARDS (FEB 2009)

(a) Pursuant to Department of Defense Instruction Number 2000.16, “DoD Antiterrorism (AT) Standards,” dated October 2, 2006, each contractor employee requiring access to a Federally-controlled installation, facility and/or Federally-controlled information system(s) shall complete Level I AT Awareness Training on an annual basis and receive a certificate of completion. The training is accessible from any computer and is available at https://atlevel1.dtic.mil/at/. The contractor is responsible for ensuring that all applicable employees have completed antiterrorism awareness training and shall certify that their workforce has completed the training through the submission of completion certificate(s) to the Contracting Officer and the Contracting Officer’s Representative (if appointed) within five working days after contract award or prior to access to a Federally-controlled installation or information system.

(b) In the event that the automated system at https://atlevel1.dtic.mil/at/ is not available (e.g., server problems), Level I AT Awareness Training can be provided by a qualified instructor. However, if the training is not completed online, the Level I AT Awareness Instructor qualification must be coordinated with the Installation Antiterrorism Officer (or Installation Security equivalent) and the resultant name(s) of approved instructors shall be provided the contracting officer or designee along with all associated cost or schedule impacts to the contract.

(c) Antiterrorism performance (Level I AT Awareness Training attendance and compliance) may be documented as a performance metric under the resultant contract, and be part of past performance information in support of future source selections.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

Document Type Description

Attachment 1 Seed Project - Statement of Work

Attachment 2 Seed Project - Tab B - Specifications, Drawings, and Plans

Attachment 3 Seed Project - Contractor’s Price Schedule

Attachment 4 Site Visit Location

Attachment 5 Q + A post site visit

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

L.1. General Instructions

a. Submission of Offer. All Proposals shall be submitted via email prior to the closing date and time identified on the SF 1442 , to Mr. John Fleshman, Contract Specialist, john.fleshman.civ@mail.mil and Mr. Abelardo C. Lopez, Contracting Officer, abelardo.c.lopez.civ@mail.mil.

Address: ATTN: DPW Construction Contracting

Mission + Installation Contracting Command 4300 Butner Rd, Bldg 3-1634 Fort Bragg, NC 28310

b. Submissions – Provide hardycopy and one (1) CD with proposal. No electronic copies. (see address above)

c. Site Visit. The Government will hold an on site as indicated in the seed projects. All interested firms may attend with a limit of three (3) attendees per firm. Please submit, in writing, the names of attendees three days prior to the site visit to the Contracting Officer. All Contractors shall meet at the DPW Classroom building 3-2239 at 1330. A map has been provided for direction and may be found under Section ‘J’, titled Site Visit Location.pdf.

Technical questions shall be submitted in writing three days after the specified site visit date to Mr. John Fleshman, Contract Specialist, john.fleshman.civ@mail.mil and Mr. Abelardo C. Lopez, Contracting Officer, abelardo.c.lopez.civ@mail.mil. If the Government responses to technical questions affect the Statement of Work (SOW) or any other portion of the solicitation, then an Amendment of Solicitation will be issued.

d. The selection of a offerors shall be conducted using Lowest Price Technically Acceptable (LPTA) approach in accordance with Federal Acquisition Regulation (FAR) 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). Offers will be evaluated using the criteria under Section M, “Evaluation Factors for Award.”

Noncompliance with the Request for Proposal (RFP) requirements may hamper the Government's ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.

e. The Offer. The submission of the documentation specified below will constitute the offeror's acceptance of the terms and conditions of the RFP, concurrence with the SOW, and contract type.

f. It is the Government’s intention to award without discussions. Offerors are encouraged to present their best proposal in their initial submission. However, in accordance with (IAW) FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. Therefore, the offeror’s initial proposal shall contain the offeror’s best proposal in their initial submission if this occurs, a competitive range will be determined and offerors notified.

g. Instructions outlined below, prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.

h. If an offeror believes that the requirements in these instructions contain an error, an ambiguity, omission, or are otherwise deemed unsound, the offeror shall immediately notify the KO in writing with supporting rationale.

The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.

i. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.

j. All referenced documents for this solicitation are available on the Federal Business Opportunities (FBO.GOV) website at https://www.fbo.gov . Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.

k. Debriefings. The KO will promptly notify offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505. The KO will notify offerors who were in the competitive range of the source but were not selected for award in accordance with FAR 15.503(b). Upon such notification, unsuccessful offerors may request and receive a debriefing in accordance with the requirements of FAR 15.506.

L.2. Proposal Submission, Preparation Instructions, and Content.

The following instructions prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.

L.3.1. Proposal Submission. Submit signed and dated offer at or before the exact time specified in this solicitation.

Failure to provide all required documents or information may exclude the Offeror(s) from further consideration. No email proposals will be accepted. Failure to provide all required documents or information may exclude the Offeror(s) from further consideration.

L.3.2. Proposal Preparation Instructions.

a. The proposals shall be organized into four (4) volumes. A cover sheet shall be clearly marked as to volume number, title, copy number, solicitation identification and the offeror's name. All text shall be single spaced and printed black on white paper (Black and white requirement does not apply to graphics, photos, etc., Company stationary and logo’s are acceptable). Cross-references should be utilized to preclude unnecessary duplication of data between sections. Volume’s I thru III shall be in a protected format. Page limitations are as follows:

VOLUME TITLE FORMAT

NUMBER OF

COPIES

MAXIMUM PAGE

LIMIT

Volume I

RFP Documents:

TAB A – Signed

Solicitation, Offer, and Award (SF 1442) and any Amendments

TAB B – Section K TAB C – Section

Transmittal Summary Letter

TAB D – Responsibility Statement

TAB E – Bid Guarantee TAB F- Bonding Capacity TAB G– OCI Mitigation

Plan (if applicable)

MS Word 2013 or earlier

1 electronic copy

None

Volume II

Factor 1: Technical Volume:

TAB A – Table of

Contents TAB B – Glossary of

Abbreviations and Acronyms

TAB C – List of Table and Drawings and/or cross reference matrix (if applicable)

TAB D – Sub-factor 1 – MA IDIQ Contract Management Approach

TAB E – Sub factor 2 – Experience

TAB F – Sub factor 3 – Concept for MA IDIQ Contract Seed Task Order Reponse

TAB G – Sub factor 4 – Bonding Capacity

MS Word 2013 or

30 page count

Volume III

Factor 2 – Past Performance

TAB A - Table of Contents TAB B – Summary Page TAB C – Consent Letters TAB D – Specific Relevant

Contracts

MS Excel 2013; if narrative is included: MS Word 2013 or

5 page count

Volume III

Factor 3 - Price Table of Contents TAB B – Glossary of

Abbreviation and Acronyms

TAB C – Pricing Schedule for the Seed Project

MS Excel 2013; if narrative is included: MS Word 2013 or

None

b. Proposal Limitation. The proposal shall not exceed the page limits identified above. If the page limits are exceeded, the pages in excess of the limit shall be removed and returned, unread, to the offeror. The Government will not accept any changes to the offeror’s proposal after the closing date of the solicitation (See FAR 15.208 for further information regarding late proposals). If discussions become necessary, page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors.

c. Page Limit Includes. All appendices, charts, graphs, diagrams, tables, photographs, drawings, etc. All

Appendices, Charts, Graphs, Diagrams, Tables, Photographs, Drawings or fold-outs used for charts or tables (8.5 x 14 fold-outs) will count as one (1) page; 11 x 17 foldouts are permissible up to 10 pages and are excluded from page count).

d. Page: A page shall be an 8 ½ X 11” sheet of paper. When both sides of a sheet display printed material, it shall be counted as two pages. Letter size and spacing requirements for illustrations and tables can be at the discretion of the offeror but must be easily readable. Use at least 1 inch margins on the top and bottom and 3/4 inch side margins. All pages of each proposal shall be identified with the solicitation number W91247-16-R0026.

Printing shall be easily readable (Font: Times New Roman; Font Style: Regular: Size: 10 point on 8.5 x 11 inch paper.) The offeror shall number each page in order to eliminate any confusion. In the event offeror creates an ambiguity in their numbering of pages, the Government may exercise its own discretion in counting pages.

e. Indexing. Each volume shall contain a detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections.

f. Glossary of Abbreviations and Acronyms. Each volume shall contain a glossary of all abbreviations and acronyms used, with an explanation for each.

g. All pricing spreadsheet documents shall be in Microsoft Excel. Spreadsheets will not contain hidden worksheets. All formulas, lookup tables, and links shall be intact, and no links shall exist to files not included with the submission. PDF or flat files will not be considered adequate.

C. Proposal Preparation Instruction.

L.2. PROPOSAL CONTENT

a. Volume I – RFP Documents. Part I must be clearly marked “VOLUME I - RFP DOCUMENTS, RFP W9124M-16-R-0006.” Volume I shall not pricing information included. Offerors are required to submit a completed SF 1442 (including acknowledgment of Amendments), Section K, Transmittal Summary Letter, Responsibility Statements, Bid Guarantee and OCI Mitigation plan (as applicable). Failure to follow the below RFP Document Proposal preparation instructions may cause your proposal to be determined unacceptable by the Government. The RFP Documents Volume shall be organized as follows and contain the identified information.

(1) TAB, A - SF 1442. The SF 1442 shall be submitted fully completed. The offeror is cautioned that the

SF 1442 shall contain an original signature in block 30B of the form. Acknowledgment of amendments can be made on the face of the SF 1442 in block 19 or signed copies of the amendments can be included in this Section.

(2) TAB, B - Section K (Representation, Certifications in accordance the FAR52.204-8, and Other

Statements of Offerors). The offeror shall ensure that Section K is submitted with all blocks in each certification/representation completed truthfully and completely.

(3) TAB, C - Transmittal Summary Letter. A summary cover letter to the proposal shall provide the following: (1) the name, title and telephone number of the company/division point of contact, who is authorized to make decisions with respect to the proposal and obligate the company contractually, (2) Identify those individuals authorized to negotiate with the Government, (3) A list of the proposal package contents, and (4) A listing of subcontractors and/or teaming partners that the offeror historically uses when involved in contracts of this type or magnitude.

(4) TAB D – Responsibility Statement. The Offeror shall submit a statement of their responsibility signed by their financial institutuion in accordance with FAR 9.104-1. This will be used in the Government’s determination of responsibility for the Offeror.

(5) TAB, E - Bid Guarantee. The offeror shall submit a bid guarantee in accordance with FAR 52.228-1 on a Standard Form 24.

(6) TAB F- Organizational Conflict of Interest (OCI) Mitigation Plan (if applicable). Offerors shall submit a Mitigation Plan, if required, to satisfy the requirements of FAR 9.5 “Organizational and Consultant Conflicts of Interest”. Potential OCI conflicts that may exist include Unequal Access to Information, Biased Ground Rules, and Impaired Objectivity. The OCI Mitigation Plan shall include a description of the actual or potential OCI, a description of the action that the responder has taken or proposes to take to avoid, mitigate, or neutralize the conflict, and any other relevant information that would assist the Contracting Officer in determining whether the Mitigation Plan is in fact acceptable or unacceptable.

The Contracting Officer will review any mitigation plans submitted in response to this Request for Proposal prior to award. The Contracting Officer will determine whether there is an OCI issue based on the information submitted and if the mitigation plan resolved any OCI concerns. If the Contracting Officer determines that there is an OCI issue and that it cannot be mitigated, the Contracting Officer will inform the Offeror that the proposal will not be evaluated or considered for award. The Contracting Officer and Offeror must resolve any OCI issues prior to the evaluation and consideration for award.

B. Volume II – Technical Volume – (shall not include pricing information)

1. The Technical Volume shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims in the Offeror’s proposal. Legibility, clarity and coherence are very important. This subfactors does not include a design component within the Seed Project as the design phase is 100 percent complete. Your responses will be evaluated against the Technical factors defined in Section M, Evaluation Factors for Award. The proposal should not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Statements that the offeror understands, can, or will comply with the SOW (including referenced publications, technical data, etc.);

statements paraphrasing the SOW or parts thereof (including applicable publications, technical data, etc.); and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., will be considered unacceptable. Offerors shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the Offeror's proposal. Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.

2. The Technical Volume shall, at a minimum, be prepared in a form consistent with the SOW and the evaluation criteria for award set forth in Section M of this solicitation. The section shall be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the contractor’s technical competence and ability to comply with the contract task requirements specified in the SOW. The offeror shall address as specifically as possible the actual methodology you would use for accomplishing the SOW tasks. The volume shall be organized according to the following general outline:

(1) TAB A - Table of Contents

(2) TAB B – Acronyms and Abbreviations

(3) TAB C – List of Table and Drawings

3. Factor 1 – Technical Capability. The Technical Proposal should be clearly marked, “VOLUME II”. The Technical Proposal shall consist of a written narrative that is the offeror’s response/proposed solution to the Seed Project and the IDIQ Statement of Work. Volume II shall have NO pricing information included. The Technical Proposal Volume shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims. Legibility, clarity and coherence are very important. Your responses will be evaluated against the Technical Acceptability elements defined in Section M, Evaluation Factors for Award.

(a) Subfactor 1 – MA IDIQ Contract Management Approach. The Seed Project (Attachment 1 thru

Attachment 3) is intentionally general in nature and contains all of the information that shall be provided. For the purposes of the Seed Project only, all offerors shall assume all work is performed during normal working hours.

The offeror shall propose items which, based on their knowledge and experience, provide the optimum balance among functionality and quality. This shall include:

(i). Offeror shall provide a thorough list of potential and/or previously utilized sub-contractors, joint venture partner(s), and suppliers and rationale behind your choice of sub-contractors, joint venture partner(s), and suppliers.

(ii). Offeror shall submit a brief narrative describing their project schedule and any recommendations/ideas considered in order to complete the project with an estimated value between $100,000.00 to $500,000.00.

(iii). Offeror shall thoroughly describe scheduling technique and project planning methodology used in completing the Seed Project to include approximate number of days. Any scheduling format will be acceptable.

(iv). Offeror shall provide a detailed narrative thoroughly demonstrating how the project will be accomplished utilizing the proposed project schedule and the rationale for selecting the proposed project schedule.

(v). Offerors must identify automated scheduling systems you have used and describe your understanding of events that must be considered in the schedule associated with but not limited to submittals, inspections and closeout.

(vi). Offerors shall thoroughly describe procedures, processes and methods for managing the progress of the project and interacting with the Government from beginning to end.

(vii). Offerors is required to provide any assumptions and decisions made in preparation of the proposal..

(b) Subfactor 2 – Experience: A management plan for on-site staff including the identification of proposed key management positions with regards to safety management, quality control management, and site superintendent to be in compliance with the SOW. Management plan shall also include executive support by the home and/or corporate office. The offeror shall identify which positions are deemed as key management and provide the proposed job title, specific duties, responsibilities, and qualifications for each position. The offerors management plan shall demonstrate how the offeror intends to provide contract support to include communication and reporting with the project managers. The management plan should reflect the offerors understanding of all jobs specified and describes an approach to satisfy this requirement. In addition, the offeror shall submit a plan to demonstrate the offeror’s ability to manage and coordinate multiple (no more than fifteen) task orders simultaneously, to include a list of multiple (no more then fifteen) Task Orders in progress at the same time on other contracts. The offeror shall identify their task order tracking system used to ensure that deadlines are met. At a minimum, offerors shall provide/address the following:

(i). Offeror shall provide an organization chart identifying specific functions and levels of authority for management, design, and construction teams. The organizational chart shall thoroughly demonstrate the offerors capabilities to comply with the MA IDIQ requirements.

(ii). Offerors must provide a management plan with key management personnel and key personnel who will be assigned to perform the duties of managing the contract. The Key Program Management details should be broad enough to address responsibility for proposal preparation, subcontract management, surveillance of work, acceptance, rejection, documentation and resolution of deficiencies, trend analysis and shall include corrective actions, and interface with government inspectors and engineers at each stage of design and construction.

(iii). Offeror shall explain how the organization structure will affect current Contracts/Task Orders and responses to future Task Orders. The key program management shall include the key personnel proposed and shall demonstrate the offeror has the requisite qualifications and experience to perform under the contract and on future Task Orders.

(iv). Offeror shall provide a narrative thoroughly detailing their ability to acquire the necessary personnel to satisfy the Seed Project. (Job qualifications associated with each key non-design labor category should be submitted to demonstrate the skills considered necessary. Job qualifications shall include applicable work experience (list of major projects/contracts, including brief scope, magnitude, and duty), education, and license/certification. Additionally, key personnel information shall be submitted to show offeror clearly understands all tasks specified.

(v). Offeror shall provide a detailed narrative of their ability to successfully construct multiple projects simultaneously. The offeror shall propose a sound and logical approach demonstrating their ability to respond to any Task Orders from the Government. Offerors must provide in detail their ability to manage/construct multiple small to large construction and repair projects simultaneously. Offerors must include a list of multiple task orders/contracts in progress at the same time on other contracts.

(c) Subfactor 3 – Concept for MA IDIQ Contract Management Approach: At a minimum, offerors shall provide/address the following: Offerors shall thoroughly demonstrate their design/build capabilities by providing written evidence of the job qualifications and experience of their architectural/engineering design personnel proposed for this contract. The offeror will also include information describing the proposed internal design quality control processes, and the ability to manage multiple design/build projects simultaneously.

(d) Subfactor 4 – Bonding Capacity: At a minimum, offerors shall provide/address the following:

Offeror shall demonstrate their ability to obtain sufficient bonding of $5 million. The offeror shall submit information showing minimum available bonding capacity of $25 million aggregate with verification from the Securities or Bonding Company (to be completed by Surety Company and submitted by Offeror). The information shall include how long the Surety Company has provided bonding for the Contractor and the bonding limit for a single project, aggregate amount, and current available bonding

C. Volume III - Past Performance. The Past Performance evaluation will be accomplished by reviewing aspects of an Offeror's recent and relevant Past Performance, focusing on and targeting performance which is relevant to the effort as it directly relates to the work being procured under this solicitation and as defined in Section M. A list of no more than six (6) of the Offeror’s most recent and relevant past performance information on projects: similar in size, scope, and complexity to the services being procured under this solicitation), performed for Government agencies and/or commercial customers within the last six (6) years from the solicitation release date.

1. The Government reserves the right to obtain past performance data from other sources than those identified by the Offeror in evaluating past performance. This includes, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency. Offerors are reminded that both independent data and data provided by Offerors in their proposals may be used by the Government to evaluate the Offerors past performance. The KO may also evaluated Past Performance based on direct knowledge of the Contractor’s performance on current or recent contracts. However, the burden of providing thorough, complete, and current past performance information as requested in this paragraph remains with the Offerors. All past performance received will be taken into account and could affect the overall rating. The overall past performance evaluation is a subjective decision based on the whole of all data received. In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

2. Content. Past Performance Submission Requirements. The Offeror shall submit Past Performance information within the past three (3) years that is both recent and relevant in the following format:

(a) Submission Requirements. The offeror shall submit a Past Performance Volume containing the following:

(i). Tab A - Table of Contents and Glossary of Abbreviations and Acronyms

(ii). Tab B - Summary Page describing the role of the Offeror and each subcontractor, teaming partner, and

/or joint venture partner. The Offeror is required to provide Past Performance Specific Relevant Contract Reference Sheets for the past performance experience in accordance with Attachment 2.

(iii). Tab C - Consent Letters executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing the release of past performance information so the Offeror can respond to such information. A sample consent letter is attached as Attachment 1.

(iv). Tab D - Specific Relevant Contracts Format. Sheets in accordance with Attachment 2 and are limited to 3 pages per reference. The Offeror shall provide documentation outlining the Offeror’s past performance with contracts, as a prime or major subcontractor, which is the same or similar in nature, size, and complexity to the services being procured under this Solicitation. The submittal shall include rationale supporting your assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate.

D Volume IV- Price – The offeror shall complete the Seed Project Price Schedule and encompass the entire statement of work. The Government reserves the right to require the submission of Other Than Certified Cost or Pricing Data as is deemed necessary to arrive at a fair and reasonable price.

1. The Contracting Officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the Contracting Officer will review this determination and if, in the Contracting Officer’s opinion, adequate price competition exists, no additional pricing information will be requested and certification under FAR 15.406-2 will not be required. However, if there are unusual circumstances where it is concluded that additional data are necessary to determine the reasonableness of price, the Contracting Officer shall, to the maximum extent practicable, obtain the additional data from sources other than the Offeror. The Price Volume shall be submitted fully completed and error free. The Price Volume shall be organized as follows and contain the identified information:

TAB A – Table of Content TAB B – Glossary of Abbreviation and Acronyms TAB C – Pricing Schedule for the Seed Project

2. TAB C – Pricing Schedule & Pricing Narrative.

(a) Offeror's proposal shall include complete and accurate price for the Seed Project associated with the all

Contract Line Item Numbers (CLINs). The Section B - Pricing Schedule is located within the Seed Project for contractor response. For each CLIN, the Offeror shall indicate the CLIN unit price and the resulting CLIN amount. If submitted, all formulas, lookup tables, and links should be intact, and no links should exist to files not included with the proposal. Spreadsheets shall not contain hidden worksheets.

(b) Support: For the purpose of price evaluation, the Offeror shall include a Pricing Matrix in contractor-own format which details the calculation of its proposed project fixed prices for each priced CLIN in the Seed Project. The Offeror shall submit fully all material and labor rates for each proposed cost element to complete the Seed Project. The information provided shall be utilized to facilitate a technical cross-walk. The pricing Matrix shall be prepared using MS Excel 2013 or earlier; the narrative shall be prepared using MS Word 2013 or earlier.

SUBCONTRACTOR/TEAMING PARTNER CONSENT FORM FOR THE RELEASE OF PAST

PERFORMANCE INFORMATION TO THE PRIME CONTRACTOR

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor's or teaming partner's consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government's Past Performance Evaluators in assessing your past performance relevancy and confidence, we request that the following consent form be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent forms should be submitted as part of your Past Performance Volume III Proposal.

SAMPLE

Dear (Contracting Officer)

We are currently participating as a (subcontractor/teaming partner) with (prime contractor or name of entity providing proposal) in responding to the Mission and Installation Contracting Command request for Proposal (solicitation number) for the (program title or description of effort).

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past performance information with the prime contractor during the source selection process.

(Signature and Title of individual who has the authority to sign for and legally bind the company)

Company Name:

Address:

Specific Relevant Contracts Sheet

The offeror shall provide documentation outlining the offeror’s past performance with contracts, as a prime or major subcontractor, which is the same or similar in nature, size, and complexity to the services being procured under this Solicitation. The submittal shall include rationale supporting your assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate.

1. Contract Number, Award Date and Contract type.

2. Price/Cost – original awarded AND final (or projected final, if contract is current).

3. Delivery Schedule – original AND final (or projected final, if the contract is current).

4. Contact Information - Address and telephone number for the Government (or commercial) procuring contracting activity AND contract administrative activity (if applicable).

Name, telephone number, fax number and e-mail address for the following:

5. Procuring Contracting Officer (PCO)

6. Administrative Contracting Officer (ACO)

7. Government or commercial technical representative or COR Identify in specific detail for each contract listed, why or how you consider that effort relevant or similar to the effort required by this solicitation. In determining relevancy, consideration should be given but not limited to such things as product/service similarity, product/service, size and complexity, contract type, contract environment, division of company proposing, and subcontractor interaction.

8. Narrative explanation on each contract listed describing the objectives achieved and the following data: any cost growth or schedule delays encountered. For any Government contracts which did not/do not meet original requirements with regard to cost, schedule, or technical performance, a brief explanation of the reason(s) for such shortcomings and any demonstrated corrective actions taken to avoid recurrence. Offerors may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a Limited or a No Confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror is required to clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a Substantial Confidence or Satisfactory Confidence candidate.

9. Negative Performance Documentation. A copy of any cure notices, show cause letters or contract discrepancy reports received on each contract listed and a description of any corrective action by the offeror or proposed subcontractor.

10. Completion Date/Delivery Schedule. The contractor shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary.

1. Contract Number __________________________ Award Date________________________________ Contract type_______________________________

2. Completion Date/Delivery Schedule.

Original completion/delivery date ______________________________________________ Revised completion/delivery date ______________________________________________

3. Price/Cost – original awarded price__________________________________________

4. Modified Price/Cost - ____________________________________________________

5. Completion Date or Delivery Schedule – original AND final (or projected final, if the contract is current).

6. Changed Dates - ________________________________________________________

7. Contact Information - Address and telephone number for the Government (or commercial) procuring contracting activity AND contract administrative activity (if applicable). Name, telephone number, fax number and e-mail address for the following:

8. Procuring Contracting Officer (PCO).

Address: _____________________________________________________________ Phone Number: _______________________________________________________ Fax Number: _________________________________________________________ E-Mail Address: ______________________________________________________

9. Administrative Contracting Officer (ACO).

Address: _____________________________________________________________ Phone Number: _______________________________________________________ Fax Number: _________________________________________________________ E-Mail Address: ______________________________________________________

10. Government or commercial technical representative or COR.

Address: ____________________________________________________________ Phone Number: _______________________________________________________ Fax Number: _________________________________________________________ E-Mail Address: _______________________________________________________

11. Relevancy Description.__________________________________________________

12. Narrative explanation.__________________________________________________

13. Negative Performance Documentation.______________________________________

SECTION M - EVALUATION FACTORS FOR AWARD

Evaluation Factors for Award

A. Basis for Contract Award.

Basis for Award.

(1) This is a Lowest Price Technically Acceptable (LPTA) source selection conducted IAW FAR Subpart 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). Awards will be made to the offerors whose proposals offer the lowest evaluated price and for which all non-price factors are rated as Acceptable IAW the established criteria specified in the solicitation. Additionally, offerors shall also be determined responsible in accordance with the FAR Part 9, prior to award.

(2) Trade-offs between factors are not permitted.

(3) The Government will evaluate proposed prices for reasonableness using price analysis techniques IAW FAR 15.404-1(b), to include comparison of proposed prices received in response to the solicitation.

This is the start of the file's text. The full file is on GovTribe.