W91247-26-R-TH01_DRAFT Technical Exhibit 3_Washer and Dryer Site Locations and Preventative Maintenance Schedule.pdf
PDF 974 KB Posted
- Solicitation number
- W9124726RTH01
About this file
Technical Exhibit 3 is a detailed washer and dryer preventative maintenance schedule covering July through May across multiple buildings and locations. The document tracks the number of washers, dryers, stack dryers, ADA washers, ADA dryers, and combo (washer and dryer) units for various building designations (1-xxxx, A-xxxx, B-xxxx, C-xxxx, D-xxxx, E-xxxx, H-xxxx, J-xxxx, M-xxxx, Pope, X-xxxx, and Mackall). Some buildings are marked as "Demo" (demolished), indicating they have been or will be removed from the maintenance schedule.
The schedule provides monthly totals for each equipment type, with specific counts per building. In May, for example, the total equipment count is 1,556 washers, 1,338 dryers, 334 stack dryers, 14 ADA washers, 14 ADA dryers, and 80 combo units. The document includes notes indicating that some washers and dryers have been removed to a warehouse, some barracks were demolished but were originally on the contract, and there is a projected life cycle replacement plan.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit 3 Washer and Dryer Site Locations & Preventative Maintenance Schedule
BLDG WASHERS DRYERS
STACK
DRYERS
ADA
WASHERS
ADA DRYERS
COMBO
(W+D)
JULY 117 50 60
1-1938 7 7 1-2334 6 6 2-4406 33 23 2-5704 15 12 2-5708 6 6 2-5906 14 1 11 3-4607 9 9 2 3-4805 9 9 2 3-4809 9 9 2 3-5007 9 9 2
AUGUST 199 195 12 12
4-1137 17 17 4-1238 17 17 4-2027 69 69 12 12 A-2451 8 8 A-2460 8 8 A-2649 16 16 A-2652 16 16 A-2653 16 16 A-2658 16 16 A-3149 16 12
SEPTEMBER 121 129
A-3153 16 16 A-3158 16 16 A-3162 16 16 A-3351 8 8
Washer and Dryer Site Locations and Preventative Maintenance Schedule
DRAFT
A-3360 8 8 A-4159 8 8 A-4357 16 16 A-4361 16 16 A-4386 5 7 B-1331 12 18
OCTOBER 154 100 59
B-1529 12 18 B-1532 6 9 B-1931 12 18 B-1932 12 18 B-2131 12 18 C-1244 20 1 14 C-1647 20 4 12 C-1943 20 15 C-3022 20 12 6 C-3024 20 2 12
NOVEMBER 196 205 41
C-3223 20 19 C-4124 20 6 10 C-4322 20 4 12 C-5429 18 24 C-5624 18 24 C-5631 13 19 C-5726 15 16 C-5728 13 19 C-5824 13 19 C-6833 46 74
DECEMBER 171 143 48
C-6937 24 18
DRAFT
C-8961 45 76 D-2320 5 4 D-2515 19 4 8 D-2723 D-2732 5 4 D-2825 10 2 4 D-2929 15 25
D-3026 (Demo) 0 0 D-3229 48 36 10
JANUARY 185 198 10
D-3256 45 76 D-3337 14 1 8 D-3436 14 7 2 E-4728 15 15 E-4824 15 15 H-3531 48 50 H-4350 34 34 H-4445 0 0
H-4654(Demo) 0 0 H-4812(Demo) 0 0 H-4817(Demo) 0 0
FEBRUARY 90 90
H-4822 34 34
H-4952 (Demo) 0 0 H-5117(Demo) 0 0
H-5122 34 34 H-5214(Demo) 0 0 H-5245 (Demo) 0 0 H-5412(Demo) 0 0 H-5448 (Demo) 0 0 H-5454 (Demo) 0 0
H-5748 22 22
MARCH 86 66 10
H-5752 (Demo) 0 0 H-5812(Demo) 0 0
H-6630 18 18 M-3019 8 8 M-3213 8 8 M-3226 8 8 M-3233 8 8 M-3519 8 6 M-3540 18 10 M-4040 10 10
APRIL 54 66 48
M-4313 10 10 M-4346 10 10 M-4520 0 0 M-4540 10 10 M-5219 0 20 M-5816 0 20 M-5822 12 18 4 M-6419 12 18 4
MAY 183 96 106 6 5 69
Pope 296 27 Pope 298 12 7
X-2616 16 12 X-2721 16 12 X-2817 16 12 X-2921 16 12
MACKALL 28 20
J-2535 79 96 31 6 5 42
1556 1338 334 14 14 80
NOTES: In construction W/D removed to WH
Warehouse
Demoed Barracks but were orignally on contract
Projected life cycle replacement
As of 31 July 2025