NSA Industry Day Slides.pdf
PDF 3 MB Posted
- Attached to
- USACE SPK Design Build (DB) Construction, NSA-U Consolidation Mission Facility, Utah-Virtual Industry Day
- Solicitation number
- W9123826S0001-Virtual-Industry-Day
About this file
This document is a virtual industry day presentation for the NSA-U Consolidation Mission Facility in Utah, a two-phase design-build federal construction project managed by USACE Sacramento District.
The project involves design and construction of four major facilities: a three-story Administrative Facility (SCIF-compliant office and conference space), a two-story Commons Facility (unclassified personnel support spaces including fitness center and cafeteria), a four-level parking structure with minimum 650 spaces, and a Vehicle Control Point (VCP) with guard booths and vehicle inspection canopy. Construction magnitude is estimated between $250 million and $500 million under a firm-fixed-price contract type with mandatory Project Labor Agreement inclusion. Source selection will follow Best Value Tradeoff evaluation under FAR Part 15, with schedule compliance and cost management as primary priorities alongside security requirement compliance. The solicitation will be released as a Request for Proposal (RFP) with Solicitation Number W9123826RA012 on PIEE (estimated April 2026). Key acquisition milestones include bidder inquiries closing January 21, 2026, Phase I advertisement April 2026 with proposals due May 2026, Phase II advertisement November 2026 with proposals due December 2026, and contract award targeted for March 2027. Prospective contractors must register in both SAM and PIEE to access technical documentation. Questions must be submitted via ProjNet using Project 567249 2585 & 2586 with Bidder Inquiry Key 2FFURG-8QC8K6 by the January 21, 2026 suspense date. The project emphasizes extensive site work including retaining walls, utility infrastructure, security enhancements, and modifications to maintain access to existing facilities during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NSA Industry Day Attendance.pdf | ||
| ProjNet_ Industry Day.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSA-U CONSOLIDATION
MISSION FACILITY – UTAH
VIRTUAL INDUSTRY DAY
TWO PHASE
DESIGN BUILD
14 JANUARY 2026
This presentation is for information purposes only and is not and will not be contractually binding
CUI Designation:
• Name of the Department/Agency: Department of War, USACE
• Distribution Statement: DL Only (Dissemination is limited to a specific list of people/offices provided (Federal Employees, Federal Contractors, and No Foreign Nationals or Governments)
• Point of Contact: Rachel Kinney, USACE Contracting Officer
CUI
CUI
AGENDA – Pacific Standard Time (PST) 9:00 AM Welcome & Introductions 9:05 AM Administrative Announcements 9:10 AM Procurement Overview
Industry Day Objective Major Project Milestones Changes to Posted Sources Sought General Scope How to obtain the Solicitation
(BREAK)
9:45 AM Project Overview 10:30 AM Questions & Answers 10:45 AM Closing Remarks
This presentation is for information purposes only and is not and will not be contractually binding
CUI
CUI
WELCOME AND INTRODUCTIONS
USACE Sacramento District
Mr. Eric Vazquez-Rosario Project Manager
CPT Paul Stetekluh Project Manager
Ms. Daphne Ross Project Manager
Ms. Natasha Jackson Technical Lead
Mr. Neil-Richard Tugaoen Technical Lead
Ms. Rachel L. Kinney Contracting Officer
Ms. Natalia Gomez Contract Specialist
NSA
Tina Love Chief Enterprise MILCON, NSA-Washington
Sean Maley Project Manager, NSA-Washington
Adam Jacobson Chief, Installations and Logistics, NSA-Utah
Darren Mitchell Deputy Chief, Installations and Logistics, NSA-Utah
This presentation is for information purposes only and is not and will not be contractually binding
CUI
CUI
ADMINISTRATIVE ANNOUNCEMENTS
• Please make sure you are muted, and cameras are off
• Please type Company Name and POC information (name and email) in the chat
• Please hold questions until the Q&A Session
This presentation is for information purposes only and is not and will not be contractually binding
CUI
CUI
PROCUREMENT OVERVIEW
CONTRACTING STRATEGY
This presentation is for information purposes only and is not and will not be contractually binding
Contract Type: Firm-Fixed-Price (FFP)
Project Labor Agreement – Will be included.
Source Selection: Best Value Tradeoff IAW FAR Part 15
Project Priorities: Schedule is met, the cost is within the budgeted amount
Constant compliance with construction security requirements and no disruptions to ongoing operations.
Construction Magnitude between $250,000,000 and $500,000,000
Solicitation: Request for Proposal (RFP) and posted on PIEE
CUI
CUI
INDUSTRY DAY OBJECTIVE
This presentation is for information purposes only and is not and will not be contractually binding
Industry Day - Informal Presentation
• Provide interested parties with a clear understanding of Government requirements, timelines to facilitate value-added Q&A from industry, trade information, and conduct market research
• Provide virtual visibility of interested parties (prime contractors and sub-contractors)
• Questions and Answers: All questions and correspondence must be submitted via ProjNet:
Project: (567249 2585 & 2586) NSA-U Consolidation Review: NSA-U Industry Day Bidder Inquiry Key: 2FFURG-8QC8K6
• Suspense for ProjNet inquiries is 21 JAN 2026
• Industry Day Briefing will be posted on the System for Award Management (SAM) – www.sam.gov
CUI
CUI
MAJOR ACQUISITION MILESTONES
This presentation is for information purposes only and is not and will not be contractually binding
• Sources Sought Notice: 26 AUG 2025
• Industry Day: 14 JAN 2026
• Bidder Inquiries Close: 21 JAN 2026
• Advertise Phase I (estimated): APR 2026
• Phase I Bidder Inquiries Close (estimated): MAY 2026
• Phase I Proposals Due (estimated): MAY 2026
• Advertise Phase II (estimated): NOV 2026
• Pre-Proposal Site Visit (estimated): DEC 2026
• Phase II Bidder Inquires Close (estimated): DEC 2026
• Phase II Proposals Due (estimated): DEC 2026
• Award: MAR 2027
CUI
CUI
CHANGE TO INFORMATION POSTED
IN SOURCES SOUGHT
This presentation is for information purposes only and is not and will not be contractually binding
Sources Sought Information:
• 100% design documents for the parking structure and the VCP/VCIF with their associated infrastructure
• Design Build RFP design documents for the administrative facility (SCIF building) and the unclassified commons building with their associated infrastructure.
Current Requirement:
• Design Build RFP design documents for the parking structure and the VCP with associated infrastructure
• Design Build RFP design documents for the administrative facility (SCIF building) and the unclassified commons building with their associated infrastructure.
CUI
CUI
GENERAL SCOPE
This presentation is for information purposes only and is not and will not be contractually binding
• Two Phase Design Build
• Design and construction of the following facilities:
• Administrative facility:
• Provide administrative space, support space, infrastructure, equipment and communications space, and storage areas.
• Administrative space includes office areas, conference rooms, storage areas, and multipurpose auditorium.
• The facility will be built to Sensitive Compartmented Information Facility (SCIF) standards and NSA security requirements.
• Commons facility:
• Provide personnel support spaces, including fitness center, grab and go cafeteria, outdoor seating, unclassified conference rooms, mechanical, electrical, and telecom support spaces, as well as loading dock.
This project will include all required supporting facilities, associated site work, and environmental measures.
CUI
CUI
GENERAL SCOPE - continued
This presentation is for information purposes only and is not and will not be contractually binding
• Parking Structure:
• Constructed to provide privately-owned vehicle (POV) parking for staff and visitors.
• The parking structure will include accessible parking, pedestrian stair towers and elevators, as well as mechanical and electrical spaces.
• Vehicle Control Point (VCP):
• The VCP will consist of an overhead canopy with two guard booths, inbound and outbound roadway, overwatch booth, and rejection lane with rejection shelter. A new traffic circle will be constructed with point of connection to the NSA-U site access road.
Existing parking and roadways will be modified to provide access to the new VCP and maintain access to the existing Vehicle and Cargo Inspection Facility (VCIF) and existing Visitor Control Center (VCC).
This project will include all required supporting facilities, associated site work, and environmental measures.
CUI
CUI
HOW TO OBTAIN THE SOLICITATION
This presentation is for information purposes only and is not and will not be contractually binding
• PIEE – https://piee.eb.mil/
• Solicitation Number: W9123826RA012 Estimated Release Date: April 2026
• View Interested Vendors List and register as an interested vendor.
• Requirements to download Technical Data Package:
1) Need to be registered in System for Award Management (SAM) – www.sam.gov
2) Need to be registered in PIEE
• Register to receive notifications and updates/amendments.
• RFP technical information will be posted on the PIEE website.
CUI
CUI
FEEDBACK REQUEST
This presentation is for information purposes only and is not and will not be contractually binding
• Only US firms and US Citizens
• Proposal preparation time
• Local effects on competition
• PLA – labor availability, relationship with Labor Unions
• Finger-printing and background checks for on-site access
• Bonding for the extended duration and contract magnitude
CUI
CUI
BREAK
This presentation is for information purposes only and is not and will not be contractually binding
Please take 10 minutes, return at 9:45 AM
CUI
CUI
Project Location
This presentation is for information purposes only and is not and will not be contractually binding
NSA
UTAH
Hill AFB
CUI
CUI
Site Master Plan
This presentation is for information purposes only and is not and will not be contractually binding
CUI
CUI
PROJECT OVERVIEW
This presentation is for information purposes only and is not and will not be contractually binding
This project consist of 4 facilities. The 3-story Admin. Facility, the 2-story Commons Facility, the 4-level Parking Structure and the VCP with Utility Building, Police Booths, main entry canopy and a separate vehicle inspection canopy.
•The Admin. Facility – Will consolidate leadership and support personnel into one location while providing flexibility for future growth.
To be designed per ICD-705, UFC 4-010-05, and RF Shielding guidance from NSA.
•The Commons Facility – This facility is intended to improve the wellness and quality of life for everyone on campus.
Serves as unclassified gathering and conference space for NSA personnel and visitors.
There is a “Grab and Go” Cafeteria and Large Dining area that may be used for ceremonial events.
The lowest level has a Fitness area and separate locker rooms for Police personnel.
CUI
CUI
PROJECT OVERVIEW
This presentation is for information purposes only and is not and will not be contractually binding
•The Parking Structure – Four (4) levels, with minimum 650 parking spaces.
Accessible Van parking on lowest level, and Accessible POV parking on 2nd level.
Structure to accommodate snow.
• The Vehicle Control Point (VCP) - New VCP Canopy with Police Booths and Vehicle Inspection Canopy to be provided.
Architecture to fit within the context of the site.
Room for third “outside” lane for expansion.
Police Booths and/or Guard Stands to be UL 752 Level III rated.
Guard/Police must have 360 views and sightlines from both incoming and outgoing traffic cannot be blocked.
Final Denial Barrier button in each Guard booth.
Site access to be reconfigured to include provisions for temporary access to remain at the existing Vehicle Cargo Inspection Facility (VCIF) and Visitor Control Center (VCC)
CUI
CUI
PROJECT OVERVIEW: CONCEPTS
The following project overview slides present conceptual renderings and floor plans for the proposed facilities.
These are provided only for illustrative purposes and are subject to refinement.
CUI
CUI
Outside Fence Improvements
This presentation is for information purposes only and is not and will not be contractually binding
• Existing Vehicle and Cargo Inspection Facility (VCIF) and Visitor Control Center (VCC) will remain.
• Demolish majority of existing parking lot and construct Vehicle Control Point facility
• Dedicated visitor access road
• Two lanes of employee inbound road through guard booths. Single-lane after booths.
• Rejection lane with four parking spaces
• Single-lane employee outbound road
• Leave minimum of 100 visitor spaces in existing parking lot
• Extend PSAT fence to surround VCP area
• Passive and active vehicle barriers throughout
CUI
CUI
PROJECT OVERVIEW
Inside Fence Improvements
This presentation is for information purposes only and is not and will not be contractually binding
• Construct paved, two-lane employee access road from VCP area to Parking Structure, Commons Facility, and Administrative Facility
• Continue paved, access road along the fenceline to the North Gate
• Maintain continuous access to current buildings during construction
• Two driveways to Parking Structure
• One driveway and turnaround at Commons Facility loading area
• One driveway and turnaround at Administrative Facility loading area
• Minimum 8’ wide sidewalk throughout the site
• From existing VCC to Commons Facility
• From existing plaza outside Admin building to the three proposed buildings
CUI
CUI
Retaining Walls/Elevation Challenges
This presentation is for information purposes only and is not and will not be contractually binding
• Extensive retaining walls will be required to accommodate steep elevation changes throughout the project
• VCP area off edge of visitor parking
• Access road where road alignment will need to be adjusted into the hillside (around the VCC area)
• South side of Parking Structure (approx. 30-35’ high)
• Earthwork
• Outside fence – Majority in fill
• Inside fence – Majority in cut
CUI
CUI
PROJECT CONCEPT RENDITION
Administrative Facility Exterior Concepts
This presentation is for information purposes only and is not and will not be contractually binding
CUI
CUI
PROJECT CONCEPT RENDITION
Administrative Facility Concept: Building Level 0
This presentation is for information purposes only and is not and will not be contractually binding
CUI
CUI
PROJECT CONCEPT RENDITION
Commons Facility Exterior Concepts
This presentation is for information purposes only and is not and will not be contractually binding
CUI
CUI
Commons Facility Concept: Building Level 0
This presentation is for information purposes only and is not and will not be contractually binding
CUI
CUI
PROJECT CONCEPT RENDITION
Commons Facility Concept: Building Level 1
This presentation is for information purposes only and is not and will not be contractually binding
CUI
CUI
PROJECT CONCEPT
Parking Garage and VCP
CUI
CUI
PROJECT CONCEPT RENDITION
Parking Garage Concept: Structure Level 1
This presentation is for information purposes only and is not and will not be contractually binding
CUI
CUI
Parking Garage Concept: Structure Level 2 (Levels 3 and 4 are similar)
This presentation is for information purposes only and is not and will not be contractually binding
CUI
CUI
PROJECT CONCEPT RENDITION
Vehicle Control Point (VCP) Overview
This presentation is for information purposes only and is not and will not be contractually binding
CUI
CUI
QUESTIONS & ANSWERS
This presentation is for information purposes only and is not and will not be contractually binding