This document is a Revision Narrative for ECI Amendment 002, detailing changes to specifications and drawings for the F-35 T-7A East Campus Infrastructure project at Hill Air Force Base. The amendment includes multiple drawing revisions affecting various aspects of infrastructure work, such as relocating golf course pond access road responsibilities to American Water, clarifying gate and fence details, revising sewer district notes, and modifying water tank design provisions. Specification revisions include updating demolition requirements to reduce monitoring well relocations, revising thermal insulation specifications, and adding several appendices to the project specification book, including an American Water scope of work, City Light & Power documentation, and a TACAN asbestos and lead paint inspection report. The amendment is issued by Dustin Pennington of MBI-HZ JV for the USACE Sacramento District, with a date of 03/24/2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7090 S Union Park, Avenue, Ste 500 | Midvale, UT 84047

Office: 801.255.4400 | Fax: 801.255.0404

Revision Narrative: ECI Amendment 002 --- Specs and Drawings

Project Name: F-35 T-7A East Campus Infrastructure

Owner’s Representative: A/E:

USACE Sacramento District MBI-HZ JV Lee Roach (Project Manager) Dustin Pennington (Project Manager) 530-305-9125 801-548-4382 lee.t.roach@usace.army.mil dustin.pennington@mbakerintl.com

Narrative of Items included with Amendment 002

Drawing Revisions:

1. Drawing: G-007 --- Moved golf course pond access road and associated work from Prime Contractor to American Water SOW.

2. Drawing: GC125 --- Clarified gate width and fence post location.

3. Drawing(s): CD110 to CD112, CD130, and CD138 - Revised key notes, sheet notes, and sheet name for the 2.0

MG water tank access road, the golf course pond access road, and associated work from Prime Contractor to American Water SOW.

4. Drawing(s): CS105 to CS108 --- Revised notes and sheet name for the 2.0 MG water tank access road, the golf course pond access road, and associated work from Prime Contractor to American Water SOW.

5. Drawing: CS301 --- Revised cross section detail name from Prime Contractor to American Water.

6. Drawing(s): CG105 to CG108 --- Revised notes and sheet name for the 2.0 MG water tank access road, the golf course pond access road, and associated work from Prime Contractor to American Water SOW.

7. Drawing: CU100 --- Revised North Davis Sewer District (NDSD) notes to reflect NDSD as being the owner and the Prime Contractor being the constructor of the sewer line from the American Water sewer meter to the new NDSD sewer manhole in SR-192. American Water was previously shown as the owner/constructor.

8. Drawing:(s) CU117 and CU233 --- Revised North Davis Sewer District (NDSD) sheet notes, key notes and sewer line design to reflect NDSD as being the owner and the Prime Contractor being the constructor of the sewer line from the American Water sewer meter to the new NDSD sewer manhole in SR-192.

American Water was previously shown as the owner/constructor.

9. Drawing: CU516 --- Revised IW manhole size from 5’ to 4’ diameter.

10. Drawing: CT561 --- Added Note 2 to Detail A14 to call out drainage, separation, and subgrade requirements for materials under the trench drain.

11. Drawing(s): A-113, S-151 to S-153, S551 to S557, and S601 --- Revised drawings to remove the 2.0 MG Water

Tank Design which is now being provided by American Water as a deferred submittal. Add note to affected sheets that reads ‘‘No work on this sheet, coordinate with American Water for 2.0 MG water tank design and details’’.

12. Drawing(s): ES001 and E-001--- Added ‘‘General Note for CLP Coordination for Prime Contractor’’ which provides additional information on CLP vs Prime Contractor SOW.

Specification Revisions:

13. Revised UFGS Specification ‘‘02 41 00 - DEMOLITION’’ Section 3.1.18 Item C to list two monitoring wells for relocation instead of four.

14. Revised UFGS Specification ‘‘23 07 00 - THERMAL INSULATION FOR MECHANICAL SYSTEMS’’ Sections 3.2.1.5 Table 1 and Table 2 and Section 3.2.2.1.

15. Added American Water Abbreviated Scope of Work as Appendix 06 to the project spec book.

16. Added the following documents as CLP Appendices 07, 08, and 09 to the project spec book: 07 - CLP

Connection Charge Agreement Proposal Letter, and CLP Hill AFB East Campus Infrastructure ROM Proposal Letter, 08 - City Light & Power (CLP) Service Connection Manual, and 09 CLP Submittal and Testing Requirements Clarification Letter.

17. Added TACAN Asbestos and Lead Paint Inspection Report as Appendix 10 to the project spec book.

Issued by: Dustin Pennington, PE, MBI-HZ JV Project Manager Signature: Dustin Pennington Date: 03/24/2025