A01 Civil Demo Drawings Haul Route.pdf
PDF 3 MB Posted
- Solicitation number
- W9123825QA030
About this file
These are civil demolition drawings for the U.S. Army Corps of Engineers project at Hill Air Force Base, Utah, specifically targeting Buildings 1411 and 1432 (igloos). The documents include detailed demolition plans for two buildings, showing the precise locations of structures to be demolished, including existing pavement, underground electric utilities, and transformer locations. Key notes specify that the contractor must:
- Use designated access gates
- Determine exact staging area locations with the Contracting Officer
- Protect existing pavements and trees
- Manage temporary drainage, grading, erosion control, and utility connections
- Restore sites to original conditions upon completion
The demolition plans are dated 14 April 2023, prepared by the Sacramento District of the U.S. Army Corps of Engineers, and cover approximately 1 acre of staging area with specific instructions for utility protection and site restoration.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1: Civil Demolition Drawings/ Construction Haul Route
ENGINE
C O
TT
O
N W
O O
D S
T.
ROY GATE
SO
U
TH
G
ATE R
D
SOUTH GATE
PROJECT SITE HAUL ROUTE
GEORGIA ST
APPROXIMATE STAGING AREA (1 AC)
ALABAMA ST
SE
R
VI
C
E
M
AP
LE
BEECHNUT
NOTES:
1. CONTRACTOR ACCESS WILL BE THROUGH DESIGNATED GATE AS SHOWN
ON PLANS.
2. LOCATION OF THE CONTRACTOR STAGING AREAS SHOWN is
APPROXIMATE. THE EXACT LOCATIONS WILL BE DETERMINED IN THE
FIELD BY THE CONTRACTING OFFICER.
3. NO BLADES OR BUCKETS SHALL BE ALLOWED TO CONTACT EXISTING
PAVEMENTS THAT ARE TO REMAIN. ONLY POWER SWEEPERS SHALL BE
ALLOWED TO REMOVE DEBRIS FORM THE SURFACE OF PAVEMENTS TO
REMAIN.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DRAINAGE,
GRADING, EROSION CONTROL, STABILIZATION, AND UTILITY
CONNECTIONS IN STAGING AREAS AND SHALL RESTORE SITE TO
ORIGINAL CONDITIONS UPON COMPLETION.
5. ALL CONSTRUCTION AREAS SHALL BE CONSIDERED LAND DISTURBANCE
AREAS.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SP
EC
N O
D
ES
IG
N
F
IL
E N
O
D R
AF
T
SU
BM
IT
TA
L
H
IL
L
AI
R F
O R
C E
BA
SE
, U
TA
H B1
AN
D
IG
LO
O
D
EM
O
LI
TI
O
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
SA
C
R
AM
EN
TO
D
IS
TR
IC
T
A
PR
AN
SI
D
S.
M
IT
C
H
EL
L
S.
M
IT
C
H
EL
L
L.
N
EM
ET
Z
S.
M
IT
C
H
EL
L
G-001
H
AU
L R
O U
TE
A
N D
S
TA
G
IN
G A
R
EA
DEMOLISH BUILDING 1411
DEMOLISH
EXISTING
PAVEMENT
PROTECT TREES
IN-PLACE
W W W W W W W W W W W W
W W W W W W W W W W W W W W W W W W W W W W W
WWWWWWWWWWWWWWWWWWWWWWWW
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
E E E E E E E E
E E E E E E E E E E E E E E E E E E
E E
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
DEMOLISH EXISTING UNDERGROUND
ELECTRIC FROM IGLOO TO TRANSFORMER
PROTECT IN PLACE
NOTES:
1. SEE PERFORMANCE WORK STATEMENT (PWS) FOR
DEMOLITION DETAILS..
2. SEE BUILDING DESCRIPTION(S), PWS 3.0 DETAILED
DESCRIPTION OF SERVICES.
3. UTILITY LOCATIONS ARE APPROXIMATE.
CONTRACTOR WILL FIELD VERIFY LOCATIONS PRIOR
TO DEMOLITION.
4. PROTECT IN PLACE ALL EXISTING UTILITIES UNLESS
OTHERWISE NOTED.
BUILDING 1411 DEMOLITION PLAN
1"=30'
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SP
EC
N O
D
ES
IG
N
F
IL
E N
O
D R
AF
T
SU
BM
IT
TA
L
H
IL
L
AI
R F
O R
C E
BA
SE
, U
TA
H B1
AN
D
IG
LO
O
D
EM
O
LI
TI
O
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
SA
C
R
AM
EN
TO
D
IS
TR
IC
T
A
PR
AN
SI
D
S.
M
IT
C
H
EL
L
S.
M
IT
C
H
EL
L
L.
N
EM
ET
Z
S.
M
IT
C
H
EL
L
CD101
BU
IL
D
IN
G
D
EM
O
LI
TI
O
N P
LA
N
W W
E E
LEGEND
EXISTING WATER MAIN
EXISTING PRIMARY UNDERGROUND ELECTRIC
EXISTING SECONDARY UNDERGROUND ELECTRIC
EXISTING PAD MOUNTED TRANSFORMER
ES ES
DEMOLISH BUILDING 1411
DEMOLISH EXISTING
PAVEMENT
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
E E
E E
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
DEMOLISH EXISTING UNDERGROUND
ELECTRIC FROM IGLOO TO TRANSFORMER
NOTES:
1. SEE PERFORMANCE WORK STATEMENT (PWS) FOR
DEMOLITION DETAILS.
2. SEE BUILDING DESCRIPTION(S), PWS 3.0 DETAILED
DESCRIPTION OF SERVICES.
3. UTILITY LOCATIONS ARE APPROXIMATE.
CONTRACTOR WILL FIELD VERIFY LOCATIONS PRIOR
TO DEMOLITION.
4. PROTECT IN PLACE ALL EXISTING UTILITIES UNLESS
OTHERWISE NOTED.
BUILDING 1432 DEMOLITION PLAN
1"=30'
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SP
EC
N O
D
ES
IG
N
F
IL
E N
O
D R
AF
T
SU
BM
IT
TA
L
H
IL
L
AI
R F
O R
C E
BA
SE
, U
TA
H B1
AN
D
IG
LO
O
D
EM
O
LI
TI
O
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
SA
C
R
AM
EN
TO
D
IS
TR
IC
T
A
PR
AN
SI
D
S.
M
IT
C
H
EL
L
S.
M
IT
C
H
EL
L
L.
N
EM
ET
Z
S.
M
IT
C
H
EL
L
CD102
BU
IL
D
IN
G
D
EM
O
LI
TI
O
N P
LA
N
W W
E E
LEGEND
EXISTING WATER MAIN
EXISTING PRIMARY UNDERGROUND ELECTRIC
EXISTING SECONDARY UNDERGROUND ELECTRIC
EXISTING PAD MOUNTED TRANSFORMER
ES ES
File details come from the government source that posted it. Updated .