Attach 1 DRAFT Bid Sched Dugway.xlsx
XLSX spreadsheet 60 KB Posted
- Solicitation number
- W91238-23-R-0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Dugway PWS.pdf | ||
| Draft Dugway PWS_11-29-2022.pdf | ||
| DPG VISIT ACCESS REQUEST FORM.xlsx | XLSX spreadsheet | |
| Appendix A-UFGS Edited Dugway Specs_10-30-22.pdf | ||
| Dugway DRAFT PWS_10-28-2022.pdf | ||
| Att 2_QASP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dugway Soils Remediation
| Area 2 of SWMU 11, Dugway Proving Ground, Tooele County UT | Solicitation No: TBD |
| Waste Excavation, Transportation, and Disposal - Dugway Proving Ground |
POP: Contract Award through 36 Months
| CLIN No. | Base Tasks | PWS Reference | Task Description | Quantity | Unit | Price (Base) | |
| 1 | 5.1 | Task 1 – Mobilization and Preparatory | $0.00 | ||||
| 1001AA | 1.1 | 5.1.1 | Mobilization of Construction Equipment and Facilities | 1 | Job | ||
| 1001AB | 1.2 | 5.1.2 | Submittals/Implementation Plans | 1 | Job | ||
| 1001AC | 1.3 | 5.1.3 | Setup/Construction of Temporary Facilities | 1 | Job | ||
| 1001AD | 1.4 | 5.1.4 | OPTIONAL TASK - Additional Mobiliation/Demobilization | 1 | Job | ||
| 2 | 5.2 | Task 2 – Monitoring, Sampling, Testing and Analysis | $0.00 | ||||
| 1002AA | 2.1 | 5.2.1 | Meteorolgical Monitoring | 1 | Job | ||
| 1002AB | 2.1.1 | 5.2.2 | Radiation Monitoring | 1 | Job | ||
| 1002AC | 2.1.2 | 5.2.3 | Air Monitoring and Sampling | 1 | Job | ||
| 1002AD | 2.1.3 | 5.2.4 | Sampling Surface Water/Groundwater/Liquid Waste | 1 | Job | ||
| 1002AE | 2.1.4 | 5.2.5 | Soil Sampling | 1 | Job | ||
| 1002AF | 2.1.5 | 5.2.6 | Laboratory Chemical Analysis | 1 | Job | ||
| 1002AG | 2.1.6 | 5.2.7 | Radioactive Waste Analysis | 1 | Job | ||
| 3 | 5.3 | Task 3 – Site Work | $0.00 | ||||
| 1003AA | 3.1 | 5.3.1 | Clearing and Grubbing | 1 | Job | ||
| 1003AB | 3.2 | 5.3.2 | Earthwork | 1 | Job | ||
| 1003AC | 3.3 | 5.3.3 | Fencing | 1 | Job | ||
| 1003AD | 3.4 | 5.3.4 | BMP Installation | 1 | Job | ||
| 4 | 5.4 | Task 4 – Contaminated Soil Removal | $0.00 | ||||
| 1004AA | 4 | 5.4 | Contaminated Soil Removal | 1 | Job | ||
| 1004AB | 4.1 | 5.4.1 | OPTIONAL - Additional Contaminated Soil Removal (Beyond Base Quantity) | 1 | Job | ||
| 5 | 5.5 | Task 5 – Tranport and Disposal | $0.00 | ||||
| 1005AA | 5 | 5.5 | Transport and Disposal | 1 | Job | ||
| 1005AB | 5.1 | 5.5.1 | OPTIONAL - Transport and Disposal Mixed Waste | 1 | Job | ||
| 1005AC | 5.2 | 5.5.2 | OPTIONAL - Additional Transport and Disposal (Beyond Base Quantity) | 1 | Job | ||
| 6 | 5.6 | Task 6 – Site Restoration | $0.00 | ||||
| 1006AA | 6 | 5.6 | Site Restoration | 1 | Job | ||
| 1006AB | 6.1 | 5.4.1 | OPTIONAL - Additional Site Restoration (Beyond Base Quantity) | 1 | Job | ||
| 7 | 5.7 | Task 7 – Demobilization | $0.00 | ||||
| 1007AA | 7.1 | 5.7.1 | Removal of Temporary Facilities | 1 | Job | ||
| 1007AB | 7.2 | 5.7.2 | Final Decontamination | 1 | Job | ||
| 1007AC | 7.3 | 5.7.3 | Demobiliation of Construction Equipment and Facilities | 1 | Job | ||
| 1007AD | 7.4 | 5.7.4 | Submittals/Final Reports | 1 | Job | ||
| 8 | 5.8 | Task 8 – General Requirements | $0.00 | ||||
| 1008AA | 8.1 | 5.8.1 | Meetings/Conferences | 1 | Job | ||
| 1008AB | 8.6 | 5.8.6 | OPTIONAL - Value Added Items | 1 | Job | ||
| Sub-Total Base Tasks: | $0.00 | $0.00 | |||||
| Sub-Total Optional Tasks: | $0.00 | ||||||
| Total Project Cost: | $0.00 | $0.00 |
File details come from the government source that posted it. Updated .