Hill_ICRMP_2017_PDF_final.pdf

PDF 17 MB Posted

Attached to
Architectural & Archaeological Cultural Surveys Federal contract opportunity
Solicitation number
W91238-22-R-0042
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

View the file

Other files for this federal contract opportunity

Other files attached to Architectural & Archaeological Cultural Surveys, newest first.
File Type Posted
USACE PAST PERFORMANCE QUESTIONNAIRE (FORM PPQ-0).pdf PDF
USACE PAST PERFORMANE QUESTIONNAIRE (PPQ) TO BE COMPLETED BY CLIENT.pdf PDF
Technical Exhibits.pdf PDF
W9123822R0042.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U. S. AIR FORCE

INTEGRATED CULTURAL RESOURCES MANAGEMENT PLAN

Hill Air Force Base, Utah

9-Feb-16

ABOUT THIS PLAN

This installation-specific Environmental Management Plan (EMP) is based on the U.S. Air Force’s (AF) standardized Integrated Cultural Resources Management Plan (ICRMP) template. This plan is not an exhaustive inventory of all cultural resource requirements and practices. Where applicable, external resources, including Air Force Instructions (AFIs); AF Playbooks; federal, state, local and Final Governing Standards (FGS); and permit requirements, as applicable, are referenced.

Certain sections of this ICRMP begin with standardized, AF-wide “common text” language that addresses AF and Department of Defense (DoD) policy and federal requirements. This common text language is restricted from editing to ensure that it remains standard throughout all plans. The common text language is maintained and updated by the designated Office of Primary Responsibility (OPR) with assistance from the Office of Collateral Responsibility (OCR), as appropriate. Immediately following the AF-wide common text sections, are Installation sections. The Installation sections contain installation-specific content to address state, local and installation-specific requirements. Installation sections are unrestricted and are maintained and updated by AF environmental Installation Support Teams (ISTs) and/or installation personnel.

This document is optimized to be accessed and viewed electronically. The eDASH website at https://cs1.eis.af.mil/sites/edash/ is the primary communication tool for AF EMPs.

https://cs1.eis.af.mil/sites/edash/

TABLE OF CONTENTS

DOCUMENT CONTROL

1.0 OVERVIEW AND SCOPE

1.1 Executive Summary

1.1.1 Summary of Major Points

1.1.2 Outline of Cultural Resources Management Goals and Objectives

1.1.3 Outline of Current and Priority CRM Requirements (5 Year Plan)

1.2 General Information

1.2.1 Mission Statement

1.2.2 Historical Perspective

1.2.3 Legal Requirements

2.0 INSTALLATION PROFILE

3.0 ENVIRONMENTAL MANAGEMENT SYSTEM

4.0 GENERAL ROLES AND RESPONSIBILITIES

5.0 TRAINING

6.0 RECORDKEEPING AND REPORTING

7.0 STANDARD OPERATING PROCEDURES

7.1 Communication, Planning, and EIAP

7.2 Section 106 Process

7.3 Cultural Resources Contracting

7.4 Cultural Discoveries

7.5 Native American Access

7.6 Accidents and Emergencies Affecting Historic Properties

7.7 Suspected Vandalism

7.8 Mission Conflicts and Solutions

7.9 Curation of Collections and Records

7.10 Management and Coordination

7.11 Planned New Construction (SOP #1)

7.12 Planned Demolition of Buildings (SOP #2)

7.13 Maintenance and Repair of Historic Buildings (SOP #3)

7.14 Coordination of NEPA with Cultural Resources Requirements (SOP #4)

7.15 Unanticipated Discovery of Archaeological Deposits (SOP #5)

7.16 Inadvertent Discovery of American Indian Remains and Associated Funerary Objects, Sacred Objects, or Item of Cultural Patrimony (SOP #6)

7.17 Granting of ARPA Permits (SOP #7)

7.18 Response to ARPA Violations (SOP #8)

7.19 Unanticipated Impact to Archaeological Deposits by Plane Crashes or Jettisoning of Fuel

Tanks (SOP #9)

7.20 Disposal of Property (SOP #10)

8.0 CULTURAL RESOURCES INVENTORY

8.1 Physical Setting

8.2 Prehistory and History

8.3 Resource Inventories

8.4 Installation Areas of Concern

8.5 Other Cultural Resources

9.0 GOALS AND OBJECTIVES

10.0 PROGRAMMING AND PLANNING

11.0 REFERENCES

11.1 Standard References

11.2 Installation References

12.0 ACRONYMS

12.1 Standard Acronyms (Applicable to all AF Installations)

12.2 Installation Acronyms

13.0 DEFINITIONS

13.1 Standard Definitions (Applicable to all AF Installations)

13.2 Installation Definitions

14.0 INSTALLATION-SPECIFIC CONTENT

APPENDICES

Appendix A. Cultural Resources Inventory Tables Appendix B. Section 106 Memoranda of Agreement Appendix C. Section 106 Programmatic Agreements Appendix D. Tribal Agreements Appendix E. Wing Instructions or Policy Documents Appendix F. Archaeological Survey and Site Forms Appendix G. Historic Property Survey and Site Forms Appendix H. Historic Building Maintenance Plans Appendix I. Privatized Housing Documents Appendix J. Environmental and Cultural Contexts Appendix K. Geoarchaeological Sensitivity Model Appendix L. Tribal Consultation Appendix M. Section 106 Flowchart and Process Appendix N. Cultural Resources Management Guidance and Procedures Appendix O. HAFB Curated Artifacts Appendix P. HAFB Cultural Resources File Plan

TABLES

1. Acres Surveyed and Archaeological Resources Recorded

2. Known Archaeological Resources on Hill AFB Managed Lands

3. Architectural Resources on Hill AFB Managed Lands

4. Eastern Great Basin Cultural Sequence

5. Major Historical Themes for Utah

6. Historical Events for Hill AFB

7. Historical Events for Utah Test and Training Range

FIGURES

1. Overview of Hill AFB Managed Lands and Military Operating Area

2. Planned New Construction (SOP #1) Flowchart

3. Planned Demolition of Buildings (SOP #2) Flowchart

4. Maintenance and Repair of Historic Buildings (SOP #3) Flowchart

5. Coordination of NEPA with Cultural Resources Requirements (SOP #4) Flowchart

6. Unanticipated Discovery of Archaeological Deposits (SOP #5) Flowchart

7. Inadvertent Discovery of American Indian Remains and Associated Funerary Objects, Sacred Objects, or Items of Cultural Patrimony (SOP #6) Flowchart

8. Granting of ARPA Permits (SOP #7) Flowchart

9. Response to ARPA Violations (SOP #8) Flowchart

10. Unanticipated Impact to Archaeological Deposits by Plane Crashes or Jettisoning of Fuel

Tanks (SOP #9) Flowchart

11. General Location of HAFB and UTTR

12. Geoarchaeological Model UTTR-North

13. Geoarchaeological Model UTTR-South

DOCUMENT CONTROL

Record of Review – The ICRMP is updated as changes to cultural resource management and protection practices occur, including those driven by changes in applicable regulations. In accordance with (IAW) AFI 32-7065, Cultural Resources Management, the ICRMP is required to be updated every five years.

Annual reviews and updates will be performed by the base Cultural Resources Manager (CRM), or a Regional or Installation Support Office Cultural Resource Specialist. ICRMP updates should consider the effects of base missions on cultural resources, as well as the maintenance and upkeep of those resources and compliance with National Historic Preservation Act (NHPA) Sections 106 and 110.

ICRMP Annual Review and Coordination

Requirements

Update Data Tables (minimum will include: resources, evaluations, locations, reference), including DEPARC/EMR Questionnaire

Update Survey Locations Tables and Maps; ALWAYS include surveyed acreage Add new MOAs, PAs, NAGPRA CAs and Plans of Action that drive work requirements;

Summarize in Executive Summary and in Work Plan Add outline of new planning data, to include mission changes; construction; destruction;

development, etc. that will drive Section 106/EIAP Add Installation Tribal Relations Plan Annual Report

Timing

Update Period is October of each year; DEPARC/EMR data should capture as much of the FY as possible each October

Installation ICRMP Dashboard goes from Green to Yellow 1 OCT and returns to Green when update is complete, NLT 31 OCT

ICRMP Dashboard goes Red 10 NOV each year until update completed ICRMP may (and should) be updated continuously through the year

Validation

Validate Annual Update with Memo to BCE briefly outlining annual changes and additions Include BCE signed Memo in ICRMP Update is complete when CR Media Manager/Specialist sends Memo to BCE (ICRMP can go

Green at that time)

Archive

Archive previous ICRMP resources data for reference (keep last 5 years' ICRMP resources data and other chapters (optional) in archive).

Review Date Review Participants Notes/Remarks Result in Plan

Update? (Yes or No)

1 Nov 2017 A. Kitterman;

K. Stratford

Minor updates including resource numbers, POCs, Goals and Objectives.

No

2017 Annual Review J. Hirschi

ICRMP Approval (Signature Page)

1.0 OVERVIEW AND SCOPE

This ICRMP was developed to provide for effective management and protection of cultural resources. It summarizes the history and prehistory of the installation, and reviews past historical and archaeological survey efforts. It outlines and assigns responsibilities for the management of cultural resources, discusses related concerns, and provides standard operating procedures (SOPs) that will help to preserve the cultural resources of the installation within the context of the mission. The ICRMP is intended for use by all personnel involved in base planning. In lieu of federal, state or FGS requirements, AFI 32-7065, Cultural Resources Management, acts as the main driver for the ICRMP. The Cultural Resources Management Playbook serves as supplemental guidance to this plan.

1.1 Executive Summary

The ICRMP is designed as a planning and guidance document to assist Hill AFB in complying with federal preservation requirements and Air Force policy directives. Although not a decision-making document, the ICRMP provides the Installation Commander, and those responsible for implementing decisions with the necessary information to guide management of cultural resources within Hill AFB managed properties. It identifies known upcoming cultural resources projects programmed through 2022, as well as General Plan projects which may have the potential to significantly impact cultural resources.

In addition, it identifies various public consultation requirements.

1.1.1 Summary of Major Points

Hill AFB is comprised of a Main Base, 75 separate parcels of land known as Geographically Separated Units (GSUs), Little Mountain Test Annex, and the Utah Test and Training Range (UTTR). The Main Base consists of 6,611 acres in Weber and Davis counties, Utah, approximately 35 miles north of Salt Lake City. The GSUs include a total of 532 acres, Little Mountain Test Annex comprises 692 acres, and the properties at UTTR account for 958,147 acres. These facilities extend into Nevada and Wyoming;

thus Hill AFB manages lands in three different states (see Figure 1). The Civil Engineering Group (CEG) currently lists 1,967 buildings and structures located on these lands.

http://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7065/afi32-7065.pdf http://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7065/afi32-7065.pdf https://cs1.eis.af.mil/sites/ceportal/CEPlaybooks/CR/Pages/default.aspx

Figure 1. Overview of Hill AFB Managed Lands and Military Operating Area.

Cultural resources surveys, inventories, and assessments conducted thus far at Hill AFB have covered 283,355 acres, or 29% of the 965,982 acres managed by the Base. These surveys have identified both archaeological and historic-architectural resources that are eligible for listing in the National Register of Historic Places (NRHP). The results of these investigations to date are as follows:

Archaeological Resources

Table 1 presents the inventoried acreage and the types of sites that have been recorded. For an overview of the surveyed areas refer to Figure 5 in Appendix F Archaeological Surveys and Site Forms. A complete list of all Cultural Resources Inventories and associated map is located in Appendix F Archaeological Surveys and Site Forms.

Table 1. Acres Surveyed and Archaeological Resources Recorded.

LOCATION MANAGED

ACRES

ACRES

SURVEYED

PREHISTORIC

SITES (P)

HISTORIC-

ERA

SITES (H)

MULTI-

COMPONENT

SITES (M)

NRHP

ELIGIBLE

SITES

TOTAL

SITES

Hill AFB 6,611 656 (10%) - 3 - 1 (H) 3

UTTR-North, UTTR-South, and Wendover Auxiliary Area

958,147 281,938 (29%) 703 52 2

126 (P) 19 (H) 2 (M)

Little Mountain Test Annex 692 662

(96%) - 1 - 1 (H) 1

75 GSUs 532 99 (19%) - 2 - - 2

TOTALS 965,982 283,355

(29%) 703 58 2

126 (P) 21 (H) 2 (M)

Notes: Numbers of sites do not include isolated artifacts found.

Table 2 provides a summary of archaeological sites and features identified on lands managed by Hill AFB as of September 2017. More than half of the recorded sites have been determined ineligible for the NRHP. A complete list of all recorded archaeological sites identified on lands managed by Hill AFB can be found in Appendix F Archaeological Survey and Site Forms.

Table 2. Recorded Archaeological Resources on Hill AFB Managed Lands.

RESOURCE TYPE

ELIGIBLE FOR THE

NRHP

(OR CURRENTLY

UNEVALUATED)

NOT ELIGIBLE FOR THE

NRHP TOTALS

Prehistoric Sites 183 509 692 Historic-era Sites 27 42 69 Multi-component Sites 2 0 2

TOTALS 212 551 763

Architectural Resources

Historic-era architectural resources at Hill AFB include buildings, structures, and landscapes that date from Ogden Arsenal’s post-World War I (WWI) history to the end of the Cold War (1991). These resources embody various military themes, such as the evolution of weapons and methods for storing large supplies of munitions; military preparedness; development of nuclear weapons; US efforts to mobilize for wars involving nuclear weapons; and Cold War Alert activities.

Studies of architectural resources focus on detailed recordation and assessment of architectural integrity and potential NRHP significance; significance consideration include individual resources, potential historic districts, and potential cultural landscapes. As of October 2017, 84 architectural resources have been determined eligible for listing in the NRHP as individual buildings/structures, contributing elements of proposed historic districts, or both.

Table 3 summarizes the NRHP status of the 1,967 architectural resources on Hill AFB managed lands.

This number does not include buildings mitigated for demolition or transfer, as any adverse effect to these buildings has previously been mitigated through MOAs in consultation with the SHPO. A complete list of all buildings can be found in Appendix G Historic Property Survey and Site Forms.

Table 3. Architectural Resources on Hill AFB Managed Lands.

INSTALLATION

NRHP STATUS

TOTALS ELIGIBLE/

CONTRIBUTING

ELIGIBLE

MITIGATED

NOT

ELIGIBLE/NON-

CONTRIBUTING

NOT YET

HISTORIC

IN AGE

NO EVALUATION

NEEDED-

INFRASTRUCTURE

Boulder 5 - 15 - - 20 Bovine - - 6 3 - 9 Carter Creek - - 5 14 - 19 Clive - - 1 1 - 2 Confusion - - 3 4 - 7 Goshute Annex - - - 5 5 Grassy Mtn. - - 7 6 - 13 Hill AFB 48 177 594 706 - 1,525 Hill Middle Marker - - 4 - - 4 Little Mtn. Test 7 - 47 31 - 85 UTTR-North 24 16 77 66 - 183 UTTR-South - - 29 47 - 76 Wendover - - 9 10 - 19

TOTALS 84 193 797 893 - 1,967

Traditional Cultural Properties and Sacred Sites

To date, one sacred site has been identified on Hill AFB by the Northwest Band of Shoshone Nation. Hill AFB Cultural Resources continues consultation with concerned tribes on the management of this property.

1.1.2 Outline of Cultural Resources Management Goals and Objectives

Add installation-specific content. Consider: Cultural resource management requirements and objectives related to the activities outlined in the installation 5-Year Plan.

Cultural Resources Goals and Objectives

NOTE: Refer to the Cultural Resources Environmental Action Plan (EAP) when setting goals. Where possible, integrate installation objectives and supporting tasks into the EAP tool, rather than documenting in the ICRMP

1. Goal: Continue integration of cultural resources management processes with day-to-day management at Hill AFB.

Objectives:

• 1.1 CRM will participate in planning meetings for work being undertaken on Hill AFB managed lands to assure that historic properties are considered during the early planning stages of the project.

• 1.2 CRM will coordinate with National Environmental Policy Act (NEPA) Manager and throughout Environmental Impact Analysis Process (EIAP) by participating in work order reviews, interdisciplinary teams, and Environmental Assessments (EAs) / Environmental Impact Statements (EISs).

2. Goal: Develop effective cultural resources monitoring plans.

Objectives:

• 2.1 CRM will annually monitor identified highly sensitive sites (including, but not limited to Homestead Cave (42BO763), Lower Lead Mine Hills Cave (42TO701), and Snoopy Rockshelter (26EK6395).

• 2.2 CRM will develop monitoring plan for Snoopy Rockshelter in conjunction with Confederated Tribes of the Goshute Reservation.

• 2.3 Ground disturbance in areas identified as moderate/high probability in the Hill AFB Geoarchaeological Model shall require an archaeological monitor.

3. Goal: Provide guidance and assistance to Installation leadership on cultural resource preservation according to pertinent laws, regulations, and AFIs.

Objectives:

• 3.1 CRM will complete and coordinate an Annual Data Call with Hill IST archaeologist.

• 3.2 CRM will coordinate with Boyer Hill Military Housing (BHMH) on privatized housing areas and historic structures per the signed MOA. This includes an amendment to the current MOA to better fit BHMH and Hill AFB CR management needs.

• 3.3 CRM will advise, recommend, and implement compliance driven SOPs for installation leadership.

4. Goal: Develop feasible concepts and proposals to engage public interest and raise awareness of Hill AFB Cultural Resources.

Objectives:

• 4.1 CRM will participate in Utah Archaeology Day, Utah Indigenous Day, Heritage Fest, tribal outreach programs, school outreach programs, base library outreach programs, and special requests based on funding and availability.

• 4.2 CRM will update required historic building interactive map and Fact sheet links via public affairs guidance, in conjunction with PA updated website.

• 4.3 CRM will coordinate an Open House exhibit and temporary exhibit with the Natural History Museum of Utah highlighting Hill AFB resources and research.

5. Goal: Provide effective cultural resources education/training for Hill AFB https://cs1.eis.af.mil/sites/edash/WebPartPagesEAP/ViewEAP.aspx?EAPID=58 personnel.

Objectives:

• 5.1 CRM will train project managers, environmental liaisons, maintenance personnel, and 75CEG/CEI staff in the pertinent SOPs listed in Section 7.0 of this document through online, classroom, and individual training sessions.

• 5.2 CRM will establish Computer-Based Training and recommend incorporating into newcomer’s briefing or other appropriate distribution.

6. Goal: Assist Installation in Tribal Consultation according to pertinent laws, regulations, and AFIs.

Objectives:

• 6.1 75ABW/CC will appoint and maintain a designated Installation Tribal Liaison Officer

(ITLO).

• 6.2 CRM will assist ITLO in development of an Installation Tribal Relationship Plan

(ITRP).

• 6.3 CRM will ensure assistance to ITLO with facilitation of an annual meeting for its

21 consulting tribes and development of a summary report.

• 6.4 CRM will assist ITLO to identify resources of concern to consulting tribes, and notification of upcoming projects which have the potential to impact said resources.

Notification will consist of letter correspondence followed by phone, e-mail, or face-to-face meetings. Type of notification based on interest level indicated by individual tribes. Hill AFB will notify tribes of upcoming projects which have the potential to impact tribal interests and prehistoric sites.

• 6.5 CRM will ensure assistance to ITLO to maintain records of all tribal POCs and all tribal consultation interactions and file them according to the approved File Plan.

• 6.6 CRM will ensure assistance to ITLO in production of an Annual Report per AFI 90-2002, which ITLO will coordinate with appropriate parties.

• 6.7 In conjunction with the Annual Report, CRM will assist ITLO in reassessing affiliated tribes and resources of concern.

• 6.8 CRM will assist ITLO in providing opportunities for tribal site visits, range tours, and subsistence gathering upon tribal request.

• 6.9 CRM will assist ITLO in development of MOU for preservation and treatment of Homestead Cave (42BO763) faunal and soil remains currently housed at the NHMU.

7. Goal: Complete Vision, Objective, Target (VOT) 1.3 of annually completing Cold War Era significant evaluations for facilities 45-50 years of age on Hill AFB managed lands.

Objectives:

• 7.1 CRM will ensure completion of 5 year Architectural Survey and Assessments (approx. 5-

15 structures/year for survey and 90 eligible structure/5 year for assessment) to take place in FY2017 and FY2022.

• 7.2 CRM will ensure update information in Hill AFB Geo-database and ACES-RPIR system and assure accuracy.

• 7.3 CRM will ensure coordination of inventory results with Real Property.

• 7.4 CRM will obtain 7115 from Real Property and update cultural resources records accordingly.

• 7.5 CRM will ensure monitoring of NRHP-eligible structures as outlined in AFI 32-9005, Real

Property Accountability and Reporting.

8. Goal: Complete VOT Target 1.2 of completing archaeological surveys on 50% of surveyable acres on installations > 64,001 total acreage. 50% of UTTR=479,155, Remaining total acreage to meet VOT=216,384.

Objectives:

• 8.1 CRM will ensure annual inventory of up to 5,000 acres on UTTR.

• 8.2 In conjunction with inventories, CRM will ensure NRHP evaluation of unevaluated archaeological sites on the UTTR (14 – NUTTR, 49 – SUTTR).

9. Goal: Maintain Cultural Resource Digital and Hard Copy Records and File Plan in compliance with Federal and AF standards, as well as within the approved File Plan.

Objectives:

• 9.1 CRM will ensure that Spatial Data is updated and integrated into databases for day to day management of resources and for use to assist project managers in potential impacts of upcoming projects

• 9.2 CRM will ensure appointed Records Custodian and Alternate complete required training.

• 9.3 CRM will ensure cultural resource spreadsheets, databases, and File Plan are updated and accurately reflect changing circumstances on the ground (i.e. demolitions, loss of integrity).

• 9.4 CRM will coordinate with Real Property to ensure records are accurate and up to date.

10. Goal: Complete required MOA stipulations within appropriate timelines.

Objectives:

• 10.1 CRM will ensure completion and coordination of NRHP nomination for Building 225.

• 10.2 CRM will coordinate with Sunset Ridge Development to review and update timeline for chapel and barracks restoration. Any updates will be coordinated with SHPO.

• 10.3 CRM, in coordination with BHMH, will distribute coffee-table book, Sheltering Those

Who Serve to appropriate parties.

11. Goal: Maintain compliance with applicable curation laws, regulations, and AFIs.

Objectives:

• 11.1 CRM will review curation agreements with Natural History Museum of Utah (NHMU) and renew, as appropriate.

• 11.2 CRM will ensure appropriate funding amounts budgeted for curation requirements with the NHMU.

• 11.3 CRM will ensure that collections records are updated as new finds/collections are discovered through inventory and evaluation of historic properties.

• 11.4 CRM will develop curation monitoring SOP in coordination with NHMU anthropological collections staff.

• 11.5 CRM will monitor the records and conditions of collections curated at NHMU through physical inspection, via a random sample, of 10% of the collections.

12. Goal: Complete VOT 3.1 for completion of Processual Programmatic Agreements

(pPA) on routine operations for long term management of Hill AFB managed lands projects.

Objectives:

• 12.1 CRM will ensure development of pPA for UTTR and coordinate with appropriate

SHPOs.

• 12.2 CRM will ensure development of pPAs for Hill AFB and GSUs and coordinate with the appropriate SHPOs.

13. Goal: Maintain Professional Skills, Abilities, and Training.

Objectives:

• 13.1 CRM will attend Air Force Civil Engineer Center (AFCEC)-provided and/or leadership approved cultural resources training, professional development, and certification.

1.1.3 Outline of Current and Priority CRM Requirements (5 Year Plan)

Add installation-specific content. Consider: 1-stop-shop for status of current projects; priority projects in next FY; costs; completion dates; issues. Probably best displayed as a table or spreadsheet.

Programming and Planning Work Plan

FY Project Title and Description Timeline Status Identify relevant Fiscal Year

Identify project/action. Include brief description and justifications based on specific goals, objectives and/or requirements. For future years, add expected new requirements based on mission, comprehensive, and other long-range plans

Identify proposed timeline, is project ongoing or recurring?

Has project been funded? Is project complete?

2018 1. Survey/Inventory Update, Cultural Resources, Hist Bldgs: Actions include:

1.1 Survey and NRHP evaluation of ~40 buildings

and re-assessment of ~ 84 national register eligible structures.

1.2 Analysis of project impacts on historic

buildings, structures, and districts with implementation of the Secretary of the Interior Standards for Rehabilitation or development and implementation of mitigation measures for adverse effects (approximately 425 work order requests)

1.3 MOA compliance (6 large-scale building

MOAs), and overall assistance specific to historic building management

1.4 Little Mountain Firehouse Expansion: The

NRHP-eligible that currently houses the fire house for the Little Mountain Test facility is proposed for significant alteration. A 35% plan is complete and an MOA will follow.

1.5 Complete Building 225 NRHP Nomination

1.6 Unanticipated Discovery – two previously

updated buildings will be included as part of the EUL MOA Amendment per SHPO request.

1.7 Hill AFB Historic Structure and Archaeological

Programmatic Agreement for Hill AFB and associated GSUs.

Recurring

1.1 TBC by 29

Sept. 2018

1.2 TBC by 29

Sept. 2018

1.3 Review

completed Annually by Sept.

1.4 MOA TBC

29 Sept. 2018

1.5 Coordinated

through FPO by 29 Sept 2018

1.6 EUL MOA

Amendment completed by 29 Sept 2018

1.7 PA signed

by 29 Sept 2018

Programmed in ACES, pending funding

1.8 Complete BHMH MOA Amendment as needed

for BHMH and Hill AFB CRM management needs.

1.9 Coordinate and advise on SMIC renovation.

Potential for MOA.

Required by the NHPA Sections 106 and 110. Meets Goals and Objectives 7.1, 9.3.

1.8 TBC by 29

Sept 2018

1.9 Ongoing

2018 2. Consultation, Native American: Actions Include:

2.1 Consultations, coordination & relations with

federally recognized American Indian and other Native American governments on Air Force activities that potentially affect resources important to Native Americans

2.2 AFI 90-2002 required Annual Meeting

2.3 Project notifications (approximately 75)

2.4 Face to face meetings (approximately 10)

2.5 UTTR Buffer Zone expansion project tribal

coordination and consultation

2.6 Wendover Land Relinquishment project tribal

coordination and consultation

Required by NHPA Section 110(a)(2)(D), NAGPRA, DoDI 4710.02, AFI 32-7065, AFI 90-2002, and EO 13175. Meets Goal 6, Objectives 6.3, 6.4, 6.7, 6.8.

Recurring

2.1 Ongoing

2.2 TBC by 20

April 2018

2.3 Ongoing

2.4 Quarterly/

Per Request

2.5 Ongoing

2.6 Ongoing

Programmed in ACES, pending funding

2018 3. Curation: Actions Include:

3.1 Based on projected collections, curated material

consists of ~10 cubic feet and one linear foot of collections to be curated at the NHMU, SLC, UT. An MOA/MOU exists between the base & repository that and stipulates annual curation fees or operating costs

3.2 Curation Supplies

Required by 36 CFR 79, ARPA, NAGPRA, Antiquities Act, NHPA, and AFI 32-7065. Meets Goal 11, Objectives 11.1 and 11.2.

Recurring

3.1 TBC by 30

June 2018

3.2 TBC by 29

Sept. 2018

Programmed in ACES, pending

2018 4. Management, Cultural Resource Sites: Actions Recurring Programmed in

Include:

4.1 Management and update of three specialized

databases and 20 associated data layers

4.2 Update archaeological inventory maps to assist

with overall planning activities

4.3 Integrating the GIS cultural resources database

into the day-to-day management of resources at Hill AFB

4.4 Continue to update the database as new

information becomes available

4.5 Updating maps identifying areas that have been

surveyed to assist UTTR Headquarters staff in planning activities

4.6 Review NPS Cold War Study to determine Hill

AFB recommendation on proposed archaeological sites and historic districts. Work will include site form updates, aerial and ground truthing, and consultation with SHPO.

4.7 Complete Draft of Railroad Pamphlet as

required per Historic Railroad MOA

Required by NHPA Sections 106 and 110. Meets Goals and Objectives 1.1, 9.1.

4.1TBC by 29 Sept. 2017

4.2 TBC by 29

Sept. 2017

4.3 Ongoing

4.4 Ongoing

4.5 Ongoing

4.6 TBC 30 Dec

4.7 Draft TBC

30 Sept 2017

ACES, pending funding

2018 5. Survey/Inventory Update, Cultural Resources, Archaeological: Actions Include:

5.1 Inventory of up to 5000 acres within areas of

high probability for mission requirements and archaeological sites

5.2 Preparation of UTTR based Programmatic

Agreement

Required by NHP Sections 106 and 110, ARPA. Meets Goals and Objectives 8.1, 8.2, and 12.1.

Recurring

5.1 TBC by 29

Dec. 2018

5.2 TBC by 29

Dec. 2018

Programmed in ACES, pending funding

2019 1. Survey/Inventory Update, Cultural Resources, Hist Bldgs: Actions include:

1.1 Analysis of project impacts on historic

buildings, structures, and districts with implementation of the Secretary of the Interior

Recurring

1.1 TBC by 29

Sept. 2019

Programmed in

Standards for Rehabilitation or development and implementation of mitigation measures for adverse effects (approximately 425 work order requests)

1.2 MOA compliance (5 large-scale building

MOAs), and overall assistance specific to historic building management

1.3 Coordinate and advices on SMIC Renovation.

Potential for MOA.

Required by the NHPA Sections 106 and 110. Meets Goals and Objectives 7.1, 9.3.

1.2 Review

completed Annually by Sept.

1.3 Ongoing

2019 2. Consultation, Native American: Actions Include:

2.1 Consultations, coordination & relations with

federally recognized American Indian and other Native American governments on Air Force activities that potentially affect resources important to Native Americans

2.2 AFI 90-2002 required Annual Meeting

2.3 Project notifications (approximately 75)

2.4 Face to face meetings (approximately 10)

2.5 UTTR Buffer Zone expansion project tribal

coordination and consultation

2.6 Wendover Land Relinquishment project tribal

coordination and consultation

Required by NHPA Section 110(a)(2)(D), NAGPRA, DoDI 4710.02, AFI 32-7065, AFI 90-2002, and EO 13175. Meets Goal 6, Objectives 6.3, 6.4, 6.7, 6.8.

Recurring

2.1 Ongoing

2.2 TBC by 30

April 2019

2.3 Ongoing

2.4 Quarterly/

Per Request

2.5 Ongoing

2.6 Ongoing

Programmed in ACES, pending funding

2019 3. Curation: Actions Include:

3.1 Based on previous annual collections, curated

material consists of approximately five cubic feet of collections to be curated at the NHMU, SLC, UT. An MOA/MOU exists between the base & repository that and stipulates annual curation fees or operating costs

3.2 Curation Supplies

Recurring

3.1 TBC by 30

Sept. 2019

3.2 TBC by 30

Sept. 2019

Programmed in

Required by 36 CFR 79, ARPA, NAGPRA, Antiquities Act, NHPA, and AFI 32-7065. Meets Goal 11, Objectives 11.1 and 11.2.

2019 4. Management, Cultural Resource Sites: Actions Include:

4.1 Management and update of three specialized

databases and 20 associated data layers

4.2 Update archaeological inventory maps to assist

with overall planning activities

4.3 Integrating the GIS cultural resources database

into the day-to-day management of resources at Hill AFB

4.4 Continue to update the database as new

information becomes available

4.5 Updating maps identifying areas that have been

surveyed to assist UTTR Headquarters staff in planning activities

4.6 Review NPS Cold War Study to determine Hill

AFB recommendation on proposed archaeological sites and historic districts. Work will include site form updates, aerial and ground truthing, and consultation with SHPO

Required by NHPA Sections 106 and 110. Meets Goals and Objectives 1.1, 9.1.

Recurring

4.1TBC by 30 Sept. 2019

4.2 TBC by 30

Sept. 2019

4.3 Ongoing

4.4 Ongoing

4.5 Ongoing

4.6 TBC 30 Dec

Programmed in ACES, pending funding

2019 5. Survey/Inventory Update, Cultural Resources, Archaeological: Actions Include:

5.1 Inventory of up to 5000 acres within areas of

high probability for mission requirements and archaeological sites

Required by NHP Sections 106 and 110, ARPA. Meets Goals and Objectives 8.1, 8.2, and 12.1.

Recurring

5.1 TBC by 31

Dec. 2019

Programmed in ACES, pending funding

2020 1. Survey/Inventory Update, Cultural Resources, Hist Bldgs: Actions include:

1.1 Analysis of project impacts on historic

buildings, structures, and districts with implementation of the Secretary of the Interior Standards for Rehabilitation or development and implementation of mitigation measures for

Recurring

1.1 TBC by end

of Sept.

Annually

Programmed in adverse effects (approximately 425 work order requests)

1.2 MOA compliance (5 large-scale building

MOAs), and overall assistance specific to historic building management

1.3 Coordinate and advise on SMIC renovation.

Potential for MOA.

Required by the NHPA Sections 106 and 110. Meets Goals and Objectives 7.1, 9.3.

1.2 Review

completed Annually by Sept.

1.3 Ongoing

2020 2. Consultation, Native American: Actions Include:

2.1 Consultations, coordination & relations with

federally recognized American Indian and other Native American governments on Air Force activities that potentially affect resources important to Native Americans

2.2 AFI 90-2002 required Annual Meeting

2.3 Project notifications (approximately 75)

2.4 Face to face meetings (approximately 10)

2.5 UTTR Buffer Zone expansion project tribal

coordination and consultation

2.6 Wendover Land Relinquishment project tribal

coordination and consultation

Required by NHPA Section 110(a)(2)(D), NAGPRA, DoDI 4710.02, AFI 32-7065, AFI 90-2002, and EO 13175. Meets Goal 6, Objectives 6.3, 6.4, 6.7, 6.8.

Recurring

2.1 Ongoing

2.2 TBC by end

of August Annually

2.3 Ongoing

2.4 Quarterly/

Per Request

2.5 Ongoing

2.6 Ongoing

Programmed in ACES, pending funding

2020 3. Curation: Actions Include:

3.1 Based on previous annual collections, curated

material consists of approximately five cubic feet of collections to be curated at the NHMU, SLC, UT. An MOA/MOU exists between the base & repository that and stipulates annual curation fees or operating costs

3.2 Curation Supplies

Required by 36 CFR 79, ARPA, NAGPRA, Antiquities Act, NHPA, and AFI 32-7065. Meets Goal 11, Recurring

3.1 TBC by end

of Sept.

Annually

3.2 TBC by end

of Sept.

Annually

Programmed in

Objectives 11.1 and 11.2.

2020 4. Management, Cultural Resource Sites: Actions

Include:

4.1 Management and update of three specialized

databases and 20 associated data layers

4.2 Update archaeological inventory maps to assist

with overall planning activities

4.3 Integrating the GIS cultural resources database

into the day-to-day management of resources at Hill AFB

4.4 Continue to update the database as new

information becomes available

4.5 Updating maps identifying areas that have been

surveyed to assist UTTR Headquarters staff in planning activities

Required by NHPA Sections 106 and 110. Meets Goals and Objectives 1.1, 9.1.

Recurring

4.1TBC by end of Sept.

Annually

4.2 TBC by end

of Sept.

Annually

4.3 Ongoing

4.4 Ongoing

4.5 Ongoing

Programmed in ACES, pending funding

2020 5. Survey/Inventory Update, Cultural Resources, Archaeological: Actions Include:

5.1 Inventory of up to 5000 acres within areas of

high probability for mission requirements and archaeological sites

Required by NHP Sections 106 and 110, ARPA. Meets Goals and Objectives 8.1, 8.2, and 12.1.

Recurring

5.1 TBC by end

of Dec.

Annually

Programmed in ACES, pending funding

2020 6. HSM UTTR MOA and Excavation: Based on initial surface inventory results, it has been determined that a follow-up excavation of the proposed HSM expansion site on the UTTR is required. An MOA will be drafted with the SHPO detailing the specifications and stipulations of this project. Subsurface archaeology collections and an excavation report will be included.

6.1 Complete excavation of sites including curation of

artifacts and final report

6.2 Complete any additional MOA stipulations

Required by Section 106, Section 110, AF 32-7065.

Once

6.1 TBC by 30

Dec. 2020

6.2 TBC by 28

June 2021

To be programmed

2021 1. Survey/Inventory Update, Cultural Resources, Hist Bldgs: Actions include:

Recurring Programmed in

1.1 Analysis of project impacts on historic

buildings, structures, and districts with implementation of the Secretary of the Interior Standards for Rehabilitation or development and implementation of mitigation measures for adverse effects (approximately 425 work order requests)

1.2 MOA compliance (5 large-scale building

MOAs), and overall assistance specific to historic building management

1.3 Coordinate and advise on SMIC renovation.

Potential for MOA.

Required by the NHPA Sections 106 and 110. Meets Goals and Objectives 7.1, 9.3.

1.1 TBC by end

of Sept.

Annually

1.2 Review

completed Annually by Sept.

1.3 Ongoing

2021 2. Consultation, Native American: Actions Include:

2.1 Consultations, coordination & relations with

federally recognized American Indian and other Native American governments on Air Force activities that potentially affect resources important to Native Americans

2.2 AFI 90-2002 required Annual Meeting

2.3 Project notifications (approximately 75)

2.4 Face to face meetings (approximately 10)

2.5 UTTR Buffer Zone expansion project tribal

coordination and consultation

2.6 Wendover Land Relinquishment project tribal

coordination and consultation

Required by NHPA Section 110(a)(2)(D), NAGPRA, DoDI 4710.02, AFI 32-7065, AFI 90-2002, and EO 13175. Meets Goal 6, Objectives 6.3, 6.4, 6.7, 6.8.

Recurring

2.1 Ongoing

2.2 TBC by end

of August Annually

2.3 Ongoing

2.4 Quarterly/

Per Request

2.5 Ongoing

2.6 Ongoing

Programmed in ACES, pending funding

2021 3. Curation: Actions Include:

3.1 Based on previous annual collections, curated

material consists of approximately five cubic feet of collections to be curated at the NHMU, SLC, UT. An MOA/MOU exists between the base & repository that and stipulates annual curation fees or operating costs

Recurring

3.1 TBC by end

of Sept.

Annually

Programmed in

3.2 Curation Supplies

Required by 36 CFR 79, ARPA, NAGPRA, Antiquities Act, NHPA, and AFI 32-7065. Meets Goal 11, Objectives 11.1 and 11.2.

3.2 TBC by end

of Sept.

Annually

2021 4. Management, Cultural Resource Sites: Actions Include:

4.1 Management and update of three specialized

databases and 20 associated data layers

4.2 Update archaeological inventory maps to assist

with overall planning activities

4.3 Integrating the GIS cultural resources database

into the day-to-day management of resources at Hill AFB

4.4 Continue to update the database as new

information becomes available

4.5 Updating maps identifying areas that have been

surveyed to assist UTTR Headquarters staff in planning activities

Required by NHPA Sections 106 and 110. Meets Goals and Objectives 1.1, 9.1.

Recurring

4.1TBC by end of Sept.

Annually

4.2 TBC by end

of Sept.

Annually

4.3 Ongoing

4.4 Ongoing

4.5 Ongoing

Programmed in ACES, pending funding

2021 5. Survey/Inventory Update, Cultural Resources, Archaeological: Actions Include:

5.1 Inventory of up to 5000 acres within areas of

high probability for mission requirements and archaeological sites

Required by NHP Sections 106 and 110, ARPA. Meets Goals and Objectives 8.1, 8.2, and 12.1.

Recurring

5.1 TBC by end

of Dec.

Annually

Programmed in ACES, pending funding

2021 6. HSM UTTR MOA and Excavation: Based on initial surface inventory results, it has been determined that a follow-up excavation of the proposed HSM expansion site on the UTTR is required. An MOA will be drafted with the SHPO detailing the specifications and stipulations of this project. Subsurface archaeology collections and an excavation report will be included.

6.1 Complete excavation of sites including curation of

artifacts and final report

6.2 Complete any additional MOA stipulations

Once

6.1 TBC by 30

Dec. 2020

6.2 TBC by 28

To be programmed

Required by Section 106, Section 110, AF 32-7065.

June 2021

2022 1. Survey/Inventory Update, Cultural Resources, Hist Bldgs: Actions include:

1.1 Analysis of project impacts on historic

buildings, structures, and districts with implementation of the Secretary of the Interior Standards for Rehabilitation or development and implementation of mitigation measures for adverse effects (approximately 425 work order requests)

1.2 MOA compliance (5 large-scale building

MOAs), and overall assistance specific to historic building management

1.3 Coordinate and advise on SMIC renovation.

Potential for MOA.

Required by the NHPA Sections 106 and 110. Meets Goals and Objectives 7.1, 9.3.

Recurring

1.1 TBC by end

of Sept.

Annually

1.2 Review

completed Annually by Sept.

1.3 Ongoing

Programmed in ACES, pending funding

2022 2. Consultation, Native American: Actions Include:

2.1 Consultations, coordination & relations with

federally recognized American Indian and other Native American governments on Air Force activities that potentially affect resources important to Native Americans

2.2 AFI 90-2002 required Annual Meeting

2.3 Project notifications (approximately 75)

2.4 Face to face meetings (approximately 10)

2.5 UTTR Buffer Zone expansion project tribal

coordination and consultation

2.6 Wendover Land Relinquishment project tribal

coordination and consultation

Required by NHPA Section 110(a)(2)(D), NAGPRA, DoDI 4710.02, AFI 32-7065, AFI 90-2002, and EO 13175. Meets Goal 6, Objectives 6.3, 6.4, 6.7, 6.8.

Recurring

2.1 Ongoing

2.2 TBC by end

of August Annually

2.3 Ongoing

2.4 Quarterly/

Per Request

2.5 Ongoing

2.6 Ongoing

Programmed in ACES, pending funding

2022 3. Curation: Actions Include:

3.1 Based on previous annual collections, curated

Recurring

3.1 TBC by end

Programmed in material consists of approximately five cubic feet of collections to be curated at the NHMU, SLC, UT. An MOA/MOU exists between the base & repository that and stipulates annual curation fees or operating costs

3.2 Curation Supplies

Required by 36 CFR 79, ARPA, NAGPRA, Antiquities Act, NHPA, and AFI 32-7065. Meets Goal 11, Objectives 11.1 and 11.2.

of Sept.

Annually

3.2 TBC by end

of Sept.

Annually

2022 4. Management, Cultural Resource Sites: Actions Include:

4.1 Management and update of three specialized

databases and 20 associated data layers

4.2 Update archaeological inventory maps to assist

with overall planning activities

4.3 Integrating the GIS cultural resources database

into the day-to-day management of resources at Hill AFB

4.4 Continue to update the database as new

information becomes available

4.5 Updating maps identifying areas that have been

surveyed to assist UTTR Headquarters staff in planning activities

Required by NHPA Sections 106 and 110. Meets Goals and Objectives 1.1, 9.1.

Recurring

4.1TBC by end of Sept.

Annually

4.2 TBC by end

of Sept.

Annually

4.3 Ongoing

4.4 Ongoing

4.5 Ongoing

Programmed in ACES, pending funding

2022 5. Survey/Inventory Update, Cultural Resources, Archaeological: Actions Include:

5.1 Inventory of up to 5000 acres within areas of

high probability for mission requirements and archaeological sites

Required by NHP Sections 106 and 110, ARPA. Meets Goals and Objectives 8.1, 8.2, and 12.1.

Recurring

5.1 TBC by end

of Dec.

Annually

Programmed in

1.2 General Information

1.2.1 Mission Statement

Hill AFB is an Air Force Materiel Command (AFMC) base located in Northern Utah. Hill AFB is the AF’s second largest base by population and size, and is home to many operational and support missions;

its host organization is the 75th Air Base Wing (ABW).

Hill AFB’s vision is for professional and highly disciplined Airmen to achieve Art of the Possible results.

Its mission is to provide mission-ready Airmen and equipment, outstanding support to Team Hill, and supreme care to its people, with the motto, “Count on us!”

The 75th ABW is responsible for the base operating support of all units at Hill AFB. These units include the Ogden Air Logistics Complex (OO-ALC), Life Cycle Management Center, Nuclear Weapons Center, the 388th and 419th Total Force Fighter Wings, and more than 50+ other associate units totaling over 20,000 personnel. The 75th ABW is responsible for mission support, civil engineering, medical, airfield operations, command post, explosive ordnance disposal, public affairs, financial management, and ground operations for the installation and the 1,500 square mile UTTR, and 75 GSUs throughout Utah, Nevada, and Wyoming. The Installation Commander, 75 ABW/CC, has overall responsibility for proper management of cultural resources within the base boundary, GSUs, UTTR-North, UTTR-South, and Wendover Auxiliary Area. The 75th CEG provides infrastructure and facilities support, environmental support, UTTR support, fire protection, disaster preparedness, housing management, explosive ordnance removal, and energy management for Hill AFB-managed properties. It is the focal point for manpower and personnel issues. The Hill AFB CR Program is part of the Environmental Management Branch of the 75th CEG.

The Cultural Resources Program at Hill AFB protects our cultural heritage for future generations through the identification, evaluation, and preservation of cultural resources while simultaneously providing mission critical support to the Air Force and the Department of Defense. The program is responsible for assuring installation compliance with the NHPA, ARPA, Native American Graves Protection Act (NAGPRA), and other national, state, and local cultural resource laws and regulations.

1.2.2 Historical Perspective

Ogden Arsenal: In 1920 the United States Army started looking for an inland storage area for the unprecedented amount of surplus munition left over from WWI. A site at the mouth of Weber Canyon was chosen for the sandy soil, railroad lines and readily accessible national transportation routes, climactic conditions and distance from major Pacific Coast depots and cities. Work began on the Ogden Arsenal by the end of 1920. By 1923 the Ogden Arsenal became dormant, used mainly as a general storage depot and years later placed on inactive status due to the national financial crisis that accompanied the stock market crash.

A 1921 War Department General Order (#55) officially changed the name to Ogden Ordnance Reserve Depot and another Order in 1927 re-designated the installation as the Ogden Ordnance Depot. Rehabilitation and reconstruction of the Ogden Ordnance Depot began in 1936. It would soon expand to include manufacture as well as storage of bombs, shells, and other ammunition.

During WWII the Ogden Ordnance Depot expanded further to include production tasks, as well as new duties of storage and resupply. After the war the arsenal returned to its beginnings as a collection depot for reserve materiel. After resurgence during the Korean War, Army ordnance operations and manufacturing would be moved to Tooele Ordnance Depot and other depots around the country. Many structures from the old army installation still stand today on the grounds of Hill AFB.

Hill Field: In 1939, the War Department, under the direction of President Franklin Roosevelt, commissioned the construction of military supply and maintenance depots throughout the U.S., with north central Utah being chosen to serve the northwest. A 3,000-acre site was chosen adjacent to the Ogden Ordnance Depot, which manufactured and stored aerial bombs for the Army Air Corps. Key location factors included the close proximity to this depot as well as access to rail and motor transport routes; good climatic and aviation conditions; ample supplies of power, fuel, and water; and the relative protection from enemy attack from the Pacific.

In 1940, the base was activated and named Hill Field in honor of Major Ployer Hill, a test pilot killed in 1935 while testing the B-17 Flying Fortress. During WWII and the Korean Conflict, Hill AFB provided support and maintenance for military aircraft. In 1955, the base doubled in size with the annexation of the adjacent Ogden Ordnance Depot. Also in the 1950s, Hill AFB became the system manager of the Minuteman Missile, a role it continues today.

In the 1960s, Hill AFB became the logistics manager for the F-110 tactical fighter and employed 15,000 military and civilian personnel. During the Vietnam War, Hill provided airlift support using C-124, C-130, C-133, and C-141 aircraft. Hill AFB accepted missions from other bases that were closing and employed 21,000 persons by 1969. The 1970s ushered in operation and flight training of F-16s at Hill AFB. Air Force helicopter combat training schools and the 40th Aerospace Rescue and Recovery Squadron were established at the base.

The 1980s saw the Ogden Air Logistics Complex’s (OO-ALC) deactivation of the Titan missiles, and the assignment of a new mission to upgrade Minuteman missile silos and launch facilities.

With the end of the Cold War in the 1990s, Soviet Union arms control inspectors came to Hill AFB to witness the destruction of missile first-stage rocket motors. The base provided support personnel and supplies that were deployed during Operation Desert Storm.

At the turn of the century, the Ogden Air Logistics Center began the massive effort of supporting the war on terrorism through increased engineering, sustainment/logistics management, and maintenance support for many of the Air Force’s weapon systems-minuteman III, C-130, F-16, A-10, F-22, and F-35 (began arriving September 2015.) In addition to maintenance and acquisition support, several operational units on base-388th Fighter Wing and 419th Fighter Wing- have been in constant deployment rotations to the Middle East and Southwest Asia, providing aerial support by way of the F-16. (75 ABW History Office 2015a & b).

For further information reference the Historic Overview of Hill AFB found in the Appendices.

1.2.3 Legal Requirements

Cultural resource management must be performed in accordance with numerous federal, DoD and AF laws and requirements. Specific legal requirements are identified in applicable sections of this Plan, in the Cultural Resources Management Playbook, the Cultural Resources eDASH Home Page, the eDASH Air https://cs1.eis.af.mil/sites/ceportal/CEPlaybooks/CR/Pages/default.aspx https://cs1.eis.af.mil/sites/edash/Web%20Part%20Pages%20%20Program%20Pages/Environmental/Cultural%20Resources.aspx https://cs1.eis.af.mil/sites/edash/Lists/AFLOA%20Legal%20and%20Other%20Requirements/AllItems.aspx?View=%7b5B4DE9A5-F96C-46E3-8540-00FA5C26D797%7d&FilterField1=Program%5Fx0020%5FArea&FilterValue1=Cultural%20Resources

Force Legal Operations Agency (AFLOA) Legal and Regulatory References List and in referenced documents.

Installation Supplement – Legal Requirements

None…