This addendum modifies specifications for a federal solicitation to procure construction services for a wastewater treatment facility. The addendum inserts language into the plumbing specifications requiring polyethylene storage tanks meeting ASTM D1998 standards for two applications: a chlorine contact tank of minimum 1,500 gallon capacity and maximum 94 inch diameter by 63 inch height, and a clearwell tank of minimum 5,000 gallon capacity and maximum 142 inch diameter by 92 inch height. Both tank types must include manways of at least 18 and 36 inches respectively. The addendum also adds an operational test for polyethylene storage tanks requiring filling to the overflow pipe level and inspection for leaks, with corrective action and retesting until leaks are eliminated. The solicitation is for the Department of the Army Corps of Engineers Engineering District Sacramento to construct a wastewater treatment facility at Fort Hunter-Liggett, provided in solicitation W91238-21-B-0013 with attached specifications, plans, and wage determinations.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Following language to be inserted in Specification 22 00 00 PLUMBING, GENERAL PURPOSE.
Under Article 1.1, References, Insert the following:
ASTM D1998 (2015) Standard Specification for Polyethylene Upright Storage Tanks
Following article 2.6.4, Labels, insert the following:
2.7 Polyethylene Storage Tanks
Storage tanks shall be cross linked high-density polyethylene construction and shall meet or exceed all requirements of ASTM D1998. Tanks shall be vertical, flat bottom with dome top construction. Provide with factory-applied level gradations in gallons.
Each tank and its associated attachments shall be structurally adequate for all tank design criteria specified herein. Provide a minimum of four Type 316 stainless steel holddown lugs, complete with plate, anchor bolts, nuts, and washers for proper anchoring of the tank. Actual number of holddown lugs shall be calculated with the tank full. All exposed metal surfaces not constructed of stainless steel shall be painted in accordance with Section 09 90 00 PAINTS AND COATINGS.
2.7.1 Chlorine Contact Tanks
| Equipment Identification |
| TNK-140, TNK-141 |
| Tank Minimum Volume |
| 1,500 gallons |
| Dimensions |
| Maximum diameter: 94 inches |
Maximum height: 63 inches
| Nozzles and Instrumentation Connections |
| As shown in Drawings |
| Manway |
| Minimum 18 inches diameter, location as shown in Drawings |
2.7.2 RCY Clearwell Tank
| Equipment Identification |
| TNK-148 |
| Tank Minimum Volume |
| 5,000 gallons |
| Dimensions |
| Maximum diameter: 142 inches |
Maximum height: 92 inches
| Nozzles and Instrumentation Connections |
| As shown in Drawings |
| Manway |
| Minimum 36 inches diameter, location as shown in Drawings |
Following article 3.4.4, Operational Test, Item j., insert the following:
k. Polyethylene storage tanks shall be filled with potable water to a level equal to the overflow pipe. Inspect tank, piping, and pipe joints for leakage. Correct defective items as required and repeat test until all leakage is eliminated.