About this file
This solicitation is for construction services at Fort Hunter Liggett to build a new wastewater treatment facility and purple pipe distribution system. The solicitation includes plans and specifications divided into three volumes covering site work, concrete, metals, finishes, equipment, utilities, and other requirements. The Department of the Army Corps of Engineers Engineering District Sacramento is the contracting agency. The wage determination and pre-award survey are also attached. The response date is not provided but the period of performance is 360 calendar days.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Volume 2 of 3 Specifications
(Division 06 through Division 46)
For
Secondary Wastewater Treatment and Purple Pipe Distribution System
At
Fort Hunter Liggett, California
Issue Date - April 2021
US Army Corps of Engineers
SOLICITATION NO.: W91238-21-R-0047
CONTRACT NO.:
THIS PAGE INTENTIONALLY LEFT BLANK
and Purple Pipe Distribution System
PW\DEN003\697284 Section 00 01 07 Page 1
SECTION 00 01 07
SEALS PAGE
SPECIFICATIONS
01 45 33, SPECIAL INSPECTIONS
02 41 00, DEMOLITION
DIVISION 03—CONCRETE
DIVISION 05—METALS
DIVISION 09—FINISHES
DIVISION 13—SPECIAL CONSTRUCTION
44 42 25.02, PREFABRICATED FIBER REINFORCED PLASTIC (FRP) TANK COVER
Jeremy A. Kellogg
4/7/21
Solicitation No.: W91238-21-R-0047 Contract No.: XXXXXXXXXXXXXXXXXXXX
PW\DEN003\697284 Section 00 01 07 Page 2
SPECIFICATIONS
01 91 00.15 10, PLANT EQUIPMENT TESTING, FACILITY STARTUP, COMMISSIONING, AND
SHORT-TERM OPERATION
DIVISION 46—WATER AND WASTEWATER EQUIPMENT
Ryujiro Tsuchihashi
04/07/21
PW\DEN003\697284 Section 00 01 07 Page 3
SPECIFICATIONS
02 81 00, TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
Jeffrey Dana Enzminger
04/07/21
PW\DEN003\697284 Section 00 01 07 Page 4
SPECIFICATIONS
22 00 00, PLUMBING, GENERAL PURPOSE
33 05 23.23, UTILITY HORIZONTAL DIRECTIONAL DRILL
33 16 16, WATER STORAGE FLEXIBLE MEMBRANE TANK
Kyle Hamilton
AI
NROFILAC FO
ET
A
T S
R E
E
NI
G
NE
L
ANOISSEFORP DE
RE
T
SI
G E
R M39446
L
A
CINAHC
E
M
N
OT
LI
MAH NAED EL
Y K
04/07/21
PW\DEN003\697284 Section 00 01 07 Page 5
SPECIFICATIONS
22 13 29, SANITARY SEWER PUMPS
35 45 05.00, INLINE MULTISTAGE CENTRIFUGAL PUMPS
40 05 13, PIPELINES, PROCESS PIPING
Michael R. Riess
6/30/21
04/02/2021
PW\DEN003\697284 Section 00 01 07 Page 6
SPECIFICATIONS
DIVISION 26—ELECRICAL
33 71 01, OVERHEAD TRANSMISSION AND DISTRIBUTION
Stephen D. Parker
4/2/2021
PW\DEN003\697284 Section 00 01 07 Page 7
SPECIFICATIONS
DIVISION 31—EARTHWORK
33 47 13, POND AND RESERVOIR LINERS
Mark R. Twede
04/07/21
PW\DEN003\697284 Section 00 01 07 Page 8
SPECIFICATIONS
DIVISION 32—EXTERIOR IMPROVEMENTS
33 40 00, STORM DRAINAGE UTILITIES
Travis J. Howard
SPECIFICATIONS
40 95 00, PROCESS CONTROL
Dhumal N. Aturaliye
END OF SECTION
PW\DEN00J\697284 Section 00 01 07 Page 9
Contract No.:
PW\DEN003\697284 PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
VOLUME 1 OF 3
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
ATTACHMENTS:
MEMORANDUM OF AGREEMENT (MOA)
CESPK FORM 450 CONTRACTOR EQUIPMENT DATA SHEET
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01 PROJECT SCHEDULE
ATTACHMENT:
DD FORM 1354 TRANSFER AND ACCEPTANCE OF DOD PROPERTY
01 33 00 SUBMITTAL PROCEDURES
ATTACHMENT:
ENG FORM 4025-R TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT
DATA, MATERIAL SAMPLES, OR MANUFACTURER’S
CERTIFICATES OF COMPLIANCE
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 41 QUALITY CONTROL
ATTACHMENT:
SAMPLE FORMS
CESPK 415-1-2 CONSTRUCTION CONTROL MANUAL
01 45 00.15 41 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
ATTACHMENTS:
STATEMENT OF SPECIAL INSPECTIONS
SPECIAL INSPECTION SCHEDULE
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
ATTACHMENT:
USACE ECB 2020-1 CONSTRUCTION PROJECT SIGNS AND USE OF
THE ARMY STAR
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00 PROJECT IDENTIFICATION
ATTACHMENT:
PROJECT SIGN DETAILS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 10 PLANT EQUIPMENT TESTING, FACILITY STARTUP, COMMISSIONING,
AND SHORT-TERM OPERATION
ATTACHMENTS:
UNIT PROCESS STARTUP FORM
FACILITY PERFORMANCE DEMONSTRATION/CERTIFICATION FORM
PW\DEN003\697284 PROJECT TABLE OF CONTENTS Page 2
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 52 00 METAL RAILINGS
VOLUME 2 OF 3
DIVISION 09 - FINISHES
09 90 00 PAINTS AND COATINGS
09 96 00 HIGH-PERFORMANCE COATINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 PRE-ENGINEERED METAL CANOPY
13 48 00 BRACING FOR MISCELLANEOUS EQUIPMENT
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 13 29 SANITARY SEWAGE PUMPS
DIVISION 26 - ELECTRICAL
26 05 00.00.40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 INTERIOR LIGHTING
DIVISION 31 - EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 23 00.00 20 EXCAVATION AND FILL
ATTACHMENT 1:
GEOTECHNICAL DATA APPENDICES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
PW\DEN003\697284 PROJECT TABLE OF CONTENTS Page 3
DIVISION 33 - UTILITIES
33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 16 16 WATER STORAGE FLEXIBLE MEMBRANE TANK
33 40 00 STORM DRAINAGE UTILITIES
33 47 13 POND AND RESERVOIR LINERS
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 45 05.00 INLINE MULTISTAGE CENTRIFUGAL PUMPS
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 13 PIPELINES, PROCESS PIPING
40 95 00 PROCESS CONTROL
ATTACHMENTS:
ATTACHMENT A, PROCESS CONTROL DESCRIPTIONS
ATTACHMENT B, RECYCLED WATER TREATMENT PLANT I/O LIST
DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT
44 42 25.02 PREFABRICATED FIBER REINFORCED PLASTIC (FRP) TANK COVER
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
46 07 53 PACKAGED TREATMENT EQUIPMENT, DISSOLVED AIR
FLOTATION
46 30 00 WATER AND WASTEWATER CHEMICAL FEED SYSTEMS
46 61 00 FILTRATION EQUIPMENT
VOLUME 3 OF 3 – DRAWINGS (BOUND SEPARATELY)
-- End of Project Table of Contents --
Secondary Wastewater Treatment Solicitation No.: W91238-21-R-0047 and Purple Pipe Distribution System Contract No.:
SECTION 09 90 00
PAINTS AND COATINGS
05/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
ACGIH 0100 (2015; Suppl 2002-2016) Documentation of the Threshold Limit Values and Biological Exposure Indices
ASME INTERNATIONAL (ASME)
ASME A13.1 (2015) Scheme for the Identification of Piping Systems
ASTM INTERNATIONAL (ASTM)
ASTM D235 (2002; R 2012) Mineral Spirits (Petroleum Spirits) (Hydrocarbon Dry Cleaning Solvent)
ASTM D4214 (2007; R 2015) Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films
ASTM D523 (2014; R 2018) Standard Test Method for Specular Gloss
MASTER PAINTERS INSTITUTE (MPI)
MPI 101 (2012) Primer, Epoxy, Anti-Corrosive, for Metal
MPI 107 (2012) Primer, Rust-Inhibitive, Water Based
MPI 108 (2012) Epoxy, High Build, Low Gloss
MPI 163 (2012) Light Industrial Coating, Exterior, Water Based, Semi-Gloss (MPI Gloss Level 5)
MPI 164 (2012) Light Industrial Coating, Exterior, Water Based, Gloss (MPI Gloss Level 6)
MPI 23 (2012) Primer, Metal, Surface Tolerant
MPI 72 (2012) Polyurethane, Two-Component, Pigmented, Gloss (MPI Gloss Level 6-7)
MPI 77 (2012) Epoxy, Gloss
PW\DEN003\697284 SECTION 09 90 00 Page 1
MPI 79 (2012) Primer, Alkyd, Anti-Corrosive for Metal
MPI 9 (2012) Alkyd, Exterior Gloss (MPI Gloss Level 6)
MPI 94 (2012) Alkyd, Exterior, Semi-Gloss (MPI Gloss Level 5)
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC 7/NACE No. 4 (2007; E 2004) Brush-Off Blast Cleaning
SSPC PA 1 (2016) Shop, Field, and Maintenance Coating of Metals
SSPC PA Guide 3 (1982; E 1995) A Guide to Safety in Paint Application
SSPC QP 1 (2012; E 2012) Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)
SSPC SP 1 (2015) Solvent Cleaning
SSPC SP 10/NACE No. 2 (2007) Near-White Blast Cleaning
SSPC SP 12/NACE No. 5 (2002) Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating
SSPC SP 2 (1982; E 2000; E 2004) Hand Tool Cleaning
SSPC SP 3 (1982; E 2004) Power Tool Cleaning
SSPC SP 6/NACE No. 3 (2007) Commercial Blast Cleaning
SSPC VIS 1 (2002; E 2004) Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
SSPC VIS 3 (2004) Guide and Reference Photographs for Steel Surfaces Prepared by Hand and Power Tool Cleaning
SSPC VIS 4/NACE VIS 7 (1998; E 2000; E 2004) Guide and Reference Photographs for Steel Surfaces Prepared by Waterjetting
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
PW\DEN003\697284 SECTION 09 90 00 Page 2
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-STD-101 (2014; Rev C) Color Code for Pipelines and for Compressed Gas Cylinders
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA Method 24 (2000) Determination of Volatile Matter Content, Water Content, Density, Volume Solids, and Weight Solids of Surface Coatings
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
The current MPI, "Approved Product List" which lists paint by brand, label, product name and product code as of the date of contract award, will be used to determine compliance with the submittal requirements of this specification. The Contractor may choose to use a subsequent MPI "Approved Product List", however, only one list may be used for the entire contract and each coating system is to be from a single manufacturer. Provide all coats on a particular substrate from a single manufacturer. No variation from the MPI Approved Products List is acceptable.
Samples of specified materials may be taken and tested for compliance with specification requirements.
SD-03 Product Data
Coating; G, in accordance with Section 09 90 00 PAINTS AND COATINGS
SD-07 Certificates
Applicator's Qualifications
Qualification Testing laboratory for coatings; G, in accordance with Section 09 90 00 PAINTS AND COATINGS
Indoor Air Quality for Paints and Primers
Indoor Air Quality for Consolidated Latex Paints
SD-08 Manufacturer's Instructions
Application Instructions
Mixing
PW\DEN003\697284 SECTION 09 90 00 Page 3
Manufacturer's Safety Data Sheets
SD-10 Operation and Maintenance Data
Coatings; G, in accordance with Section 09 90 00 PAINTS AND
COATINGS
1.3 CERTIFICATES
1.3.1 Indoor Air Quality
Submit required indoor air quality certifications in one submittal package.
1.3.1.1 Paints and Coatings
Provide paint and coating products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs.
Provide current product certification documentation from certification body.
1.4 APPLICATOR'S QUALIFICATIONS
1.4.1 Contractor Qualification
Submit the name, address, telephone number, FAX number, and e-mail address of the contractor that will be performing all surface preparation and coating application. Submit evidence that key personnel have successfully performed surface preparation and application of coatings on project infrastructure on a minimum of three similar projects within the past three years. List information by individual and include the following:
a. Name of individual and proposed position for this work.
b. Information about each previous assignment including:
Position or responsibility
Employer (if other than the Contractor)
Name of facility owner
Mailing address, telephone number, and telex number (if non-US) of facility owner
Name of individual in facility owner's organization who can be contacted as a reference
Location, size and description of structure
Dates work was carried out
Description of work carried out on structure
1.4.2 SSPC QP 1 Certification
All contractors and subcontractors that perform surface preparation or coating application must be certified by the Society for Protective Coatings (formerly Steel Structures Painting Council) (SSPC) to the requirements of SSPC QP 1 prior to contract award, and must remain
PW\DEN003\697284 SECTION 09 90 00 Page 4 certified while accomplishing any surface preparation or coating application. If a contractor's or subcontractor's certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered and liquidated damages will apply. Notify the Contracting Officer of any change in contractor certification status.
1.5 QUALITY ASSURANCE
1.5.1 Field Samples and Tests
The Contracting Officer may choose up to two coatings that have been delivered to the site to be tested at no cost to the Government. Take samples of each chosen product as specified in the paragraph SAMPLING PROCEDURES. Test each chosen product as specified in the paragraph TESTING PROCEDURE. Remove products from the job site which do not conform, and replace with new products that conform to the referenced specification.
Test replacement products that failed initial testing at no cost to the Government.
Another required testing is Batch Quality Conformance Testing to prove conformance of the manufacturer's paint to the specified MPI standard.
This testing is accomplished before the materials are delivered to the job site. Provide testing for project paint products. Test paint products as specified in the paragraph "Testing Procedure".
1.5.1.1 Sampling Procedure
The Contracting Officer will select paint at random from the products that have been delivered to the job site for sample testing. The Contractor will provide one quart samples of the selected paint materials. Take samples in the presence of the Contracting Officer, and label, and identify each sample. Provide labels in accordance with the paragraph PACKAGING, LABELING, AND STORAGE of this specification.
1.5.1.2 Testing Procedure
Provide Batch Quality Conformance Testing for specified products, as defined by and performed by MPI. As an alternative to Batch Quality Conformance Testing, the Contractor may provide Qualification Testing for specified products above to the appropriate MPI product specification, using the third-party laboratory approved under the paragraph "Qualification Testing" laboratory for coatings. Include the backup data and summary of the test results within the qualification testing lab report. Provide a summary listing of all the reference specification requirements and the result of each test. Clearly indicate in the summary whether the tested paint meets each test requirement. Note that Qualification Testing may take 4 to 6 weeks to perform, due to the extent of testing required.
Submit name, address, telephone number, FAX number, and e-mail address of the independent third party laboratory selected to perform testing of coating samples for compliance with specification requirements. Submit documentation that laboratory is regularly engaged in testing of paint samples for conformance with specifications, and that employees performing testing are qualified. If MPI is chosen to perform the Batch Quality Conformance testing, the above submittal information is not required, only a letter is required from the Contractor stating that MPI will perform the
PW\DEN003\697284 SECTION 09 90 00 Page 5 testing.
1.6 REGULATORY REQUIREMENTS
1.6.1 Environmental Protection
In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction. Notify Contracting Officer of any paint specified herein which fails to conform.
1.6.2 Lead Content
Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.
1.6.3 Chromate Content
Do not use coatings containing zinc-chromate or strontium-chromate.
1.6.4 Asbestos Content
Provide asbestos-free materials.
1.6.5 Mercury Content
Provide materials free of mercury or mercury compounds.
1.6.6 Silica
Provide abrasive blast media containing no free crystalline silica.
1.6.7 Human Carcinogens
Provide materials that do not contain ACGIH 0100 confirmed human carcinogens (A1) or suspected human carcinogens (A2).
1.7 PACKAGING, LABELING, AND STORAGE
Provide paints in sealed containers that legibly show the contract specification number, designation name, formula or specification number, batch number, color, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name and address of manufacturer. Furnish pigmented paints in containers not larger than 5 gallons. Store paints and thinners in accordance with the manufacturer's written directions, and as a minimum, stored off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors, and at temperatures between 40 to 95 degrees F.
1.8 SAFETY AND HEALTH
Apply coating materials using safety methods and equipment in accordance with the following:
Comply with applicable Federal, State, and local laws and regulations, and with the ACCIDENT PREVENTION PLAN, including the Activity Hazard Analysis as specified in Section 01 35 26 GOVERNMENT SAFETY REQUIREMENTS and in Appendix A of EM 385-1-1 as well as, the Manufacturer's Safety Data Sheets..
PW\DEN003\697284 SECTION 09 90 00 Page 6
Include in the Activity Hazard Analysis the potential impact of painting operations on painting personnel and on others involved in and adjacent to the work zone.
1.8.1 Safety Methods Used During Coating Application
Comply with the requirements of SSPC PA Guide 3 and Manufacturer's Safety Data Sheets.
1.9 ENVIRONMENTAL CONDITIONS
Comply, at minimum, with manufacturer recommendations for space ventilation during and after installation. Isolate area of application from rest of building when applying high-emission paints or coatings.
1.9.1 Coatings
Do not apply coating when air or substrate conditions are:
a. Less than 5 degrees F above dew point;
b. Below 50 degrees F or over 95 degrees F, unless specifically pre-approved by the Contracting Officer and the product manufacturer.
Do not, under any circumstances, violate the manufacturer's application recommendations.
1.10 LOCATION AND SURFACE TYPE TO BE PAINTED
1.10.1 Painting Included
Where a space or surface is indicated to be painted, include the following unless indicated otherwise.
a. Surfaces behind portable objects and surface mounted articles readily detachable by removal of fasteners, such as screws and bolts.
b. New factory finished surfaces that require identification or color coding and factory finished surfaces that are damaged during performance of the work.
c. Existing coated surfaces that are damaged during performance of the work.
1.10.2 Painting Excluded
Do not paint the following unless indicated otherwise.
a. Steel to be embedded in concrete.
b. Copper, stainless steel, aluminum, brass, and lead except existing coated surfaces.
c. Hardware, fittings, and other factory finished items.
1.10.3 Exterior Painting of Site Work Items
Field coat the following items:
PW\DEN003\697284 SECTION 09 90 00 Page 7
New Surfaces Existing Surfaces
a. Accordance to 09 90 00 Accordance to 09 90 00
1.10.4 Definitions and Abbreviations
1.10.4.1 Qualification Testing
Qualification testing is the performance of all test requirements listed in the product specification. This testing is accomplished by MPI to qualify each product for the MPI Approved Product List, and may also be accomplished by Contractor's third party testing lab if an alternative to Batch Quality Conformance Testing by MPI is desired.
1.10.4.2 Batch Quality Conformance Testing
Batch quality conformance testing determines that the product provided is the same as the product qualified to the appropriate product specification. This testing must be accomplished by an MPI testing lab.
1.10.4.3 Coating
A film or thin layer applied to a base material called a substrate. A coating may be a metal, alloy, paint, or solid/liquid suspensions on various substrates (such as metals, plastics, wood, paper, leather, cloth). They may be applied by electrolysis, vapor deposition, vacuum, or mechanical means such as brushing, spraying, calendaring, and roller coating. A coating may be applied for aesthetic or protective purposes or both. The term "coating" as used herein includes emulsions, enamels, stains, varnishes, sealers, epoxies, and other coatings, whether used as primer, intermediate, or finish coat. The terms paint and coating are used interchangeably.
1.10.4.4 DFT or dft
Dry film thickness, the film thickness of the fully cured, dry paint or coating.
1.10.4.5 DSD
Degree of Surface Degradation, the MPI system of defining degree of surface degradation. Five (5) levels are generically defined under the Assessment sections in the MPI Maintenance Repainting Manual.
1.10.4.6 EPP
Environmentally Preferred Products, a standard for determining environmental preferability in support of Executive Order 13101.
1.10.4.7 EXT
MPI short term designation for an exterior coating system.
1.10.4.8 INT
MPI short term designation for an interior coating system.
PW\DEN003\697284 SECTION 09 90 00 Page 8
1.10.4.9 micron / microns
The metric measurement for 0.001 mm or one/one-thousandth of a millimeter.
1.10.4.10 mil / mils
The English measurement for 0.001 in or one/one-thousandth of an inch, equal to 25.4 microns or 0.0254 mm.
1.10.4.11 mm
The metric measurement for millimeter, 0.001 meter or one/one-thousandth of a meter.
1.10.4.12 MPI Gloss Levels
MPI system of defining gloss. Seven (7) gloss levels (G1 to G7) are generically defined under the Evaluation sections of the MPI Manuals.
Traditionally, Flat refers to G1/G2, Eggshell refers to G3, Semigloss refers to G5, and Gloss refers to G6.
Gloss levels are defined by MPI as follows:
Gloss Description Units Level at 60 degrees at 85 degrees
G1 Matte or Flat 0 to 5 10 max G2 Velvet 0 to 10 10 to 35 G3 Eggshell 10 to 25 10 to 35 G4 Satin 20 to 35 35 min G5 Semi-Gloss 35 to 70 G6 Gloss 70 to 85 G7 High Gloss
Gloss is tested in accordance with ASTM D523. Historically, the Government has used Flat (G1 / G2), Eggshell (G3), Semi-Gloss (G5), and Gloss (G6).
1.10.4.13 MPI System Number
The MPI coating system number in each Division found in either the MPI Architectural Painting Specification Manual or the Maintenance Repainting Manual and defined as an exterior (EXT/REX) or interior system (INT/RIN).
The Division number follows the CSI Master Format.
1.10.4.14 Paint
See Coating definition.
1.10.4.15 REX
MPI short term designation for an exterior coating system used in repainting projects or over existing coating systems.
1.10.4.16 RIN
MPI short term designation for an interior coating system used in repainting projects or over existing coating systems.
PW\DEN003\697284 SECTION 09 90 00 Page 9
PART 2 PRODUCTS
2.1 MATERIALS
Conform to the coating specifications and standards referenced in PART 3.
Submit product data sheets for specified coatings and solvents. Provide preprinted cleaning and maintenance instructions for all coating systems.
Submit Manufacturer's Instructions on Mixing: Detailed mixing instructions, minimum and maximum application temperature and humidity, potlife, and curing and drying times between coats.
Provide certification of Indoor Air Quality for paints and primers.
Provide certification of Indoor Air Quality for consolidated latex paints.
PART 3 EXECUTION
3.1 PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED
Prior to surface preparation and coating applications, remove, mask, or otherwise protect hardware, hardware accessories, machined surfaces, radiator covers, plates, lighting fixtures, public and private property, and other such items not to be coated that are in contact with surfaces to be coated. Following completion of painting, reinstall removed items by workmen skilled in the trades. Restore surfaces contaminated by coating materials, to original condition and repair damaged items.
3.2 SURFACE PREPARATION
Remove dirt, splinters, loose particles, grease, oil, disintegrated coatings, and other foreign matter and substances deleterious to coating performance as specified for each substrate before application of paint or surface treatments. Remove oil and grease prior to mechanical cleaning.
Schedule cleaning so that dust and other contaminants will not fall on wet, newly painted surfaces. Spot-prime exposed ferrous metals such as nail heads on or in contact with surfaces to be painted with water-thinned paints, with a suitable corrosion-inhibitive primer capable of preventing flash rusting and compatible with the coating specified for the adjacent areas.
3.2.1 Additional Requirements for Preparation of Surfaces With Existing Coatings
Before application of coatings, perform the following on surfaces covered by soundly-adhered coatings, defined as those which cannot be removed with a putty knife:
a. Test existing finishes for lead before sanding, scraping, or removing.
If lead is present, refer to paragraph Toxic Materials.
b. Wipe previously painted surfaces to receive solvent-based coatings, except stucco and similarly rough surfaces clean with a clean, dry cloth saturated with mineral spirits, ASTM D235. Allow surface to dry. Wipe immediately preceding the application of the first coat of any coating, unless specified otherwise.
c. Sand existing glossy surfaces to be painted to reduce gloss. Brush, and wipe clean with a damp cloth to remove dust.
PW\DEN003\697284 SECTION 09 90 00 Page 10
d. The requirements specified are minimum. Comply also with the application instructions of the paint manufacturer.
e. Thoroughly clean previously painted surfaces specified to be repainted damaged during construction of all grease, dirt, dust or other foreign matter.
f. Remove blistering, cracking, flaking and peeling or otherwise deteriorated coatings.
g. Remove chalk so that when tested in accordance with ASTM D4214, the chalk resistance rating is no less than 8.
h. Roughen slick surfaces. Repair damaged areas such as, but not limited to, nail holes, cracks, chips, and spalls with suitable material to match adjacent undamaged areas.
i. Feather and sand smooth edges of chipped paint.
j. Clean rusty metal surfaces as per SSPC requirements. Use solvent, mechanical, or chemical cleaning methods to provide surfaces suitable for painting.
k. Provide new, proposed coatings that are compatible with existing coatings.
3.2.2 Existing Coated Surfaces with Minor Defects
Sand, spackle, and treat minor defects to render them smooth. Minor defects are defined as scratches, nicks, cracks, gouges, spalls, alligatoring, chalking, and irregularities due to partial peeling of previous coatings. Remove chalking by sanding or blasting so that when tested in accordance with ASTM D4214, the chalk rating is not less than 8.
3.2.3 Removal of Existing Coatings
Remove existing coatings from the following surfaces:
a. Surfaces containing large areas of minor defects;
b. Surfaces containing more than 20 percent peeling area; and
c. Surfaces designated by the Contracting Officer, such as surfaces where rust shows through existing coatings.
3.2.4 Substrate Repair
a. Repair substrate surface damaged during coating removal;
b. Sand edges of adjacent soundly-adhered existing coatings so they are tapered as smooth as practical to areas involved with coating removal;
and
c. Clean and prime the substrate as specified.
PW\DEN003\697284 SECTION 09 90 00 Page 11
3.3 PREPARATION OF METAL SURFACES
3.3.1 Existing and New Ferrous Surfaces
a. Ferrous Surfaces including Shop-coated Surfaces and Small Areas That Contain Rust, Mill Scale and Other Foreign Substances: Solvent clean or detergent wash in accordance with SSPC SP 1 to remove oil and grease.
Where shop coat is missing or damaged, clean according to SSPC SP 2, SSPC SP 3, SSPC SP 6/NACE No. 3, or SSPC SP 10/NACE No. 2. Brush-off blast remaining surface in accordance with SSPC 7/NACE No. 4; Water jetting to SSPC SP 12/NACE No. 5 WJ-4 may be used to remove loose coating and other loose materials. Use inhibitor as recommended by coating manufacturer to prevent premature rusting. Protect shop-coated ferrous surfaces from corrosion by treating and touching up corroded areas immediately upon detection.
b. Surfaces With More Than 20 Percent Rust, Mill Scale, and Other Foreign Substances: Clean entire surface in accordance with SSPC SP 6/NACE No.
3/SSPC SP 12/NACE No. 5 WJ-3 SSPC SP 10/NACE No. 2/SSPC SP 12/NACE No. 5
WJ-2.
c. Metal Floor Surfaces to Receive Nonslip Coating: Clean in accordance with SSPC SP 10/NACE No. 2 SSPC SP 12/NACE No. 5 WJ-2.
3.3.2 Final Ferrous Surface Condition:
For tool cleaned surfaces, the requirements are stated in SSPC SP 2 and SSPC SP 3. Use as a visual reference, photographs in SSPC VIS 3 for the appearance of cleaned surfaces.
For abrasive blast cleaned surfaces, the requirements are stated in SSPC 7/NACE No. 4, SSPC SP 6/NACE No. 3, and SSPC SP 10/NACE No. 2. Use as a visual reference, photographs in SSPC VIS 1 for the appearance of cleaned surfaces.
For waterjet cleaned surfaces, the requirements are stated in SSPC SP 12/NACE No. 5. Use as a visual reference, photographs in SSPC VIS 4/NACE VIS 7 for the appearance of cleaned surfaces.
3.4 APPLICATION
3.4.1 Coating Application
Comply with applicable federal, state and local laws enacted to insure compliance with Federal Clean Air Standards. Apply coating materials in accordance with SSPC PA 1. SSPC PA 1 methods are applicable to all substrates, except as modified herein.
At the time of application, paint must show no signs of deterioration.
Maintain uniform suspension of pigments during application.
Unless otherwise specified or recommended by the paint manufacturer, paint may be applied by brush, roller, or spray. Use trigger operated spray nozzles for water hoses. Use rollers for applying paints and enamels of a type designed for the coating to be applied and the surface to be coated.
Wear protective clothing and respirators when applying oil-based paints or using spray equipment with any paints.
Only apply paints, except water-thinned types to surfaces that are
PW\DEN003\697284 SECTION 09 90 00 Page 12 completely free of moisture as determined by sight or touch.
Thoroughly work coating materials into joints, crevices, and open spaces.
Pay special attention to ensure that all edges, corners, crevices, welds, and rivets receive a film thickness equal to that of adjacent painted surfaces.
Apply each coat of paint so that dry film is of uniform thickness and free from runs, drops, ridges, waves, pinholes or other voids, laps, brush marks, and variations in color, texture, and finish. Completely hide all blemishes.
Touch up damaged coatings before applying subsequent coats. Broom clean and clear dust from interior areas before and during the application of coating material.
Apply paint to new fire extinguishing sprinkler systems including valves, piping, conduit, hangers, supports, miscellaneous metal work, and accessories. Shield sprinkler heads with protective coverings while painting is in progress. Remove sprinkler heads which have been painted and replace with new sprinkler heads. For piping in unfinished spaces, provide primed surfaces with one coat of red alkyd gloss enamel to a minimum dry film thickness of 1.0 mil. Unfinished spaces include attic spaces, spaces above suspended ceilings, crawl spaces, pipe chases, mechanical equipment room, and space where walls or ceiling are not painted or not constructed of a prefinished material. For piping in finished areas, provide prime surfaces with two coats of paint to match adjacent surfaces, except provide valves and operating accessories with one coat of red alkyd gloss enamel. Upon completion of painting, remove protective covering from sprinkler heads.
a. Drying Time: Allow time between coats, as recommended by the coating manufacturer, to permit thorough drying, but not to present topcoat adhesion problems. Provide each coat in specified condition to receive next coat.
b. Primers, and Intermediate Coats: Do not allow primers or intermediate coats to dry more than 30 days, or longer than recommended by manufacturer, before applying subsequent coats. Follow manufacturer's recommendations for surface preparation if primers or intermediate coats are allowed to dry longer than recommended by manufacturers of subsequent coatings. Cover each preceding coat or surface completely by ensuring visually perceptible difference in shades of successive coats.
c. Finished Surfaces: Provide finished surfaces free from runs, drops, ridges, waves, laps, brush marks, and variations in colors.
d. Thermosetting Paints: Topcoats over thermosetting paints (epoxies and urethanes) should be applied within the overcoating window recommended by the manufacturer.
e. Floors: For nonslip surfacing on level floors, as the intermediate coat is applied, cover wet surface completely with almandite garnet, Grit No. 36, with maximum passing U.S. Standard Sieve No. 40 less than
0.5 percent. When the coating is dry, use a soft bristle broom to sweep up excess grit, which may be reused, and vacuum up remaining residue before application of the topcoat. For nonslip surfacing on ramps, provide MPI 77 with non-skid additive, applied by roller in
PW\DEN003\697284 SECTION 09 90 00 Page 13 accordance with manufacturer's instructions.
3.4.2 Mixing and Thinning of Paints
Reduce paints to proper consistency by adding fresh paint, except when thinning is mandatory to suit surface, temperature, weather conditions, application methods, or for the type of paint being used. Obtain written permission from the Contracting Officer to use thinners. Verify that the written permission includes quantities and types of thinners to use.
When thinning is allowed, thin paints immediately prior to application with not more than 0.125 L 1 pint of suitable thinner per required liter or gallon. The use of thinner does not relieve the Contractor from obtaining complete hiding, full film thickness, or required gloss. Thinning cannot cause the paint to exceed limits on volatile organic compounds. Do not mix paints of different manufacturers.
3.4.3 Two-Component Systems
Mix two-component systems in accordance with manufacturer's instructions.
Follow recommendation by the manufacturer for any thinning of the first coat to ensure proper penetration and sealing for each type of substrate.
3.4.4 Coating Systems
a. Systems by Substrates: Apply coatings that conform to the respective specifications listed in the following Tables:
Table
Division 3. Exterior Concrete Paint Table Division 4. Exterior Concrete Masonry Units Paint Table Division 5. Exterior Metal, Ferrous and Non-Ferrous Paint Table Division 6. Exterior Wood; Dressed Lumber, Paneling, Decking, Shingles Paint Table Division 9: Exterior Stucco Paint Table Division 10. Exterior Cloth Coverings and Bituminous Coated Surfaces Paint Table
Division 3. Interior Concrete Paint Table Division 4. Interior Concrete Masonry Units Paint Table Division 5. Interior Metal, Ferrous and Non-Ferrous Paint Table Division 6. Interior Wood Paint Table
b. Minimum Dry Film Thickness (DFT): Apply paints, primers, varnishes, enamels, undercoats, and other coatings to a minimum dry film thickness of 1.5 mil each coat unless specified otherwise in the Tables. Coating thickness where specified, refers to the minimum dry film thickness.
c. Coatings for Surfaces Not Specified Otherwise: Coat surfaces which have not been specified, the same as surfaces having similar conditions of exposure.
d. Existing Surfaces Damaged During Performance of the Work, Including New Patches In Existing Surfaces: Coat surfaces with the following:
(1) One coat of primer.
(2) One coat of undercoat or intermediate coat.
PW\DEN003\697284 SECTION 09 90 00 Page 14
(3) One topcoat to match adjacent surfaces.
e. Existing Coated Surfaces To Be Painted: Apply coatings conforming to the respective specifications listed in the Tables herein, except that pretreatments, sealers and fillers need not be provided on surfaces where existing coatings are soundly adhered and in good condition. Do not omit undercoats or primers.
3.5 COATING SYSTEMS FOR CONCRETE AND CEMENTITIOUS SUBSTRATES
Apply coatings of Tables in Division 3, 4 and 9 for Exterior and Interior.
3.6 COATING SYSTEMS FOR METAL
Apply coatings of Tables in Division 5 for Exterior and Interior.
a. Apply specified ferrous metal primer on the same day that surface is cleaned, to surfaces that meet all specified surface preparation requirements at time of application.
b. Inaccessible Surfaces: Prior to erection, use one coat of specified primer on metal surfaces that will be inaccessible after erection.
c. Shop-primed Surfaces: Touch up exposed substrates and damaged coatings to protect from rusting prior to applying field primer.
d. Surface Previously Coated with Epoxy or Urethane: Apply MPI 101, 1.5 mils DFT immediately prior to application of epoxy or urethane coatings.
e. Pipes and Tubing: The semitransparent film applied to some pipes and tubing at the mill is not to be considered a shop coat. Overcoat these items with the specified ferrous-metal primer prior to application of finish coats.
f. Exposed Nails, Screws, Fasteners, and Miscellaneous Ferrous Surfaces.
On surfaces to be coated with water thinned coatings, spot prime exposed nails and other ferrous metal with latex primer MPI 107.
3.7 PIPING IDENTIFICATION
Piping Identification, Including Surfaces In Concealed Spaces: Provide in accordance with MIL-STD-101 and ASME A13.1. Place stenciling in clearly visible locations. On piping not covered by MIL-STD-101 and ASME A13.1, stencil approved names or code letters, in letters a minimum of 1/2 inch high for piping and a minimum of 2 inches high elsewhere. Stencil arrow-shaped markings on piping to indicate direction of flow using black stencil paint.
3.8 INSPECTION AND ACCEPTANCE
In addition to meeting previously specified requirements, demonstrate mobility of moving components, including swinging and sliding doors, cabinets, and windows with operable sash, for inspection by the Contracting Officer. Perform this demonstration after appropriate curing and drying times of coatings have elapsed and prior to invoicing for final payment.
PW\DEN003\697284 SECTION 09 90 00 Page 15
3.9 WASTE MANAGEMENT
As specified in the Waste Management Plan and as follows. Do not use kerosene or any such organic solvents to clean up water based paints.
Properly dispose of paints or solvents in designated containers. Close and seal partially used containers of paint to maintain quality as necessary for reuse. Store in protected, well-ventilated, fire-safe area at moderate temperature. Place materials defined as hazardous or toxic waste in designated containers. Coordinate with manufacturer for take-back program. Set aside scrap to be returned to manufacturer for recycling into new product. When such a service is not available, contact local recyclers to reclaim the materials. Set aside extra paint for future color matches or reuse by the Government. Where local options exist for leftover paint recycling, collect all waste paint by type and provide for delivery to recycling or collection facility for reuse by local organizations.
3.10 PAINT TABLES
All DFT's are minimum values. Use only materials with a GPS green check mark having a minimum MPI "Environmentally Friendly" E1, E2, E3 rating based on VOC (EPA Method 24) content levels. Acceptable products are listed in the MPI Green Approved Products List, available at http://www.specifygreen.com/APL/ProductIdxByMPInum.asp.
3.10.1 Exterior Paint Tables
DIVISION 5: EXTERIOR METAL, FERROUS AND NON-FERROUS PAINT TABLE
STEEL / FERROUS SURFACES
A. New Steel that has been hand or power tool cleaned to SSPC SP 2 or
SSPC SP 3
1. Alkyd New; MPI EXT 5.1Q-G5 (Semigloss) Existing; MPI REX 5.1D-G5 Primer: Intermediate: Topcoat:
MPI 23 MPI 94 MPI 94
System DFT: 5.25 mils
New; MPI EXT 5.1Q-G6 (Gloss) / Existing; MPI REX 5.1D-G6 Primer: Intermediate: Topcoat:
MPI 23 MPI 9 MPI 9
System DFT: 5.25 mils
B. New Steel that has been blast-cleaned to SSPC SP 6/NACE No. 3:
2. Alkyd New; MPI EXT 5.1D-G5 (Semigloss) / Existing; MPI REX 5.1D-G5 Primer: Intermediate: Topcoat:
MPI 79 MPI 94 MPI 94
System DFT: 5.25 mils
New; MPI EXT 5.1D-G6 (Gloss) / Existing; MPI REX 5.1D-G6 Primer: Intermediate: Topcoat:
MPI 79 MPI 9 MPI 9
System DFT: 5.25 mils
C. Existing steel that has been spot-blasted to SSPC SP 6/NACE No. 3:
PW\DEN003\697284 SECTION 09 90 00 Page 16
STEEL / FERROUS SURFACES
1. Surface previously coated with alkyd or latex:
Waterborne Light Industrial Coating MPI REX 5.1C-G5 (Semigloss) Spot Primer: Intermediate: Topcoat:
MPI 79 MPI 163 MPI 163
System DFT: 5 mils
MPI REX 5.1C-G6 (Gloss) Spot Primer: Intermediate: Topcoat:
MPI 79 MPI 164 MPI 164
System DFT: 5 mils
2. Surface previously coated with epoxy:
Waterborne Light Industrial
a. MPI REX 5.1L-G5 (Semigloss) Spot Primer: Intermediate: Topcoat:
MPI 101 MPI 163 MPI 163
System DFT: 5 mils
MPI REX 5.1L-G6 (Gloss) Spot Primer: Intermediate: Topcoat:
MPI 101 MPI 164 MPI 164
System DFT: 5 mils
Pigmented Polyurethane
b. MPI REX 5.1H-G6 (Gloss) Spot Primer: Intermediate: Topcoat:
MPI 101 MPI 108 MPI 72
System DFT: 8.5 mils
D. New and existing steel blast cleaned to SSPC SP 10/NACE No. 2:
1. Waterborne Light Industrial MPI EXT 5.1R-G5 (Semigloss) Primer: Intermediate: Topcoat:
MPI 101 MPI 108 MPI 163
System DFT: 8.5 mils
MPI EXT 5.1R-G6 (Gloss) Primer: Intermediate: Topcoat:
MPI 101 MPI 108 MPI 164
System DFT: 8.5 mils
2. Pigmented Polyurethane MPI EXT 5.1J-G6 (Gloss) Primer: Intermediate: Topcoat:
MPI 101 MPI 108 MPI 72
System DFT: 8.5 mils
-- End of Section --
PW\DEN003\697284 SECTION 09 90 00 Page 17
PW\DEN003\697284 SECTION 09 90 00 Page 18
SECTION 09 96 00
HIGH-PERFORMANCE COATINGS
11/14
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
MASTER PAINTERS INSTITUTE (MPI)
MPI ASM (2012) Architectural Painting Specification Manual
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC 7/NACE No.4 (2007; E 2004) Brush-Off Blast Cleaning
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
QPL-TNT-AP-28 (2004) Paint, Aluminum, Heat Resisting (1200 Degrees F)
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Equipment List; G, and in accordance with Section 09 96 00
HIGH-PERFORMANCE COATINGS
SD-03 Product Data
Heat-Resistant Coatings; G, and in accordance with Section
09 96 00 HIGH-PERFORMANCE COATINGS
Epoxy Coatings; G, and in accordance with Section 09 96 00
HIGH-PERFORMANCE COATINGS
Polyurethane Coatings; G, and in accordance with Section 09 96 00
HIGH-PERFORMANCE COATINGS
SD-04 Samples
Color Chips; G, and in accordance with Section 09 96 00
HIGH-PERFORMANCE COATINGS
SD-07 Certificates
PW\DEN003\697284 SECTION 09 96 00 Page 1
Heat-Resistant Coatings; G, and in accordance with Section
09 96 00 HIGH-PERFORMANCE COATINGS
Epoxy Coatings; G, and in accordance with Section 09 96 00
HIGH-PERFORMANCE COATINGS
Polyurethane Coatings; G, and in accordance with Section 09 96 00
Manufacturer's Printed Instructions; G, and in accordance with Section 09 96 00 HIGH-PERFORMANCE COATINGS
1.3 QUALITY CONTROL
Comply with Master Painters Institute (MPI) Standards indicated and listed in "MPI Approved Products List." Comply with the requirements in "MPI Architectural Painting Specification Manual" before any project is started.
Submit an equipment list consisting of a list of proposed equipment to be used in performance of construction work.
Submit three color chips 3-inch by 4-inch or manufacture's pull-down of each finish color and gloss as scheduled.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver special coating materials to the project in their original containers bearing manufacturer's name, descriptive label, and coating formulations. Provide new and unopened containers.
Store special coating materials in tightly closed containers in a covered, well-ventilated area where they are not exposed to excessive heat, fumes, sparks, flame, or direct sunlight. Protect water-based coatings against freezing.
Store solvents, thinners, and equipment cleaners with the same care as the coating materials with ambient temperatures continuously maintained at a minimum 45 degrees F.
PART 2 PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
Submit manufacturer's catalog data including manufacturer's name and identification. Include detailed data analysis of each special coating material required for the project, with all the coating constituents measured as percentages of the total weight of the coating. Also provide manufacturer's data concerning application, thinning, and average coverage per gallon
2.1.1 Heat-Resistant Coatings
2.1.1.1 Category 1, 50 to 400 Degrees F
Provide alkyd resin-based material for surface temperature coatings not exceeding 400 degrees F. Apply a minimum two coats of coating with a dry-film thickness of a minimum 4 mils.
Apply an epoxy zinc primer as a first coat conforming to MPI ASM, No. 20 with the resin solids and zinc pigment not less than 80 percent of the
PW\DEN003\697284 SECTION 09 96 00 Page 2 total weight of the material.
White and color pigmented finish coats are an alkyd resin-based material with the resin solids and pigments not less than 85 percent of the total weight of the material. Ensure pigments are heat-stable materials, formulated to colors as scheduled.
Ensure black-pigmented finish coats are an alkyd resin, carbon-black pigmented material with resin solids and pigments not less than 50 percent of the total weight of the material.
Provide aluminum pigmented finish coats that are an alkyd resin-based material with resin solids and pigments not less than 50 percent of the total weight of the material.
2.1.1.2 Category 2, 300 to 600 Degrees F
Coatings for surface temperatures not exceeding 600 degrees F are based on modified silicone and silicone-based resins. Apply coatings in not less than two coats with a dry-film thickness of not less than 3 mils.
Provide a silicone-based resin zinc-pigmented material with the resin solids and zinc pigment for the first coat not less than 80 percent of the total weight of the material.
Apply color pigmented finish coats using silicone-based resin material with the resin solids and pigments not less than 80 percent of the material's total weight. Pigments are heat-stable materials, formulated to colors as scheduled.
Ensure black-pigmented finish coat is a silicone-based resin carbon-black pigmented material with resin solids and pigments not less than 50 percent of the total weight of the material.
Aluminum-pigmented finish coats are a modified, silicone-based-resin material with the resin solids and pigments not less than 50 percent of the total weight of the material.
2.1.1.3 Category 3, 600 to 800 Degrees F
Provide a modified silicone or a silicone-based material of coating for surface temperatures not exceeding 800 degrees F. Apply a minimum two coats with a dry-film thickness of a minimum 1 mils per manufacturer's recommendations.
Provide a silicone-based resin, zinc-pigmented material first coat with the resin solids and zinc pigment for the first coat not less than 80 percent of the total weight of the material.
Ensure black-pigmented finish coat is a silicone-based resin, carbon-black pigmented material with resin solids and pigments not less than 50 percent of the total weight of the material.
Aluminum-pigmented finish coat is a a modified, silicone-based-resin material with the resin solids and pigments not less than 50 percent of the total weight of the material.
PW\DEN003\697284 SECTION 09 96 00 Page 3
2.1.1.4 Category 4, 800 to 1,200 Degrees F
Provide an aluminum-pigmented, silicone-resin-based coating for surface temperatures not exceeding 1,200 degrees F conforming to QPL-TNT-AP-28, as modified.
Apply a minimum two coats with a minimum dry-film thickness of 2 mils.
Ensure the coating pigment contains a minimum 28 percent aluminum, based on the total weight of the material. Ensure coating contains a minimum of 22 percent silicone resin and a maximum of 49 percent of volatile thinners and driers based on the total weight of the material.
2.2 MATERIALS
2.2.1 Epoxy Coatings
Conform to MPI ASM, No. 116 for epoxy coatings and epoxy block filler, as modified.
Resins for finish coats are based on a polyamide-cured, epoxy-resin material. Apply finish coats with a dry-film thickness of not less than 4 mils per coat. Finish color and gloss are as indicated.
2.2.1.1 Ferrous and Galvanized Metal Surface Coatings
Coatings on ferrous and galvanized metal surfaces consist of a prime coat and not less than two finish coats. Comply with MPI ASM, No. 101 for an epoxy zinc primer with a metallic-zinc pigment for the substrate to be coated and the end use of the coated surface. Ensure resin solids and zinc pigment are not less than 80 percent of the total weight of the coating material. Apply prime coat with a total dry-film thickness of not less than 4 mils. Provide an epoxy-based finished coat as specified.
2.2.2 Polyurethane Coatings
Ensure polyurethane coatings conform to MPI ASM for each substrate indicated.
Resins for finish coats are based on a two-part, prepolymer,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .