Prequalified Sources List - Final_26 Nov 19.pdf
PDF 169 KB Posted
- Solicitation number
- W91238-20-S-0001
About this file
This document announces a prequalification of sources process to establish a prequalified sources list for cutoff wall construction projects in support of levee improvements by the U.S. Army Corps of Engineers, Sacramento District. Interested contractors must demonstrate experience with conventional slurry supported, deep mix method, and trench cutting remixed deep cutoff wall construction projects. Contractors must also show experience with earth embankment construction and provide documentation of past projects, bonding capacity of at least $50 million single and $200 million aggregate, and past performance ratings. Responses are due by November 6, 2019 and must include a completed questionnaire and surety letter. The prequalified sources list will be used for multiple stand-alone construction contracts over four years for cutoff wall projects using various methods on the Sacramento and American Rivers. Solicitations will proceed as sealed bid IFBs, though RFPs may be used if discussions are needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prequalified Sources List - Final_23 Dec 19.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prequalified Sources List (PSL) for Cutoff Wall Construction in Support of the Sacramento District Levee Improvement – Seepage and Stability Constriction Contracts
26 November 2019
1) As defined in Defense Federal Acquisition Regulation Supplement (DFARS) 236.272 Prequalification of Sources may be used when necessary to ensure timely and efficient performance of critical construction projects.
2) Pursuant to the United States Army Corps of Engineers (USACE) Acquisition Instruction (UAI) 5136.272, the Chief of Contracting in the pay grade of General Schedule GS-15 is delegated by the Head of the Contracting Activity to authorize the use of prequalification by determining, in writing, that a construction project is of an urgency or complexity that requires prequalification.-
3) On 24 October 2019, the Chief of Contracting, Sacramento District determined that it was in the best interest of the Government to use prequalification procedures in support of the USACE Cutoff Wall Levee Improvement – Seepage and Stability Construction Contracts.
4) On 25 October 2019, the Sacramento District posted the announcement of the Prequalified Sources List (PSL) on Federal Business Opportunities (FBO).1
5) Based on the procedures approved in the aforementioned determination and the revised minimum prequalification standards, the following list of prequalified contractors, is hereby established. Please note these standards have been met either individually or in combination with their key subcontractor or teaming partners submission:
a. Nordic Industries - (approved for DMM and Earthwork)
b. Raito - (approved for DMM)
c. Great Lakes E&I - (approved for Cutoff Wall, DMM and Earthwork)
d. Ahtna-Great Lakes – (approved for Cutoff Wall, DMM and Earthwork)
e. Kiewit – (approved for Cutoff Wall and Earthwork)
f. Odin – (approved for Cutoff Wall, DMM and Earthwork)
6) Note: Your Company will be required to maintain the “prequalified” team or a collaboration of contractors included on the PSL when bidding on projects issued against the PSL or provide supporting information for any new team member added.
Additionally, this will need to be supported by letters of commitment.
1 As of 12 November 2019, FBO was replaced by beta.SAM.gov.
File details come from the government source that posted it. Updated .