This document announces a Prequalification of Sources List for cutoff wall construction projects by the U.S. Army Corps of Engineers Sacramento District. Interested contractors must demonstrate experience constructing at least two soil bentonite and two slag cement-cement bentonite cutoff walls over 50 feet deep, 24 inches wide, and 500 feet long, with maximum permeability of 1x10^-6 cm/sec. They must also show experience on two deep mix method, two trench cutting remixed deep method, or one earth embankment project placing over 50,000 cubic yards of engineered fill. Responses to the prequalification questionnaire are due by November 6, 2019 and should include bonding capability documentation and a completed questionnaire with signatures. Firms meeting the criteria will comprise the Prequalified Sources List to be solicited for future cutoff wall projects between $50-100 million over four years, with solicitations issued as sealed bid IFBs or negotiated RFPs depending on conditions. The first project solicitation notice will be posted in November 2019.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prequalified Sources List - Final_26 Nov 19.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prequalified of Sources List (PSL) for Cutoff Wall Construction in Support of the Sacramento District Levee Improvement –
Seepage and Stability Constriction Contracts
26 November 2019 Revised 23 December 2019
1) As defined in Defense Federal Acquisition Regulation Supplement (DFARS) 236.272
Prequalification of Sources may be used when necessary to ensure timely and efficient performance of critical construction projects.
2) Pursuant to the United States Army Corps of Engineers (USACE) Acquisition Instruction (UAI) 5136.272, the Chief of Contracting in the pay grade of General Schedule GS-15 is delegated by the Head of the Contracting Activity to authorize the use of prequalification by determining, in writing, that a construction project is of an urgency or complexity that requires prequalification.
3) On 24 October 2019, the Chief of Contracting, Sacramento District determined that it was in the best interest of the Government to use prequalification procedures in support of the USACE Cutoff Wall Levee Improvement – Seepage and Stability Construction Contracts.
4) On 25 October 2019, the Sacramento District posted the announcement of the Prequalified Sources List (PSL) on Federal Business Opportunities (FBO).1
5) Based on the procedures approved in the aforementioned determination and the revised minimum prequalification standards, the following list of prequalified contractors, is hereby established. Please note these standards have been met either individually or in combination with their key subcontractor or teaming partners submission:
a. Nordic Industries - (approved for DMM and Earthwork)
b. Raito - (approved for DMM)
c. Great Lakes E&I - (approved for Cutoff Wall, DMM and Earthwork)
d. Ahtna-Great Lakes – (approved for Cutoff Wall, DMM and Earthwork)
e. Kiewit – (approved for Cutoff Wall and Earthwork)
f. Odin – (approved for Cutoff Wall, DMM and Earthwork)
g. Maloney-Odin – (approved for Cutoff Wall, DMM and Earthwork)
h. Geo-Solutions – (approved for Cutoff Wall)
i. Malcolm International - (approved for DMM)
1 As of 12 November 2019, FBO was replaced by beta.SAM.gov.
6) Note: Your Company will be required to maintain the “prequalified” team or a collaboration of contractors included on the PSL when bidding on projects issued against the PSL or provide supporting information for any new team member added.