This submittal register outlines products and services required for the repair of an emergency levee located at Site 1151-11. The repair includes removing an existing emergency berm and underground pipes at the levee toe, and constructing a new 150-foot long by 1800-foot long seepage berm. The berm may include filter sand, geotextile, drain rock, levee fill, coarse rock or rip rap. A new aggregate surfaced road and surface drainage system will also be installed.

The register lists over 80 submittal items across various specification sections requiring contractor documentation, plans, product data, test reports, certificates, closeout documents and more. Key submittals include a project schedule, accident prevention and environmental protection plans, quality control documentation, as-built drawings, warranties and construction records. Testing is specified for embankment and backfill materials, geotextiles, in-place compaction and hydrostatic leakage. The U.S. Army Corps of Engineers Engineering District Sacramento will approve all submittals and oversee the emergency levee repair work.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 8 PAGES

USACE

PL 84-99 Emergency Levee Repair

01 00 00 SD-01 Preconstruction Submittals

1.12.1 GPreconstruction Quantity Survey

Plan

1.12.1.1Preconstruction Access Road

Survey

SD-11 Closeout Submittals

1.12.1.2Post-construction Access Road

Survey

01 22 00 SD-01 Preconstruction Submittals

3.1Contract Cost Breakdown

01 32 01 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.6 G DOAccident Prevention Plan (APP)

1.6.2.11 GHealth Hazard Control Plan

1.6.2.12 GEmergency Action Plan

1.6.2.2 GStandard Lift Plan

1.6.2.3 G DOCritical Lift Plan

1.7Activity Hazard Analysis (AHA)

SD-06 Test Reports

1.11.3Monthly Exposure Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 8 PAGES

PL 84-99 Emergency Levee Repair

01 35 26 1.11Notifications and Reports

1.11.2 G DOAccident Investigation Reports

1.11.4LHE Inspection Reports

1.11.6Regulatory Citations and

Violations

SD-07 Certificates

1.5.1.4Crane Operators/Riggers

1.6.2.3Naval Architecture Analysis

1.8.1Confined Space Entry Permit

1.8.1Hot Work Permit

1.11.5Certificate of Compliance

3.7Excavation Permit

1.5.1.4Proof of Current Qualification

01 45 00 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

2.2 GHaul Road Plan

3.7 GTemporary Field Drainage Plan

01 57 19 SD-01 Preconstruction Submittals

1.7.1 GPreconstruction Survey

1.9.8 GSolid Waste Management Permit

1.7.2 GRegulatory Notifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 8 PAGES

PL 84-99 Emergency Levee Repair

01 57 19 1.8 G DOEnvironmental Protection Plan

1.7.4 GEnvironmental Manager

Qualifications

1.8.10.3 GDirt And Dust Control Plan

1.8.10.1 GAir Quality Control Plan

1.8.14 GWaste Water Management Plan

1.8.11 G DOWater Quality Management Plan

3.4.1 G DOWater Quality Management Plan

1.8.12 G DOWater Quality Monitoring Plan

1.8.15 G DOHistorical, Archaeological, and

Cultural Resources Plan

1.8.15 GBiological Resources And

Wetlands Protection Plan

1.8.2.3 GTraffic Control Plan

1.8.8 GSpill Control Plan

SD-06 Test Reports

3.14.2.1 GSolid Waste Management Report

3.8.2 G DOAir Quality Control Plan Reports

3.8.3 G DOPERP Data

3.8.8.1 G DOPERP Data

3.4.1Water Quality Monitoring Results

3.13Non-hazardous Solid Waste

Diversion Report

1.9.8.1Solid Waste Disposal Report

SD-07 Certificates

1.7.5 GEmployee Training Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 8 PAGES

PL 84-99 Emergency Levee Repair

01 57 19 SD-11 Closeout Submittals

3.14.1 GWaste Determination

Documentation

3.14.3.1 GHazardous Waste/Debris

Management

1.7.5 GAssembled Employee Training

Records

1.8.2.3 GPost-Construction Survey

3.14.2.1 GSales Documentation

1.10Environmental Records Binder

1.9.8.1Solid Waste Disposal Closeout

Report

01 57 23 SD-01 Preconstruction Submittals

1.6.1 G DOSWPPP

1.6.2 G DOPRDs

SD-03 Product Data

1.6.1.3BMP Product Data

3.1.1BMP Product Data

SD-06 Test Reports

3.1.1SWPPP Amendment

3.2.1SWPPP Amendment

1.6.2Sampling Results

3.2.5Sampling Results

3.2.6.1Sampling Results

3.2.2REAPs and Inspection Reports

3.2.6.1Exceedance Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 8 PAGES

PL 84-99 Emergency Levee Repair

01 57 23 1.6.2Annual Report

3.1.2Final Annual Report

SD-10 Operation and Maintenance

Data

3.1.2Post-Construction Stormwater

Management Plan

3.1.2Post-Construction Stormwater

Management Plan

SD-11 Closeout Submittals

3.1.2 G DOFinal SWPPP

3.1.2 G DONOT Application

01 71 10 SD-01 Preconstruction Submittals

1.4 GMobilization/Demobilization Work

Plan

01 74 19 SD-01 Preconstruction Submittals

1.5 GWaste Management Plan

SD-11 Closeout Submittals

1.6Records

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

1.7.4Warranty Tags

1.5Spare Parts Data

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 8 PAGES

PL 84-99 Emergency Levee Repair

01 78 00 1.7.1As-Built Record of Equipment and Materials

3.6As-Built Record of Equipment and Materials

3.4Final Approved Shop Drawings

3.5Construction Contract

Specifications

31 00 00 SD-01 Preconstruction Submittals

1.5.5 G DOExcavation Plan

1.5.1 G ROPre-Construction Access Road

Survey

1.5.1 G ROPreconstruction Survey

1.5.2 G ROEquipment Data

1.5.3 G DOMaterial Distribution And

Stockpile Plan

3.2.2 G DOShoring And Sheeting Plan

1.5.2 G DOPlan Of Operations

3.3.4Pipe Excavation Work Plan

SD-03 Product Data

2.1 G DOEmbankment And Backfill

Materials

2.2.4 G DOFilter Sand

2.2.4 G DODrain Blanket

2.2.7 G DORock Slope Protection

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 8 PAGES

PL 84-99 Emergency Levee Repair

31 00 00 2.3.8Borrow Area Chemical Suitability

Certification Report

SD-09 Manufacturer’s Field

Reports

3.8.1 G DOQuality Control Testing

3.8.4 G DOTest Data Summaries

3.8.4 G ROConstruction Verification Survey

Report

SD-11 Closeout Submittals

1.5.1Post-Construction Access Road

Survey

31 05 19 SD-01 Preconstruction Submittals

3.6 G ROManufacturer's Quality Control

Manual

3.1.1 G DOWork Plan

SD-03 Product Data

3.6 G ROManufacturing Quality Control

Sampling And Testing

2.3 G RORsp Fabric

SD-06 Test Reports

3.8.1 G ROConstruction Records

SD-07 Certificates

2.2 G ROGeotextile for Drainage Trench

31 11 00 SD-01 Preconstruction Submittals

3.1 G DOSite Preparation Work Plan

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 8 PAGES

PL 84-99 Emergency Levee Repair

31 11 00 1.3 G DOSurveys

3.6 G DOQuality Control Documentation

32 15 00 SD-03 Product Data

1.5 GPlant, Equipment, and Tools

2.3.1 GPlant Tests

SD-06 Test Reports

3.9.1 G DOIn-Place Tests

32 92 19 SD-03 Product Data

2.3Fertilizer

SD-07 Certificates

2.2Seed

SD-08 Manufacturer’s Instructions

2.7Erosion Control Materials

33 40 00 SD-04 Samples

2.1Plastic Pipe

SD-07 Certificates

2.1Resin Certification

3.5.1.2Leakage Test

3.5.1.1Hydrostatic Test on Watertight

Joints

3.5.2.1.2Post-Installation Inspection

Report

3.3Placing Pipe

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .