This specification section outlines health, safety, and emergency response procedures for contaminated site cleanup work. It requires developing and implementing practices and procedures to safely comply with OSHA and USACE regulations when performing hazardous waste site remediation. It addresses site characterization, task hazards and controls, training, medical surveillance, PPE, exposure monitoring, decontamination, emergency response, and other safety and health requirements. Contractors must designate qualified safety personnel including a Safety and Health Manager and Site Safety and Health Officer, and develop an Accident Prevention Plan and Site Safety and Health Plan covering all requirements.
Attachment 8
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jet Fuel Design Update - Fresno 19023
SECTION 01 35 29.13
HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR CONTAMINATED SITES
01/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN PETROLEUM INSTITUTE (API)
API RP 1604 (1996; R 2010) Closure of Underground Petroleum Storage Tanks
API RP 2219 (2005; R 2012) Safe Operation of Vacuum Trucks in Petroleum Service
API Std 2015 (2014) Safe Entry and Cleaning of Petroleum Storage Tanks
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
ANSI/ISEA Z358.1 (2014) American National Standard for Emergency Eyewash and Shower Equipment
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
NIOSH 85-115 (1985) Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
ER 385-1-95 (2007; Errata 2007) Safety -- Safety and Health Requirements for Munitions and Explosives of Concern (MEC) Operations
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1904 Recording and Reporting Occupational Injuries and Illnesses
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.120 Hazardous Waste Operations and Emergency Response
29 CFR 1926 Safety and Health Regulations for Construction
SECTION 01 35 29.13 Page 1
29 CFR 1926.65 Hazardous Waste Operations and Emergency Response
49 CFR 171 General Information, Regulations, and Definitions
49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements
1.2 DESCRIPTION OF WORK
This section requires Contractors to implement practices and procedures for working safely and in compliance with OSHA and USACE regulation while performing cleanup activities on uncontrolled hazardous waste sites.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Work Zones; G, RO Decontamination Facilities; G, RO
SD-03 Product Data
Exposure Monitoring/Air Sampling Program Site Control Log Employee Certificates
1.4 REGULATORY REQUIREMENTS
Comply with EM 385-1-1, OSHA requirements in 29 CFR 1910 and 29 CFR 1926 with work performed under this contract, especially OSHA's Standards 29 CFR 1926.65 and 29 CFR 1910.120 and state specific OSHA requirements where applicable. Submit to the Contracting Officer for resolution matters of interpretation of standards before starting work. The most stringent requirements apply where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary.
1.5 PRECONSTRUCTION SAFETY CONFERENCE
Conduct a preconstruction safety conference prior to the start of site activities and after submission of the Contractor's APP/SSHP. The objective of the meeting will be to discuss health and safety concerns related to the impending work, discuss project health and safety organization and expectations, review and answer comments and concerns regarding the APP/SSHP or other health and safety concerns the Contractor may have. Ensure that those individuals responsible for health and safety at the project level are available and attend this meeting.
SECTION 01 35 29.13 Page 2
1.6 ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN (APP/SSHP)
Develop and implement a Site Safety and Health Plan and attach to the Accident Prevention Plan (APP) as an appendix (APP/SSHP). Address all occupational safety and health hazards (traditional construction as well as contaminant-related hazards) associated with cleanup operations within the APP/SSHP. Cover each SSHP element in section 28.A.01 of EM 385-1-1 and each APP element in Appendix A of EM 385-1-1. There are overlapping elements in Section 28.A.01 and Appendix A of EM 385-1-1. SSHP appendix elements that overlap with APP elements need not be duplicated in the APP/SSHP provided each SOH issue receives adequate attention and is documented in the APP/SSHP. The APP/SSHP is a dynamic document, subject to change as project operations/execution change. The APP/SSHP will require modification to address changing and previously unidentified health and safety conditions. It is the Contractor's responsibility to ensure that the APP/SSHP is updated accordingly. Submit amendments to the APP/SSHP to the COR as the APP/SSHP is updated. For long duration projects resubmit the APP/SSHP to the COR annually for review. The APP/SSHP must contain all updates.
1.6.1 Acceptance and Modifications
Prior to submittal, the APP/SSHP must be signed and dated by the Safety and Health Manager and the Site Superintendent. Submit for review 14 days prior to the Preconstruction Safety Conference. Deficiencies in the APP/SSHP will be discussed at the preconstruction safety conference, and be revised to correct the deficiencies and resubmitted for acceptance. Onsite work must not begin until the plan has been accepted. Maintain a copy of the written APP/SSHP onsite. Changes and modifications to must be made with the knowledge and concurrence of the Safety and Health Manager, the Site Superintendent, and the Contracting Officer. Bring to the attention of the Safety and Health Manager, the Site Superintendent, and the Contracting Officer any unforeseen hazard that becomes evident during the performance of the work, through the Site Safety and Health Officer (SSHO) for resolution as soon as possible. In the interim, take necessary action to re-establish and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public, and the environment. Disregard for the provisions of this specification or the accepted APP/SSHP will be cause for stopping work until the matter has been rectified.
1.6.2 Availability
Make available the APP/SSHP in accordance with 29 CFR 1910.120, (b)(1)(v) and 29 CFR 1926.65, (b)(1)(v).
1.7 SITE DESCRIPTION AND CONTAMINATION CHARACTERIZATION
1.7.1 Ordnance and Explosives (OE)
Stop work and contact the Contracting Officer (CO) if ordnance and explosives (OE), explosive media or chemical agent contaminated media (CACM) are discovered during hazardous waste site cleanup activities.
Proceed with work after the CO gives permission and, according to ER 385-1-95 requirements.
1.8 TASK SPECIFIC HAZARDS, INITIAL PPE, HAZWOPER MEDICAL SURVEILLANCE AND
TRAINING APPLICABILITY
Task specific occupational hazards, task specific HAZWOPER medical
SECTION 01 35 29.13 Page 3 surveillance and training applicability and task specific initial PPE requirements for the project are listed on the Task Hazard and Control Sheets at the end of this section. It is the Contractor's responsibility to reevaluate occupational safety and health hazards as the work progresses and to adjust the PPE and onsite operations, if necessary, so that the work is performed safely and in compliance with occupational safety and health regulations.
1.9 STAFF ORGANIZATION, QUALIFICATION AND RESPONSIBILITIES
1.9.1 Safety and Health Manager
Safety and Health Manager must be an Industrial Hygienist certified by the American Board of Industrial Hygiene.
1.9.1.1 Additional Qualifications
The Safety and Health Manager must have the following additional qualifications:
a. A minimum of 3 years experience in developing and implementing safety and health programs in the petroleum processing industry or at underground storage tank removal projects.
b. Documented experience in supervising professional and technician level personnel.
c. Documented experience in developing worker exposure assessment programs and air monitoring programs and techniques.
d. Documented experience in managing personal protective equipment programs and conducting PPE hazard evaluations for the types of activities and hazards likely to be encountered on the project.
e. Working knowledge of state and Federal occupational safety and health regulations.
1.9.1.2 Responsibilities and Duties
The Safety and Health Manager shall:
a. Be responsible for the development, implementation, oversight, and enforcement of the APP/SSHP.
b. Sign and date the APP/SSHP prior to submittal.
c. Conduct initial site-specific training.
d. Be present onsite during the first 3 days of remedial activities and at the startup of each new major phase of work.
e. Visit the site as needed and at least once per week for the duration of activities, to audit the effectiveness of the APP/SSHP.
f. Be available for emergencies.
g. Provide onsite consultation as needed to ensure the APP/SSHP is fully implemented.
SECTION 01 35 29.13 Page 4
h. Coordinate any modifications to the APP/SSHP with the Site Superintendent, the SSHO, and the Contracting Officer.
i. Provide continued support for upgrading/downgrading of the level of personal protection.
j. Be responsible for evaluating air monitoring data and recommending changes to engineering controls, work practices, and PPE.
k. Review accident reports and results of daily inspections.
l. Serve as a member of the Contractor's quality control staff.
1.9.2 Site Safety and Health Officer
Designate an individual and one alternate as the Site Safety and Health Officer (SSHO). The name, qualifications (education and training summary and documentation), and include work experience of the Site Safety and Health Officer and alternate in the APP/SSHP.
1.9.2.1 Qualifications
The SSHO shall meet the following qualifications:
a. A minimum of 2 years experience in implementing safety and health programs at underground storage tank removal projectsor in the chemical or petroleum processing industry.
b. Documented experience in construction techniques and construction safety procedures.
c. Working knowledge of Federal and state occupational safety and health regulations.
d. Specific training in personal and respiratory protective equipment, confined space entry and in the proper use of air monitoring instruments and air sampling methods including monitoring for ionizing radiation.
1.9.2.2 Responsibilities and Duties
The Site Safety and Health Officer shall:
a. Assist and represent the Safety and Health Manager in onsite training and the day to day onsite implementation and enforcement of the accepted APP/SSHP.
b. Be assigned to the site on a full time basis for the duration of field activities. The SSHO cannot have collateral duties in addition to Safety and Health related duties. If operations are performed during more than 1 work shift per day, a site Safety and Health Officer must be present for each shift and when applicable, act as the radiation safety officer (RSO) as defined in paragraph 06.E.02 of EM 385-1-1 on radioactive waste cleanup projects.
c. Have authority to ensure site compliance with specified safety and health requirements, Federal, state and OSHA regulations and all aspects of the APP/SSHP including, but not limited to, activity hazard analyses, air monitoring, monitoring for ionizing radiation, use of
SECTION 01 35 29.13 Page 5 bstrayer Rectangle bstrayer Callout Allowable duties of the SSHO have been clarified.
PPE, decontamination, site control, standard operating procedures used to minimize hazards, safe use of engineering controls, the emergency response plan, confined space entry procedures, spill containment program, and preparation of records by performing a daily safety and health inspection and documenting results on the Daily Safety Inspection Log in accordance with 29 CFR 1904.
d. Have authority to stop work if unacceptable health or safety conditions exist, and take necessary action to re-establish and maintain safe working conditions.
e. Consult with and coordinate any modifications to the APP/SSHP with the Safety and Health Manager, the Site Superintendent, and the Contracting Officer.
f. Serve as a member of the Contractor's quality control staff on matters relating to safety and health.
g. Conduct accident investigations and prepare accident reports.
h. Conduct daily safety inspection and document safety and health findings into the Daily Safety Inspection Log. Track noted safety and health deficiencies to ensure that they are corrected.
i. In coordination with site management and the Safety and Health Manager, recommend corrective actions for identified deficiencies and oversee the corrective actions.
1.9.3 Occupational Physician
Utilize the services of a licensed physician, who is certified in occupational medicine by the American Board of Preventative Medicine, or who, by necessary training and experience is Board eligible. The physician must be familiar with this site's hazards and the scope of this project.
Include the medical consultant's name, qualifications, and knowledge of the site's conditions and proposed activities in the APP/SSHP. The physician will be responsible for the determination of medical surveillance protocols and for review of examination/test results performed in compliance with 29 CFR 1910.120, (f) and 29 CFR 1926.65, (f) and paragraph MEDICAL
SURVEILLANCE.
1.9.4 Persons Certified in First Aid and CPR
At least two persons who are currently certified in first aid and CPR by the American Red Cross or other approved agency must be onsite at all times during site operations. They must be trained in universal precautions and the use of PPE as described in the Bloodborne Pathogens Standard of 29 CFR 1910, Section .1030. These persons may perform other duties but will be immediately available to render first aid when needed.
1.9.5 Safety and Health Technicians
For each work crew in the exclusion zone, one person, designated as a Safety and Health technician, must perform activities such as air monitoring, decontamination, and safety oversight on behalf of the SSHO.
They must have appropriate training equivalent to the SSHO in each specific area for which they have responsibility and report to and be under the supervision of the SSHO.
SECTION 01 35 29.13 Page 6
1.10 TRAINING
Meet the following requirements in the Contractor's training program for workers performing cleanup operations and who will be exposed to contaminants.
1.10.1 General Hazardous Waste Operations Training
All Personnel performing duties with potential for exposure to onsite contaminants must meet and maintain the following 29 CFR 1910.120/ 29 CFR 1926.65 (e) training requirements:
a. 40 hours of off site hazardous waste instruction.
b. 3 days actual field experience under the direct supervision of a trained, experienced supervisor.
c. 8 hours refresher training annually.
Onsite supervisors must have an additional 8 hours management and supervisor training specified in 29 CFR 1910.120/29 CFR 1926.65 (e) (4).
1.10.2 Pre-entry Briefing
Prior to commencement of onsite field activities, all site employees, including those assigned only to the Support Zone, must attend a site-specific safety and health training session. This session will be conducted by the Safety and Health Manager and the Site Safety and Health Officer to ensure that all personnel are familiar with requirements and responsibilities for maintaining a safe and healthful work environment.
Thoroughly discuss procedures and contents of the accepted APP/SSHP and Sections 01.B.02 and 28.D.03 of EM 385-1-1 . Each employee must sign a training log to acknowledge attendance and understanding of the training.
Notify the Contracting Officer at least 5 days prior to the initial site-specific training session so government personnel involved in the project may attend.
1.10.3 Periodic Sessions
Conduct periodic onsite training by the SSHO at least weekly for personnel assigned to work at the site during the following week. Address safety and health procedures, work practices, any changes in the APP/SSHP, activity hazard analyses, work tasks, or schedule; results of previous week's air monitoring, review of safety discrepancies and accidents. Convene a meeting prior to implementation of the change must be convened should an operational change affecting onsite field work be made, to explain safety and health procedures. Conduct a site-specific training sessions for new personnel, visitors, and suppliers by the SSHO using the training curriculum outlines developed by the Safety and Health Manager. Each employee must sign a training log to acknowledge attendance and understanding of the training.
1.11 PERSONAL PROTECTIVE EQUIPMENT
1.11.1 Site Specific PPE Program
Provide onsite personnel exposed to contaminants with appropriate personal protective equipment. Components of levels of protection (B, C, D and modifications) must be relevant to site-specific conditions, including heat
SECTION 01 35 29.13 Page 7 and cold stress potential and safety hazards. Use only respirators approved by NIOSH. Commercially available PPE, used to protect against chemical agent, must be approved by the director of Army Safety through the Chemical Agent Safety and Health Policy Action Committee (CASHPAC) .
Keep protective equipment and clothing clean and well maintained. Include site-specific procedures to determine PPE program effectiveness and for onsite fit-testing of respirators, cleaning, maintenance, inspection, and storage of PPE within the PPE section of the APP/SSHP.
1.11.2 Levels of Protection
The Safety and Health Manager must establish and evaluate as the work progresses the levels of protection for each work activity. Also establish action levels for upgrade or downgrade in levels of PPE. Describe in the SSHP the protocols and the communication network for changing the level of protection. Address air monitoring results, potential for exposure, changes in site conditions, work phases, job tasks, weather, temperature extremes, individual medical considerations, etc. within the PPE evaluation protocol.
1.12 MEDICAL SURVEILLANCE PROGRAM
Meet 29 CFR 1910.120/29 CFR 1926.65 (f) and the following requirements for medical surveillance program for workers performing cleanup operations and who will be exposed to contaminants. Assure the Occupational Physician or the physician's designee performs the physical examinations and reviews examination results. Participation in the medical surveillance program will be without cost to the employee, without loss of pay and at a reasonable time and place.
1.12.1 Frequency of Examinations
Medical surveillance program participants must receive medical examinations and consultations on the following schedule:
a. Every 12 months
b. If and when the participant develops signs and symptoms indicating a possible overexposure due to an uncontrolled release of a hazardous substance on the project.
c. Upon termination or reassignment to a job where medical surveillance program participation is not required, unless his/her previous annual examination/consultation was less than 6 months prior to reassignment or termination.
d. On a schedule specified by the occupational physician.
1.12.2 Content of Physical Examinations/Consultation
Verify the following information about medical surveillance program participants:
a. Baseline health conditions and exposure history.
b. Allergies/sensitivity/susceptibility to hazardous substances exposure.
c. Ability to wear personal protective equipment inclusive of NIOSH certified respirators under extreme temperature conditions.
SECTION 01 35 29.13 Page 8
d. Fitness to perform assigned duties.
Provide the occupational physician with the following information for each medical surveillance program participant:
a. Information on the employee's anticipated or measured exposure.
b. A description of any PPE used or to be used.
c. A description of the employee's duties as they relate to the employee's exposures (including physical demands on the employee and heat/cold stress).
d. A copy of 29 CFR 1910.120, or 29 CFR 1926.65.
e. Information from previous examinations not readily available to the examining physician.
f. A copy of Section 5.0 of NIOSH 85-115.
g. Information required by 29 CFR 1910 Section .134.
1.12.3 Physician's Written Opinion
Obtain and furnish to the Safety and Health Manager; and the employee before work begins, a copy of the physician's written opinion for each employee. Address the employee's ability to perform hazardous waste site remediation work and containing the following:
a. The physician's verification of the employee's fitness to perform duties as well as recommended limitations upon the employee's assigned work and/or PPE usage.
b. The physician's opinion about increased risk to the employee's health resulting from work; and
c. A statement that the employee has been informed and advised about the results of the examination.
1.12.4 Employee Certificates
Provided on employee certificates for each worker performing cleanup operations with potential for contaminant-related occupational exposure signed by the safety and health manager and the occupational physician indicating the workers meet the training and medical surveillance requirements of this contract.
1.13 EXPOSURE MONITORING/AIR SAMPLING PROGRAM
Prepare and implement by the Safety and Health Manager an exposure monitoring/air sampling program to identify and quantify safety and health hazards and airborne levels of hazardous substances in order to assure proper selection of engineering controls, work practices and personal protective equipment for affected site personnel. Include action levels for upgrading/downgrading PPE in the program. Submit personnel exposure monitoring/sampling results.
SECTION 01 35 29.13 Page 9
1.14 HEAT STRESS MONITORING AND MANAGEMENT
Document in the APP/SSHP and implement the procedures and practices in section 06.J. in EM 385-1-1 to monitor and manage heat stress.
1.15 SPILL AND DISCHARGE CONTROL
Develop and implement written spill and discharge containment/control procedures. Address radioactive wastes, shock sensitive wastes, laboratory waste packs, material handling equipment, as well as drum and container handling, opening, sampling, shipping and transport. Describe prevention measures, such as building berms or dikes; spill control measures and material to be used (e.g. booms, vermiculite); location of the spill control material; personal protective equipment required to cleanup spills;
disposal of contaminated material; and who is responsible to report the spill. Storage of contaminated material or hazardous materials must be appropriately bermed, diked and/or contained to prevent any spillage of material on uncontaminated soil. If the spill or discharge is reportable, and/or human health or the environment are threatened, the National Response Center, the state, and the Contracting Officer must be notified as soon as possible. Reporting requirements must be in accordance with Section 02 65 00 UNDERGROUND STORAGE TANK REMOVAL.
1.16 MATERIALS TRANSFER SAFETY
Remove liquids and residues from the tanks using explosion-proof or air-driven pumps. Bond to the tank and ground pump motors and suction hoses to prevent electrostatic ignition hazards. Use of a hand pump will be permitted to remove the last of the liquid from the bottom of the tanks. If a vacuum truck is used for removal of liquids or residues, the area of operation for the vacuum truck must be vapor free. locate the truck upwind from the tank and outside the path of probable vapor travel.
Discharge the vacuum pump exhaust gases through a hose of adequate size and length downwind of the truck and tank area. Vacuum truck operating and safety practices must conform to API RP 2219. Collect tank residues in drums, tanks, or tank trucks labeled according to 49 CFR 171 and 49 CFR 172 and disposed of as specified. Disconnect and drain fittings and lines of their contents after the materials have been transferred and the tanks have been exposed. Do not spill contents into the environment during cutting or disconnecting of tank fittings. Transfer materials drained into DOT-approved drums for storage and/or transportation. Only non-sparking or non-heat producing tools shall be used to disconnect and drain or to cut through tank fittings. Electrical equipment (e.g., pumps, portable hand tools, etc.) used for tank preparation must be explosion-proof. Following cutting or disconnecting of the fittings, plug openings leading to the tanks.
1.17 HOT WORK
Hot work will not be permitted on or within the tanks or anywhere else not previously specified as a hot work area, except as outlined herein. Prior to conducting hot work, a hot work permit must be prepared by the person to be conducting the hot work and reviewed and signed off by the Contractor's qualified person. An additional hot work permit may need to be obtained from local authorities or in the case of military or other federal installations, the fire marshal. An example format for a hot work permit must be included in the AAPP/SSHP. Describe compliance with the following procedures. After tank interiors have been decontaminated, hot work may be conducted only when the tank is inerted, and to the extent necessary to
SECTION 01 35 29.13 Page 10 begin dismantling the tanks. After decontamination of tank interiors, hot work must not be performed unless monitoring indicates atmospheres within and immediately surrounding the tanks are less than 8 percent oxygen inside the tank and less than 10 percent of the LFL outside the tank; continuous monitoring must continue until the hot work is completed. The hot work prohibition includes welding, cutting, grinding, sawing, or other similar operations which could be expected to potentially generate combustion-producing temperatures or sparks, or which could produce potentially hazardous fumes or vapors. Designate an individual at each hot work site as a fire watch. This person's sole responsibility is to monitor the hot work and have immediate access to the fire extinguisher located at each hot work site. A new permit must be obtained at the start of each work shift during which hot work will be conducted.
1.18 TANK PURGING FOR PERMIT-REQUIRED CONFINED SPACE ENTRIES
Purge tanks for confined space entry. Reduce the flammable vapors to less than 10 percent of the LFL and the oxygen content be between 19.5 percent and 23.5 percent. Do not attempt confined space entry into the tanks unless absolutely necessary, as for example, to remove sludge from the tank. Flammable vapors may be exhausted from the tank by any of the methods from API RP 1604 listed below, or any method approved by the Contracting Officer. Specify the purging method to be used within the
APP/SSHP.
1.18.1 Ventilation by Eductor-Type Air Movers
Properly bond and ground the eductor-type air mover to prevent the generation and discharge of static electricity. When using this method, the fill (drop) tube must remain in place to ensure ventilation at the bottom of the tank. Tanks equipped with fill (drop) tubes that are not removable must be purged by this method. Use an eductor extension to discharge vapors a minimum of 12 feet above grade or 3 feet above adjacent roof lines, whichever is greater. If this is not possible, propose and get approved alternative methods prior to purging. Noise levels generated by these devices as a result of high airflow may exceed OSHA PELs. Evaluate noise levels and provide appropriate hearing protection.
1.18.2 Ventilation by Diffused Air Blowers
When using this purging method, the air-diffusing pipe is properly bonded and grounded to prevent the discharge of a spark. Fill (drop) tubes must be removed to allow proper diffusion of the air in the tank. Air supply must be from a compressor that has been checked to ensure that Grade D breathing air is being supplied. Air pressure in the tank must not exceed 5 psi gauge to avoid tank failure.
1.18.3 Commercial Emulsifiers and Volatile Fuel Encapsulators
These products are completely miscible in water, aid in the elimination of flammable vapors, and are biodegradable. Determine prior to using this method, regulatory requirements for treatment and disposal of the water.
Standing outside the tank, rinse the tank with a 3-to-6 percent solution of the product using a pressure sprayer through a tank opening. Measure explosive concentrations at several levels (top, middle, and bottom) within the tank. If readings are greater than 10 percent of the LFL, rinse the tank again. When LFL readings are acceptable, pump the water in the tank for disposal.
SECTION 01 35 29.13 Page 11
1.19 TANK INERTING (NO ENTRY)
Following the removal of tank contents but prior to removal of the tank(s) and tank preparation activities, inert the tank(s) only by introducing an inert gas, carbon dioxide (CO2) or liquid nitrogen (N2), to remove flammable vapors. Before inerting, plug all openings in the tanks with threaded or expansion type plugs except the vent tube and the opening to be used for introducing the inert gas. Within 30 minutes prior to initiating any activities (e.g., excavating, preparation, removal, opening, demolition, transportation, or other similar activities) involving a tank which has been inerted, the inerted nature of the tank (oxygen levels less than 8 percent) must be verified.
a. Do not use CO2 fire extinguishers for inerting the tank interiors. If a compressed gas (e.g., CO2 or N2) is introduced into the tank the following requirements must be met to prevent the buildup of static electricity:
(1) Bond together and ground the UST and the compressed gas supply tank.
(2) Supply the compressed gas only at low flows.
(3) Release the liquid or gas at the tank bottom so that static electricity is not generated by liquid falling to the bottom of the tank. Slowly fill the tank from the bottom up.
b. If used, introduce dry ice, which evolves CO2 gas as it evaporates, in the amount of at least 3 lbs per 100 gallons of tank capacity. Prevent skin contact with dry ice by wearing heavy cloth gloves.
c. Introduce sufficient quantities of inert gas (CO2 or N2) into the tanks to lower the oxygen content to less than 8 percent. Do not exceed 5 psi pressure inside the tank. Prior to proceeding with additional activities on the tank (e.g., excavating), the oxygen content of the tanks must be monitored to confirm that it is less than 8 percent.
Conduct additional oxygen level monitoring at least hourly while activities involving the tanks are underway but prior to decontamination of tank interiors; at least daily during periods in which the tanks are not being disturbed but prior to decontamination of their interiors; or as directed by the Contracting Officer. If monitoring of tank interiors indicates that oxygen levels are not remaining below 8 percent, introduce additional inert gas and initiate more frequent oxygen monitoring.
d. During inerting procedures, use an extension vent tube a minimum of 12 feet above grade or 3 feet above any adjacent (within 75 feet) roof lines, whichever is greater to discharge tank vapors. If this is not possible, propose and get approved alternative methods prior to inerting. Conduct continuous combustible gas/oxygen monitoring shall be conducted at the vent and inert gas introduction holes.
1.20 TANK ATMOSPHERE TESTING
Monitor the air within the storage tanks to ensure the space is either adequately purged and safe for personnel entry, or to ensure the tank has been adequately inerted and the oxygen content is less than 8 percent. In both instances, perform monitoring at the top, bottom, and middle areas of the tanks to ensure stratification has not occurred. Report monitoring
SECTION 01 35 29.13 Page 12 results to project personnel to ensure safe operations. Record data as specified in paragraph EXPOSURE MONITORING/AIR SAMPLING PROGRAM.
1.20.1 Monitoring to Ensure Purging
When monitoring to ensure purging, both oxygen content and LFL readings are required. Prior to obtaining LFL readings, monitor the oxygen content of the space and verify that the combustible gas indicators are operating within the oxygen limits identified by the CGI manufacturer. Do not permit personnel to enter spaces with oxygen levels are less than 19.5 percent, except in emergencies, and then only when equipped with the proper PPE and when following permit-required confined space entry procedures. Monitor toxic air contaminants as specified in paragraph EXPOSURE MONITORING/AIR
SAMPLING PROGRAM.
1.20.2 Monitoring to Ensure Inerting
Monitor inerted tanks to ensure oxygen readings remain below a maximum allowable percentage of 8 percent by volume.
1.21 TANK LIFTING
Lift tanks using equipment with a rated capacity greater than the load to be lifted. Lift tanks by lifting eyes or by straps under the ends of the tanks. Do not lift by the manhole flange or by removing the bungs. Direct personnel to remain away from the ends of the tanks and position tanks , whenever possible, with the ends oriented away from occupied or traveled areas, due to potential for rupture. During transportation, secure the tanks to prevent movement.
1.22 TANK DEMOLITION
Demolish excavated tanks before being removed from the site unless they are transported directly to a state certified tank destruction facility.
Demolition will not be permitted until a decontamination of the interiors and exteriors is complete. Demolition must involve opening the tanks sufficiently to permanently prohibit further use as containers of liquids.
Tanks must be inerted and tested before they are opened. Submit plans and procedures in the APP/SSHP, including a list of materials and supplies, for safely and effectively demolishing the tanks.
1.23 TANK CLEANING
conform to API Std 2015 for safety practices and procedures for the cleaning of the storage tanks. Conduct opening of the tanks to permit decontamination utilizing only methods approved in the APP/SSHP.
Decontaminate the interior and exterior of the tank prior to removing it from the work site unless the tank is being transported directly to a state certified tank destruction facility. Submit plans and procedures in the SSHP, including materials and supplies, for safely and effectively opening the tanks, cleaning surfaces of the interior and exterior of the tanks, and disposing of the decontamination fluids. Volatile organic solvents are not permitted to be utilized for decontamination procedures. Personnel must not enter any of the storage tanks as a part of this project, except when following permit-required confined space entry procedures. Collect and dispose of decontamination fluids. Upon completion of this project, written certification must be made that the tank was properly decontaminated prior to being removed from the site.
SECTION 01 35 29.13 Page 13
1.24 SITE CONTROL MEASURES
1.24.1 Work Zones
Initial anticipated work zone boundaries (exclusion zone, contamination reduction zone, support zone, all access points and decontamination areas) are to be clearly delineated on the site drawings. Base delineation of work zone boundaries on the contamination characterization data and the hazard/risk analysis to be performed as described in paragraph: HAZARD/RISK ANALYSIS. As work progresses and field conditions are monitored, work zone boundaries may be modified (and site drawings modified) with approval of the Contracting Officer. Clearly identify work zones and marked in the field (using fences, tape, signs, etc.). Submit and post a site map, showing work zone boundaries and locations of decontamination facilities in the onsite office. Work zones must consist of the following:
1.24.1.1 Exclusion Zone (EZ)
The exclusion zone is the area where hazardous contamination is either known or expected to occur and the greatest potential for exposure exists.
Control entry into this area and exit may only be made through the CRZ.
1.24.1.2 Contamination Reduction Zone (CRZ)
The CRZ is the transition area between the Exclusion Zone and the Support Zone. The personnel and equipment decontamination areas must be separate and unique areas located in the CRZ.
1.24.1.3 Support Zone (SZ)
The Support Zone is defined as areas of the site, other than exclusion zones and contamination reduction zones, where workers do not have the potential to be exposed to hazardous substances or dangerous conditions resulting from hazardous waste operations. Secure the Support Zone against active or passive contamination. Site offices, parking areas, and other support facilities must be located in the Support Zone.
1.24.2 Site Control Log
A log of personnel visiting, entering, or working on the site must be maintained. Include the following: date, name, agency or company, time entering and exiting site, time entering and exiting the exclusion zone (if applicable). Before visitors are allowed to enter the Contamination Reduction Zone or Exclusion Zone, they must show proof of current training, medical surveillance and respirator fit testing (if respirators are required for the tasks to be performed) and fill out a Certificate of Worker or Visitor Acknowledgment. Record this visitor information, including date, in the log.
1.24.3 Communication
Provide and install an employee alarm system that has adequate means of on and off site communication in accordance with 29 CFR 1910 Section .165.
The means of communication must be able to be perceived above ambient noise or light levels by employees in the affected portions of the workplace.
The signals must be distinctive and recognizable as messages to evacuate or to perform critical operations.
SECTION 01 35 29.13 Page 14
1.24.4 Site Security
Print signs in bold large letters on contrasting backgrounds. Signs must be visible from all points where entry might occur and at such distances from the restricted area that employees may read the signs and take necessary protective steps before entering.
1.25 PERSONAL HYGIENE AND DECONTAMINATION
Personnel entering the Exclusion or Contamination Reduction Zones or otherwise exposed to hazardous chemical vapors, gases, liquids, or contaminated solids must decontaminate themselves and their equipment prior to exiting the contamination reduction zone (CRZ) and entering the support zone. Consult Chapter 10.0 of NIOSH 85-115 when preparing decontamination procedures. Submit a detailed discussion of personal hygiene and decontamination facilities and procedures to be followed by site workers as part of the APP/SSHP. Train employees in the procedures and enforce the procedures throughout site operations.
1.25.1 Decontamination Facilities
Submit drawings showing the layout of the personnel and equipment decontamination areas.
1.25.2 Personnel Decontamination
Initially set up a decontamination line in the CRZ. Employees must exit the exclusion zone through the CRZ and implement the following decontamination procedures and techniques: remove all outer garments hand and face wash. It is the Site Safety and Health Officer's responsibility to recommend techniques to improve personnel decontamination procedures, if necessary.
1.25.3 Equipment Decontamination
Decontaminate the vehicles and equipment used in the EZ shall be decontaminated in the CRZ prior to leaving the site.
1.25.3.1 Procedures
Procedures for equipment decontamination must be developed and utilized to prevent the spread of contamination into the SZ and offsite areas. These procedures must address disposal of contaminated products and spent materials used on the site, including containers, fluids, oils, etc.
Assume any item taken into the EZ to be contaminated and perform an inspection and decontaminate. Vehicles, equipment, and materials must be cleaned and decontaminated prior to leaving the site. Handle construction material in such a way as to minimize the potential for contaminants being spread and/or carried offsite. Prior to exiting the site, vehicles and equipment must be monitored to ensure the adequacy of decontamination.
1.26 EMERGENCY EQUIPMENT AND FIRST AID REQUIREMENTS
Maintain, as a minimum, the following items onsite and available for immediate use:
a. First aid equipment and supplies approved by the consulting physician.
b. Emergency eyewashes and showers that comply with ANSI/ISEA Z358.1.
SECTION 01 35 29.13 Page 15
c. Emergency-use respirators. For escape purposes, supply 2 5- to 15-minute emergency escape masks. For rescue purposes, Supply 2 positive pressure self-contained breathing apparatus (SCBA). Dedicate these for emergency use only and maintained onsite in the Contamination Reduction Zone.
d. Provide fire extinguishers of sufficient size and type at site facilities and in all vehicles and at any other site locations where flammable or combustible materials present a fire risk.
1.27 EMERGENCY RESPONSE AND CONTINGENCY PROCEDURES
An Emergency Response Plan, that meets the requirements of 29 CFR 1910.120
(l) and 29 CFR 1926.65 (l), must be developed and implemented as a section of the APP/SSHP. In the event of any emergency associated with remedial action, without delay, alert all onsite employees and as necessary offsite emergency responders that there is an emergency situation; take action to remove or otherwise minimize the cause of the emergency; alert the Contracting Officer; and institute measures necessary to prevent repetition of the conditions or actions leading to, or resulting in, the emergency.
Train employees that are required to respond to hazardous emergency situations to their level of responsibility according to 29 CFR 1910.120
(q) and 29 CFR 1926.65 (q) requirements. Rehearse the plan regularly as part of the overall training program for site operations. Review the plan periodically and revised as necessary to reflect new or changing site conditions or information. Provide copies of the Emergency Response Portion of the accepted APP/SSHP to the affected local emergency response agencies. Address, as a minimum, the following elements in the plan:
a. Pre-emergency planning. Coordinate with local emergency response providers during preparation of the Emergency Response Plan. At a minimum, coordinate with local fire, rescue, hazardous materials response teams, police and emergency medical providers to assure all organizations are capable and willing to respond to and provide services for on-site emergencies. Ensure the Emergency Response Plan for the site is compatible and integrated with the local fire, rescue, medical and police security services available from local emergency response planning agencies.
b. Personnel roles, lines of authority, communications for emergencies.
c. Emergency recognition and prevention.
d. Site topography, layout, and prevailing weather conditions.
e. Criteria and procedures for site evacuation (emergency alerting procedures, employee alarm system, emergency PPE and equipment, safe distances, places of refuge, evacuation routes, site security and control).
f. Specific procedures for decontamination and medical treatment of injured personnel.
g. Route maps to nearest prenotified medical facility. Site-support vehicles must be equipped with maps. At the beginning of project operations, drivers of the support vehicles must become familiar with the emergency route and the travel time required.
SECTION 01 35 29.13 Page 16
h. Emergency alerting and response procedures including posted instructions and a list of names and telephone numbers of emergency contacts (physician, nearby medical facility, fire and police departments, ambulance service, Federal, state, and local environmental agencies; as well as Safety and Health Manager, the Site Superintendent, the Contracting Officer and/or their alternates).
i. Criteria for initiating community alert program, contacts, and responsibilities.
j. Procedures for reporting incidents to appropriate government agencies.
In the event that an incident such as an explosion or fire, or a spill or release of toxic materials occurs during the course of the project, the appropriate government agencies must be immediately notified. In addition, verbally notify the Contracting Officer and the local district safety office immediately and receive a written notification within 24 hours. Include within the report the following items:
(1) Name, organization, telephone number, and location of the Contractor.
(2) Name and title of the person(s) reporting.
(3) Date and time of the incident.
(4) Location of the incident, i.e., site location, facility name.
(5) Brief summary of the incident giving pertinent details including type of operation ongoing at the time of the incident.
(6) Cause of the incident, if known.
(7) Casualties (fatalities, disabling injuries).
(8) Details of any existing chemical hazard or contamination.
(9) Estimated property damage, if applicable.
(10) Nature of damage, effect on contract schedule.
(11) Action taken to ensure safety and security.
(12) Other damage or injuries sustained, public or private.
k. Procedures for critique of emergency responses and follow-up.
1.28 CERTIFICATE OF WORKER/VISITOR ACKNOWLEDGEMENT
A copy of a Contractor-generated certificate of worker/visitor acknowledgement must be completed and submitted for each visitor allowed to enter contamination reduction or exclusion zones, and for each employee, following the Example Certificate Of Worker/Visitor Acknowledgement at the end of this section.
1.29 INSPECTIONS
Attach to and submit with the Daily Quality Control reports the SSHO's Daily Inspection Logs. Include with each entry the following: date, work area checked, employees present in work area, PPE and work equipment being
SECTION 01 35 29.13 Page 17 used in each area, special safety and health issues and notes, and signature of preparer.
1.30 SAFETY AND HEALTH PHASE-OUT REPORT
Submit a Safety and Health Phase-Out Report in conjunction with the project close out report and will be received prior to final acceptance of the work. Include the following minimum information :
a. Summary of the overall performance of safety and health (accidents or incidents including near misses, unusual events, lessons learned, etc.).
b. Final decontamination documentation including procedures and techniques used to decontaminate equipment, vehicles, and on site facilities.
c. Summary of exposure monitoring and air sampling accomplished during the project.
d. Signatures of Safety and Health Manager and SSHO.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 35 29.13 Page 18
Task Hazard and Control Requirements Sheet
Task
Initial Anticipated Hazards
Initial PPE
Initial Controls
Initial Exposure Monitoring
YesNo HAZWOPER Medical Surveillance Required
YesNo HAZWOPER Training Required
-- End of Section --
SECTION 01 35 29.13 Page 19
File details come from the government source that posted it. Updated .