Yuba_Gravel_Placement_Attachments_1-6.pdf

PDF 978 KB Posted

Attached to
Yuba Gravel Placement Federal contract opportunity
Solicitation number
W9123819Q0036
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

Yuba Gravel Placement solicitation attachments.

View the file

Other files for this federal contract opportunity

Other files attached to Yuba Gravel Placement, newest first.
File Type Posted
W9123819Q0036_Combo_Synop_Solicitation_Amend_0003.doc DOC document
Contractor_Questions.docx DOCX document
Contractor_Questions.docx DOCX document
W9123819Q0036_Combo_Synop_Solicitation_Amend_0002.doc DOC document
Attachment_7_-_Wage_Determination.pdf PDF
W9123819Q0036_Combo_Synop_Solicitation_Final.doc DOC document
W9123819Q0036_Combo_Synop_Solicitation_Final.doc DOC document
W9123819Q0036_Combo_Synop_Solicitation_Draft.DOC DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J – List of Documents, Exhibits and Other Attachments Yuba Gravel Placement

ATTACHMENT 1

SAFETY EXPOSURE REPORT

ATTACHMENT 2

MONTHLY SAFETY MEETING MINUTES

CONTRACTOR:

DATE: TOPIC:

SUMMARY:

CORRECTIVE ACTIONS REQUIRED (IF ANY):

Feb 2018

ATTACHMENT 3

ACTIVITY HAZARD ANALYSIS

Date Prepared Date Revised Revision No.

Project Analysis prepared by: Reviewed by: Accepted by:

Doug Grothe Park Manager

Activity Hazard Recommended Controls Activity

1. 1.1. 1.

1.2 1.3

2. 2.1 2.2 2.3

3. 3.1 3.2 3.3

4. 4.1 4.2 4.3

5. 5.1 5.2 5.3

Attachment 4 Map of Yuba River/ Gravel Placement above Smartsville gage.

ATTACHMENT 5

Repair/Work Request

Date: Name:

Specific item that needs to be repaired:

Physical Location:

Repair/Work Request Details:

Priority: □ 1: Deferrable, low priority

□ 2: Normal, for effective operation

□ 3: Urgent, to stop eventual loss

□ 4: Critical, to stop immediate loss

Reason for Priority:

Jan 2018

Section G – QASP- Performance Standards and Ratings Definitions

QUALITY ASSURANCE MONITORING FORM

Date: / /

Work Task (Milestone/Activity):

Survey Period: / / through / /

Method of Surveillance: COR Review

Evaluation of Contractor’s Performance:

Corrective Action Required: Yes No

Narrative Discussion of Contractor’s Performance During Survey Period:

Evaluation

Discussion

Attachment 6 - QASP Forms - May 2019

Quality Control Inspection Checklist

Quality Control Inspection Checklist

Section G – QASP- Performance Standards and Ratings Definitions

Section G – QASP Performance Standards and Ratings Definitions Englebright

– Land Janitorial Services

CORRECTIVE ACTION FORM FOR QASP

1) Work Task (Milestone/Activity):

2) Survey Period: / / through / /

3) Description of the Failure/Deficiency that Precipitated the Corrective Action:

4) Description of the Criterion that the Failure/Deficiency was Evaluated Against:

5) Personnel Involved in the Identification of the Failure/Deficiency, Determination of the Appropriate Corrective Action, Approval of the Corrective Action, and Implementation of the Corrective Action:

6) Description of the Corrective Action that was Required:

7) Date/Time of Implementation of the Corrective Action: / /

8) Follow-Up Information to Prevent Recurrence of Failure/Deficiency (i.e., Need for Revision of Procedures or Specifications):

9) Personnel Responsible for Follow-Up Work:

10) Planned Date for Follow-Up Surveillance: / /

11) Other

Description

Description

Description

Description

Description

File details come from the government source that posted it.