Amendment No.: 01, SF30 and Summary of Changes

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

A. Section 01 11 00, paragraph 1.2.4, subparagraph 'g' is deleted in its entirety because there is no archeologist requirement associated w ith this project.

B. Revise section 22 00 00 (paragraph 2.6.5) to clarify that piping insulation is necessary.

C. Add section 00 73 00 - Supplementary Conditions regarding w ork hours and coordination for w orking at multiple site locations simultaneously.

D. Extend the bid-opening date/time as reflected on the SF 1442 Block 13.A. See summary of changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123819B0023

X 9B. DATED (SEE ITEM 11)

17-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Aug-2019

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123819B0023

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 23-Aug-2019 10:00 AM to 27-Aug-2019 02:00 PM.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

SCHEDULE OF WORK

Section 73 00 00

Work Hours Limitations:

a. During the progress of work, the existing facility(s) shall be allowed to be fully operational without interruption from the Contractor, except by specific arrangement with the COR and then only at such times as approved in writing by the COR.

b. The Contractor shall coordinate the work of this contract through the COR assigned by the ACO.

c. The normal hours of work shall be 7:00 a.m. to 3:30 p.m., Monday through Friday, unless otherwise noted. The

Contractor shall not schedule work on Saturday, Sunday or Federal Holidays without prior approval from the

Government. The Contractor shall obtain approval from the COR at least five calendar days in advance for work scheduled on the weekends, holidays or outside of the normal hours of work.

d. The Contractor shall coordinate with the contracting officer for approval to work in multiple areas. Working in multiple locations shall not shut down the complete operations of the shop. Work shall be conducted and scheduled to have minimal impact on the shop operations. Contractor shall coordinate with the COR to establish a work plan.

e. Contractor shall coordinate with the COR to schedule work that will generate high noise levels.

f. Contractor shall not work in the facility if it is not occupied by the tenant unit or an 88th representative.

g. Contractor shall coordinate with the COR to comply with Installation security protocols while working in the vicinity of the Arms Vault.