W9123819B00210002.pdf

PDF 291 KB Posted

Attached to
Marysville Ring Levee Repair Phase 2C
Solicitation number
W9123819B0021
Issued by

About this file

Amendment 2 to solicitation: New Pricing Schedule Items, updated Specification section: Payment and Measurements, and extend the solicitation due date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Reason for this Amendment is to:

1. Update the Bid Schedule to include Item 0030, 0031, 1001 and 1002; and add CLIN 1001 and 1002 to this solicitation;

2. Providing updated 01 22 00; and

3. Extend the solicitation due date from 13 September at 1000 to 17 September at 1000.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123819B0021

X 9B. DATED (SEE ITEM 11)

25-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Sep-2019

CODE

CIVIL/STRUCT DESIGN SECTION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123819B0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The following have been modified:

TABLE OF ATTACHMENTS

Name Title of Attachment Pages Date Attachment 1 Wage Determination 49 06-AUG-2019 Attachment 2 Specifications 958 23-APR-2019 Attachment 3 Plans 50 26-JUL-2019 Attachment 4 Bid Schedule 2 09-SEP-2019

TABLE OF CONTENTS

Table of Contents

Name Title of Attachment Pages Date Exhibit A Bid Schedule 1 9 September 2019

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 13-Sep-2019 10:00 AM to 17-Sep-2019 10:00 AM.

CLIN 1001

The CLIN description has changed from Option to Imported Impervious Fill.

The CLIN extended description has changed from:

IMPORTED IMPERVIOUS LEVEE FILL

To:

CLIN 1002 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1002 30 Days OPTION Construction Standby

FFP

This option item allows the Government the unilateral right to require the contractor to standby at the daily rate proposed for a period of time as the Government determines is necessary, in each instance, for up to a total period of time not to exceed thirty (30) calendar days, which days may be non-consecutive.

Upon receipt of the Government's written notice(s) to standby, the Contractor shall immediately standby until otherwise directed by the Government FOB: Destination

NET AMT

The following Delivery Schedule for CLIN 1002 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

381 dys. ANP 30 USACE SACRAMENTO DISTRICT

ZACHARY M MOORE

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

916 373-1617 X318 FOB: Destination

W91238

The following have been deleted:

EXHIBIT A

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

SUPPLEMENTARY INSTRUCTIONS

INQUIRIES: Prospective bidders should submit inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):

a. For information related to amendments, and the dates set for bid opening, please check http://www.fedbizopps.gov

b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the QUICK ADD link. Select http://www.fedbizopps.gov/ https://www.projnet.org/projnet agency as USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click continue. Fill in all required information and click Add User.

2. From this page you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.

4. The Solicitation Number is: W91238-19-B-0021 The Bidder Inquiry Key is: EBS7R3-62QS8U

c. The Bidder Inquiry System will be unavailable for new inquiries 10 days prior to the bid opening date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

d. Bidders are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

DIRECTIONS FOR SUBMITTING BIDS:

Envelopes containing bids must be sealed, marked and addressed as follows:

Solicitation No. W91238-19-B-0021 Department of the Army U.S. Army Engineer District, Sacramento ATTN: Contracting Division 1325 J Street Sacramento CA 95814-2922

SPECIAL INSTRUCTIONS PERTAINING TO HAND-CARRIED BIDS:

Hand-carried bids must be delivered to: The Building Lobby at 1325 J Street, Sacramento, CA.

Due to security precautions, all Corps of Engineers visitors are now required to sign-in, leave a Photo-ID (such as a driver’s license), and get a Visitor’s Pass at the Security Desk in the Building Lobby. Bidders may no longer hand-carry their bids directly to Contracting Division. Bids may NOT be either turned-in at the Security Desk or left unattended elsewhere in the Lobby. Additionally, you are advised that there is no public parking in the Building.

The Bid Opening Officer will be in the Building Lobby 20 minutes prior to the scheduled bid opening time to accept sealed bids. At the scheduled bid opening time the Bid Opening Officer will announce that no further bids will be received, and will escort the bidders waiting in the Building Lobby as a group to the Bid Opening Room, where the bids will be publicly opened and read.

Bidders who desire to hand-deliver their bids at an earlier time must coordinate with the contract specialist in advance to arrange to be met in the Building Lobby by Contracting Division personnel. In the event the contract specialist cannot be reached, please call the main Contracting Division telephone number, (916) 557-5201, in order to request assistance. Please ensure that all courier and delivery personnel are aware of these procedures.

BASIS FOR AWARD:

The Government contemplates award of one contract to the responsive, responsible bidder who submits the low bid for the total of the following items in the Bid Schedule:

a. All line items listed in Bid Schedule

b. A responsibility determination will be made in accordance with policies and procedures listed in FAR Part 9 to include review of Contractors previous work to ensure it meets the requirements listed in the Special Standards of Responsibility

FACSIMILE BIDS/OFFERS:

Facsimile bids/offers, modifications thereto, or cancellations of bids/offers will not be accepted. Electronic bids will not be accepted.

PERFORMANCE AND PAYMENT BONDS:

The bidder/offeror whose bid/offer is accepted will, within the time established in the contract, furnish performance and payment bonds in accordance with FAR 52.228-15.

INDIVIDUAL SURETIES IN SUPPORT OF BID BONDS:

Bidders/offerors utilizing individual sureties in support of a bid bond shall include a Standard Form (SF) 28 (Affidavit of Individual Surety), accompanied by a pledge of acceptable assets from each person acting as an individual surety, and include these with the SF 24 (Bid Bond), and the bid itself (see clause titled "Pledges of Assets," FAR 52.228-11).

Pledges of acceptable assets shall be in the form of (1) evidence of an escrow account and/or (2) a recorded lien on real estate. If this is an IFB, failure to provide pledges of acceptable assets, with the bid, in the specified form, accompanied by a properly executed SF 24 and SF 28, will render the bidder nonresponsible and thus ineligible for award. If this is an RFP, failure to provide required documentation described herein may cause the offeror to be deemed "unacceptable".

BID GUARANTEE FORM AND AMOUNT:

The bidder shall furnish a separate bid guarantee in accordance with the solicitation provision titled "Bid Guarantee", FAR 52.228-1. In accordance with FAR 28.101-2 the bid guarantee amount shall be at least 20 percent of the "bid price" but shall not exceed $3 million. When the penal sum is expressed as a percentage, a maximum dollar limitation may be stated. FAR 28.106-1 states that a Standard Form (SF) 24 shall be used for the bid bond. In accordance with FAR 28.202(a)(1), corporate sureties utilized must appear on the list contained in the Department of Treasury Circular 570 titled "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies."

ACCEPTANCE OF OFFERS:

A written award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.

SUPPLEMENTARY INSTRUCTIONS TO BIDDERS- DETAILED SUBMISSION REQUIREMENTS

a. Submit the original hard-copy and one (1) complete copy of the bid on Compact Disk (CD) using a searchable “PDF” file format.

b. Use only 8-1/2” x 11” pages. There are no page limits; however, limit responses to required information.

Organize your bid as indicated below. If a tab is not applicable to your bid, omit that tab but do not renumber the subsequent tabs.

TAB CONTENTS OF THE BID

1 Bid Cover Sheet 2 SF 1442; Acknowledgement of Amendments; Joint Venture Agreement 3 Bid Schedule 4 Representations, Certifications, and Other Statements of Offerors 5 Bid Guarantee 6 Pre-Award Survey Information 7 Special Standards of Responsibility 8 Subcontracting Plan

TAB 1 BID COVER SHEET

1. Solicitation Number

2. The name, address, DUNS Number, e-mail address, and telephone and facsimile numbers of the bidder.

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the Solicitation and agreement to furnish any or all items upon which prices are bid (as indicated by writing the price set opposite each item.)

4. Names, titles, e-mail addresses, telephone and facsimile numbers of persons authorized to answer questions from the government on behalf the bidder in connection with this solicitation.

5. Name, title, and signature of person who signed the bid. Bids signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

Tab 2: SF 1442; Acknowledgement of Amendments; Joint Venture Agreement: The Standard Form (SF) 1442 must be completed by the bidder and duly executed with an original signature by the official(s) identified in the bid price cover sheet as authorized to bind the bidder in accordance with FAR 4.102, which includes specific instructions pertaining to individuals, partnerships, corporations, Joint Venture participants, and agents. Include the bidder’s DUNS number in block 14 of the SF 1442, along with the bidder’s address. All amendments must be acknowledged in accordance with the instructions on the Standard Form 30, Amendment. If the bidder is a Joint Venture (JV), include a copy of the JV agreement and indicate its status. (Note: It is preferred, but not required, that you use a document protector in lieu of punching holes in the original SF 1442.)

Tab 3: Bid Schedule: Submit the completed Bid Schedule (Section 00 10 00) with the bidder’s proposed contract prices inserted in the appropriate spaces. Prices must be proposed for all contract line items. Unit prices must be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off the extended prices to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission. Any qualification of pricing may render the bid unacceptable and therefore not eligible for award.

(Note: It is preferred, but not required, that you use document protectors in lieu of punching holes in the completed “original” pricing schedule) Tab 4: Representations, Certifications, and Other Statements of Bidders

Your completed Representations, Certifications, and Other Statements of Bidders/Offerors. The offeror must have electronically completed the annual representations and certifications on the “System for Award Management” (SAM) website in accordance with FAR 52.204-8. The offeror is responsible for ensuring that these on-line Representations and Certifications are updated as necessary to reflect changes at least annually to ensure that they are kept current, accurate and complete. In addition, the offeror must also complete and return the “Representations, Certifications, and Other Statements of Offerors” included in Section 00 45 00 of the solicitation. If the offeror is a Joint Venture, all participants must separately complete both the ORCA Representations and Certifications and Section 00 45 00.

Tab 5: Bid Guarantee: All bidders must submit a bid guarantee, (e.g., Standard Form 24, Bid Bond) which complies with the requirements of FAR 28.101 Bid Guarantees, and any Defense and Army supplements thereto.

Tab 6: Pre-Award Survey Information

a. The contracting officer is required to make an affirmative pre-award determination of the prospective contractor’s responsibility in accordance with the mandatory requirements of Part 9 of the Federal Acquisition Regulation (FAR) and its supplements. The contracting officer must have sufficient information available to determine that a prospective contractor meets these minimum standards.

(1) Construction Contractor Data Form with Supplemental Schedules A-C (see format which follows). If the bidder is a large multi-segmented business concerns, the data provided on the supplemental schedules may be limited to information that directly pertains to the specific segment of the business concern (i.e., the division, group, unit, etc.) proposed to perform work under the prospective contract with its own work force. If the bid is being submitted by a Joint Venture, submit a separate form for each Joint Venture participant. The bidder may submit pre-award survey information in another format, provided that the information furnished is substantially the same as that which would be furnished on the Construction Contractor Data Form and its supplemental schedules.

(2) Current financial statements. If the financial statement is more than 60 days old, submit a certificate stating that the firm's financial condition is substantially the same, or, if not the same, state the changes that have taken place. If a Joint Venture, provide this information for each participant in the Joint Venture.

(3) Banking information. Provide letters from banks or other financial institutions with which the contractor conducts business. The letters should contain information about your firm's accounts, loans, lines of credit, etc. The Government is interested in financial stability, timely payments, the length and nature of the relationship between the firm and the financial institution, and the firm's financial ability to perform the contract. The letters should also provide the name and telephone number of the bank representative the Government may contact. If a Joint Venture, provide this information for each Joint Venture participant.

b. The Government will treat the pre-award survey information submitted by the bidder as proprietary.

(Tab 6: Pre-Award Survey Information)

CONSTRUCTION CONTRACTOR DATA DATE:

Firm Name and Telephone Number Main Office Address (Street, City, and State)

Branch Offices Services Rendered Construction Design Consultant

Organization Individual Joint Venture Partnership Corporation

Date Organized Date Incorporated:

State:

Names of Officers and Other Key Personnel

CONSTRUCTION CONTRACTOR DATA – SCHEDULE A – EXISTING COMMITMENTS

List below the construction projects your firm currently has under way, including recent awards. Also list construction projects for which your firm is the apparent successful offeror/bidder, but for which a contract has not yet been awarded.

CONTRACT

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

COMPLETE

I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below) Partners:

Officers:

Other Key:

Remainder: Subtotal Permanent:

Maximum Personnel at Any Time:

Date:

Total:

II—EQUIPMENT OWNED III—FINANCIAL DATA AS OF

(DATE): Present Value ($) Current Assets:

Acquisition Cost ($) Current Liabilities:

Net Worth:

IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION

WORK IN PAST 6 YRS EXCLUSIVE OF JOINT VENTURE

(LIST MOST RECENT FIRST)

V—LARGEST JOB EVER

CONTRACTED

(If Other Than in Past Six Years)

$ LARGEST JOB IN PAST 6 YRS Contract Amount:

Date:

Description:

Owner:

$ Contract Amount:

Date:

Description:

Owner:

Avg. Annual Income

VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES

NAME AND POSITION/TITLE OF PERSON SIGNING

SIGNATURE

See attachment for explanations or detailed description of item(s) reported above.

CONSTRUCTION CONTRACTOR DATA – SCHEDULE B – COMPLETED PROJECTS

List below the principal construction projects your firm has completed within the past six years, including all DoD contracts.

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

SUBLET

CONSTRUCTION CONTRACTOR DATA – SCHEDULE C –

CONSTRUCTION AND/OR TECHNICAL EQUIPMENT

List total equipment and facilities owned for performing the prospective contract and present status as to whether or not it is currently committed to existing contracts.

QUANTITY

DESCRIPTION

CONDITION

YEARS OF

SERVICE

PRESENT

STATUS

Tab 7: Special Standards of Responsibility

In accordance with FAR 9.104-2, Special Standards of Contractor Responsibility, please include with your bid evidence (by filling in the form below titled “Special Standards Contract Evidence”) that supports the following experience:

a. A project that included placing a temporary bypass for an active utility (sewage, storm water, etc), removing and replacing the pipe through the levee embankment;

b. Successfully erformed Construction of at least two deep mix method (DMM) 9.104(e) cutoff wall for seepage control using the method proposed for this project with recommended minimum dimensions of 500 feet long, 75 feet deep, and 24 inches wide completed after 1 January 2012. For the purposes of this question, DMM is defined as in situ soil mixing methods classified as: Wet Rotary Shaft (WRS), Wet Rotary End (WRE), Wet Rotary and Jet End (WJE) or Wet Vertical Panel (WVP), as described in the Federal Highway Administration manual Deep Mixing for Embankment and Foundation Support; and

c. Earthwork: TWO successfully completed projects that included placing at least 50,000 cubic yards of engineered fill for flood control levees, earth dams, or earthen embankments for water retention or conveyance, completed since 1 January 2012.

* Please provide supplementary information to fulfil the requirements above as well as filling out the table below.

Special Standards Contract Evidence

CONTRACT/PROJECT

NUMBER

CONTRACT AMOUNT DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

Rating at

COMPLETE

Tab 8: Small Business Participation Proposal/Subcontracting Plan:

Small Business Subcontracting Plan is required (FAR 52.219-9 (Deviation 2018-O0018)).

Other than U.S. Small Business Offerors must also submit a subcontracting plan with the bid meeting the requirements of FAR 52.219-9 ALT 1 and DFARS 252.219-7003 (or DFARS 252.219-7004). Other than U.S. Small Businesses must submit acceptable subcontracting plans to be eligible for award.

FAR 19.702 provides: Any contractor receiving a contract with a value greater than the simplified acquisition threshold must agree in the contract that small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns will have the maximum practicable opportunity to participate in contract performance consistent with its efficient performance. It is further the policy of the United States that its prime contractors establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts with small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns.

FAR 19.702(a)(2) provides: In sealed bidding acquisitions, each invitation for bids to perform a contract that is expected to exceed $700,000 ($1.5 million for construction) and that has subcontracting possibilities, shall require the bidder selected for award to submit a subcontracting plan. If the selected bidder fails to submit a plan within the time limit prescribed by the contracting officer, the bidder will be ineligible for award.

As such, the apparent low bidder, as identified at the bid opening (See SF1442 Block 13.A. for date and time), shall provide a subcontracting plan within three calendar days from the bid opening.

Regarding evaluation of subcontracting plans, see FAR 17.705-4(b). Each bidder's plan must cover each of the 15 required elements (see 19.704). If the bidder does not submit a plan that incorporates the required elements within the time allotted, the bidder shall be ineligible for award. If the plan, although responsive, evidences the bidder’s intention not to comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the contracting officer may find the bidder non-responsible.

Questions on the Subcontracting Plan requirements or the Electronic Subcontracting Reporting System (eSRS) requirements as required by FAR 52.219-9, shall be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

The Corps of Engineers highly encourages all bidders/offerors to meet the recommended subcontracting goals as follows:

Small Businesses: 23%

The recommended breakdown to support the various small business subcategories is as follows:

Small Disadvantaged Businesses: 6%

Women-Owned Small Businesses: 3% HUBZone Small Business: 4% Veteran-Owned Small Business: 8% Service Disabled Veteran Owned: 2%

The goals are calculated as a percentage of the TOTAL SUBCONTRACTING DOLLARS, NOT THE TOTAL

CONTRACT AMOUNT.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following Acceptance/Inspection Schedule was added for CLIN 1002:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

(End of Summary of Changes)