2019_0909_Bid_Schedule.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Marysville Ring Levee Repair Phase 2C
- Solicitation number
- W9123819B0021
About this file
Amendment 2 to solicitation: New Pricing Schedule Items, updated Specification section: Payment and Measurements, and extend the solicitation due date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PricingSchedule
| Item Number | DESCRIPTION | EST QTY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE | |||
| 0001 | MOBILIZATION AND DEMOBILIZATION | 1 | JOB | $ | ||||
| 0002 | STORM WATER POLLUTION PREVENTION PLAN | 1 | JOB | $ | ||||
| 0003 | PRE-AND-POST CONSTRUCTION SURVEY | 1 | JOB | $ | ||||
| 0004 | CLEARING AND GRUBBING | 1 | JOB | $ | ||||
| 0005 | TOPSOIL STRIPPING | 7,200 | * | SQUARE YARD | $ | |||
| 0006 | TRAFFIC CONTROL | 1 | JOB | $ | ||||
| 0007 | SAWCUT PAVEMENT | 64 | * | LF | $ | |||
| 0008 | DEMOLITION | 1 | JOB | $ | ||||
| 0009 | LEVEE EXCAVATION (DEGRADE) | 16,000 | * | CY | $ | |||
| 0010 | CUTOFF WALL CONSTRUCTION | 87,000 | * | SQUARE FEET | $ | |||
| 0011 | LEVEE EMBANKMENT ( FILL MATERIAL) | 13,000 | * | CY | $ | |||
| 0012 | LEVEE EMBANKMENT (IMPERVIOUS FILL) | 3,000 | * | CY | $ | |||
| 0013 | 6" AGGREGATE SURFACE COURSE ( LEVEE CROWN) | 225 | * | TON | $ | S | ||
| 0014 | 6" AGGREGATE BASE (PAVED LEVEE CROWN) | 130 | * | TON | $ | |||
| 0015 | ASPHALTIC CONCRETE (PAVED LEVEE CROWN) | 177 | * | TON | $ | |||
| 0016 | TEMPORARY WWTP BYPASS AND INCIDENTAL WORK | 1 | JOB | $ | ||||
| 0017 | PERMANENT PRESSURIZED 18-INCH SEWER PIPE AND INCIDENTAL WORK | 1 | JOB | $ | ||||
| 0018 | 6-INCH AGGREGATE BASE (AB), BIZ JOHNSON DRIVE | 704 | * | TON | $ | |||
| 0019 | ASPHALTIC CONCRETE PAVEMENT (AC), BIZ JOHNSON DR. | 407 | * | TON | $ | |||
| 0020 | ASPHALTIC CONCRETE (AC) DIKE | 400 | LF | $ | ||||
| 0021 | REMOVE AND REINSTALL EXISTING CALTRANS A77L1 GUARDRAIL AND SUPPORTS TO THE EXTENT POSSIBLE | 1 | JOB | $ | ||||
| 0022 | REMOVE AND REINSTALL 2(E) PIPE-GATES AND BOLLARDS AND CONSTRUCT 1 NEW PIPE-GATE AND BOLLARDS | 1 | JOB | $ | ||||
| 0023 | ; | 1 | JOB | $ | ||||
| 0024 | PAVEMENT STRIPING | 1 | JOB | $ | ||||
| 0025 | PERMANENT EROSION CONTROL SEEDING (PROJECT SITE) | 1 | JOB | $ | ||||
| 0026 | CHAIN LINK FENCE AND STREET-END-BARRICADE | 1 | JOB | $ | ||||
| 0027 | TEMPORARY CONSTRUCTION FENCE AND RAIL | 1 | JOB | $ | ||||
| 0028 | EXCAVATION (30" NON -ACTIVE SEWER PIPE) | 178 | * | CY | $ | |||
| 0029 | EXCAVATION (12" ACTIVE HDPE PIPE) | 1,300 | * | JOB | $ | |||
| 0030 | EXCAVATION (24" NON-ACTIVE SEWER PIPE) | 32 | * | JOB | $ | |||
| 0031 | PAVEMENT MARKERS | 1 | JOB | $ | ||||
| OPTION ITEM (PRICE REQUIRED) | ||||||||
| 1001 | IMPORTED IMPERVIOUS LEVEE FILL | 3,000 | * | CY | $ | |||
| 1002 | CONSTRUCTION STANDBY | 30 | * | DAY | $ |
TOTAL PRICE ($)
* Quantity is an estimated amount.