About this file
Final Revised Pricing Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract.pdf | ||
| W9123819B0021.0002.pdf | ||
| Amendment_3.pdf | ||
| Updates_Specs.Amend3.pdf | ||
| W9123819B0021.0001.pdf | ||
| W9123819B0021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT: MARYSVILLE RING LEVEE ‐ PHASE 2C
TABLE: QUANTITIES FOR CONSTRUCTION
CONSTRUCTION METHOD: Deep Mix Method
DESIGN: FINAL
DATE: September 12, 2019
See Specification Section 01 22 00 "Measurement and Payment" for Description Details
LINE ITEM
NO.
DESCRIPTION
ESTIMATED
QUANTITY
UNIT OF
MEASURE
UNIT PRICE TOTAL PRICE
0001 MOBILIZATION AND DEMOBILIZATION 1 JOB $ $
0002 STORM WATER POLLUTION PREVENTION PLAN 1 JOB $ $
0003 PRE‐AND‐POST CONSTRUCTION SURVEY 1 JOB $ $
0004 CLEARING AND GRUBBING 1 JOB $ $
0005 TOPSOIL STRIPPING 7,200 * SQUARE YARD $ $
0006 TRAFFIC CONTROL 1 JOB $ $
0007 SAWCUT PAVEMENT 64 * LF $ $
0008 DEMOLITION 1 JOB $ $
0009 LEVEE EXCAVATION (DEGRADE) 16,000 * CY $ $
0010 CUTOFF WALL CONSTRUCTION 87,000 * SQUARE FEET $ $
0011 LEVEE EMBANKMENT ( FILL MATERIAL) 13,000 * CY $ $
0012 LEVEE EMBANKMENT (IMPERVIOUS FILL) 3,000 * CY $ $
0013 6" AGGREGATE SURFACE COURSE ( LEVEE CROWN) 225 * TON $ $
0014 6" AGGREGATE BASE (PAVED LEVEE CROWN) 130 * TON $ $
0015 ASPHALTIC CONCRETE (PAVED LEVEE CROWN) 177 * TON $ $
0016 TEMPORARY WWTP BYPASS AND INCIDENTAL WORK 1 JOB $ $
PERMANENT PRESSURIZED 18‐INCH SEWER PIPE AND
INCIDENTAL WORK
1 JOB $ $
0018 6‐INCH AGGREGATE BASE (AB), BIZ JOHNSON DRIVE 704 * TON $ $
0019 ASPHALTIC CONCRETE PAVEMENT (AC), BIZ JOHNSON DR. 407 * TON $ $
0020 ASPHALTIC CONCRETE (AC) DIKE 400 * LF $ $
LINE ITEM
NO.
DESCRIPTION
ESTIMATED
QUANTITY
UNIT OF
MEASURE
UNIT PRICE TOTAL PRICE
REMOVE AND REINSTALL EXISTING CALTRANS A77L1
GUARDRAIL AND SUPPORTS TO THE EXTENT POSSIBLE
1 JOB $ $
REMOVE AND REINSTALL 2(E) PIPE‐GATES AND BOLLARDS
AND CONSTRUCT 1 NEW PIPE‐GATE AND BOLLARDS
1 JOB $ $
0023 REMOVE AND REINSTALL SIGNAGES 1 JOB $ $
0024 PAVEMENT STRIPING 1 JOB $ $
0025 PERMANENT EROSION CONTROL SEEDING (PROJECT SITE) 1 JOB $ $
0026 CHAIN LINK FENCE AND STREET‐END‐BARRICADE 1 JOB $ $
0027 TEMPORARY CONSTRUCTION FENCE AND RAIL 1 JOB $ $
EXCAVATION, REMOVE PIPE, AND BACKFILL (30" NON ‐
ACTIVE SEWER PIPE)
1 JOB $ $
EXCAVATION , REMOVE PIPE, AND BACKFILL (12" ACTIVE
HDPE PIPE)
1 JOB $ $
EXCAVATION,, REMOVE PIPE, AND BACKFILL (24" NON‐
ACTIVE SEWER PIPE)
1 JOB $ $
0031 PAVEMENT MARKERS 1 JOB $ $
0032 REMOVE AND RE‐USE EXISTING ROCK SLOPE PROTECTION 1,300 * CY $ $
EXCAVATION, REMOVE PIPE, AND BACKFILL (8" NON ‐ACTIVE
STORM WATER PIPE)
1 JOB $ $
EXCAVATION , REMOVE PIPELINE PORTION, AND REPLACE
(30" STEEL ACTIVE STORM WATER PIPE)
1 JOB $ $
OPTION ITEM (PRICE REQUIRED)
1001 IMPORTED IMPERVIOUS LEVEE FILL 3,000 * CY $ $
1002 CONSTRUCTION STANDBY 30 * DAY $ $
TOTAL PRICE ($)
* Quantity is an estimated amount.
File details come from the government source that posted it.