2019_0621_Presolicitation_Notice.docx
DOCX document 3 MB Posted
- Attached to
- Marysville Ring Levee Repair Phase 2C
- Solicitation number
- W9123819B0021
About this file
Pre-solicitation notice including maps
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W0123810B0021_Marysville_2C_Amendment.pdf | ||
| Crosswalk.docx | DOCX document | |
| W0123819B0021_Marysville_2C.pdf | ||
| 2019_0806_Wage_Determination.pdf | ||
| Crosswalk.docx | DOCX document | |
| W0123810B0021_Marysville_2C.pdf | ||
| 2019_0806_Wage_Determination.pdf | ||
| Crosswalk.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Marysville Ring Levee (MRL) Phase 2C Construction Project
The government anticipates issuing an Invitation for Bid (IFB) with the intent of awarding one Firm-Fixed Price construction contract for the Marysville Ring Levee Phase 2C Construction Project.
PROJECT DESCRIPTION
The Marysville Ring Levee (MRL) Phase 2C project is located in Yuba County CA, on the right bank of the Yuba River, in the city of Marysville. The project consists of degrading a section of the levee, constructing an approximately 90 foot deep cutoff wall using the Deep Mix Method, and reconstructing the degraded levee section.
Construction must be completed within one construction season (15 Apr 2020 to 31 Oct 2020). The cutoff wall will be constructed at the center line of the levee. One end of the wall is adjacent to an active railroad and the other end is adjacent to State Highway 70. Approximately 6 to 8 feet of levee section material will be degraded (approx. 13,500 Cubic Yards (CY) to provide a platform for construction of the cutoff wall. The levee will be reconstruction using levee embankment (fill material) (approx. 17,000 CY) and levee embankment (clay cap) approximately (2,000 CY). An existing shallow cutoff wall, which is approximately 350 feet long (Station 237+00 to Station 240+50) will also need to be degraded to the construction platform and the new cutoff wall will be constructed parallel to the existing wall.
The cutoff wall must be soil-cement-bentonite (SCB) constructed using in-situ soil mixing methods classified as either: Wet Rotary Shaft (WRS), Wet Rotary End (WRE), Wet Rotary and Jet End (WJE), or Wet Vertical Panel (WVP); as described in the Federal Highway Administration Design Manual: Deep Mixing For Embankment and Foundation Support. Methods that do not use mechanical soil cutting or mixing are NOT acceptable. The cutoff wall minimum width is 2 feet and the cutoff wall length is approximately 1,100 feet. The cutoff wall will require a demonstration section to be constructed and approved before construction of the production wall can begin. The cutoff wall depth will vary up to 90 feet and the construction equipment must be capable of constructing the cutoff wall 20 feet deeper than the maximum depth shown on the drawings. The total square footage of the cutoff wall is approximately 91,000 ft2.
The in-situ soil mixing must produce an incompressible, relatively low-strength, low- permeability, continuous seepage cutoff wall with an appropriate overlap between elements and/or headings to ensure continuity to full depth. The cutoff wall must consist of either a series of overlapping SCB elements formed underground, through and beneath the levee, or by a full-depth horizontal advancement. The permeability must be less than 5 x 10^-7 centimeters per second (cm/sec) with the strength of the cutoff wall between 50 and 300 pounds per square inch (psi).
The total amount of excavation for the levee degrade is approximately 13,500 CY, 17,000 CY will be used as levee fill material, and 2,000 CY will be used as clay cap. The embankment will be reconstructed and erosion control measures must be provided in disturbed areas.
| - | - |
| -· | - |
.Y'
| , | , | --1 | - |
| 0 | ..,-_ | - |
EDR ALIGNMENT
OOTPRINT _ : -:- EDRA LGI NMENT
- PHASE 2C PROJ
PHASE 2A PR ECTFOOTf RI HJ I N .-'.'f- .#k STAGINGA OJ ECH OO TRRi NT
•• • • • • • HAUL.,ROU,.R.T.,E!A
VCHICL e-o i ro u ' ••1 ja I l.:SIKE TRA IL D -rt ia1-i-.1•,1111n,i UNI ON eACIFIC RAILROAD ETOU JLi
... -P-ttA-H-2C-:----- PHASE 2C PltOJECT FOOTPltlNT 2
ION PACIFIC
ADDITIONAL INFORMATION
· As stated in paragraph one of the Project Description above, the contractor must finish within one construction season (15 Apr 2020 to 31 Oct 2020). There are two active construction projects in the same vicinity and will need coordination on all construction schedules and overlaps.
· Marysville Project is seeking the following specialized expertise for the 2C Construction Contract for award by approximately 30 September 2019.
· Levee is within Union Pacific Railroad (UPRR) right-of-way and will require contractors and employee to take UPRR training.
· Biz Johnson road will be closed during construction but contractor will still be required to provide flaggers for Bridge Contractor (5th Street Bridge) to enter/exit project for equipment.
In accordance with FAR 36.204(g), the estimated value of the resulting contract is expected to be between $5,000,000 and $10,000,000.
NAICS Code: 237990– Other Heavy and Civil Engineering Construction Classification Code: Y– Construction of Structures and Facilities The small business size standard is $36.5 million, and the Product Service Code is Y1LC Construction of Tunnels and Subsurface Structures.
The IFB is estimated to be issued in early to mid-July 2019 with bids due approximately 30 calendar days later. The IFB will be issued on FBO.gov.
The site visit date and location will be identified in the solicitation.
PLEASE BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTATION AND/OR FINAL AWARD PROCESS.
The Government will notify prequalified contractors via email of any changes to this notice.
image6.png image7.png image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg
File details come from the government source that posted it.