A07.02_-_Amendment_W91239-19-B-0008-0001.pdf

PDF 135 KB Posted

Attached to
Repair Roofs B231, 232, 241, and 246 at DDJC Tracy, CA
Solicitation number
W91238-19-B-0008
Issued by

About this file

Solicitation Amendment 0001

View the file

Other files

File Type Posted
B01.01_-_Abstract_of_Offers_at_Bid_Opening_W91238-19-B-0008_14_May_19.pdf PDF
B01.01_-_Abstract_Continuation_Sheet_1.pdf PDF
A07.02_-_IFB_-_Atch_13_Appendix_05__As-Built_Building_231.pdf PDF
A07.02_-_Amendment_W91238-19-B-0008-0003.pdf PDF
A07.02_-_IFB_-_Atch_12_Appendix_04__Lab_Test_Results_B231,_B232,_B246.pdf PDF
A07.02_-_IFB_-_20190426_REV_-_Atch_10_Appendix_03_-_Specifications_for_R....pdf PDF
A07.02_-_IFB_-_20190426_REV_-_Atch_01_SOW_Repair_Replace_Roofs,_Bldgs.__....pdf PDF
A07.02_-_W91238-19-B-0008_Amendment_0002.pdf PDF
A07.02_-_IFB_-_Atch_11_Site_Visit_Badge_Request.xlsx XLSX spreadsheet
A07.01_-_IFB_-_Atch_10_Appendix_03_-_Specifications_for_Repair_Replace_Roofs,_Bldgs.__231,_232,....pdf PDF
A07.01_-_IFB_-_Atch_09_Appendix_02_-_Environmental_Checklist.pdf PDF
A07.01_-_IFB_-_Atch_08_Appendix_1d_-_Drawings_Roof_Buildings_246.pdf PDF
A07.01_-_IFB_-_Atch_04_Contract_Acknowlegement_21_Dec_18.pdf PDF
A07.01_-_IFB_-_Atch_07_Appendix_1c_-_Drawings_Roof_Buildings_241.pdf PDF
A07.01_-_IFB_-_Atch_02_Supplemental_Contract_Requirements_21_Dec_18.pdf PDF
A07.01_-_IFB_-_Atch_06_Appendix_1b_-_Drawings_Roof_Buildings_232.pdf PDF
A07.01_-_IFB_-_Atch_03_Davis_Bacon_Wage_Determination_7_Dec_18.pdf PDF
A07.01_-_Solicitation_W91238-19-B-0008.pdf PDF
A07.01_-_IFB_-_Atch_05_Appendix_1a_-_Drawings_Roof_Buildings_231.pdf PDF
A07.01_-_IFB_-_Atch_01_SOW_Repair_Replace_Roofs,_Bldgs.__231,_232,_241,_246_-_27_Mar_19.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to issue New Attachment 11 Site Visit Access Request Form. Interested parties must submit the completed no later than form 72 hours in advance of the 11 Apr 19 site visit IAW Revised Provision FAR 52.326-27 Site Visit (Construction) - Alternate I incorporated herein. Submit completed form via email to both the Contracting Officer's Representative Ms Cynthia Baksys, Cynthia.Baksys@usace.army.mil, and also the Contract Administrator How ard Gregory, how ard.gregory@usace.army.mil. All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Apr-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123819B0008

X 9B. DATED (SEE ITEM 11)

29-Mar-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Apr-2019

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123819B0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Statement of Work 10 27-MAR-2019 Attachment 10 Appendix 3 Project

Specifications

420 03-OCT-2018

Attachment 2 Supplemental Contract Requirements

1 21-DEC-2018

Attachment 3 Davis Bacon Wage Determination

80 07-DEC-2018

Attachment 4 Contract Acknowledgement

2 21-DEC-2018

Attachment 5 Appendix 1a Drawings Building 231

2 22-OCT-2018

Attachment 6 Appendix 1b Drawings Building 232

2 22-OCT-2018

Attachment 7 Appendix 1c Drawings Building 241

1 22-OCT-2018

Attachment 8 Appendix 1d Drawings Building 246

2 22-OCT-2018

Attachment 9 Appendix 2 Environmental Checklist

3 03-OCT-2018

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Statement of Work 10 27-MAR-2019 Attachment 10 Appendix 3 Project

Specifications

420 03-OCT-2018

Attachment 11 Site Visit Access Form 1 03-APR-2019 Attachment 2 Supplemental Contract

Requirements

1 21-DEC-2018

Attachment 3 Davis Bacon Wage Determination

80 07-DEC-2018

Attachment 4 Contract Acknowledgement

2 21-DEC-2018

Attachment 5 Appendix 1a Drawings Building 231

2 22-OCT-2018

Attachment 6 Appendix 1b Drawings Building 232

2 22-OCT-2018

Attachment 7 Appendix 1c Drawings Building 241

1 22-OCT-2018

W9123819B0008

Attachment 8 Appendix 1d Drawings Building 246

2 22-OCT-2018

Attachment 9 Appendix 2 Environmental Checklist

3 03-OCT-2018

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- Thursday, 11 Apr 2019, 10:00am PST

Site Visit Attendees must submit a completed solicitation Attachment 11 Base Access Request no later than 72 hours prior to the site visit date and time. Submit forms via email to: Cynthia.Baksys@usace.army.mil, with howard.gregory@usace.army.mil on cc:

(c) Participants will meet at--

Defense Depot San Joaquin Tracy Depot, Bldg 29 (Main Gate) 25600 Chrisman Road Tracy, CA 95304

(End of provision)

(End of Summary of Changes)