A07.6_Region_5_Solicitation_ammendment_1.pdf
PDF 412 KB Posted
- Attached to
- Amendment to Region 5 FIS solicitation
- Solicitation number
- W9123818R0070
About this file
Amendment to Solicitation for Region 5 FIS pertaining to evaluation critera.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A07.6_Region_5_Solicitation_amendment_2.pdf | ||
| A04.11_Wage_Determinations.docx | DOCX document | |
| A01.12_Revisedd_ELINs_J-0200000-07_FIS_Region_5_1_Jun_2018.xlsx | XLSX spreadsheet | |
| A07.6_W9123818R00709_Posted_Solicitation.pdf | ||
| A01.12_63d_RD_DPW_Operations_Area_Map_FY18_2018.pdf | ||
| A01.12_63RD_REGION5FIS_FINALPWS_2MAY2018.pdf | ||
| A01.12_Revised_ELINS_J-1800000_Environmental_Reg_5_1_Jun_2017.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to modify/amend the evlauation critera for the subject solicitation, found in section M.
Throughout the documents, the term RSC should be 63D Readiness Division.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123818R0070
X 9B. DATED (SEE ITEM 11)
15-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jun-2018
CODE
ENVIRONMENTAL ENGINEERING SECTION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123818R0070
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide Facility Investment services in the Region 5 locations outlined and described in the associated Performance Work Statement (PWS) dated .This CLIN will include the offeror’s proposed Coefficient amount indicated within the ELIN bid sheet (see attached Excel file).
This proposed Coefficient amount will aid in the price evaluation for this solicitation. The proposed Coefficient amount will be applied to all future negotiated Task Orders stemming from award.The Indefinite Quantity Capacity is $9,600,000.00. FOB: Destination
To:
The Contractor shall furnish all labor, supervision, management, tools,materials, equipment, facilities, transportation, incidental engineering,and other items necessary to provide Facility Investment services in theRegion 5 locations outlined and described in the associated Performance Work Statement (PWS).The contractor will have 30 days after date of award to provide all permits,licenses, accident prevention plans, quality management plans, qualitycontrol plans, etc as required by the PWS to successfully start in alllocations designated in the region at the end of the start-up submittalperiod.This CLIN will include the offeror's proposed Coefficient amount indicatedwithin the ELIN bid sheet (see attached Excel file). This proposedCoefficient amount will aid in the price evaluation for this solicitation.The proposed Coefficient amount will be applied to all future negotiatedTask Orders stemming from award.For Service Calls, the government will develop the total evaluated price forprice evaluation purposes only, by multiplying the proposed labor rate by anestimated 1,000 hours and applying the co-efficient to the total $400,000 inthe total amount. These two totals will be combined to evaluate the pricefor service calls. This process will be used for price evaluation only.However, the total service calls will not exceed $400,000 once awardedunless that amount is modified after award by a contracting officer.The Indefinite Quantity Capacity is $9,600,000.00. FOB: Destination
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
ADDITIONAL INSTRUCTIONS TO OFFERORS (SOLICITATION/REQUEST FOR
PROPOSAL -RFP)
PROPOSAL SUBMISSION – INSTRUCTIONS TO OFFERORS
1. INTRODUCTION
Submit the original and one (1) complete copy of the proposal on Compact Disk (CD) using a searchable “PDF” file format. Each volume must be a separate and searchable PDF file.
The Proposal shall provide the Government address and receipt date (USACE provides this) for proposal submittal.
The offeror’s proposal shall consist of four (4) volumes. The Volumes are: I-Technical; II- Cost/Price; III-Past Performance; and IV- Solicitation, Offer and Award Documents and Certifications/Representations. Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.
Offerors are cautioned that “parroting” of the Technical Requirements or the PWS with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
2. PROPOSAL SUBMISSION REQUIREMENTS
a. Any document pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated.
b. Page formatting should be single spaced. Each paragraph shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.
NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.
*Manpower charts and the small business subcontracting plan are excluded from the page count.
3. PROPOSAL FILES
a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and Solicitation number in the header and/or footer. A Table of Contents should be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right – 1” Gutter – 0” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”
b. The following additional requirements apply:
Files shall be in read-only format, using PDF files. All price breakdown information to aide in the cost/price evaluation shall be submitted in Microsoft Office Excel Read/Write format and viewable in Microsoft Excel 2007 or later version. Each disk shall be externally labeled with Solicitation Number, Date, and the Offeror’s name.
c. Facsimile bids/offers, modifications thereto, or cancellations of bids/offers will NOT be accepted through this means.
d. Content Requirement
All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked.
The following shall be included in the Narrative discussion:
Volume I – Technical (non-price). The volume shall be organized into the following sections:
Section A – Factor 1 - Corporate Relevant Experience. Include completed CORPORATE RELEVANT SPECIALIZED EXPERIENCE DATA SHEETS in addition to your proposal information. A sample sheet is provided in this Section (See Appendix 2).
Section B- Factor 2 - Understanding of the Work. Include a brief narrative (See requirements in Section M, Factor 2, Understanding of Work), in addition to your proposal information.
Volume II – Price. This volume shall consist of all information, required to support proposed prices. Certified cost and pricing data are not currently required; however, the Government reserves the right to request such data prior to award. The information submitted in this volume shall comply with FAR 15.408, Table 15-2, and the requirements set forth below. There are no page limitations for this volume.
Section A - Completed copy of the Proposal Data sheet (Appendix 1), copy of completed Standard Form (SF 1449), using a printed copy of the SF1449 included in this solicitation for the contract.
Section B - Exhibit Line Items (ELINs): ELINs spreadsheet posted with the solicitation shall be completed by the Offeror & submitted in MS Excel Format. The completed ELINs will constitute Offeror’s proposed prices for the services corresponding to the PWS. Upon contract award, a price schedule in contract section B will be created using the completed ELINs from the successful Offeror.
Volume III – Past Performance. This volume shall consist of completed Past Performance Evaluation Questionnaire Forms in addition to your proposal information. A sample Past Performance Evaluation Questionnaire Form is provided in this Section (See Appendix 3).
4. DISCUSSIONS
a. GENERAL INFORMATION. In accordance with FAR 15.306(d), discussion sessions with each offeror may be held. Should discussions take place, all offerors in the competitive range will be allowed a minimum of 14 calendar days to submit Final Proposal Revisions.
b. DISCUSSION SCHEDULING. If discussions are conducted, the Contracting Officer will schedule the discussion sessions, and each offeror will be notified of the time and place at least three (3) business days prior to their discussion session. The Contracting Officer will provide additional instructions with the notification.
APPENDICES (SECTION L)
APPENDIX 1: PROPOSAL DATA SHEET
1. NAME OF
OFFEROR. Name of Offeror(s):
If a joint venture or contractor-subcontractor association of firms, list the individual firms and briefly describe the nature of the association.
Firm 1:
Firm 2:
Nature of Association:
2. DUNS NUMBER FOR OFFEROR (If more than one DUNS number is to be considered, explain affiliation to Offeror)
3. CCASS INDENTIFICATION FOR OFFEROR
4. AUTHORIZED NEGOTIATORS. FAR 52.215-11
5. CAGE CODE:
6. Tax ID# The offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this Request for Proposals (RFP). List names, titles, and telephone number of the authorized negotiator.
Name of Person Authorized to Negotiate:
Negotiator's Address:
Negotiator's Telephone:
NOTE TO OFFERORS
This OFFEROR PERFORMANCE CAPABILITY PROPOSAL DATA SHEET must be completed and attached as the first page of the body of your proposal. The information required by this data sheet may be completed directly on this form or attached to the form as supplemental data sheets.
APPENDIX 2: CORPORATE RELEVANT SPECIALIZED EXPERIENCE DATA SHEET
FACTOR 1: CORPORATE RELEVANT SPECIALIZED EXPERIENCE.
On an attached sheet, provide information for substantially complete or completed projects within the last five years that are similar in terms of cost, complexity, design or features that have been perform by the Offeror to be used for reference and evaluation purposes. For each project provide the following information:
Project Title:
Location:
Award Date:
Contract number:
Nature of involvement in this project, i.e. General Contractor, subcontractor, designer:
Procuring activity:
Procurement point of contact and telephone number:
Performance period (month/year start to month/year end and # of years complete if underway):
Address of project:
Address and telephone number of owner:
Indicate type of project (private sector, Government, planned unit development, etc.):
General description of project (narrative):
How this project to relevant to the requirements of this solicitation, i.e., how this project performed Service Calls (routine and/or emergency); developed and implemented a Preventative Maintenance Program; provided Inspection, Testing and Certification services and/or performed IDIQ work to include facility repair, restoration and/or modernization work. (narrative):
Cost/Price Data (must clearly indicate yearly price information):
Initial Award / Year 2 / Year 3/ etc:
Modifications:
Total cost:
TERMINATED PROJECTS: Attach a list of any projects within the last three years that have been terminated. Provide an explanation, as well as a Point of Contact (Name, organization, email, phone number) for each terminated project.
APPENDIX 3: PAST PERFORMANCE ATTACHEMENTS
CONTRACT INFORMATION (Contractor to complete Blocks 1‐4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location: Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable): Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.
CLIENT INFORMATION (Client to complete Blocks 5‐8
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND
SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED
QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE
FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO
SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE
SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC
INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION
ON THIS FORM. Form PPQ‐0 (9/30/11)
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub‐element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub‐element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST
REFLECT YOUR EVALUATION OF THE CONTRACTOR’S
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub‐element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub‐element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub‐element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract
Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S
PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on‐site management, including management of subcontractors, suppliers, materials, and/or labor force?
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E
VG
S
M
U
N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
5. COST/FINANCIAL MANAGEMENT
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back‐up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes
No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
Please provide responses to the questions above (if applicable) and/or additional remarks.
Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
INSTRUCTIONS TO OFFERORS LOCAL
INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/OFFEROR
SUBMITTAL INFORMATION FOR OFFERORS (RFPS):
The following documents must be returned with your quote, bid, or offer.
--The completed Standard Form 33, duly executed with an original signature by an official authorized to bind the company. Ensure that the firm’s DUNS or DUNS+4 Number is entered in the block with its name and address.
--Your acknowledgement of any and all Amendments to the solicitation in accordance with the instructions on the Standard Form 30 Amendment.
Note: If the SF 33 and/or the pricing schedule were changed by amendment, be sure to use the amended pages when submitting your quote, bid, or offer.
--The completed ELIN Schedule with your proposed contract line item prices inserted in the appropriate spaces. Prices must be proposed for all Elin items. Unit prices are to be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off extended prices to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission.
--Your completed Representations, Certifications, and Other Statements of Bidders/Offeror’s (Section K).
INQUIRIES:
Prospective offerors should submit inquiries related to this solicitation in accordance with the following
(collect calls will not be accepted):
a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the QUICK ADD link. Select agency as USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click continue. Fill in all required information and click Add User.
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.
4. The Solicitation Number is: W9123818R0070 The Bidder Inquiry Key is: 6EA93B-7SNUVA
c. The Bidder Inquiry System will be unavailable for new inquiries 10 days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
g. The point of contact for this solicitation is:
Contract Specialist: Tilden Brooks Jr. Telephone: (916) 557‐7929 EMAIL:tilden.l.brooks@usace.army .mil
DIRECTIONS FOR SUBMITTING OFFERS:
Envelopes/packages containing offers must be sealed, marked and addressed as follows:
MARK ENVELOPES/PACKAGES:
Solicitation No. W9123818R0070
ADDRESS ENVELOPES/PACKAGES
TO:
Department of the Army U.S. Army Engineer District, Sacramento ATTN: Contracting Division 1325 J Street Sacramento CA 95814-2922
SPECIAL INSTRUCTION PERTAINING TO HAND-CARRIED OFFERS:
Hand-carried offers must be delivered to: The Building Lobby at 1325 J Street, Sacramento, CA.
Due to security precautions, offerors may no longer hand-carry their offers directly to Contracting Division.
Offers may NOT be turned-in at the Security Desk or left unattended elsewhere in the Lobby. Additionally, you are advised that there is no public parking in the Building.
The contract specialist will be in the Building Lobby 20 minutes prior to the closing time to accept hand-carried offers.
Offerors who desire to hand-deliver their offers at an earlier time must coordinate with the contract specialist in advance in order to arrange to be met in the Building Lobby by Contracting Division personnel.
Please ensure that all courier and delivery personnel are aware of these procedures.
CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY:
In order to determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work (see Section K - Attachments, Pre-award Survey). All offerors will complete and return the Preaward Survey as part of the Price/Cost proposal. Failure to submit the Pre-award Survey in conjunction with the price proposal will not of itself render the offer unacceptable.
Determination of Contractor Responsibility will be completed in accordance with FAR 9.104-1:
If the contractor or subcontractor does not already have sufficient resources demonstrated in the completed Pre-award Survey, acceptable evidence of "the ability to obtain" the required, adequate resources (all of the resources discussed in FAR 9.104-1) normally consists of a commitment or explicit arrangement that will be in existence at the time of contract award to rent, purchase or otherwise acquire the needed facilities, equipment, other resources, or personnel.
The Pre-award Survey as a tool used by the Government in determining responsibility of the offeror is submitted as part of the Price/Cost proposal and is separate from the technical proposal's response to the technical evaluation criteria found later in this section. Some of the information required from the offeror for completion of the Preaward Survey and the technical proposal may be duplicative but it is necessary that the information be provided in full in both places and that the Price/Cost proposal and the Technical proposal be separate documents. DO NOT state, for example, in the technical proposal, "See Price/Cost proposal for past performance information".
AVAILABILITY OF CORPS OF ENGINEERS PUBLICATIONS DESCRIPTIONS:
a. The internet URL for Corps of Engineers publications is:
http://www.publications.usace.army.mil/
FACSIMILE BIDS/OFFERS:
Facsimile bids/offers, modifications thereto, or cancellations of bids/offers will not be accepted.
ACCEPTANCE OF OFFERS:
A written award or acceptance of an offer mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.
System for Award Management (SAM) Registration:
It is a requirement that any and all contractors that intend to do business with the government must be registered in the System for Award Management (SAM) database. No contract may be awarded by the government to any contractor who is not registered in SAM. If your company is not registered in SAM, you must register in order to be eligible for any government award.
The following link provides access to the SAM website:
https://www.sam.gov/portal/public/SAM/
If you have difficulties with or questions regarding the SAM registration, the following link has been set up by the Defense Logistics Agency (DLA) to assist contractors registering for CAGE codes for enrollment and navigation within SAM:
https://www.logisticsinformationservice.dla.mil/CAGETier3/
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management JUL 2013 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004
CLAUSES INCORPORATED BY FULL TEXT
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Army Corps. Of Eng., Sacramento District ATTN: Brittaniya Poirier, RM 970 1325 J St.
Sacramento, CA 95814
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been added by full text:
EVALUATION FACTORS REVISED
EVALUATION FACTORS
A. BASIS FOR AWARD
The Government intends to award ONE (1) contract to a Small Business to the responsible offeror whose proposal(s) is determined to be most advantageous to the Government in accordance with the following relationship between price and technical merit:
The technical evaluation factors, when combined, are approximately greater than the cost or price.
The Government is concerned with striking the most advantageous balance between technical, quality and/or past performance features and cost to the Government.
B. FACTORS AND SUB-FACTORS TO BE EVALUATED
The Government will select the proposal that represents the best value to the Government by using the tradeoff process. This process permits tradeoffs among cost or price and non-price factors and allows the Government to accept other than the lowest priced proposal.
Concurrent with or upon completing the evaluation of all non-price proposals, the Contracting Officer will, in accordance with the provisions of this RFP and applicable acquisition regulations, evaluate price. In the event that discussions are determined necessary, the Contracting Officer will conduct discussions with Offeror’s determined to be within the competitive range. In determining the competitive range, the Government will include analysis of the non-price and price proposals of Offeror’s. Upon conclusion of discussions, the Contracting Officer will request final proposal revisions and may, upon receipt of final proposal revisions, proceed to award a contract without further discussions or notice.
The following evaluation factors will be used to evaluate each proposal:
NON-PRICE FACTORS: The purpose of the non-price factors is to assess whether the Offeror’s proposal will satisfy the Government’s minimum requirements. An unacceptable evaluation for any one of these factors will result in an overall unacceptable proposal
Factor 1: Corporate Relevant Experience Factor 2: Understanding of the Work Factor 3: Past Performance
RELATIVE WEIGHTING OF THE TECHNICAL EVALUATION FACTORS
The following Technical Evaluation Factors are listed in descending order of importance: Factor
1 – Corporate Relative Experience is weighted the same as Factor 2.
Factor 2 – Understanding of Work is weighted the same as Factor 1. Factor 3
– Past Performance is weighted less than both factors 1 and 2.
C. EVALUATION APPROACH
All proposals shall be subject to evaluation by the Source Selection Evaluation Board (SSEB).
NON PRICE FACTORS: Data provided in response to the non-price factors described below shall be included in Volume I, “Non-Price Proposal.” If the Offeror is a joint venture, the Offeror must provide evidence of a binding teaming agreement or other contractual agreement, which creates legal responsibility on the part of all contractors in the joint venture and submit evidence or confirm that the J.V. submitted its paperwork to its local Small Business Administration Office for this specific requirement. If the Offeror proposes to utilize a “key subcontractor” as described in FAR 9.6, it is Government policy to recognize the integrity and validity of contractor team arrangements. For a teaming arrangement to be recognized for purposes of source selection evaluation and the application of non-price factors, there must be full disclosure of the teaming arrangement and company relationships in the team's proposal. The proposal must include a narrative that explains the major or critical aspects of the work to be performed by each team member. The proposal must also include an agreement that has been or will be executed prior to award between/among all team members. The proposal and agreement must be consistent; substantive inconsistencies between the proposal and agreement may be construed against the offeror. In the case of prime-sub teams, the prime contractor remains fully responsible for contract performance, regardless of any team arrangement between the prime contractor and its subcontractors. However, consistent with FAR 9.104, the Government may consider the responsibility of subcontractor team members when it may adversely affect the prospective prime contractor’s responsibility or when it is in the Government’s interest to do so.
The team agreement submitted with the proposal will govern the performance of the work by the team.
The agreement must address the following items: identification of team members, a full delineation of roles and responsibilities of team members, and the duration of the agreement. In the case of Joint Ventures or other partnerships seeking award to the team as a prime contractor, the agreement must indicate the percentages of the participants, in particular the percent of the controlling party. In the case of a prime-sub team, the agreement must reflect that the prime contractor is vested with control and responsibility for the daily management of the work, and that it remains responsible for contract performance, including those items allocated to a subcontractor on the team. Contractor teams should not submit an agreement in their proposal that is subject to substantive revision because the agreement will be part of the evaluation process. The timely submission of the executed teaming agreement prior to award shall be a precondition to a finding of responsibility. In the case of prime-sub teams, any resulting subcontract(s) may not deviate from the substantive provisions of the teaming agreement.
Regardless of any provision to the contrary in a team or subcontract agreement, all members of a recognized team arrangement are bound to perform any resulting contract and options by means of the same team. There can be no substitution of subcontractor team members except that, in the case of a prime-sub team arrangement, the Government may (in its sole discretion and without any obligation whatsoever), at the request of the prime, permit the substitution of a subcontractor with equivalent or greater capability for a subcontractor on the identified team. The failure of the Offeror to perform with one or more subcontractors on a recognized team may be grounds for termination for default.
Note: Only a Contracting Officer can approve such a change after contract award.
For evaluation purposes, the definition of a relevant contract is as follows: A recent contract awarded to the Offeror (or in the case of an Offeror which is a JV, a contract awarded to either member of the JV) as the prime contractor:
a. completed no earlier than five calendar years before the closing date of the RFP Or
b. ongoing for at least one year before the closing date of
RFP.
In addition, a relevant contract must include the following:
c. Similar in size, scope, and complexity to the work per section 150200 paragraph 3 in this solicitation.
A contract value of no less than $1,000,000
Factor 1, Corporate Relevant Experience: Offers shall submit a minimum of three (3) relevant contracts, but no more than four (4). If there is a teaming arrangement, a minimum of 3 relevant contracts are required from the prime. The Offeror shall complete and provide a Corporate Relevant Specialized Experience Data Sheet for each relevant contract. The Corporate Relevant Specialized Experience Data Sheet shall not exceed 2 pages per contract and the font shall not be smaller than 10pt. The Government’s experience evaluation will include an assessment of whether the Offeror demonstrates the ability to accomplish the work specified under the RFP. This assessment will be based on consideration of all relevant facts and circumstances.
Blue Outstanding Quotation meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
Purple Good Quotation meets requirements and indicates a thorough approach and understanding of the requirements. Quotation contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Green Acceptable Quotation meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Quotation does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The quotation has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Red Unacceptable Quotation does not meet requirements and contains one or more deficiencies.
Quotation is un-awardable.
Factor 2, Understanding of the Work: Evaluators will determine whether the Offeror demonstrates an understanding of the complexity and magnitude of service requirements set forth in the performance objectives and standards of the Performance Work Statement.
The proposal submission for this factor shall include a narrative (conceptual work plan) that clearly demonstrates an understanding of requirements of the solicitation. The narrative shall address how the Offeror will perform Service Calls (routine, urgent, and emergency); develop, implement and maintain a Preventative Maintenance Program;
provide Inspection, Testing and Certification services and perform IDIQ work that includes facility repair, restoration and modernization work. The narrative shall also address each criterion below as it pertains to each service shown in Section 1502000 block 1.1 (HVAC, electrical, plumbing, miscellaneous mechanical work and associated operation and maintenance activities, etc.). This information can be in charts, tables, sketches and maps as necessary to make the work approach understandable. The narrative shall not exceed 77 pages.
(1) A thorough understanding of the current commercial standards, policies, procedures, and processes utilized in each of the service areas identified in the PWS.
(2) A thorough understanding of the interrelationships and interdependencies associated with each of the service areas identified in the PWS, as well as administering the contract as a whole.
(3) A thorough understanding of the difficulties, uncertainties and risks associated with each of the service areas identified in the PWS, as well as administering the contract as a whole.
(4) A logical performance approach for each of the service areas identified in the PWS, as well as administering the contract as a whole.
(5) Management & administration capabilities commensurate with the magnitude of the resulting contract.
(6) Appropriate types of resources required to perform the work and of their appropriate allocation to the work activities in multiple locations during weekdays, weekends, and holidays when applicable;
(7) Personnel and subcontractors necessary to perform the work to ensure their ability to inspect, repair, maintain, test, certify, and operate the equipment and systems required by the RFP.
(8) Ability to maintain the MAXIMO performance requirement as specified in Annex 0200000 2.6.4.
(9) Organizational Chart: The Offeror shall provide an organizational chart that identifies key personnel and individuals on the project team that show clear lines of authority, responsibility, and communication between corporate staff, key on-site staff, and subcontractor interface. The Offeror should propose a logical flow of authority and demonstrate how assigned responsibilities and experience of proposed on-site personnel for the multiple geographic sites will enhance operation of the project.
Blue Outstanding Quotation meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
Purple Good Quotation meets requirements and indicates a thorough approach and understanding of the requirements. Quotation contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Green Acceptable Quotation meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Quotation does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The quotation has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Red Unacceptable Quotation does not meet requirements and contains one or more deficiencies.
Quotation is un-awardable.
Factor 3, Past Performance: The Government’s past performance evaluation will include an assessment of past performance on relevant contracts (as defined above). The evaluators will assess whether the Offeror has obtained an overall satisfactory past performance rating on relevant contracts to demonstrate the ability of the Offeror to accomplish the work specified under the RFP. Key focus areas will include the following:
・ Quality ・ Schedule/Timeliness of Performance ・ Customer Satisfaction ・ Management/Personnel/Labor ・ Cost/Financial Management ・ Safety/Security
This assessment will be based on consideration of all relevant facts and circumstances, including any trends in past performance. The Offeror shall complete and provide a Past Performance Evaluation Questionnaire Forms, on the same contracts submitted for consideration under Factor 1, Corporate Relevant Experience. This information sheet shall not exceed 4 pages per contract.
The Offeror shall complete Blocks 1-4 of the provided Past Performance Questionnaire (PPQ, Appendix 3) and have the Contracting Activity and the Technical Representative responsible for the past/current contract complete the remainder of the contract. Offeror shall ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires shall be submitted with the proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).
The Offeror should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests; questionnaires may be submitted directly to the Government’s point of contact via email no later than the closing date of this RFP. Include Contractor Performance Assessment Rating System (CPARS) performance evaluation ratings, if available. For projects which were performed for other government entities, submit the performance appraisal sheets used by that government entity if available.
Also include performance recognition documents received for the Factor 1 projects such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.
The Government may call and confirm information provided by the Offeror on the Past Performance Information Sheet with the points of contact. The Government reserves the right to interview other individuals if the point of contact is not available.
Rating Definition Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
1. Past Performance Confidence Assessment - Performance confidence is the confidence associated with an offeror's likelihood of success in performing the solicitation's requirements as indicated by that offeror's record of current or past performance. Performance Confidence Assessment: In conducting a performance confidence assessment, each offeror shall be assigned one of the ratings in accordance with the table below (Reference FAR 15.305(2) for information on assigning an unknown/neutral confidence rating.)
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Rating Description Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral) No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
PRICE: Offeror’s will be required to price all line items for each contract period (base and option years). Price will not be scored, but will be a factor in establishing the competitive range prior to discussions (if held) and in making the final determination for award.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.