Atch_3_Plans_PL_84-99_Site_1151_Final_Submittal_V12.pdf

PDF 21 MB Posted

Attached to
PL 84-99 1151 Levee System Repairs Federal contract opportunity
Solicitation number
W91238-18-R-0028
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

Atch 3 Plans

View the file

Other files for this federal contract opportunity

Other files attached to PL 84-99 1151 Levee System Repairs, newest first.
File Type Posted
Sitewalk_Sign-In_Sheet_PL_84-99_1151_Levee_System_Repairs.pdf PDF
Atch_7_PL_84-99_Site_Visit_2177.pdf PDF
Atch_1_SOW_2177_Levee_System_1151.pdf PDF
SF1442_Final_PL_84-99_1151_Levee_System_Repairs_9JUL2018.pdf PDF
Atch_5_PPQ_0_Form.pdf PDF
Atch_4_Pre-Award_Survey_25_APR_2017.pdf PDF
Atch_6_Wage_Determination_6JUL18.pdf PDF
Atch_2_2177_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ISSUE DATE:

US Army Corps of Engineers

SOLICITATION NO.:

CONTRACT NO.:

Sacramento District

W91238-XX-X-XXXX

JUNE, 8 2018

W91238-XX-X-XXXX

SAN JOAQUIN COUNTY, CALIFORNIA

PL 84-99 SOUTH SAN JOAQUIN LEVEE REPAIRS

RD 2075 MCMULLIN RANCH SITES 1151-11, 1151-12, 1151-14, 1151-15, 1151-16,

1151-17, 1151-18,1151-19 AND RD 2064 RIVER JUNCTION SITES 1151-22, 1151-23

APPROVED FOR PUBLIC RELEASE. DISTRIBUTION UNLIMITED

DISTRIBUTION STATEMENT A

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C T

N

O

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

P S

F

E

N G

I N

E E

R S

S P

E

D E

S I G

N

F

I L

PREPARED UNDER THE DIRECTION OF:

USACE SACRAMENTO SIGNATURE BLOCK

Col. Corps of Engineers, Sacramento District

Chief, Engineering Division

Chief, Design Branch

APPROVED BY:

APPROVED FUNCTIONAL ADEQUACY:

David G. Ray

/s/ Rick Poeppelman P.E.

/s/ Scott Tincher P.E.

This project was designed by the Sacramento District of the U. S. Army Corps of Engineers.The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152

G-001

C O

V E

R

S

H E

E T

P

L O

V A

T O

P

L O

V A

T O

C

V

E L A

S Q

U E

Z

P

L O

V A

T O

NOT FOR CONSTRUCTION

P L

E

M E

R G

E N

Y

R

P

A I R

S

T A

K

D

X

X

D

S

I T

A

S

I T

I

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

M A

Y

X X

X X

X X

X

X X

X

X X

X

X X

X X

X X

X

X X

X

X X

X

X X

X X

X X

X X

X A

N S

I

D

S A

N

J O

A Q

U

U

N T

Y

C

A L I F

O R

N I A

G-001.dwg

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

D E

S I G

N

F

I

F I

M

E

NOT FOR CONSTRUCTION

P L

E

M E

R G

E N

P

A I R

S

T

A S

K

O

R D

S

I T

I N

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

M A

Y

A N

S I

D

A

S

I T

G-002.dwg

G-002

V I C

I N

I T

Y

M

A P

G

E N

E R

T

E S

A

B B

R E

V I A

T I O

N S

A N

D

I N

D E

X

O

F

D

R A

W I N

G S

P

L O

V A

T O

P

L O

V A

T O

C

V

E L A

S Q

U E

Z

P

L O

V A

T O

VICINITY MAP

N

PERRIN RD.

S

J

A

Q

U

V

E

R

GENERAL NOTES

I N

T E

R S

T A

SITE 1151-14 SEE SHEET C-103

INDEX OF DRAWINGS

SEQUENCE NO. SHEET ID. DESCRIPTION

1 G-001 COVER SHEET

2 G-002

VICINITY MAP, GENERAL NOTES, ABBREVIATIONS AND INDEX OF DRAWINGS

3 C-101

SITE 1151-11 HAUL ROUTE, STAGING AREA AND SITE PLAN

4 C-102

SITE 1151-12 HAUL ROUTE, STAGING AREA AND SITE PLAN

5 C-103

SITE 1151-14 HAUL ROUTE, STAGING AREA AND SITE PLAN

6 C-104

SITE 1151-15 AND 1151-16 HAUL ROUTE, STAGING AREA AND SITE PLAN

7 C-105

SITE 1151-17 HAUL ROUTE, STAGING AREA AND SITE PLAN

8 C-106

SITE 1151-18 AND 1151-19 HAUL ROUTE, STAGING AREA AND SITE PLAN

9 C-107

SITE 1151-22 HAUL ROUTE, STAGING AREA AND SITE PLAN

10 C-108

SITE 1151-23 HAUL ROUTE, STAGING AREA AND SITE PLAN

11 C-301 TYPICAL REPAIR SECTIONS

12 C-302 TYPICAL REPAIR SECTIONS

SITES 1151-11, 1151-12 AND

1151-14 STAGING AREA

SITE 1151-11 SEE SHEET C-101

TO LATHROP

TO PATTERSON

0 4000'2000'

SITE 1151-12 SEE SHEET C-102

SITE 1151-17

STAGING AREA

SITE 1151-18 SEE SHEET C-106

SITE 1151-17 SEE SHEET C-105

SITES 1151-18 AND

1151-19 STAGING AREA

SITE 1151-15 SEE SHEET C-104

SITE 1151-16 SEE SHEET C-104

SITES 1151-15 AND 1151-16 STAGING AREA

SITE 1151-19 SEE SHEET C-106

HAUL ROUTE

A I R

P O

W

Y

S

A

Q

U

V

E

R

S

A

Q

U

V

E

R

HAUL ROUTE

HAUL ROUTE

S

H

A Y

S

R

D

S

S

A

D

S

S

A

D

A

I

R

P

O

R

T

W

A

Y

SITES 1151-22 AND

1151-23 STAGING AREA

SITE 1151-22 SEE SHEET C-107

HAUL ROUTE

SITE 1151-23 SEE

SHEET C-108

R

I V

E R

S

R

D

D

I

V

I

S

I

1. DIMENSIONS AND QUANTITIES SHOWN ARE APPROXIMATE AND ONLY INDICATE GENERAL SCOPE OF REPAIR.

2. CONTRACTOR TO DETERMINE THE EXACT LOCATION OF ALL UTILITIES WITHIN THE CONSTRUCTION ZONE, ALONG THE CONSTRUCTION ACCESS\

HAUL ROUTES AND IN STAGING AREAS BEFORE COMMENCING THE WORK. CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE CAUSED BY

CONTRACTORS FAILURE TO LOCATE AND PROTECT ALL UTILITIES.

3. CONTRACTOR MUST KEEP ROADWAYS CLEAR OF MUD AND DEBRIS AT ALL TIMES.

4. ANY TEMPORARY EARTHWORK ASSOCIATED WITH CONSTRUCTION MUST BE APPROVED IN ADVANCE BY THE CONTRACTING OFFICER.

5. LEVEE SLOPES SHALL NOT BE CUT TO PROVIDE TEMPORARY CONSTRUCTION ACCESS RAMPS. IF NECESSARY, TEMPORARY CONSTRUCTION

RAMPS SHALL BE CONSTRUCTED BY PLACING FILL MATERIAL ON LEVEE SLOPES.

6. WHEN REMOVING TEMPORARY FILL, CONTRACTOR MUST EXERCISE CAUTION TO AVOID DISTURBING THE EXISTING GROUND SURFACE BELOW

TEMPORARY FILL. THE BOTTOM APPROXIMATELY ONE INCH OF TEMPORARY FILL MUST BE LEFT IN PLACE. UPON COMPLETION OF WORK, CONTRACTOR IS REQUIRED TO REMOVE AND DISPOSE OF ALL TEMPORARY FILL AND HYDROSEED DISTURBED AREAS.

7. REPAIR LENGTHS SHOWN ON SITE PLANS INCLUDE THE TRANSITIONS TO EXISTING GROUND AT EACH END OF THE REPAIR.

ABBREVIATIONS

AB AGGREGATE BASE

APN ASSESSOR PARCEL NUMBER

AVE AVENUE

CO COUNTY

CY CUBIC YARD

E EAST

EA EACH

EG EXISTING GROUND

FG FINISH GRADE

FT FEET

HWY HIGHWAY

IN INCH

LF LINEAR FEET

LS LANDSIDE

LAT LATITUDE

LONG LONGITUDE

MAX MAXIMUM

MIN MINIMUM

NTS NOT TO SCALE

N NORTH

RD ROAD

S SOUTH

SF SQUARE FEET

ST STREET

TYP TYPICAL

W WEST

WS WATERSIDE

WSE WATER SURFACE ELEVATION

YD YARD

RECLAMATION DISTRICT 2075

MCMULLIN RANCH

W. LINNE RD.

PERRIN RD.

E. MCMULLIN RD.

DURRAM FERRY RD.

A

H

E

RECLAMATION DISTRICT 2064

RIVER JUNCTION

TO MANTECA

LEGEND

HAUL ROUTE

WAVE WASH REPAIR SITE

BANK EROSION REPAIR AREA

STAGING AREA

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

D E

S I G

N

F

I

F I

M

E

NOT FOR CONSTRUCTION

P L

E

M E

R G

E N

P

A I R

S

T

A S

K

O

R D

S

I T

I N

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

M A

Y

A N

S I

D

A

S

I T

C-101.dwg

C-101

S I T

E

H A

U

U

T E

S

T A

G I N

G

A

R E

A

A

T

E

P

L A

N

P

L O

V A

T O

P

L O

V A

T O

C

V

E L A

S Q

U E

Z

P

L O

V A

T O

1151-11 HAUL ROUTE AND STAGING AREA

1151-11 SITE PLAN

N

N

600'0 300'

PERRIN ROAD

S

A

Q

U

V

E

R

100' 200'0

HAUL ROUTE (FARM ROAD)

HAUL ROUTE (LEVEE CROWN)

HAUL ROUTE (LEVEE TOE)

SITES 1151-11, 1151-12 AND

1151-14 STAGING AREA

END SITE 1151-11

BREACH REPAIR

LAT.: 37.730459°

LONG: -121.293836°

BEGIN SITE 1151-11

BREACH REPAIR

LAT: 37.729796°

LONT: -121.293958°

PROJECT SITE 1151-11

BREACH REPAIR

LENGTH 240 LF

HAUL ROUTE (LEVEE CROWN)

HAUL ROUTE (LEVEE TOE)

C

A

C

B

SITES 1151-11, 1151-12 AND

1151-14 STAGING AREA

S

A

Q

U

V

E

R

GENERAL NOTES

LEGEND

1. SEE SHEETS C-301 AND C-302 FOR TYPICAL SECTIONS

HAUL ROUTE

WAVE WASH REPAIR SITE

BANK EROSION REPAIR AREA

BREACH REPAIR AREA

LAT: 37.730816°

LONG: -121.293941°

LAT: 37.730997°

LONG: -121.295380°

LAT: 37.729408°

LONG: -121.295677°

LAT: 37.729233°

LONG: -121.294247°

STAGING AREA

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

D E

S I G

N

F

I

F I

M

E

NOT FOR CONSTRUCTION

P L

E

M E

R G

E N

P

A I R

S

T

A S

K

O

R D

S

I T

I N

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

M A

Y

A N

S I

D

A

S

I T

C-102.dwg

C-102

H A

U

T E

S

T A

G I N

G

A

R E

A

A

T

E

P

L A

N

P

L O

V A

T O

P

L O

V A

T O

C

V

E L A

S Q

U E

Z

P

L O

V A

T O

1151-12 HAUL ROUTE AND STAGING AREA

1151-12 SITE PLAN

N

400'0 200'

800'0 400'

N

C

D

HAUL ROUTE (FARM ROAD)

PERRIN ROAD

HAUL ROUTE (LEVEE TOE)

HAUL ROUTE (LEVEE TOE)

SITE 1151-11 (SEE SHEET C-101)

SITES 1151-11, 1151-12 AND

1151-14 STAGING AREA

PROJECT SITE 1151-12

WAVE WASH REPAIR

LENGTH 650 LF

PROJECT SITE 1151-12

BANK EROSION REPAIR

APPROX. LENGTH 395 LF

S

A

Q

U

V

E

R

END SITE 1151-12

WAVE WASH REPAIR

LAT: 37.725198°

LONG: -121.294401°

BEGIN SITE 1151-12

WAVE WASH REPAIR

LAT: 37.723874°

LONG: -121.292958°

BEGIN SITE 1151-12

BANK EROSION REPAIR

LAT: 37.724122°

LONG: -121.293587°

END SITE 1151-12

BANK EROSION REPAIR

LAT: 37.724890°

LONG: -121.294394°

S

A

Q

U

V

E

R

HAUL ROUTE (LEVEE TOE)

GENERAL NOTES

1. SEE SHEETS C-301 AND C-302 FOR TYPICAL SECTIONS

LEGEND

HAUL ROUTE

WAVE WASH REPAIR SITE

BANK EROSION REPAIR AREA

STAGING AREA

LAT: 37.730816°

LONG: -121.293941°

LAT: 37.730997°

LONG: -121.295380°

LAT: 37.729408°

LONG: -121.295677°

LAT: 37.729233°

LONG: -121.294247°

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

D E

S I G

N

F

I

F I

M

E

NOT FOR CONSTRUCTION

P L

E

M E

R G

E N

P

A I R

S

T

A S

K

O

R D

S

I T

I N

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

M A

Y

A N

S I

D

A

S

I T

C-103.dwg

C-103

H A

U

T E

S

T A

G I N

G

A

R E

A

A

T

E

P

L A

N

P

L O

V A

T O

P

L O

V A

T O

C

V

E L A

S Q

U E

Z

P

L O

V A

T O

1151-14 HAUL ROUTE AND STAGING AREA

1151-14 SITE PLAN

N

400'0 200'

800'0 400'

N

HAUL ROUTE (FARM ROAD)

PROJECT SITE 1151-14

WAVE WASH REPAIR

LENGTH 1260 LF

C

E

PERRIN ROAD

S

A

Q

U

V

E

R

SITES 1151-11, 1151-12 AND

1151-14 STAGING AREA

SITE 1151-11 SEE SHEET C-101

HAUL ROUTE (FARM ROAD)

HAUL ROUTE (LEVEE TOE)

HAUL ROUTE (LEVEE CROWN)

S

A

Q

U

V

E

R

S

A

Q

U

V

E

R

BEGIN SITE 1151-14

WAVE WASH REPAIR

LAT: 37.735389°

LONG: -121.289308°

END SITE 1151-14

WAVE WASH REPAIR

LAT: 37.734556°

LONG: -121.285897°

HAUL ROUTE (LEVEE CROWN)

GENERAL NOTES

1. SEE SHEETS C-301 AND C-302 FOR TYPICAL SECTIONS

LEGEND

HAUL ROUTE

WAVE WASH REPAIR SITE

BANK EROSION REPAIR AREA

STAGING AREA

LAT: 37.730816°

LONG: -121.293941°

LAT: 37.730997°

LONG: -121.295380°

LAT: 37.729408°

LONG: -121.295677°

LAT: 37.729233°

LONG: -121.294247°

HAUL ROUTE (LEVEE TOE)

HAUL ROUTE (LEVEE TOE)

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

D E

S I G

N

F

I

F I

M

E

NOT FOR CONSTRUCTION

P L

E

M E

R G

E N

P

A I R

S

T

A S

K

O

R D

S

I T

I N

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

M A

Y

A N

S I

D

A

S

I T

C-104.dwg

C-104

H A

U

T E

S

T A

G I N

G

A

R E

A

A

T

E

P

L A

N

P

L O

V A

T O

P

L O

V A

T O

C

V

E L A

S Q

U E

Z

P

L O

V A

T O

1151-15 AND 1151-16 HAUL ROUTE AND STAGING AREA

1151-15 AND 1151-16 SITE PLAN

N

N

0 600' 1200'

400'0 200'

P

E

R

R

HAUL ROUTE (LEVEE CROWN)

HAUL ROUTE (FARM ROAD)

HAUL ROUTE (LEVEE CROWN)

SITE 1151-12 SEE SHEET C-102

SITE 1151-17 SEE SHEET C-105

SITE 1151-17 STAGING AREA

HAUL ROUTE (LEVEE TOE)

HAUL ROUTE

(LEVEE TOE)

HAUL ROUTE (LEVEE TOE)

SITES 1151-15 AND

1151-16 STAGING AREA

PROJECT SITE 1151-16

WAVE WASH REPAIR

LENGTH 257 LF

PROJECT SITE 1151-15

WAVE WASH REPAIR

LENGTH 344 LF

S

A

Q

U

V

E

R

S

A

Q

U

V

E

R

C

F

C

G

SITES 1151-15 AND

1151-16 STAGING AREA

BEGIN SITE 1151-16

WAVE WASH REPAIR

LAT: 37.714630°

LONG: -121.278263°

END SITE 1151-16

WAVE WASH REPAIR

LAT: 37.714048°

LONG: -121.278363°

BEGIN SITE 1151-15

WAVE WASH REPAIR

LAT: 37.713492°

LONG: -121.278982°

END SITE 1151-15

WAVE WASH REPAIR

LAT: 37.713388°

LONG: -121.280018°

S

A

Q

U

V

E

R

S

A

Q

U

V

E

R

HAUL ROUTE (LEVEE CROWN)

HAUL ROUTE (LEVEE TOE)

HAUL ROUTE (LEVEE TOE)

GENERAL NOTES

1. SEE SHEETS C-301 AND C-302 FOR TYPICAL SECTIONS

LAT: 37.714308°

LONG: -121.281895°

LAT: 37.713575°

LONG: -121.280047°

LAT: 37.713547°

LONG: -121.279636°

LAT: 37.713663°

LONG: -121.279151°

LAT: 37.713970°

LONG: -121.278722°

LAT: 37.714174°

LONG: -121.278589°

LAT: 37.714649°

LONG: -121.278495°

LEGEND

HAUL ROUTE

WAVE WASH REPAIR SITE

BANK EROSION REPAIR AREA

STAGING AREA

PERRIN RD.

HAUL ROUTE (FARM ROAD)

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

D E

S I G

N

F

I

F I

M

E

NOT FOR CONSTRUCTION

P L

E

M E

R G

E N

P

A I R

S

T

A S

K

O

R D

S

I T

I N

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

M A

Y

A N

S I

D

A

S

I T

C-105.dwg

C-105

H A

U

T E

S

T A

G I N

G

A

R E

A

A

T

E

P

L A

N

P

L O

V A

T O

P

L O

V A

T O

C

V

E L A

S Q

U E

Z

P

L O

V A

T O

1151-17 HAUL ROUTE AND STAGING AREA

1151-17 SITE PLAN

N

400'0 200'

N

100' 200'0

PROJECT SITE 1151-17

BANK EROSION REPAIR

LENGTH 289 LF

HAUL ROUTE (LEVEE CROWN)

HAUL ROUTE (LEVEE TOE)

HAUL ROUTE (FARM ROAD)

SITE 1151-17 STAGING AREA

PERRIN RD.

S A

N

J O

A Q

U

V

E R

C

H

PERRIN RD.

H A

S A

N

J O

A Q

U

V

E R

BEGIN SITE 1151-17

BANK EROSION REPAIR

LAT: 37.727799°

LONG: -121.274252°

END SITE 1151-17

BANK EROSION REPAIR

LAT: 37.728460°

LONG: -121.274671°

HAUL ROUTE (LEVEE CROWN)

HAUL ROUTE (LEVEE TOE)

GENERAL NOTES

1. SEE SHEETS C-301 AND C-302 FOR TYPICAL SECTIONS

LEGEND

HAUL ROUTE

WAVE WASH REPAIR SITE

BANK EROSION REPAIR AREA

STAGING AREA

LAT: 37.727150°

LONG: -121.278609°

LAT: 37.725842°

LONG: -121.279479°

LAT: 37.726940°

LONG: -121.278099°

LAT: 37.725621°

LONG: -121.278960°

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

D E

S I G

N

F

I

F I

M

E

NOT FOR CONSTRUCTION

P L

E

M E

R G

E N

P

A I R

S

T

A S

K

O

R D

S

I T

I N

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

M A

Y

A N

S I

D

A

S

I T

C-106.dwg

C-106

A

H A

U

T E

S

T A

G I N

G

A

R E

A

A

T

E

P

L A

N

P

L O

V A

T O

P

L O

V A

T O

C

V

E L A

S Q

U E

Z

P

L O

V A

T O

1151-18 AND 1151-19 HAUL ROUTE AND STAGING AREA

1151-18 AND 1151-19 SITE PLAN

N

400'0 200'

N

0 500' 1000'

HAUL ROUTE (LEVEE CROWN)

PROJECT SITE 1151-18

WAVE WASH REPAIR

LENGTH 601 LF

HAUL ROUTE (LEVEE TOE)

HAUL ROUTE (LEVEE TOE)

SITES 1151-18 AND

1151-19 STAGING AREA

HAUL ROUTE (LEVEE TOE)

PROJECT SITE 1151-19

WAVE WASH REPAIR

LENGTH 1374 LF

HAUL ROUTE (LEVEE CROWN)

HAUL ROUTE (FARM ROAD)

S

A

Q

U

V

E

R

C

J

S A

N J

O

A Q

U

IN

R

IV

E R

PERRIN RD.

A I R

P O

Y

C

K

HAUL ROUTE (LEVEE CROWN)

HAUL ROUTE (LEVEE TOE)

HAUL ROUTE (LEVEE TOE)

SITES 1151-18 AND

1151-19 STAGING AREA

HAUL ROUTE (LEVEE TOE)

BEGIN SITE 1151-19

WAVE WASH REPAIR

LAT: 37.721294°

LONG: -121.260394°

END SITE 1151-19

WAVE WASH REPAIR

LAT: 37.722386°

LONG: -121.264583°

BEGIN SITE 1151-18

WAVE WASH REPAIR

LAT: 37.722456°

LONG: -121.269222°

END SITE 1151-18

WAVE WASH REPAIR

LAT: 37.723819°

LONG: -121.270244°

GENERAL NOTES

1. SEE SHEETS C-301 AND C-302 FOR TYPICAL SECTIONS

LEGEND

HAUL ROUTE

WAVE WASH REPAIR SITE

BANK EROSION REPAIR AREA

STAGING AREA

LAT: 37.722610°

LONG: -121.264591°

LAT: 37.722666°

LONG: -121.264243°

LAT: 37.722711°

LONG: -121.262965°

LAT: 37.722601°

LONG: -121.262076°

LAT: 37.722132°

LONG: -121.261277°

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

D E

S I G

N

F

I

F I

M

E

NOT FOR CONSTRUCTION

P L

E

M E

R G

E N

P

A I R

S

T

A S

K

O

R D

S

I T

I N

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

M A

Y

A N

S I

D

A

S

I T

C-107.dwg

C-107

H A

U

T E

S

T A

G I N

G

A

R E

A

A

T

E

P

L A

N

P

L O

V A

T O

P

L O

V A

T O

C

V

E L A

S Q

U E

Z

P

L O

V A

T O

1151-22 HAUL ROUTE AND STAGING AREA

1151-22 SITE PLAN

N

800'0 400'

N

SITES 1151-22 AND

1151-23 STAGING AREA

PROJECT SITE 1151-22

WAVE WASH REPAIR

LENGTH 251 LF

HAUL ROUTE (LEVEE TOE)

HAUL ROUTE (LEVEE CROWN)

C

M

S

A

Q

U

V

E

R

A

I

R

P

O

Y

C-302

L

S A

N

J O

A Q

U

V

E R

A

I

R

P

O

Y

BEGIN SITE 1151-22

WAVE WASH REPAIR

LAT: 37.677156°

LONG: -121.264419°

R

E A

H

END SITE 1151-22

WAVE WASH REPAIR

LAT: 37.677840°

LONG: -121.264398°

HAUL ROUTE (LEVEE TOE)

100' 200'0

GENERAL NOTES

1. SEE SHEETS C-301 AND C-302 FOR TYPICAL SECTIONS

R

E

A

LEGEND

HAUL ROUTE

WAVE WASH REPAIR SITE

BANK EROSION REPAIR AREA

STAGING AREA

LAT: 37.676434°

LONG: -121.263168°

LAT: 37.675977°

LONG: -121.263190°

LAT: 37.675414°

LONG: -121.263088°

LAT: 37.675271°

LONG: -121.263293°

LAT: 37.675797°

LONG: -121.263891°

LAT: 37.676096°

LONG: -121.263920°

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

D E

S I G

N

F

I

F I

M

E

NOT FOR CONSTRUCTION

P L

E

M E

R G

E N

P

A I R

S

T

A S

K

O

R D

S

I T

I N

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

M A

Y

A N

S I

D

A

S

I T

C-108.dwg

C-108

H A

U

T E

S

T A

G I N

G

A

R E

A

A

T

E

P

L A

N

P

L O

V A

T O

P

L O

V A

T O

C

V

E L A

S Q

U E

Z

P

L O

V A

T O

1151-23 HAUL ROUTE AND STAGING AREA

1151-23 SITE PLAN

N

800'0 400'

N

100' 200'0

SITE 1151-22 AND

1151-23 STAGING AREA

A

I

R

P

O

Y

HAUL ROUTE (LEVEE CROWN)

PROJECT SITE 1151-23

WAVE WASH REPAIR

LENGTH 220 LF

HAUL ROUTE (LEVEE TOE)

T W

O

R

I V

E R

S

R

D

S

A

Q

U

V

E

R

S

A

Q

U

V

E

R

BEGIN SITE 1151-23

WAVE WASH REPAIR

LAT: 37.672198°

LONG: -121.246747°

END SITE 1151-23

WAVE WASH REPAIR

LAT: 37.671646°

LONG: -121.246799°

C -3

N

GENERAL NOTES

1. SEE SHEETS C-301 AND C-302 FOR TYPICAL SECTIONS

HAUL ROUTE (LEVEE TOE)

HAUL ROUTE (LEVEE CROWN)

LEGEND

HAUL ROUTE

WAVE WASH REPAIR SITE

BANK EROSION REPAIR AREA

STAGING AREA

LAT: 37.676434°

LONG: -121.263168°

LAT: 37.675977°

LONG: -121.263190°

LAT: 37.675414°

LONG: -121.263088°

LAT: 37.675271°

LONG: -121.263293°

LAT: 37.675797°

LONG: -121.263891°

LAT: 37.676096°

LONG: -121.263920°

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

D E

S I G

N

F

I

F I

M

E

NOT FOR CONSTRUCTION

P L

E

M E

R G

E N

P

A I R

S

T

A S

K

O

R D

S

I T

I N

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

M A

Y

A N

S I

D

A

S

I T

C-301.dwg

C-301

T Y

P I C

P

A

C

T I O

N S

P

L O

V A

T O

P

L O

V A

T O

C

V

E L A

S Q

U E

Z

P

L O

V A

T O

SECTION A - SITE 1151-11 BREACH REPAIR

GENERAL NOTES

4'

18'

10'

2'

15'

WATERSIDE LANDSIDE

EXCAVATION LIMITS TO BE CONFIRMED BY USACE

GEOTECHNICAL ENGINEER DURING CONSTRUCTION.

EXISTING RELOCATED IRRIGATION DITCH

ORIGINAL IRRIGATION DITCH LOCATION.

APPROXIMATE LOCATION OF EMERGENCY SEEPAGE/STABILITY

BERM. REMOVE AND REPLACE EXISTING SEEPAGE/STABILITY BERM.

EXISTING ROCK MATERIAL MAY BE REUSED PROVIDED IT MEETS

SPECIFICATION REQUIREMENTS BASED ON TESTING AND

INSPECTION.

EXPLORATION KEYWAY

5'

NTS

SECTION D - SITE 1151-12 WAVE WASH AND BANK EROSION REPAIR

NTS

SECTION E - SITE 1151-14 WAVE WASH REPAIR

NTS

SECTION F - SITE 1151-15 WAVE WASH REPAIR

NTS

SECTION G - SITE 1151-16 WAVE WASH REPAIR

NTS

WATERSIDE LANDSIDE

WATERSIDE LANDSIDE

WATERSIDE LANDSIDE

WATERSIDE LANDSIDE

EXISTING BENCH WIDTH 30'

LEVEE CROWN

LEVEE CROWN

QUARRY STONE

SOIL-FILLED QUARRY STONE

LEVEE CROWN HAUL ROUTE

LEVEE CROWN HAUL ROUTE

LEVEE CROWN HAUL ROUTE

3'

EXISTING 400' TO 500'

BENCH TO RIVER

EXISTING BENCH

EXISTING BENCH

EXISTING BENCH

LEVEE TOE

WAVE WASH SCARP

6" - 18" VERTICAL TYPICAL

EXCAVATION TO BE BENCHED BELOW WAVE WASH

SCARP AND NEW FILL KEYED INTO SLOPE. COMPACT

PER SPECIFICATIONS.

LEVEE TOE

WAVE WASH SCARP

6" VERTICAL TYPICAL

EXCAVATION TO BE BENCHED BELOW WAVE WASH

SCARP AND NEW FILL KEYED INTO SLOPE. COMPACT

PER SPECIFICATIONS.

LEVEE TOE

WAVE WASH SCARP

36" VERTICAL TYPICAL

EXCAVATION TO BE BENCHED BELOW WAVE WASH

SCARP AND NEW FILL KEYED INTO SLOPE. COMPACT

PER SPECIFICATIONS.

11'

1. SLIP PLANE EXCAVATION SHALL BE APPROVED BY THE

CONTRACTING OFFICER PRIOR TO PLACEMENT OF LEVEE FILL

MATERIAL. ADDITIONAL EXCAVATION BEYOND WHAT IS SHOWN MAY

BE REQUIRED.

2. LEVEE TOE TO BE PROJECTED FROM ADJACENT UNDAMAGED

LEVEE TOE.

3. FINAL LEVEE SLOPE SHALL NOT BE STEEPER THAN WHAT IS SHOWN

IN SECTIONS OR ADJACENT UNDAMAGED SLOPES, WHICHEVER IS

FLATTER.

4. AT EACH END OF REPAIR AREA, CONTRACTOR IS REQURED TO

PROVIDE A SMOOTH TRANSITION TO EXISTING UNDAMAGED

ADJACENT SLOPE.

5. PLACE LEVEE FILL IN 6" LOOSE LIFTS.

6. SOME WAVE WASH REPAIR SITES HAVE BEEN GRADED BY LOCAL

LANDOWNERS. EXCAVATE AND REPLACE MATERIAL PER TYPICAL

REPAIR SECTIONS.

7. HYDROSEED ALL DISTURBED AREAS PER PROJECT

SPECIFICATIONS.

SECTION B - SITE 1151-11 BREACH REPAIR

NTS

45' TRANSITION ZONE 150' FULL DEPTH BREACH REPAIR 45' TRANSITION ZONE

EXPLORATION KEYWAY

UNDISTURBED LEVEE.

MATCH EXISTING CROWN

ELEVATION

UNDISTURBED LEVEE. MATCH EXISTING

CROWN ELEVATION.

EXISTING UNDISTURBED GROUND

COIR FABRIC BETWEEN SOIL-FILLED

QUARRY STONE AND QUARRY STONE

6" TOPSOIL AND HYDROSEED

C-301.dwg

LEVEE TOE

WAVE WASH SCARP

12" VERTICAL TYPICAL

EXCAVATION TO BE BENCHED BELOW WAVE WASH

SCARP AND NEW FILL KEYED INTO SLOPE. COMPACT

PER SPECIFICATIONS.

NOTES:

1. EXISTING LEVEE FILL IS ROCK AND SOIL PLACED DURING EMERGENCY REPAIR. EXISTING

MATERIAL REQUIRES TESTING AND EVALUATION PRIOR TO REUSE AS FILL.

EMBANKMENT TO BE RECONSTRUCTED TO MEET EXISTING ADJACENT LEVEE HEIGHT

AND SLOPES. NEW LEVEE FILL TO BE SIMILAR TO EXISTING LEVEE FILL AND LEVEE

FOUNDATION SOIL TO MATCH ADJACENT CLAYEY LEVEE FOUNDATION SOILS. EXISTING

LEVEE MATERIAL TO BE TESTED TO DETERMINE REQUIRED PROPERTIES FOR IMPORTED

FILL MATERIAL.

2. SITE REQUIRED TO BE DE-WATERED PRIOR TO EXCAVATION.

6" THICK AGGREGATE

BASE COURSE

LEVEE FILL. COMPACT PER SPECIFICATIONS.

LEVEE FILL. COMPACT PER SPECIFICATIONS.

3'

EXCAVATION TO BE BENCHED AND

NEW FILL KEYED INTO EXISTING LEVEE EXCAVATION TO BE BENCHED AND

NEW FILL KEYED INTO EXISTING LEVEE

6" THICK AGGREGATE

BASE COURSE

M E

A N

S U

M M

E R

H E

I G

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

D E

S I G

N

F

I

F I

M

E

NOT FOR CONSTRUCTION

P L

E

M E

R G

E N

P

A I R

S

T

A S

K

O

R D

S

I T

I N

H

O U

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

M A

Y

A N

S I

D

A

S

I T

C-302.dwg

C-302

T Y

P I C

P

A

C

T I O

N S

P

L O

V A

T O

P

L O

V A

T O

C

V

E L A

S Q

U E

Z

P

L O

V A

T O

SECTION H - SITE 1151-17 BANK EROSION REPAIR

SECTION J - SITE 1151-18 WAVE WASH REPAIR

NTS

NTS

SECTION K - SITE 1151-19 BANK EROSION REPAIR

NTS

SECTION L - SITE 1151-22 REACH I WAVE WASH REPAIR

NTS

SECTION M - SITE 1151-22 REACH II WAVE WASH REPAIR

NTS

SECTION N - SITE 1151-23 WAVE WASH REPAIR

NTS

GENERAL NOTES

WATERSIDE LANDSIDE

EXISTING BENCH WIDTH

VARIES 10' TO 20'

LEVEE CROWN

QUARRY STONE

SOIL-FILLED QUARRY STONE

LEVEE CROWN HAUL ROUTE

EXISTING BENCH

LEVEE TOE

WAVE WASH SCARP

6" - 16" VERTICAL TYPICAL

EXCAVATION TO BE BENCHED BELOW WAVE WASH

SCARP AND NEW FILL KEYED INTO SLOPE. COMPACT

PER SPECIFICATIONS.

3'

3'

LEVEE CROWN HAUL ROUTE

EXISTING BENCH

LEVEE TOE

WAVE WASH SCARP

6" - 16" VERTICAL TYPICAL

EXCAVATION TO BE BENCHED BELOW WAVE WASH

SCARP AND NEW FILL KEYED INTO SLOPE. COMPACT

PER SPECIFICATIONS.

3'

LEVEE CROWN

EXISTING BENCH

LEVEE TOE

WAVE WASH SCARP

12" VERTICAL TYPICAL

EXCAVATION TO BE BENCHED BELOW WAVE WASH

SCARP AND NEW FILL KEYED INTO SLOPE. COMPACT

PER SPECIFICATIONS.

LEVEE CROWN

EXISTING BENCH

LEVEE TOE

WAVE WASH SCARP

24" - 36" VERTICAL TYPICAL

EXCAVATION TO BE BENCHED BELOW WAVE WASH

SCARP AND NEW FILL KEYED INTO SLOPE. COMPACT

PER SPECIFICATIONS.

LEVEE CROWN HAUL ROUTE

EXISTING BENCH

LEVEE TOE

WAVE WASH SCARP

6" - 12" VERTICAL TYPICAL

EXCAVATION TO BE BENCHED BELOW WAVE WASH

SCARP AND NEW FILL KEYED INTO SLOPE. COMPACT

PER SPECIFICATIONS.

3'

3'

WATERSIDE LANDSIDE

WATERSIDE LANDSIDE

WATERSIDE LANDSIDE

WATERSIDE LANDSIDE

WATERSIDE LANDSIDE

COIR FABRIC BETWEEN SOIL-FILLED

QUARRY STONE AND QUARRY STONE

6" TOPSOIL AND HYDROSEED

1. SLIP PLANE EXCAVATION SHALL BE APPROVED BY THE

CONTRACTING OFFICER PRIOR TO PLACEMENT OF LEVEE FILL

MATERIAL. ADDITIONAL EXCAVATION BEYOND WHAT IS SHOWN

MAY BE REQUIRED.

2. LEVEE TOE PROJECTED FROM ADJACENT UNDAMAGED LEVEE

TOE.

3. FINAL LEVEE SLOPE SHALL NOT BE STEEPER THAN WHAT IS

SHOWN IN SECTIONS OR ADJACENT UNDAMAGED SLOPES,

WHICHEVER IS FLATTER.

4. AT EACH END OF REPAIR AREA, CONTRACTOR IS REQURED TO

PROVIDE A SMOOTH TRANSITION TO EXISTING UNDAMAGED

ADJACENT SLOPE.

5. PLACE LEVEE FILL IN 6" LOOSE LIFTS.

6. SOME WAVE WASH REPAIR SITES HAVE BEEN GRADED BY LOCAL

LANDOWNERS. EXCAVATE AND REPLACE MATERIAL PER TYPICAL

REPAIR SECTIONS.

7. HYDROSEED ALL DISTURBED AREAS PER PROJECT

SPECIFICATIONS.

3'

HAUL ROUTE

STAGING AREA

M E

A N

S U

M M

E R

H E

I G

H T

Sheets
G-001
G-002
C-101
C-102
C-103
C-104
C-105
C-106
C-107
C-108
C-301
C-302

File details come from the government source that posted it.