AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment necessary to:
1. Revise the Performance Work Statement (PWS) dated 26 June 2018. Revisions to the PWS adding language is identified by italicized font, and language being removed is identified by "strikethrough" font.
2. Include four (4) additional photos, attached separately.
3. Extend the due date for quotes to 13 July 2018.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123818Q0031
X 9B. DATED (SEE ITEM 11)
18-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jun-2018
CODE
US ARMY CORPS OF ENGINEERS, SACRAMENTO
CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123818Q0031
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 29-Jun-2018 03:00 PM to 13-Jul-2018 05:00 PM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
PERFORMANCE WORK STATEMENT
Performance Work Statement VRO New Office Trailer Installation
West Sacramento, CA
SUBJECT: Place new 24’ by 40’ office trailer. Block and level the new trailer in line with, and physically connecting to existing structure. Install skirting, steps, and landing for the new trailer. Electrically connect new office trailer.
1. General Conditions:
a. Contractor shall coordinate work schedule with the Contracting Officer’s Representative (COR) Mr.
Jonathon Revolinsky prior to the execution of work. Normal work schedule is from 0700 – 1500, Monday through Friday, except for Federal Holidays. Weekend work is permitted; however, the contractor shall coordinate with the COR three (3) working days prior the anticipated schedule.
b. Any item and/or material intended for use shall be submitted to the COR for approval. Whenever a particular make of material or trade name is specified herein, it is only to demonstrate required standards.
c. Coordinate site location for placement of debris container (if necessary) and equipment with the COR. All associated debris incurred during and upon completion of project shall be disposed of off-site in accordance with the installation and city policies.
d. Dispose of all hazardous waste in accordance with all Federal, State, and local requirements.
e. Contractor shall submit a list of employees to the COR for security access processing and approval. List shall contain the employee’s full name, state driver’s license number and/or date of birth.
f. Contractor shall ensure that government structures, equipment, and vegetation are protected during and throughout the conduct of the work.
g. Contractor shall schedule a final inspection activity with the COR on/or before the legal completion date.
h. Contractor shall provide a one-year warranty for all purchased equipment, materials, and components to the
COR within thirty (30) days following completion and acceptance of work.
2. Preparations and New Installations:
Contractor shall provide all labor, material, and equipment necessary to execute and complete the subject project.
Work requirements include, but are not limited to the following:
a. Specifications for New Trailer: 24’ by 40’ with an enclosed breezeway connecting to existing structure via a 4 foot pass thru. Steps and landing shall be installed and built to Unified Facilities Guide Specifications (UFGS) California Occupational Safety and Health Administration (Cal-OSHA) standards. Trailer shall have HVAC, a minimum of 6 standard electrical outlets, with 1 Cubicle Power Connection (as seen in Attachment 4), a pass thru for internet cables (as seen in Attachment 4), a minimum of 2 4 windows, 1 external door with a minimum 6’ opening, and a 6 to 12 foot wide enclosed breezeway that is 3’ long.
Trailer is to be leveled such that the floor shall match level with the existing structure (approximately 3’ 6” off the ground; please see attachment 5, photo of the side of the trailer). Trailer is to have carpet installed, the same or equal to: (Commercial loop, tan/light brown in color, with no patterns.) Trailer must have adequate installed lighting, and safety alarms as per Cal-OSHA regulations.
W9123818Q0031
b. Trailer to be electrically connected to the existing trailer electrical system in accordance to all local, state, and federal safety and construction guidelines. Connections to be run from the existing electrical panel, under the existing, and new trailer, through a conduit, and to the new trailer.
c. Trailer to be structurally connected to the existing structure in a manner that allows transition from the existing structure to the new trailer in accordance with all local, state, and federal construction and safety guidelines. An example of this type of connection is found in Attachment 3.
d. Cleanup. Work Areas must be cleared of all unused construction materials, equipment, and waste prior to acceptance of the project by COR.
3. Period of Performance: Work shall be completed within sixty (60) one-hundred-twenty (120) calendar days from the date of contract award– this includes fabrication and delivery of material.
4. Attachment(s): Please find attached separately, two (2) six (6) photos.
Attachment 1: Location of new trailer on property (aerial view) Attachment 2: Floor plan (Sketch) Attachment 3: Existing Trailer Pass-thru Connection (Example) Attachment 4: Cubicle Power and Internet Fittings Attachment (2) 5: General Location of Structural Connection (side view) Attachment 6: Existing Electrical System and New Trailer Electrical Calculations
(End of Summary of Changes)