Pier_2_Solicitation_Site_Visit_Slides.pdf
PDF 2 MB Posted
- Attached to
- Replace/Upgrade Pier 2 Federal contract opportunity
- Solicitation number
- W9123817R0065
About this file
Site Visit Presentation
View the file
Other files for this federal contract opportunity
Show all 50
Replace/Upgrade Pier 2 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
BUILDING STRONG®
MOTCO Pier 2 Replacement & Modernization Solicitation Site Visit
September 19, 2017 @ 0900
Daniel Ross Project Manager US Army Corps of Engineers
Daniel Czech Contracting Officer US Army Corps of Engineers
Mike Onines, P.E.
Technical Lead US Army Corps of Engineers
Industry Day Schedule 0930 – 1030 In Brief
► Welcome / Ground Rules – PM (Daniel Ross) ► Introduce the Installation / Mission / Importance – DPW (Andrew Bianchi) ► Draft Scope / Project Constraints – TL (Mike Onines) ► Acquisition Process – CT (Daniel Czech)
1030 – 1045 Load Bus 1045 – 1100 Arrive at Site 1100 – 1230 Site Visit 1230 – 1315 Load Bus and return to parking Lot
Ground Rules
Questions must be asked and answered for all attendees ► You may ask anonymously by using Projnet (Bidder Inquiry) ► Questions & answers will be posted to FBO via amendment ► Only rely on the solicitation as issued
No wandering The purpose of the day is to allow contractors to view the site to assist in proposal development
NO PHOTOS, NO CELL PHONES OUT
► Photos will be taken and distributed via an amendment
0930 – 1030 In Brief
► Welcome / Ground Rules – PM (Daniel Ross) ► Introduce the Installation / Mission / Importance – DPW (Andrew Bianchi) ► Draft Scope / Project Constraints – TL (Mike Onines) ► Acquisition Process – CT (Daniel Czech)
1030 – 1045 Load Bus 1045 – 1100 Arrive at Site
0930 – 1030 In Brief
► Welcome / Ground Rules – PM (Daniel Ross) ► Introduce the Installation / Mission / Importance – DPW (Andrew Bianchi) ► Draft Scope / Project Constraints – TL (Mike Onines) ► Acquisition Process – CT (Daniel Czech)
1030 – 1045 Load Bus 1045 – 1100 Arrive at Site
Site Map
Project Overview
BUILDING STRONG®9
Environmental Constraints Endangered Species Act – Approved
Biological Opinions with NMFS and
USFWS
►No seasonal restrictions on work (authorized work outside normal “fish window”) ►24 month window for all in/over-water work ►7 months to complete over-water demolition ►12 month window for pile driving ►Agency-approved Biological Monitor ►Turbidity / Water Quality requirements
Environmental Constraints Pile-driving specific restrictions
►Only one pile-driver driving at any time ►Vibratory driving if feasible; impact driver authorized ►Cushion blocks ►Hydroacoustic monitoring (clarifying amendment forthcoming) Additional requirements; see specifications
Munitions Response Sites Area impacted by Port Chicago explosion Terrestrial Explosion Area MRS Water Explosion Area MRS
►Pre-construction clearance completed ►Cleared magnetic anomalies to 5’ below mudline See specifications for MEC support requirements
0930 – 1030 In Brief
► Welcome / Ground Rules – PM (Daniel Ross) ► Introduce the Installation / Mission / Importance – DPW (Andrew Bianchi) ► Draft Scope / Project Constraints – TL (Mike Onines) ► Acquisition Process – CT (Daniel Czech)
1030 – 1045 Load Bus 1045 – 1100 Arrive at Site
Contract Timeline/Issues
Current RFP Due Date: 11 October 2017 ► Bidder inquiries to extend due date under review
Discussions prior to Award date Expected
Evaluation Criteria
Descending Order of Importance:
►Experience and Capability ►Technical Approach (Co-equal with E&C) ►Past Performance ►Small Business Participation
Technical Factors Greater Than Price
Experience and Capability ►Prime Contractor/Key Subcontractor Example
Projects Demonstrating Experience and Capability
►Key Subcontractors:
• ≥ 25% Construction Effort
• Underwater Demo MEC/UXO
• Biological Surveys
• Pile Driving
• Demolition of Existing Pier
Technical Approach ►Organization Chart and Narrative ►Project Schedule
• Assume NTP of August 15, 2018
Past Performance ►Prime Contractor/Key Subcontractor Example
Projects Past Performance ►Key Subcontractor Authorization Letters
Socioeconomic Considerations ►Proposed Small Business Participation
Offerors Propose Their Own Socioeconomic Goals
Best Practices Thorough solicitation review – bring ambiguities/conflicts/questions to our attention Organization – make it easy for the reviewer to see that you have addressed/exceeded the request Concise proposal clearly aligned with GOVT Needs Articulate that you thoroughly understand the requirement and why you’re the solution Highlight the challenges you foresee and proposed mitigation measures Clearly identify proposed betterments
Solicitation Review Do your homework --- carefully read and reread the solicitation document to clearly understand what is being asked, including clauses and provisions
If you are not sure about something --- ask questions Review and understand the regulations (FAR Parts) governing the specific type of solicitation you plan to respond to
Make a list/matrix of the requirements Understand all important deadlines, including the deadline for Q&A
Align Proposal with Gov’t Needs Good proposals will clearly articulate how the offeror can solve the problem or fill the need defined by the solicitation
Understanding the government’s request is important -- how your firm can execute or deliver an appropriate solution is critical
A proposal may look good, but if it is not clearly aligned with fulfilling the government’s needs, it will fall behind other more substantive, solution focused proposals
Articulate What Makes You the Best Solution
Key is pulling it all together in a proposal package that clearly describes why your firm offers the best solution
No One Thing – it comes down to doing a lot of things right, e.g.:
• Understanding the solicitation and responding appropriately
• Demonstrating how your firm can best fulfill the government’s needs
• Offering pricing that is fair and reasonable, and competitive
• Making sure your proposal is well-written and error free
• Showing evidence of success through past performance
• Interweaving an amazing story throughout all parts of the proposal that makes a compelling case for your firm as the best solution
Common Mistakes: What to Avoid
Failure to fully understand the solicitation and governing regulations
Incomplete or late submission Proposal is not specific and to the point High on fluff and weak on substance Failure to understand best value considerations Unrealistic proposal pricing Evaluation components are not sufficiently addressed in the proposal Errors in the submission
Common Mistakes: Presentation This is a “sample” of your work
• Typos
• Grammatical errors
• Do your tables/charts convey the message?
• Check your firm’s name throughout the document
• Check the project title, especially when copying another proposal
• Answer all stated requirements in the solicitation
• Textboxes
• Use bold, highlighting, etc. to focus the readers eyes
• Readability
Use of “white space” Break lines into shorter segments
• Watch color combinations and font size
Common Mistakes: Spell Check Your Friend – Your Enemy
Spellcheck won’t check that you’ve used the correct word ORDINANCE – a law set forth by a governmental authority ORDNANCE – Weapons and Ammunition
Common Mistakes: Independent Review
Have someone outside of the proposal team (but familiar with the type of work) review your document
Make a list of the requirements – ►Does your proposal address every point ►Check experience and training requirements for all resumes
Source Selection Evaluation Boards Can ONLY Evaluate
What is in the Proposal
We do not evaluate past the page requirement.
0930 – 1030 In Brief
► Welcome / Ground Rules – PM (Daniel Ross) ► Introduce the Installation / Mission / Importance – DPW (Andrew Bianchi) ► Draft Scope / Project Constraints – TL (Mike Onines) ► Acquisition Process – CT (Daniel Czech)