ELINS Summary

Grounds Maintenance Services Summary
Service Code: 404
This sheet is filled out automatically as other sheets are completed
CLINTOTAL
0009Base Period Firm Fixed-Price - High Service Level (Green)$0.00
0010Base Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL--
0010AACA207$0.00
0011Base Period Firm Fixed-Price - Medium Service Level (Amber)$0.00
0012Base Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL--
0012AACA207$0.00
0013Base Period Indefinite Quantity$70,000.00
1009First Option Period Firm Fixed-Price - High Service Level (Green)$0.00
1010First Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL--
1010AACA207$0.00
1011First Option Period Firm Fixed-Price - Medium Service Level (Amber)$0.00
1012First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL--
1012AACA207$0.00
1013First Option Period Indefinite Quantity$70,000.00
2009Second Option Period Firm Fixed-Price - High Service Level (Green)$0.00
2010Second Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL--
2010AACA207$0.00
2011Second Option Period Firm Fixed-Price - Medium Service Level (Amber)$0.00
2012Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL--
2012AACA207$0.00
2013Second Option Period Indefinite Quantity$70,000.00
$210,000.00
Note: Either CLIN 0009 or CLIN 0011 (but not both) will be awarded for fixed-price grounds maintenance services, at the discretion of the Contracting Officer.

&F

&A &P of &N

Site Summary Sheet

GROUNDS MAINTENANCE (1503050)

This sheet is filled out automatically as other sheets are completed
CLIN / SUBCLINFAC IDELINSTotal Price
0009Base Period Firm Fixed-Price - High Service Level 1 (Green)
0009AACA001(Items A001 Through A003)$0.00
0009ABCA012(Items A004 Through A005)$0.00
0009ACCA014(Items A006 Through A007)$0.00
0009ADCA021(Items A008 Through A010)$0.00
0009AECA062(Items A011 Through A013)$0.00
0009AFCA070(Items A014 Through A016)$0.00
0009AGCA090(Items A017 Through A018)$0.00
0009AHCA150(Items A019 Through A021)$0.00
0009AJCA187(Items A022 Through A023)$0.00
$0.00
0010Base Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL
0010AACA207(Items A001 Through A002)$0.00
$0.00
0011Base Period Firm Fixed-Price - Medium Service Level 2 (Amber)
0011AACA001(Items A101 Through A103)$0.00
0011ABCA012(Items A104 Through A105)$0.00
0011ACCA014(Items A106 Through A107)$0.00
0011ADCA021(Items A108 Through A110)$0.00
0011AECA062(Items A111 Through A113)$0.00
0011AFCA070(Items A114 Through A116)$0.00
0011AGCA090(Items A117 Through A118)$0.00
0011AHCA150(Items A119 Through A121)$0.00
0011AJCA187(Items A122 Through A123)$0.00
$0.00
0012Base Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL
0012AACA207(Items A101 Through A102)$0.00
$0.00
0013Base Period Indefinite Quantity
TOTAL IQ LINE ITEMS - A701 THROUGH A737$70,000.00
1009First Option Period Firm Fixed-Price - High Service Level 1 (Green)
1009AACA001(Items B001 Through B003)$0.00
1009ABCA012(Items B004 Through B005)$0.00
1009ACCA014(Items B006 Through B007)$0.00
1009ADCA021(Items B008 Through B010)$0.00
1009AECA062(Items B011 Through B013)$0.00
1009AFCA070(Items B014 Through B016)$0.00
1009AGCA090(Items B017 Through B018)$0.00
1009AHCA150(Items B019 Through B021)$0.00
1009AJCA187(Items B022 Through B023)$0.00
$0.00
1010First Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL
1010AACA207(Items B001 Through B002)$0.00
$0.00
1011First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber)
1011AACA001(Items B101 Through B103)$0.00
1011ABCA012(Items B104 Through B105)$0.00
1011ACCA014(Items B106 Through B107)$0.00
1011ADCA021(Items B108 Through B110)$0.00
1011AECA062(Items B111 Through B113)$0.00
1011AFCA070(Items B114 Through B116)$0.00
1011AGCA090(Items B117 Through B118)$0.00
1011AHCA150(Items B119 Through B121)$0.00
1011AJCA187(Items B122 Through B123)$0.00
$0.00
1012First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL
1012AACA207(Items B101 Through B102)$0.00
$0.00
1013First Option Period Indefinite Quantity
TOTAL IQ LINE ITEMS - B701 THROUGH B737$70,000.00
2009Second Option Period Firm Fixed-Price - High Service Level 1 (Green)
2009AACA001(Items C001 Through C003)$0.00
2009ABCA012(Items C004 Through C005)$0.00
2009ACCA014(Items C006 Through C007)$0.00
2009ADCA021(Items C008 Through C010)$0.00
2009AECA062(Items C011 Through C013)$0.00
2009AFCA070(Items C014 Through C016)$0.00
2009AGCA090(Items C017 Through C018)$0.00
2009AHCA150(Items C019 Through C021)$0.00
2009AJCA187(Items C022 Through C023)$0.00
$0.00
2010Second Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL
2010AACA207(Items C001 Through C002)$0.00
$0.00
2011Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber)
2011AACA001(Items C101 Through C103)$0.00
2011ABCA012(Items C104 Through C105)$0.00
2011ACCA014(Items C106 Through C107)$0.00
2011ADCA021(Items C108 Through C110)$0.00
2011AECA062(Items C111 Through C113)$0.00
2011AFCA070(Items C114 Through C116)$0.00
2011AGCA090(Items C117 Through C118)$0.00
2011AHCA150(Items C119 Through C121)$0.00
2011AJCA187(Items C122 Through C123)$0.00
$0.00
2012Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL
2012AACA207(Items C101 Through C102)$0.00
$0.00
2013Second Option Period Indefinite Quantity
TOTAL IQ LINE ITEMS - C701 THROUGH C737$70,000.00

&F

&P of &N

ELINS BASE PERIOD FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 - A123
CLIN 0009 - Base Period - Firm Fixed-Price Work - High Service Level (Green)
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICETOTAL
CA001Wilkson Hall USARC6835
Firm Fixed-Price Work
A001Improved Grounds (Spec Item C, 3.1)3.0Month$ - 0$ - 0
A002Semi-Improved Grounds (Spec Item C, 3.2)3.0Month$ - 0$ - 0
A003Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0009AA (Items A001 Through A003)$0.00
CA012Marina USARC/OMS/AMSA 12 S-S6628
Firm Fixed-Price Work
A004Semi-Improved Grounds (Spec Item C, 3.2)3.0Month$ - 0$ - 0
A005Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0009AB (Items A004 Through A005)$0.00
CA014Leymel Hall USARC/AMSA 14(G)6845
Firm Fixed-Price Work
A006Improved Grounds (Spec Item C, 3.1)3.0Month$ - 0$ - 0
A007Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0009AC (Items A006 Through A007)$0.00
CA021Quinones AFRC6362
Firm Fixed-Price Work
A008Improved Grounds (Spec Item C, 3.1)3.0Month$ - 0$ - 0
A009Semi-Improved Grounds (Spec Item C, 3.2)3.0Month$ - 0$ - 0
A010Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0009AD (Items A008 Through A010)$0.00
CA062BT Collins USARC/AMSA 98(G)6767
Firm Fixed-Price Work
A011Improved Grounds (Spec Item C, 3.1)5.0Month$ - 0$ - 0
A012Semi-Improved Grounds (Spec Item C, 3.2)5.0Month$ - 0$ - 0
A013Storm Drainage Systems (Spec Item 3.3)5.0Month$ - 0$ - 0
Total CLIN 0009AE (Items A011 Through A013)$0.00
CA070Col Francis R. Hunter USARC6905
Firm Fixed-Price Work
A014Improved Grounds (Spec Item C, 3.1)3.0Month$ - 0$ - 0
A015Semi-Improved Grounds (Spec Item C, 3.2)3.0Month$ - 0$ - 0
A016Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0009AF (Items A014 Through A016)$0.00
CA090PFC Robert H. Young Hall USARC6935
Firm Fixed-Price Work
A017Improved Grounds (Spec Item C, 3.1)3.0Month$ - 0$ - 0
A018Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0009AG (Items A0177 Through A018)$0.00
CA150Mare Island USARC/AMSA (M)6991
Firm Fixed-Price Work
A019Improved Grounds (Spec Item C, 3.1)4.0Month$ - 0$ - 0
A020Semi-Improved Grounds (Spec Item C, 3.2)4.0Month$ - 0$ - 0
A021Storm Drainage Systems (Spec Item 3.3)4.0Month$ - 0$ - 0
Total CLIN 0009AH (Items A019 Through A021)$0.00
CA187HQ 63 RSC/ Moffett AFRC6240
Firm Fixed-Price Work
A022Semi-Improved Grounds (Spec Item C, 3.2)3.0Month$ - 0$ - 0
A023Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0009AJ (Items A022 Through A023)$0.00

TOTAL FFP LINE ITEMS - A001 THROUGH A023 $0.00

CLIN 0011 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber)

CA001Wilkson Hall USARC6835
Firm Fixed-Price Work
A101Improved Grounds (Spec Item C, 3.1)3.0Month$ - 0$ - 0
A102Semi-Improved Grounds (Spec Item C, 3.2)3.0Month$ - 0$ - 0
A103Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0011AA (Items A101 Through A103)$0.00
CA012Marina USARC/OMS/AMSA 12 S-S6628
Firm Fixed-Price Work
A104Semi-Improved Grounds (Spec Item C, 3.2)3.0Month$ - 0$ - 0
A105Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0011AB (Items A104 Through A105)$0.00
CA014Leymel Hall USARC/AMSA 14(G)6845
Firm Fixed-Price Work
A106Improved Grounds (Spec Item C, 3.1)3.0Month$ - 0$ - 0
A107Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0011AC (Items A106 Through A107)$0.00
CA021Quinones AFRC6362
Firm Fixed-Price Work
A108Improved Grounds (Spec Item C, 3.1)3.0Month$ - 0$ - 0
A109Semi-Improved Grounds (Spec Item C, 3.2)3.0Month$ - 0$ - 0
A110Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0011AD (Items A108 Through A110)$0.00
CA062BT Collins USARC/AMSA 98(G)6767
Firm Fixed-Price Work
A111Improved Grounds (Spec Item C, 3.1)5.0Month$ - 0$ - 0
A112Semi-Improved Grounds (Spec Item C, 3.2)5.0Month$ - 0$ - 0
A113Storm Drainage Systems (Spec Item 3.3)5.0Month$ - 0$ - 0
Total CLIN 0011AE (Items A111 Through A113)$0.00
CA070Col Francis R. Hunter USARC6905
Firm Fixed-Price Work
A114Improved Grounds (Spec Item C, 3.1)3.0Month$ - 0$ - 0
A115Semi-Improved Grounds (Spec Item C, 3.2)3.0Month$ - 0$ - 0
A116Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0011AF (Items A114 Through A116)$0.00
CA090PFC Robert H. Young Hall USARC6935
Firm Fixed-Price Work
A117Improved Grounds (Spec Item C, 3.1)3.0Month$ - 0$ - 0
A118Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0011AG (Items A117 Through A118)$0.00
CA150Mare Island USARC/AMSA (M)6991
Firm Fixed-Price Work
A119Improved Grounds (Spec Item C, 3.1)4.0Month$ - 0$ - 0
A120Semi-Improved Grounds (Spec Item C, 3.2)4.0Month$ - 0$ - 0
A121Storm Drainage Systems (Spec Item 3.3)4.0Month$ - 0$ - 0
Total CLIN 0011AH (Items A119 Through A121)$0.00
CA187HQ 63 RSC/ Moffett AFRC6240
Firm Fixed-Price Work
A122Semi-Improved Grounds (Spec Item C, 3.2)3.0Month$ - 0$ - 0
A123Storm Drainage Systems (Spec Item 3.3)3.0Month$ - 0$ - 0
Total CLIN 0011AJ (Items A122 Through A123)$0.00

TOTAL FFP LINE ITEMS - A101 THROUGH A123 $0.00

&F

&P of &N

ELINS BASE PERIOD FFP (OPTNL)

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH Spec Item C, SPEC ITEM 3 ELINS A001 - A102
CLIN 0010 - Base Period - Firm Fixed-Price Work - High Service Level (Green), OPTIONAL
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICETOTAL
CA207Motco USARC696A
Firm Fixed-Price Work
A001Semi-Improved Grounds (Spec Item C, 3.2)11Month$ - 0$ - 0
A002Storm Drainage Systems (Spec Item C, 3.3)11Month$ - 0$ - 0
Total CLIN 0010AA (Items A001 Through A002)$0.00

TOTAL FFP LINE ITEMS - A001 THROUGH A002 $0.00

CLIN 0012 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber), OPTIONAL

CA207Motco USARC696A
Firm Fixed-Price Work
A101Semi-Improved Grounds (Spec Item C, 3.2)11Month$ - 0$ - 0
A102Storm Drainage Systems (Spec Item C, 3.3)11Month$ - 0$ - 0
Total CLIN 0012AA (Items A101 Through A102)$0.00

TOTAL FFP LINE ITEMS - A101 THROUGH A102 $0.00

&F

&P of &N

ELINS BASE PERIOD IQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A737
CLIN 0013 - Base Period - Indefinite Quantity Work
UNITUNIT OFMIN. ORDER
ELINSHORT DESCRIPTIONFULL DESCRIPTIONPRICEISSUEQTY
A701Tree and Stump Removal
Large 18.1” DBH and above Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 10 calendar days.$ - 0Each1
A702Tree and Stump Removal
Medium 6.1" DBH up to 18" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 7 calendar days.$ - 0Each1
A703Tree and Stump Removal
Small up to 6" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A704Shrub and Stump Removal
Large 15-gallon and above, 48.1” and above Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A705Shrub and Stump Removal
Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A706Shrub and Stump Removal
Small Up to 5-gallon, up to 18” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 3 calendar days.$ - 0Each1
A707Complete Tree Pruning
Small - below and including 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 1 calendar day.$ - 0Each1
A708Complete Tree Pruning
Large - above 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 2 calendar days.$ - 0Each1
A709Soil AnalysisPerform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations.$ - 0Each1
A710GrassingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.$ - 0SF50
A711Tree PlantingAll trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A712Shrub Planting (1-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A713Shrub Planting (5-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A714Bedding/Ornamental Plants (4" pot size)All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each10
A715SoddingSod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
A716SpriggingSprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
A717FertilizeVegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days.$ - 0SF100
A718Dethatch & AerateServices shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance.
Work shall be completed within 14 calendar days.$ - 0SF100
A719AerateGrass shall be aerated to promote health and growth.
Work shall be completed within 10 calendar days.$ - 0SF100
A720Shrub Pruning (Stand-alone plants)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0Each5
A721Hedge Pruning (Continuous Hedging)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0L.F.100
A722Erosion ControlSoil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days.$ - 0SF50
A723UnderbrushingAll brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days.$ - 0SF100
A724Field MowingVegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days.$ - 0SF5,000
A725Control Undesired VegetationRemove vegetation along fence lines (20' on both sides of fence) and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
Work shall be completed within 10 calendar days.$ - 0LF100
A726Debris RemovalRemove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris.
Work shall be completed within 10 calendar days.$ - 0SF50
Special Event Grass Cutting at the following sites:Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site.
A727CA001$ - 0Each1
A728CA012$ - 0Each1
A729CA014$ - 0Each1
A730CA021$ - 0Each1
A731CA062$ - 0Each1
A732CA070$ - 0Each1
A733CA090$ - 0Each1
A734CA150$ - 0Each1
A735CA187$ - 0Each1
A736CA207$ - 0Each1
A737Plant Native VegetationAll native plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Indigenous plants, and low maintenance plants are tolerant of site's existing soils and climate without supplemental irrigation or fertilization once established. This line item may be used in conjunction with line items above to convert existing landscape to xeriscape.

Plants established shall be 5-gallon size. Native plants shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. $ - 0 Each 10

TOTAL IQ CAPACITY FOR LINE ITEMS - A701 THROUGH A737 $70,000.00

&F

&P of &N

SECTION J

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

ELINS FIRST PERIOD FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 - B123
CLIN 1009 - First Option Period - Firm Fixed-Price Work - High Service Level (Green)
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICETOTAL
CA001Wilkson Hall USARC6835
Firm Fixed-Price Work
B001Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B002Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B003Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AA (Items B001 Through B003)$0.00
CA012Marina USARC/OMS/AMSA 12 S-S6628
Firm Fixed-Price Work
B004Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B005Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AB (Items B004 Through B005)$0.00
CA014Leymel Hall USARC/AMSA 14(G)6845
Firm Fixed-Price Work
B006Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B007Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AC (Items B006 Through B007)$0.00
CA021Quinones AFRC6362
Firm Fixed-Price Work
B008Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B009Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B010Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AD (Items B008 Through B010)$0.00
CA062BT Collins USARC/AMSA 98(G)6767
Firm Fixed-Price Work
B011Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B012Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B013Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AE (Items B011 Through B013)$0.00
CA070Col Francis R. Hunter USARC6905
Firm Fixed-Price Work
B014Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B015Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B016Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AF (Items B014 Through B016)$0.00
CA090PFC Robert H. Young Hall USARC6935
Firm Fixed-Price Work
B017Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B018Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AG (Items B017 Through B018)$0.00
CA150Mare Island USARC/AMSA (M)6991
Firm Fixed-Price Work
B019Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B020Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B021Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AH (Items B019 Through B021)$0.00
CA187HQ 63 RSC/ Moffett AFRC6240
Firm Fixed-Price Work
B022Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B023Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AJ (Items B022 Through B023)$0.00

TOTAL FFP LINE ITEMS - B001 THROUGH B023 $0.00

CLIN 1011 - First Option Period - Firm Fixed-Price Work - Medium Service Level (Amber)

CA001Wilkson Hall USARC6835
Firm Fixed-Price Work
B101Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B102Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B103Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AA (Items B101 Through B103)$0.00
CA012Marina USARC/OMS/AMSA 12 S-S6628
Firm Fixed-Price Work
B104Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B105Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AB (Items B104 Through B105)$0.00
CA014Leymel Hall USARC/AMSA 14(G)6845
Firm Fixed-Price Work
B106Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B107Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AC (Items B106 Through B107)$0.00
CA021Quinones AFRC6362
Firm Fixed-Price Work
B108Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B109Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B110Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AD (Items B108 Through B110)$0.00
CA062BT Collins USARC/AMSA 98(G)6767
Firm Fixed-Price Work
B111Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B112Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B113Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AE (Items B111 Through B113)$0.00
CA070Col Francis R. Hunter USARC6905
Firm Fixed-Price Work
B114Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B115Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B116Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AF (Items B114 Through B116)$0.00
CA090PFC Robert H. Young Hall USARC6935
Firm Fixed-Price Work
B117Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B118Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AG (Items B117 Through B118)$0.00
CA150Mare Island USARC/AMSA (M)6991
Firm Fixed-Price Work
B119Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B120Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B121Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AH (Items B119 Through B121)$0.00
CA187HQ 63 RSC/ Moffett AFRC6240
Firm Fixed-Price Work
B122Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B123Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AJ (Items B122 Through B123)$0.00

TOTAL FFP LINE ITEMS - B101 THROUGH B123 $0.00

&F

&P of &N

ELINS FIRST PERIOD FFP (OPTNL)

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH Spec Item C, SPEC ITEM 3 ELINS B001 - B102
CLIN 1010 - First Option Period - Firm Fixed-Price Work - High Service Level (Green), OPTIONAL
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICETOTAL
CA207Motco USARC696A
Firm Fixed-Price Work
B001Semi-Improved Grounds (Spec Item C, 3.2)12Month$ - 0$ - 0
B002Storm Drainage Systems (Spec Item C, 3.3)12Month$ - 0$ - 0
Total CLIN 1010AA (Items B001 Through B002)$0.00

TOTAL FFP LINE ITEMS - B001 THROUGH B002 $0.00

CLIN 1012 - First Option Period - Firm Fixed-Price Work - Medium Service Level (Amber), OPTIONAL

CA207Motco USARC696A
Firm Fixed-Price Work
B101Semi-Improved Grounds (Spec Item C, 3.2)12Month$ - 0$ - 0
B102Storm Drainage Systems (Spec Item C, 3.3)12Month$ - 0$ - 0
Total CLIN 1012AA (Items B101 Through B102)$0.00

TOTAL FFP LINE ITEMS - B101 THROUGH B102 $0.00

&F

&P of &N

ELINS FIRST PERIOD IQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS B701 - B737
CLIN 1013 - First Option Period - Indefinite Quantity Work
UNITUNIT OFMIN. ORDER
ELINSHORT DESCRIPTIONFULL DESCRIPTIONPRICEISSUEQTY
B701Tree and Stump Removal
Large 18.1” DBH and above Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 10 calendar days.$ - 0Each1
B702Tree and Stump Removal
Medium 6.1" DBH up to 18" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 7 calendar days.$ - 0Each1
B703Tree and Stump Removal
Small up to 6" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
B704Shrub and Stump Removal
Large 15-gallon and above, 48.1” and above Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
B705Shrub and Stump Removal
Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
B706Shrub and Stump Removal
Small Up to 5-gallon, up to 18” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 3 calendar days.$ - 0Each1
B707Complete Tree Pruning
Small - below and including 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 1 calendar day.$ - 0Each1
B708Complete Tree Pruning
Large - above 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 2 calendar days.$ - 0Each1
B709Soil AnalysisPerform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations.$ - 0Each1
B710GrassingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.$ - 0SF50
B711Tree PlantingAll trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
B712Shrub Planting (1-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
B713Shrub Planting (5-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .