South Sacramento Streams Project 1916 Florin Creek from Franklin Blvd to Highway 99 (Contract 2D1)
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 22 00 MEASUREMENT AND PAYMENT
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 QUALITY CONTROL SYSTEM (QCS)
01 45 00 QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 71 10 MOBILIZATION AND DEMOBILIZATION
01 76 26 PROTECTION OF EXISTING UTILITIES
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 13 EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS
03 20 00 CONCRETE REINFORCING
03 31 01 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS
03 39 00 CONCRETE CURING
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 92 00 JOINT SEALANTS
DIVISION 09 - FINISHES
09 90 00 PAINTS AND COATINGS
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 09 13 GEOTECHNICAL INSTRUMENTATION AND MONITORING
31 11 00 CLEARING AND GRUBBING
31 41 16 METAL SHEET PILING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT
32 12 10 BITUMINOUS TACK COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 31 13 CHAIN LINK FENCES, GATES, AND CABLE RAILING
PROJECT TABLE OF CONTENTS Page 1 Amendment 0002
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 RELATED REQUIREMENTS
1.4 SPECIAL SCHEDULING REQUIREMENTS
1.5 CONTRACTOR ACCESS AND USE OF PREMISES
1.5.1 Subcontractors and Personnel Contacts
1.5.2 Regular Working Hours
1.5.3 Work Outside Regular Hours
1.5.4 Occupied Buildings
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
01 14 00 - 1
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010;
Changes 4-6 2011) Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following must be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G
1.3 RELATED REQUIREMENTS
The work under this contract requires special attention to the scheduling and conduct of the work in connection the construction of Florin Creek Multi-Use Basin. It is anticipated that both the Florin Creek Multi-Use Basin and the South Sacramento Steams Florin Creek improvements will be under simultaneous construction. Coordination with the Contracting Officer and project coordinators for the Florin Creek Multi-Use Basin project is required for all construction schedule submittals for approval. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
1.4 SPECIAL SCHEDULING REQUIREMENTS
To facilitate the construction of the north bank of Florin Creek adjacent to Florin Creek Park and the weir improvements by the Florin Creek Multi-Use Basin contractor, work in the segment of Florin Creek adjacent to the Park must begin no later than 01 April 2016. The limits of this area of work is between Station 54+00 and the Persimmon Avenue box culvert. All work within these limits must be completed by 30 September 2016.
1.5 CONTRACTOR ACCESS AND USE OF PREMISES
1.5.1 Subcontractors and Personnel Contacts
Furnish a list of contact personnel of the Contractor and subcontractors
01 14 00 - 2 including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.5.2 Regular Working Hours
Construction activities must be limited to between 7:00 a.m. and 6:00 p.m.
Monday through Saturday and 9:00 a.m. and 6:00 p.m. on Sundays. This will be in accordance with the Sacramento Municipal Code for Noise Ordinance exemptions for construction (Sacramento Municipal Code Section 6.68.080 details construction exemptions). Truck deliveries will not be allowed between 6:00 a.m. and 10:00 a.m. and between 3:00 p.m. and 7:00 p.m., Monday through Friday, unless a permit has first been secured from the Contracting Officer.
1.5.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval and subsequent application for and approval of permit granted by the City of Sacramento. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress. During periods of darkness, a night work plan meeting all requirements of the EM 385-1-1 must be submitted and approved prior to any work being performed during dark hours
1.5.4 Occupied Buildings
The The Project involves working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
Access to all existing residences and businesses must be accommodated at all times throughout the construction period, unless written authorization is approved in advance from the Contracting Officer. At all times, property owners, residents, customers and emergency vehicles must be allowed access to private residential and commercial properties within the limits of the project.
ADA access must be provided at all times to businesses and residences that require it.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
01 14 00 - 3
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| WORK RESTRICTIONS |
| 01 14 00 - WORK RESTRICTIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 RELATED REQUIREMENTS |
| 1.4 SPECIAL SCHEDULING REQUIREMENTS |
| 1.5 CONTRACTOR ACCESS AND USE OF PREMISES |
| 1.5.1 Subcontractors and Personnel Contacts |
| 1.5.2 Regular Working Hours |
| 1.5.3 Work Outside Regular Hours |
| 1.5.4 Occupied Buildings |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |