Amendment_0003_released.pdf
PDF 3 MB Posted
- Solicitation number
- W91238-14-R-0014
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0006_released.pdf | ||
| Amendment_0005_released_.pdf | ||
| Amednment_0004.pdf | ||
| Amendment_0002_released.pdf | ||
| Safe_site_access_sop.docx | DOCX document | |
| W981238-14-R-0014.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91238-14-R-0014
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to post the names of the Site Visit attendees and the Slide Show Presentation provided by Beal AFE on 27 Feb 2014 for solicitation W91238-14-R-0014 Beale AFB Fence to Fence Environmental Services Requirement. Submission deadline for Bidders Proposals remains unchanged as - on or before 17 Mar 2014 5:00pm PST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Mar-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-14-R-0014
X 9B. DATED (SEE ITEM 11)
16-Feb-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Mar-2014
CODE
US ARMY CORPS OF ENGINEERS, SACRAMENTO
CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
SITE VISIT ATTENDEES
Site Visit Participants 2/27/2014 W91238-14-R-0014 F2F Environmental Services
Visitor's Name
Last Name First Name Company Name AMEC Environment & Infrastructure
Kim Walter Company Name Ayuda Companies
Farquhar Travis Kwasniewski Jenifer
Company Name Adanta, Inc.
Patz Kimberly
Company Name E2 Consulting Engineers Winsor Terry
Company Name Chenega Support Services (CSS), LLC Stewart Susan
Company Name Cherokee CRC, LLC.
Sparkman Kenneth
Vanderbilt Pamela Company Name S&B Christ Consulting LLC
Christ Sharon Company Name EQM
Mason Allen Company Name TRC
Copley Elizabeth
Company Name Tepa EC (prime)
Imamura Angela (sub)
Company Name Ahna Netiye
Fink Patrick Company Name GEMS
Camacho Richard Company Name Adanta, Inc.
Patz Kimberly Company Name NationView LLC
Hymer John Company Name Ahtna Professional Services, Inc.
Mahoney Michael Company Name E2 Consulting Engineers
Tice Leslie Company Name Chenega Support Services (CSS), LLC
Shepard Andrew
SITE VISIT PRESENTATION
Beale AFB F2F Site Visit Script Beale Air Force Base (BAFB) is home to the 9th Reconnaissance Wing. Comprised of more than 4,200 military personnel in four Groups, the Wing provides national and theater commands with timely, reliable, and superior quality high‐altitude reconnaissance products. Equipped with the nation's fleet of U‐2 and RQ‐4 reconnaissance aircraft and associated support equipment, the Wing maintains a high state of readiness in its combat support and combat service, and is always ready to support forces for potential deployment in response to theater contingencies. In June 2011, Beale AFB became home to a fleet of approximately 7 MC‐12 aircraft, which are a low altitude propeller driven reconnaissance plane.
One other airframe at Beale is the T‐38, which is a trainer and not actively involved in missions.
Patrol Road
Beale is a 22,944‐acre military installation at the eastern margin of the Sacramento Valley in
Yuba County, California.
Beale manages thousands of acres of wetlands, many of which are vernal pools and are habitat for threatened and endangered species. These pools must be managed and monitored to ensure their viability as habitat. The area we are now traveling through is one of three vernal pool restoration/preservation areas on base. Every year, representative pools are monitored for vegetation, hydrology, and animal communities.
To the west is Reed’s Creek, which is one of three major tributaries to the Bear River that cross base boundaries. Reed’s Creek has been designated as a suitable habitat for the Giant Garter
Snake, one of the listed species which could possibly be found on base. As such, the habitat has management requirements that are agreed upon by Beale Air Force Base and the US Fish and
Wildlife Service.
Doolittle
Straight ahead is the AFCOMAC munitions assembly site. This area houses the 9th Munitions
Squadron, which operates one of the Air Force’s only bomb assembly schools. Thousands of students attend the school each year.
The area to the right makes up the flightline area of the base. The facilities in this area house many different base organizations and missions, including aircraft and ground support equipment maintenance, base supply, and airfield operations.
Several diverse industrial processes occur in this area of the base, accounting for many of the base’s hazardous waste Initial Accumulation Points and facilities regulated by Spill Prevention
Control and Countermeasures regulations. One example you can see is the refueler maintenance area.
Several generators and paint booths are located in this flightline area of base. These units are some examples of Beale’s 600‐plus air emissions sources regulated by local Air Districts, the Air
Resources Board and the EPA. Beale is a true minor source and regulated as a synthetic minor for air quality regulation purposes. Next month, Beale and Feather River Air Quality
Management District will conduct the annual inspection for each permitted source. In addition to this two week inspection, air emission source inspections are also conducted at Beale’s two
Geographically Separated Units (GSUs) – the Lincoln Receiver Site in Lincoln and the NEXRAD site in Oroville.
These two GSUs are also responsible for generation of hazardous waste, which Beale is responsible for properly managing and disposing.
Stop at 539
We will now be stopping at Building 539. This facility serves as the 90‐day central accumulation site for much of Beale’s hazardous waste. We are stopping so that you can see the facility that will be at your disposal. It is currently operated by 3 full‐time contractors. We ask that there are no questions while inside the facility.
J Street
We are approaching two facilities integral to the base’s Spill Prevention Control and
Countermeasures Plan. To the right is the J Street AAFES gas station, one of five sites on base that has an Underground Storage Tank. To the left is the bulk fuels area, which includes 4 active
Aboveground Storage Tanks with a total capacity of 2.4 million gallons. The fifth tank belongs to an outside agency.
WWTP
This facility is the base’s wastewater treatment plant. It was built in the 1940’s and is fed by 41 miles of sewer line. It is operated under a National Pollutant Discharge Elimination System
(NPDES) permit, which requires specific sampling and management procedures that will be performed under this contract. Daily samples are taken at the wastewater treatment plant.
Gavin Mandery
To the left is the site of a recent downed utility pole that resulted in the spill of approximately
90 gallons of transformer oil. This incident required response from the base’s spill response team to prevent impacts to waters of the US and minimize any other potential negative effects.
The base is responsible for managing 39 historic and prehistoric cultural sites. Cultural resources reported for the base include: archaeological sites evidencing prehistoric occupation by the
Southern Maidu (Nisenan); historic archaeological sites representing Euro‐american settlement and the development of a farming/ranching economy; transportation and mining; the U.S. Army operation of Camp Beale during World War II; and the Cold War era PAVE PAWS facility.
Originally an Army base used to train infantry and house prisoners of war during World War II, Beale was acquired by the Air Force in 1948 for training purposes. The runway opened in 1959.
As previously discussed, several listed species occur on base. These species can be impacted by various base projects and operations. Beale has an Integrated Natural Resources Management
Plan, which outlines habitat and species management goals and work plans.
Housing
We are now entering the military family housing area, which was privatized in 2012.
To the right is the Capehart AAFES shoppette facility, which operates Underground Storage
Tanks and generates hazardous waste.
Warren Shingle
To the right is the medical clinic. The clinic operates its own HAZMART, a 90‐day accumulation site, and a 9‐month satellite accumulation point.
To the right on the hill is PAVEPAWS – At this facility, the 7th Space Warning Squadron continuously scans the horizon for missiles, satellites, and other man‐made objects in space. Its primary mission is to detect, track, and provide the North American Aerospace Command
(NORAD) with impact prediction of Sea‐launched and Intercontinental Ballistic Missiles launched towards North America. Its secondary mission is to track man‐made objects circling in Low
Earth Orbit. The facility has a hazardous waste accumulation site, permitted air emission sources and Underground Storage Tanks.
Notice the fire breaks around the PAVEPAWS perimeter and throughout the base, indicating the high threat of wildland fires.
To the left is the base Golf Course. The golf course is irrigated by treated effluent from the wastewater treatment plant. The golf course pond is one of the wastewater sampling locations.
On the right is Heritage Park and a static display of an SR‐71.
Coming up on the left is the AFCOMAC schoolhouse associated with the AFCOMAC munitions assembly site.
Beale has several tenants on base, including the 548th Intelligence, Surveillance and
Reconnaissance Group, which operates Distributed Ground System‐2 and Deployable
Shelterized System‐Film components of the Air Force Distributed Common Ground System, a mission that includes exploitation and dissemination of near‐real‐time U‐2, RQ‐4 and Predator imagery and signals data.
See Power point slides below
(End of Summary of Changes)
Beale Environmental Programs
OverviewOverview
Beale Background Info
Organizational Chart Organizational Chart
CEIE Strengths/Challenges
Program Specific Slides
EMS/ESOH– EMS/ESOH
– Storm Water
– Wastewater
– ERPERP
– Tanks
– HazWaste
– HazMat
– Air Quality
– Solid Waste
– Natural/Cultural Resources
NEPA– NEPA
Beale AFB
CEIE
StrengthsSt e gt s
• Strengths:
•Good working relationships with regulatory agencies & publicGood working relationships with regulatory agencies & public
•Well rounded team – experts in all program areas
•Despite receiving more inspections than any other installation in the ACC, p g p y , Beale has not received a major NOV since 2010
•Successfully encouraged shop ownership of environmental requirements
• Proactive approach through oversight
• Conservation Field Inspector - contractor
• P2/Compliance Inspection Manager – civilian
• Active ESOHCAMP (Tier 1 & 2) program
Joni Gerry
Storm Water Overview
• Beale AFB is regulated by two stringent NPDES Permits:
•Industrial General Permit (new permit expected in July 2014)
•Regulates discharges associated with industrial activities.
•Construction General Permit
•Regulates dischargers whose projects disturb one or more acres of soil.
• Permit compliance can be challenging in our Mediterranean climate •Spills can be a major storm water compliance issue: SSO’s CE Fire (pictured below)•Spills can be a major storm water compliance issue: SSO s, CE Fire (pictured below), other spills (fuel, transformer, AFFF)
22 Jan Fire – BAFB CE Bldg Debris in drainages
Brian Fererro
Earthen Dam along drainage
Storm Water Program Statusg
Challenges •Potential for NOVs from State Water Resources Control Board •New 2014 CA Industrial General Permit has more stringent requirements and increased sampling frequency
•Beale has struggled with benchmark exceedances in EC and TSS (likely due to construction projects)
• 2013 Notice – SWRCB intends to increase inspection frequency for Industrial Permitees
•Close proximity to EPA HQ = easy for regulators to pop in for inspection SWRCB inspects otherClose proximity to EPA HQ easy for regulators to pop in for inspection. SWRCB inspects other media - storm water is easy target while on other inspections
Good News •Discussions/rapport with SWRCB alleviated MS4 (Municipal) permit burden.
•BAFB removed as designee saving AF $35K in annual fees/projects
• Prior to Industrial General Permit adoption, CEIE rewrote SWPPP to align with draft permit requirements •Internal Stage 2 ESOHCAMP inspections are turning up potential storm water violations prior to regulatory inspections – Stage 2’s help to push SW compliance and bridge the gap between shopregulatory inspections Stage 2 s help to push SW compliance and bridge the gap between shop level personnel and Environmental Section
• CEIE staff have leaned forward and obtained Federal and State Storm Water Certifications – this aids in construction oversight and Tier 2 inspections ensuring permit compliance
Brian Ferrero
Waste water
• Beale has aging infrastructure, i.e. 1940’s era WWTP and 41 miles of sewer lines
• WDR Permit to be revised (new draft permit expected in 2014)
•Collection system has a high inflow/infiltration (I/I) rate and high risk for sanitary sewer overflows (SSO).
• A major SSO occurred in May 2011 f C• Major flooding inundated the temporary repair sewer line in Dry Creek
• ACC Sustain Team rated Wastewater System as degraded.
Ed Wydra
Dam at Beale Lake, Jan 2006 floodDam at Beale Lake, Spring 2005
Wastewater
Challenges
• WWTP
• Fails to meet effluent limits for TDS, pH, and TPH
• Pond 4 (winter storage) is at capacity and freeboard is monitored weekly
• Recycled water is used at the Base Golf Course requiring a daily tolal coliform sample
• Currently quarterly ground water monitoring is conducted from our 14 wells surrounding the Golf Course and Pond 4 and report is submitted to the Water Board
• Collection System
• Repeated SSOs have resulted in a minor NOV and placed Beale on the radar screen.
• New WDR likely will require a timetable for rehab of the collection system
• Rehabilitation of collection system needed to reduce SSO risk and alleviate Pond 4 capacity
B l l i t t ll th i d t i l t d t i f ll t t• Beale samples via contract annually the industrial users to determine sources of pollutants
Good News
• Higher Headquarters is aware of Beale’s challenges and is highly supportive of program• Higher Headquarters is aware of Beale s challenges and is highly supportive of program.
• New WDR likely will reduce some effluent limits and sampling requirements.
• 25-yr life cycle cost study recommended regionalization for treatment of wastewater.
• Beale to issue a RFP for a utility service agreement to convey/treat Beale’s wastewater at an off-base POTW.
• Beale leadership is aware of issues - approved Environmental Action Plan for wastewater.
Ed Wydra
Tanks & POL
• Primary products: JP-8, JPTS, Gasoline, Diesel, Used Oil
• 5 permitted UST Sites
• 2 AAFES Service Stations, 1 GOV Station, 1
Emergency Generator, & 1 Hydrant fuel distribution systemdistribution system
• ASTs Located throughout Base
• 4 ASTs at Bulk Fuels (2.5 MG total)
• 8 ASTs for fuel issue
F11709 Flightline MSS, July 2013
8 ASTs for fuel issue
• 46 Emergency Generator locations
• Program Requirements:
• Annual inspections AST and USTAnnual inspections, AST and UST
• Plans: SPCC and FRP
• Site Specific Response Plans
• Annual AST Storage Statement
• Permits and Fees
Elizabeth Scott
Permits and Fees
Kinder-Morgan AST and Bulk Fuels, 2007
Overview - Mapp
Elizabeth Scott
Challenges
• Flightline Military Service station require significant repairs
• Leak Detection System and Secondary Containment failed in 2012
• Station currently in Temporary Closure (Apr 13)
• 35% Conceptual Design project awarded by AFCEC July 2013
• Follow-on Design/Build Project will be next step (est. Spring 2014)
• Currently only 1 MSS in operation (5K gal of each fuel)
• Aging emergency generator UST system at PAVE PAWS needing repairsAging emergency generator UST system at PAVE PAWS needing repairs
• Many deficiencies noted in 2007 STI Formal External Tank Inspections (ASTs)
• Many deficiencies still not addressed
• Reduced storage capacity
• Only 3 active tanks at Bulk Fuels (jet fuel) Mi i l t hi l f l t ( li /di l)• Minimal motor vehicle fuel storage (gasoline/diesel)
Good News
• Great rapport with local CUPA (Yuba County)
• Major revision of Integrated Contingency Plan (SPCC/FRP) completed Jan 2014Major revision of Integrated Contingency Plan (SPCC/FRP) completed Jan 2014
• Hydrant USTs (FRP lined, single-walled tanks) recertified per 23 CCR 2663(h) in Feb 2014
• Completed initial reporting for CERS (California Environmental Reporting System) in July 2013, currently recertifying
Hazardous Waste
Program Overview
•Beale AFB is a Large Quantity Generator of Hazardous Waste (HW)•Beale AFB is a Large Quantity Generator of Hazardous Waste (HW)
• 80 Satellite Accumulation Sites, 1 Central Accumulation Site
• 3 GSU locations (Lincoln Site, Oroville Radar and Point Arena AFS)
• HW Program Support currently provided by contract
• Three full time employees
• HW Program Management provided by GS employeeg g p y p y
Eric Maresh
Hazardous Waste Discussion
Challenges
• Hazardous Waste operations at Beale are complex and large in scale.
• New contract may require overlap with existing contract for training and familiarization
• Current employees’ expertise/experience/knowledge is critical to the HazWaste program
• EESOH-MIS Waste Module Implementation
• Full implementation required by 1 April 2014
• Electronic entry of shop processes/waste streams NOT 100% completeElectronic entry of shop processes/waste streams NOT 100% complete
• System has some bugs to workout. Periodic server issues.
• Periodic server issues
• Start dates misrepresented at 90 day site.
L Q tit G t h t 600 i t t 3 GSU’• Large Quantity Generator; heavy tonnages per year; ~600 unique waste streams; 3 GSU’s
Good News
• Active and successful relationship with Yuba CUPA inspectors.
•HazWaste staff continuously preps for and performs dozens of compliance inspections per year•HazWaste staff continuously preps for and performs dozens of compliance inspections per year
•Completed CERS (CA Env. Reporting System) HazWaste business reporting for accumulation areas •Continually maintains real-time data in CERS to identify locations, types, quantities of HW at Beale
Eric Maresh
Hazardous Materials
Program Overview:
• 125 individual shops, 5 Hazmarts, 2 active GSUs, and frequent construction projects utilizing hazmat - managed by one contract support position encompassing:
•HMMP Team Lead •Environmental AF3952 Reviews •EESOH-MIS SAAR MGMT/annual revals •Short/Long term contractor HM
•Stage 2 ESOHCAMP Inspections •Classroom HM Monitor Trainings (added EMS, SW, SPCC trainings after ESOH-TN site down)
•Short/Long-term contractor HM compliance and usage tracking •Hazmart Tech training •GPC Cardholder trainings thru CONS •Precon Hazmat requirements
•EPCRA 312/313 Annual Reporting •CA HM Business Plan Reporting (CERS database) •Base-wide Shelf-Life Management procedures •EESOH-MIS Training & Support •HM Management Plan Annual RevisionsHM Management Plan Annual Revisions
Jimmy Galloway
Challenges
•Hazardous Mat operations at Beale are complex and large in scale.
• New contract may require overlap with existing contract for training and familiarizationy q p g g
• Current employees’ expertise/experience/knowledge is critical to the HazMat program
• Initial 2010 EESOH-MIS implementation was left incomplete:
• COCESS Hazmarts not fully operational in EESOH-MIS
• Oct 2012 COCESS contract renewal provided for NIPRnet and EESOH MIS access• Oct 2012 COCESS contract renewal provided for NIPRnet and EESOH-MIS access
• Additional delays due to the installation of NIPRnet computers and security clearances
• Previous HM contract support covered database mgmt only; not comprehensive
• Hazmat management deficiencies directly affect P2 and HW programs as well as overall EMS.
Reduced management effectiveness = increased regulatory vulnerability.
Discussion
Good News •Good working relationship with Yuba County CUPA
• Significant improvement in Hazmart inventory accuracy and base wide shelf life management following• Significant improvement in Hazmart inventory accuracy and base-wide shelf-life management following April 2012 Tier 2 ESOHCAMP findings and recommendations - corrected deficiencies in the methods used to monitor supplies in storage, and effectively preventing issues of expired HM to 100+ shops supporting critical Air Force weapon system assets.
• Developed an effective material disposition review and reuse process for excess/unwanted/expired HM, reducing overall HM/HW lifecycle costs and saving the Air Force thousands of dollars in waste.
•Through coordination with 9 CONS and continued personnel training, have increased effectiveness of transient contractor tracking procedures for base contracts utilizing hazmattransient contractor tracking procedures for base contracts utilizing hazmat
•Completed CERS Hazmat business reporting for reportable quantities of HM
Air Quality
• Beale is a true minor source regulated as a synthetic minor
•Beale has over 600 emissions sources regulated by three Air Districts, the Air Resources Board (ARB) and EPA:
• Placer County APCD (PCAPCD): 2 Permits
• Butte County AQMD (BCAQMD): 1 Permit
• Feather River AQMD (FRAQMD): 16 Permits
• ARB: In-Use Off Road Vehicle Registration, Tactical Support Equipment Inventory, and Refrigeration unit Reporting
• EPA: Boiler MACT NESHAP reporting, testing and maintenance; CAA Section 118(d) Compliance
• AB 2588 Air Toxics “Hot Spots” report due June 2014
• Annual inspection is conducted by FRAQMD for each permitted source
• Triennial inspections are conducted by PCAPCD (due 2014) and BCAQMD (due 2015)
• Beale maintains 32.9 tons of VOC Emissions Reduction Credits
Darren Rector
Air Quality Program Status
Challenges
• Timely award of AEI projects to meet FRAQMD reporting requirements g
• A compliance agreement from the 2008 NOV, FRAQMD requires AEI data to be submitted in CEIDARS format
Good NewsGood News
• Maintains excellent rapport with FRAQMD regulators
Darren Rector
Solid Waste/QRP
• CEIE manages the base Qualified Recycling Program (QRP)
• Operates a recycling yard for collection of scrap metal (150-200 tons/yr) d dand wood
• Oversees scrap metal contract, sale of scrap brass from CATM range through DLA
• CA regulates several non-hazardous wastes through Title 14 of CCR:
• Waste tires – permitting, storage, and manifest requirements
• Construction & demolition debris – volume and storage time limits
• Green waste – permitting requirements and storage limitsGreen waste permitting requirements and storage limits
Nolan Swick
Solid Waste/QRP Program Status
• Challenges
• QRP program must expand/increase revenue to be self-sustaining
• Continuous local market analysis needed to identify potential g
• Continuous local market analysis needed to identify potential commodities and buyers
• Existing unpermitted storage of C&D debris throughout base
• Open 2007 Stage 3 ESOHCAMP finding
• Soil management from in-house projects (sampling/disposal costs)
• Good News
• Improved relationship w/ DLA
• Has greatly increased our ability to turn-in/recycle itemsHas greatly increased our ability to turn in/recycle items
• Reimbursements for QRP-eligible sales through DLA fund the QRP manager position
Nolan Swick
Natural Resources
- Natural Resources Program Overview
- 23,192 acres; 80% undeveloped
- Vegetative Communities: annual grasslands, oak woodlands, oak savanna riparian forest sensitive wetlandssavanna, riparian forest, sensitive wetlands
- On transition between flat Central Valley on west and Sierra Nevada foothills on east
- Grazing program – second largest in AF at 13,000 acres
- 34 Special Status Species detected on base (State and Federal)34 Special Status Species detected on base (State and Federal)
- Extensive Hunting and Fishing Programs
V l P l P t t d h bit t f T & E S i
Chuck Carroll
- Vernal Pools - Protected habitat for T & E Species
Natural Resources
Challenges
- Large Program – Part-Time Natural Resources Manager (NR/CR)g g g ( )
- Lack of Conservation Law Enforcement Staff
Good News
- Special Area Management Plan (SAMP)
- Riparian Corridor Protection
- Annual National Public Lands Day events
- Integrated Pest Management - Bat Boxes, Owl Boxes
- Earth Week Program every April
- Exceptional Support from Contract Team-MembersExceptional Support from Contract Team Members
- Partner with Boy Scouts to accomplish NR goals
Cultural Resources
-Active Construction Program – Frequent Consultation
- Consult when there is potential for impacts
- Contact with 11 Tribal Entities
- 39 Native American Sites on Base
- One Site Nominated to NRHP
- Intense Recent Interest by One Tribe
• Manpower
• CR/NR Rolled into one SlotCR/NR Rolled into one Slot
• Both positions are part-time
-Upcoming Projects M C t ti P j t R i S ti 106- Many Construction Projects Require Section 106
- SHPO Concurrence on Facilities’ Eligibility Status
- Programmatic Agreement with Tribe(s)?
-IST Support Has Been Invaluable
Spill Response Program
• Post Spill Response Team (PSRT)
• Group of qualified personnel from 9 CES/CEIE providing on-call spill support to Beale AFB
Augmented by additional Beale shop personnel and equipment as needed• Augmented by additional Beale shop personnel and equipment as needed
• Services include:
• Clean-up / mitigation expertise (hands-on or advisory role)
• Equipment and supplies (pumps, tools, containers, absorbents, vehicles, etc.)
• Notifications to regulatory authorities when neededg y
• 9 CES/CEIE personnel enter spill information into the ‘Spill Incident Report Internet System’ as required by ACC
• OSRO (Oil Spill Response Organization) preparedness
• 9 CES/CEIE ensures OSRO contract is in place and current9 CES/CEIE ensures OSRO contract is in place and current
• OSRO retainer fee paid by DLA-Energy
• Support to Beale Emergency Operations
• As requested by leadership, 9 CES/CEIE has two personnel assigned to Beale’s Emergency
Operations Center
• Assigned in Emergency Support Function #10 (Oil and Haz Mat Response) duties
• Trained in both Beale specific emergency procedures and National Incident Management
Standards
NEPA
Overview/Status
Program Overview:
•2 Contract Support personnel managing Beale AFB NEPA encompassing:
• Currently 7 EA’s being drafted
• 200 AF 813’s processed annually
• numerous consultations with SHPO, USFWS, CRWQCB and USACE underway
• 20+ design reviews annually
• 3 EBS’s drafted/reviewed annually
• 200+ AF 332’s coordinated annually200+ AF 332 s coordinated annually
• 20 Certificates of Compliance coordinated annually
• Weekly regulatory correspondence
• 5+ weekly site visits/wetland verification
Ch llChallenges •Despite AF funding constraints - Beale’s NEPA program is robust and complex
• New contract may require overlap with existing contract for training and familiarization
• Current employees’ expertise/experience/knowledge is critical to the NEPA program and supporting AF construction schedules and goalsAF construction schedules and goals
Good News
• Good working relationship with SHPO, USFWS, CRWQCB and USACE
• On target to support over $100M in FY14/15 construction
Jamie Visinoni
| For Official Use Only: For Official Use Only |
| undefined: |
| lgendl: |
| Brian Ferrero: |
| Bulk Fuels Stonge ComPex: |
| I I lgaB I r: |
| AMES Cbllt Slu Station: |
| Not: |
| Elizabeth Scott: |
| Eric Maresh: |
| Jimmy Galloway: |
| Jimmy Galloway_2: |
| Jimmy Galloway_3: |
| Darren Rector: |
| Elizabeth Scott_2: |
| Jamie Visinoni: |
File details come from the government source that posted it. Updated .