AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project: American River Common Features, Sites R3A & L10, Sacramento, CA

The purpose of this Amendment is to:

1) Extend the Proposal Due Date. See Section 00 10 00, for details.

2) Extend the Close date of the Bidders Inquiry, question and answ er System. The Bidders Inquiry System question and answ er w ill now close on November 1, 2013.

3) Revises Specifications and draw ings. See Attachments.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Oct-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-13-R-0040

X 9B. DATED (SEE ITEM 11)

30-Sep-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 6 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Oct-2013

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91238-13-R-0040

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION - CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications 395 24-SEP-2013 Attachment 2 Drawings 75 27-SEP-2013 Attachment 3 Supplementary

Conditions

17 24-SEP-2013

Attachment 4 Wage Determination CA9 43 27-SEP-2013 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications 395 24-SEP-2013 Attachment 2 Drawings 75 27-SEP-2013 Attachment 3 Supplementary

Conditions

17 24-SEP-2013

Attachment 4 Wage Determination CA9 43 27-SEP-2013 Attachment 5 Specifications AMD 0001 50 28-OCT-2013 Attachment 6 Plans AMD 0001 1 28-OCT-2013

SECTION 00 10 00 - SOLICITATION

The required response date/time 05-Nov-2013 02:00 PM has been added.

The following have been modified:

SITE L10 PRICE BREAKDOWN

Pricing Breakdown Schedule for Site L10

Item No. Description Quantity Unit Issue Unit Price Total Price

0002AA Pre‐mobilization and Submittals (Jet Grouting)

1 LS $ $

0002AB Mobilization and Demobilization 1 LS $ $

0002ACSubsurfaceExploration,SoilBoring,
andInstallationofObservationWells

1 LS $ $

0002AD SWPPP Design and Implementation 1 LS $ $

0002AE Site Demolition and Disposal 1 LS $ $

0002AF Pothole Existing Utilities 1 LS $ $

0002AG Pre‐ and Post‐Project Surveys 1 LS $ $

0002AH Deformation Monitoring 1 LS $ $

0002AI Jet Grout Waste Management 1 LS $ $

0002AJ Final Construction Report 1 LS $ $

0002AK Pre‐production Jet Grout Cut‐off Wall Installation

1 LS $ $

0002AL Traffic Control and Signage 1 LS $ $

0002AM Striping 1 LS $ $

0002AN Levee Raise 1 LS $ $

0002AORemoveandReplaceExistingCable
Fence,GateandHandrail

1 LS $ $

0002AP Elderberry Bush Protection 1 LS $ $

0002AQRemoveandReplaceSurvey
Monument(AMD0001)

2 EA $ $

0002AR Erosion Control Seeding 1 LS $ $

0002AS Irrigation Sprinkler System 1 LS $ $

0002AT Sod (L10 Staging Area) 1 LS $ $

0002AU Working Platform Preparation for Jet Grouting

1 LS $ $

0002AV Jet Grout Waste Disposal During Production

*13,440 TON $ $

0002AW Aggregate Base Course *358 TON $ $

0002AX Asphalt Concrete *218 TON $ $

0002AY CLSM for Pipe Trench Backfill *35 CY $ $

0002AZ Production Jet Grout Cutoff Wall Installation

*19,174 SF $ $

0002BA Standby Time During Pre‐Production *30 DAY $ $

0002BB Standby Time During Production *5 DAY $ $

0002BC Rotary Exploratory Drilling *200 LF $ $

0002BD Rotary Exploratory Coring *800 LF $ $

0002BE Permeability Testing of Cored Samples

*27 EA $ $

0002BF Bore Hole Camera Surveys *72 HR $ $

0002BG In‐Situ Water Pressure Testing (Stage 1)

*14 EA $ $

0002BH In‐Situ Water Pressure Testing (Stage 2)

*14 EA $ $

0002BI Jet Grout Compressive Strength *243 EA $ $

TestingonFreshGroutCubes
0002BJJetGroutCompressiveStrength

Testing on Hardened Cuttings

*27 EA $ $

0002BKJetGroutCompressiveStrength
TestingonHardenedCoredSamples

*27 EA $ $

0002BLFieldCertificationofDrilling
DeviationInstruments

*3 EA $ $

0002BMRemove,StockpileandReplace
ExistingRiprap

*531 CY $ $

0002BN CLSM for waterside blanket *191 CY $ $

0002BO Waterside Clay Blanket *2,176 CY $ $

0002BP Geomembrane *1,033 SF $ $

Total Price(0002AA thru 0002BP)

* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN

ESTIMATED QUANTITY CONTRACT CLAUSE.

(End of Summary of Changes)