Insulate and Install HVAC on Existing 20 ABM Facilities Fort Hunter Liggett (FHL), CA

A. Statement of Work. The Contractor shall furnish all labor, material, equipment, supervision, transportation, shop drawings, construction as-builts and all else necessary to perform the following Task Order Scope of Work, Insulate and install HVAC on 20 existing structures (base unit size 30’ x 50’ feet), Fort Hunter Liggett,(FHL), CA. The majority of the effort includes spraying polyurethane for roofing primer for metal substrate, sprayed polyurethane foam roofing, 3”/R18.6 minimum, sprayed polyurethane foam roofing spray-on silicone coating, rigid joint sealants, tapes and sealants, PVC from adhesive, custom fabricated frame for ground mounted of Government owned wall mounted HVAC units and access/install Governments owned 3 ton HVAC units in 20 building locations.

This statement of work generalizes major work elements and is not all inclusive. The Government will rely on the Contractor’s expertise and experience to develop a written narrative and shop drawings describing the necessary actions to successfully execute this contract.

This Task Order Scope of Work shall be performed in accordance with the Unified Facilities Guide Specifications per your basic contract, Occupation Safety and Health Requirements (29 CFR 1910 and 1926), US Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1), and all applicable state and local codes.

B. Specific.

Scope includes the following construction, installation and startup as follows:

1. Purchase and install sprayed polyurethane foam roofing (SPF), primer for metal substrate.

3160 square feet (SF) x 20 buildings = 63,200 SF

2. Purchase and install sprayed polyurethane foam roofing, closed cell spray, polyurethane foam, 3 lbs per C.F density, 3”, R18.6 minimum

3. Purchase and install sprayed polyurethane foam roofing, spray-on silicone coating.

4. Purchase and install rigid joint sealants, tapes, sealant, PVC foam adhesive, 1/8” x 1/2”

10 lineal foot (LF) x 20 building = 200 LF

5. Fabricate and install Custom frame, for ground mounting of Government owned wall mounted HVAC units. Includes minimum equipment cost to allow for flex costs. 20 ea.

6. Install Government 3 ton HVAC units based on assemblies data (Item Number: D3050-185-0580 plus 8% O&P)

7. Performance period for this work shall be 90 calendar days from the Notice to Proceed (NTP).

W91238-10-R-0071 Task Order Specification Draft overview August 11, 2010

DRAFT