W91238-10-R-0066 Task Order Pricing Schedule

CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH

IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

LINE ITEM UNIT OF UNIT TOTAL

NO. DESCRIPTION QUANTITY MEASURE PRICE PRICE

0001 Roofing, Bldg 52/53 1 LUMP SUM $_________

Task Order Attachment 1 - Statement of Work 1 of 8 W91238-10-R-0066 July 30, 2010

Statement of Work

Install Singly Ply Membrane and Insulation on Roof of Bldg 52 &53 Part I – General Roofing

1.1 General: The contractor shall furnish and provide all labor, materials, equipment and professional supervision necessary to install new 4” rigid insulation and 40 mil single ply membrane over existing built up roofing. This work shall be performed at buildings 52 and 53.

1.1.1 Stated Objectives for Roofing System: The contractor shall then furnish and install a laminated, nominal 40 mil, single ply membrane roofing system that is non-ballasted and fabricated of a weft inserted low shrink, anti-wicking polyester fabric that has a thermoplastic coating (PVC).

The single ply membrane shall be prefabricated into various panel sizes with the largest size not exceeding 2,500 SF. Each panel shall have a factory dialectically (heat) welded 3-1/4” minimum mechanical securing tab formed at intervals not exceeding 60” o/c. Mechanical anchors (screws) and distribution plates shall be used in the field areas to fasten the tabs into place meeting a minimum wind-uplift requirement of 90 psi. Full perimeter termination bar strips fasten to buildings outside edge with lag screws shall be installed to secure membrane’s outer edge. Contractor shall replace all existing gutters and downspouts with new and provide new gutters and downspouts over any door opening on the downhill slope side of the roofs where they are lacking now. Gutters and downspouts shall be galvanized commercial grade. Other mechanical methods for anchoring the roof material into place will be considered if the satisfy the90 psi wind lift requirements. The thermoplastic coated membrane shall be recognized and categorized by the National Roofing Contractors Association as vinyl chloride polymer based materials combined with other substances (i.e. Bond Coat) and not an acceptable substitute.

Rigid insulation shall be placed under the singly ply membrane.

1.1.2 Stated Objective for Repairs: Approximately 16,980 SF of roof area each. Some removal of underlayment layers, which include asbestos silver painted tarpaper (refer to Safety 1.11), may be required. Wherever possible, the underlayment layers shall be returned to its original thickness for re-use. Those areas that do not have underpayment layers dues to excessive damage may not be required to be rebuilt. However, they may be repaired or filled in if it is necessary to maintain integrity of the new roof elements.

1.1.3 General Requirements:

1.1.3.1 Roofing Assembly Approval: The membrane and related items shall be approved by Factory Mutual research as a 1-90 roofing assembly.

1.1.3.2 Additional Weight Requirements: The total weight of the installed roofing system including all insulation, plates, screws and membrane shall not exceed 50 pounds per square. Each square is

Task Order Attachment 1 - Statement of Work 2 of 8

10’ x 10’.

1.1.3.3 NESHP Notification: The contractor shall provide National Emission Standards for Hazardous Pollutants notification a minimum 10 days prior to commencement of work.

1.1.3.4 Certifications and Medical Qualifications: The contractor shall supply copies of all employees’ Asbestos Worker/Competent Person certifications with respirator qualifications and medical qualifications.

1.2 Applicable Documents:

1.2.1 SIAD Regulation 420-7 (Fire Prevention and Protection)

1.2.2 SIAD Regulation 385-1 (Safety)

1.2.3 All local, state and federal laws

1.2.4 Safety Requirements for Fall Protection (29 CFR 1926.500)

1.2.5 Asbestos Abatement (Cal-OSHA 8 CCR 1529)

1.2.6 POCA Division 00 and 01 Specifications

1.3 Materials Approval: All materials shall be approved by the ACO prior to installation.

1.4 Submittals: in addition to basic IDIQ spec required submittals

1.4.1 Manufacturers Literature/Cut Sheets on the following:

1.4.1.1 Roofing Membrane with heat welded seams

1.4.1.2 Pre-manufactured parapet wall flashing and pipe flashing

1.4.1.3 PVC Weld able drip edges, gravel stops and termination bars

1.4.1.4 Membrane liner layouts

1.4.1.5 Manufacturer’s details for sealing around roof penetrations

1.4.1.6 Fasteners pull out test results performed by fastener manufacturer for this project

1.5 Unscheduled Interruptions: Work operations are subject to unscheduled interruptions and contractor personnel may be required to immediately leave the designated work area or be denied access due to security operations. Mission requirements may necessitate suspension or cancellation of custodial operations for that period. All incomplete work shall be rescheduled for completion at a later time/date mutually agreed upon by the ACO.

1.6 Working Area Verification: The floor areas and other quantitative data stated in this task order have been computed from drawings or site measurements. The contractor shall be responsible for the coordination and proper relationship of this work to the building premises, and thoroughly familiarize themselves with all the details of the work and working conditions, to verify all dimensions in the field, and advise the ACO of any discrepancies before performing any

Task Order Attachment 1 - Statement of Work 3 of 8 work.

1.7 Quality Assurance: While performing this work the contractor shall be subject to onsite inspections by a COR. If the work is found to be in violation of specification requirements, the ACO will issue a stop work order until the violation is resolved. Standby time and expenses required resolving the violation shall be at contractor expense.

1.8 Debris:

1.8.1 Non-Hazardous Waste: All scrap, solid waste, non-hazardous materials shall be disposed off the depot and in accordance with applicable laws and regulations at the contractor’s expense.

1.8.2 Hazardous Waste: Hazardous waste generated by contractors on Sierra Army Depot shall be disposed of in accordance with depot policy, contact the Environmental Office, 530-827-4318, for proper disposal instructions. Government receptacles will be provided for hazardous waste only. The government will dispose of the hazardous waste. The government shall be notified a minimum of 10 days prior to using the receptacle, so that it can be staged.

1.9 Materials and Equipment Stored on Depot: The government shall not assume any responsibility for the security or protection of any materials or equipment stored on the depot by the contractor.

1.10 Environmental Notification: The silver painted tarpaper on the roof contains asbestos.

1.11 Dimensions: The roofs are approximately 16,980 square feet each.

1.12 Roofing Contractor Qualifications: The roofing contractor must be approved and trained by the membrane manufacturer prior to the start of the installation process.

1.13 Warranties:

1.13.1 Craftsmanship and Application Warranty: The installation contractor shall warrant the roof application with respect to craftsmanship and proper application for a period of two (2) years from the date of acceptance by the COE. Should any leaks occur under this warranty during the two-year period, corrective action will be taken by the contractor to repair the roof within five days of notification and according to the membrane manufacturer’s specifications at no cost to the government.

1.13.2 Written Warranties: The membrane manufacturer shall provide a written minimum 15-year limited warranty at no additional cost or charge. Warranties shall cover ponding or standing water without voiding the warranty or shortening the time coverage.

Task Order Attachment 1 - Statement of Work 4 of 8

1.14 Manufacturer of Membrane: All roofing system components shall conform to the current published specifications and details provided by the membrane manufacturer. There shall be no deviation from these specifications without prior written approval by the membrane manufacturer and the ACO.

1.15 Product Delivery and Storage:

1.15.1 All materials shall be delivered in unopened packaging.

1.15.2 All containers shall be labeled with manufacturer’s name, brand name and identification of item.

1.15.3 All materials shall be stored in a dry area and protected from inclement weather; damaged materials shall be replaced at contractor expense.

2.0 Additional Training for Depot Employees: The single-ply membrane liner manufacturer shall agree to provide a training course for Sierra Army Depot’s maintenance crew. Training shall cover minor repairs to the liner and proper handling of its components. All training shall take place after membrane installation and at a time, location and cost agreed upon by manufacturer and the ACO.

Note: Should the single ply membrane match existing single ply membranes already installed on the depot, and depot crews have already received training under a previous contract, then additional training is no required.

2.1 Applicable Documents:

2.1.1 SIAD Regulation 420-7 (Fire Prevention and Protection)

2.1.2 SIAD Regulation 385-1 (Safety)

2.1.3 All local, state and federal laws

2.1.4 POCA Division 00 and 01 Specifications

2.2 Material Approval: All materials shall be approved by the ACO prior to installation.

2.3 Submittals: as required by basic IDIQ specifications

2.4 Unscheduled Interruptions: Work operations are subject to unscheduled interruptions and contractor personnel may be required to immediately leave the designated work area or be denied access due to security operations. Mission requirements may necessitate suspension or cancellation of custodial operations for that period. All incomplete work shall be rescheduled for completion at a later time/date mutually agreed upon by the ACO.

Task Order Attachment 1 - Statement of Work 5 of 8

2.5 Working Area Verification: The floor areas and other quantitative data stated in this task order have been computed from drawings or site measurements. The contractor shall be responsible for the coordination and proper relationship of this work to the building premises, and thoroughly familiarize themselves with all the details of the work and working conditions, to verify all dimensions in the field, and advise the ACO of any discrepancies before performing any work.

2.6 Quality Assurance: While performing this work the contractor shall be subject to onsite inspections by a COR. If the work is found to be in violation of specification requirements, the ACO will issue a stop work order until the violation is resolved. Standby time and expenses required resolving the violation shall be at contractor expense.

2.7 Debris:

2.7.1 Non-Hazardous Waste: All scrap, solid waste, non-hazardous materials shall be disposed off the depot and in accordance with applicable laws and regulations at the contractor’s expense.

2.7.2 Hazardous Waste: Hazardous waste generated by contractors on Sierra Army Depot shall be disposed of in accordance with depot policy, contact the Environmental Office, 530-827-4318, for proper disposal instructions. Government receptacles will be provided for hazardous waste only. The government will dispose of the hazardous waste. The government shall be notified a minimum of 10 days prior to using the receptacle, so that it can be staged.

2.8 Damages: The contractor shall be responsible for repairing any damage caused by construction and or repair activities. Any damages incurred as a result of contractor actions shall be repaired or replaced at no additional cost to the government.

2.9 Materials and Equipment Stored on Depot: The government shall not assume any responsibility for the security or protection of any materials or equipment stored on the depot by the contractor.

3.0 Part II – PRODUCTS:

3.1 Contractor Supplied Materials: The contractor shall supply normal industry standard approved materials.

3.1.1 Minimum Requirements:

3.1.1.1 Minimum Physical Specifications for Membrane:

3.1.1.1.1 Type: Laminated single-ply membrane, that is non ballasted and fabricated of a weft inserted low shrink, anti-wicking polyester fabric that has a thermoplastic coating

Task Order Attachment 1 - Statement of Work 6 of 8

(PVC). The thermoplastic-coated membrane shall be recognized and categorized by the National Roofing Contractors Association as a vinyl chloride polymer-based blend (PVC) single ply membrane. Substitutes that contain a mixture of vinyl chloride polymer-based materials combined with other substances (i.e. Bond Coat) are not acceptable substitutes.

The single-ply membrane shall be prefabricated into various panel sizes with the largest size not to exceed 2,500 square feet. Each panel shall have a factory dialectically (heat) welded 3-1/4” minimum mechanical securing tab formed at intervals not to exceed 60” O/C.

3.1.1.1.2 Minimum Thickness: Nominal 40 mil.

3.1.1.1.3 Tear Strength: 130 x 110 lb when tested by ASTM D-751 (Tongue Method 8” x 8” samples).

3.1.1.1.4 Breaking Strength: 200 x 200 lb when tested by ASTM D-751 methods.

3.1.1.1.5 EMMAQUA Exposure: Minimum EMMAQUA exposure (Desert Sun) greater than

6.1 million Langley with testing done by ASTM E938 methods.

3.1.1.1.6 Elongation: Elongation not to exceed 27% with testing done by ASTM D-751.

3.1.1.1.7 Dimensional Stability: Dimensional Stability is to be less that 5% change tested with ASTM D-1 204 methods.

3.1.1.1.8 Low Temperature Flexibility: Low temperature flexibility shall show no cracks at minus forty (-40) degrees F when tested by ASTM D2136 (1-1/8” mandrel).

3.1.1.1.9 Puncturing: Puncturing (dynamic impact) shall not be less than 250 lb as tested by Fed Std 101 B methods.

3.1.1.1.10 Accelerated Weathering: Accelerated weathering, using Carbon Arc 6000 Hr and ASTM G-53 88 2000 Hr shall show no cracking or blistering.

3.1.1.2 Mechanical Anchors and Distribution Plates: Mechanical galvanized corrosion resistant anchors and distribution plates shall be used to fasten the tabs into place meeting a minimum wind-uplift requirement of 90 psi. Other mechanical methods for anchoring the roof material into place will be considered based on satisfaction of the 90 psi wind lift requirements.

3.1.1.3 Insulation: Type ES rigid foam insulation, which must comply with federal specification factory mutual class “1” roofing insulation. Underwriters Laboratories classified as a class “A” roofing insulation with thermal properties for 4” equal an R-value of 30.3. Thermal properties for a 4” tapered shall be equal to an R-value of 26.3.

Task Order Attachment 1 - Statement of Work 7 of 8

3.1.1.4 Lumber: Pressure treated, 2” x 6”, kiln dried, LP 22, treated to .40.

3.2 Government Supplied Materials: The government shall supply the non-asbestos shingles required to return the exterior of the warehouse buildings to the original state.

4.0 Part III – Execution:

4.1 Roofing:

4.1.1 Repair and Removal: Wherever possible, the underlayment shall be left in the original condition for reuse. Some removal of the underlayment layers may be required.

Wherever possible the underlayment layers shall be returned to the original thickness for reuse.

Those areas that do not have underlayment layers due to excessive damage may not be required to be rebuilt up. However, they may be repaired or filled in if necessary to maintain the integrity of the new roof elements.

4.1.2 Installation: The roofing assembly including the insulation shall be installed in accordance with the manufacturer’s installation instructions. All field welds and procedures shall conform to manufacturer’s recommendations and all surfaces shall be clean and moisture free.

Note: Any section or portion of the roof that is being worked on shall be completed in a single day to avoid exposure or damage due to rain, dew and/or snow to any roofing component or interior of the facility. Any components that must be left exposed shall be covered and water cut-offs formed around exposed edges and incomplete flashing areas as minimums.

4.1.2.1 Fasteners: Galvanized corrosion resistant screws and plates of appropriate size and lengths as recommended by the PVC single-ply membrane manufacturer shall be used to anchor the liner into place. Spacing of all anchors shall conform to the pattersn provided by the manufacturer to perimeters and parapet walls. Fasteners for insulation and membrane shall penetrate a minimum ¾ inch wood deck by a minimum of 1/8 inch. Fasteners and plates shall meet Factory Mutual Standard 4470 for corrosion resistance and wind uplift resistance. Pull out tests shall be performed. They shall meet the fastener manufacturer standards.

4.1.2.2 Cut-Outs: All protrusions through the membrane shall be made to allow for complete sealing afterwards. The membrane shall be slit only wide enough to allow for the membrane to fit over the stack, flue or protrusions. Fasten around cut-outs with only approved membrane manufacturer’s fasteners. Place skirt or stainless steel band around the protrusion and tighten to prevent water penetration, cut off excess banding or material using a factory-approved sealant, and seal the top of the band or collar.

Task Order Attachment 1 - Statement of Work 8 of 8

4.1.2.3 Parapet Walls: Fasten bottom tab of prefabricated parapet wall flashing 12” O/C with approved fasteners. Base skirt shall extend a minimum of 6” onto the roof area and a minimum of 8” up parapet walls. Install termination bar on parapet wall anchoring with approved fasteners and seal completely with factory approved sealant only.

4.1.2.4 Gutters: For gutters, the edge of the membrane shall extend to within ¼” of the gutter and terminate with the termination bars fastened 6” O/C. Apply sealant as specified by the manufacturer.

W91238-10-R-0066 Task Order Attachment 2 Jul 30, 2010

SUPPLEMENTAL CONTRACT REQUIREMENTS

1. Performance Period. Refer to contract section 00700, page 12, FAR 52.211-10. The performance period for the work stated above shall be negotiated prior to award.

2. Liquidated Damages. Refer to contract section 00700, page 13, FAR 52.211-12, Liquidated Damages-Construction. Liquidated damages for this work is $1,166.00 for each day of delay.

3. Authorities. No person other than the Government Contracting Officer/Administrative Contracting Officer has the authority to make any changes to this contract action that impact cost or schedule. Authority from the Contracting Officer/Administrative Contracting Officer to the contractor to make changes that impact cost or schedule will be in the form of an official, signed modification.

4. Wage Determination. General Decision No. CA100009 dated 07/09/2010, or its most current modification at the time of award is hereby applicable to work performed under this task order. The most current decision or its modification can be found at http://www.wdol.gov/wdol/scafiles/davisbacon/CA9.dvb

5. Time Extensions For Unusually Severe Weather. Refer to POCA contract section 01505, Default (Fixed-Priced Construction). All weather delay will need to be submitted and approved by the Contracting Officer Representative.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK-SIERRA AD, CA

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

(20) (17) (17) (13) (06) (03) (01) (01) (04) (10) (15) (20) http://www.wdol.gov/wdol/scafiles/davisbacon/CA9.dvb�

Task Order Wage Determination 1 of 39 W91238-10-R-0066 July 09, 2010

General Decision Number: CA100009 07/09/2010 CA9

Superseded General Decision Number: CA20080009

State: California

Construction Types: Building, Heavy (Heavy and Dredging) and Highway

Counties: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Marin, Modoc, Napa, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Solano, Sonoma, Sutter, Tehama, Trinity, Yolo and Yuba Counties in California.

BUILDING CONSTRUCTION PROJECTS (excluding Amador County only);

DREDGING CONSTRUCTION PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); AND HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 03/12/2010 1 03/26/2010 2 07/02/2010 3 07/09/2010

ASBE0016-001 01/01/2010

AREA 1: ALAMEDA, CONTRA COSTA, LAKE, MARIN, MENDOCINO,

MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA

CLARA, SANTA CRUZ, SOLANO, & SONOMA COUNTIES

AREA 2: ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE,

EL DORADO, FRESNO, GLENN, HUMBOLDT, KINGS, LASSEN, MADERA,

MARIPOSA, MERCED, MODOC, MONO, NEVADA, PLACER, PLUMAS,

SACRAMENTO, SAN JOAQUIN, SHASTA, SIERRA, SISKIYOU, STANISLAU,

SUTTER, TEHEMA, TRINITY, TULARE, TUOLUMNE, YOLO, & YUBA COUNTIES

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 50.43 16.66 Area 2......................$ 39.78 16.66

ASBE0016-007 01/01/2010

Task Order Wage Determination 2 of 39

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 15.18 2.80

BOIL0549-002 01/01/2009

Rates Fringes

BOILERMAKER

(1) Marin & Solano Counties.$ 40.17 22.32

(2) Remaining Counties......$ 37.01 22.25

BRCA0003-001 08/01/2008

Rates Fringes

MARBLE FINISHER..................$ 28.02 12.12

BRCA0003-004 05/01/2009

AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,

LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,

SIERRA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES

AREA 2: MARIN, NAPA, SISKIYOU, SOLANO, SONOMA AND TRINITY

COUNTIES

BRICKLAYER

AREA 1......................$ 33.49 16.00

AREA 2......................$ 38.73 18.97

SPECIALTY PAY:

(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.

(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.

(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.

BRCA0003-008 07/01/2009

Task Order Wage Determination 3 of 39

TERRAZZO FINISHER................$ 30.25 11.57

TERRAZZO WORKER/SETTER...........$ 38.93 19.32

BRCA0003-010 04/01/2009

Rates Fringes

TILE FINISHER

Area 1......................$ 21.08 8.62 Area 2......................$ 21.16 11.02 Area 3......................$ 21.34 10.89 Area 4......................$ 20.83 10.37 Tile Layer Area 1......................$ 35.95 10.42 Area 2......................$ 34.31 12.12 Area 3......................$ 38.51 12.17 Area 4......................$ 35.35 12.12

AREA 1: Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Sutter, Tehema, Yolo, Yuba AREA 2: Alpine, Amador AREA 3: Marin, Napa, Solano, Siskiyou AREA 4: Sonoma

BRCA0003-014 08/01/2008

Rates Fringes

MARBLE MASON.....................$ 39.22 18.58

CARP0034-001 07/01/2009

Rates Fringes

Diver Assistant Tender, ROV Tender/Technician...........$ 35.75 24.16 Diver standby...............$ 40.33 24.16 Diver Tender................$ 39.33 24.16 Diver wet...................$ 80.66 24.16 Manifold Operator (mixed gas)........................$ 44.33 24.16 Manifold Operator (Standby).$ 39.33 24.16

DEPTH PAY (Surface Diving):

050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot

SATURATION DIVING:

The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.

Task Order Wage Determination 4 of 39

DIVING IN ENCLOSURES:

Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48" in height, the premium will be $1.00 per foot.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP0034-003 07/01/2009

Rates Fringes

Piledriver.......................$ 35.75 24.16

CARP0035-001 08/01/2009

AREA 1: MARIN, NAPA, SOLANO & SONOMA

AREA 3: SACRAMENTO

AREA 4: ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN,

MODOC, NEVADA, PLACER, PLUMAS, SHASTA, SIERRA, SISKIYOU,

SUTTER, TEHAMA, TRINITY, YOLO & YUBA

Drywall Installers/Lathers:

Area 1......................$ 36.50 21.40 Area 3......................$ 30.22 21.40 Area 4......................$ 29.77 21.40 Drywall Stocker/Scrapper Area 1......................$ 18.25 13.29 Area 3......................$ 15.11 13.29 Area 4......................$ 14.89 13.29

CARP0035-004 07/01/2009

AREA 1: Marin, Napa, Solano, Sonoma Counties

AREA 3: Sacramento

AREA 4: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sutter, Tehama, Trinity, Yolo, Yuba counties

Task Order Wage Determination 5 of 39

Carpenters:

AREA 1:

(1) Carpenter..............$ 36.50 20.96

(2) Hardwood Floor Layer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer..................$ 36.65 20.96

(3) Bridge Builder.........$ 36.50 20.96

(4) Millwright.............$ 36.60 22.55

AREA 3:

(1) Carpenter..............$ 29.72 20.96

(2) Hardwood Floor Layer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer..................$ 29.87 20.96

(3) Bridge Builder.........$ 36.50 20.96

(4) Millwright.............$ 32.22 22.55

AREA 4:

(1) Carpenter..............$ 29.27 20.96

(2) Hardwood Floor Layer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer..................$ 29.42 20.96

(3) Bridge Builder.........$ 36.50 20.96

(4) Millwright.............$ 31.77 22.55

CARP0035-010 07/01/2009

AREA 1: Marin, Napa, Solano & Sonoma Counties

AREA 2: Alpine, Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Sutter, Tehama, Trinity, Yolo & Yuba Counties

Modular Furniture Installer Area 1 Installer I................$ 21.60 13.89 Installer II...............$ 18.17 13.89 Lead Installer.............$ 25.05 14.39 Master Installer...........$ 29.27 14.39 Area 2 Installer I................$ 18.00 13.89 Installer II...............$ 15.23 13.89 Lead Installer.............$ 20.80 14.39 Master Installer...........$ 24.22 14.39

ELEC0006-002 12/01/2008

MARIN, NAPA, SOLANO & SONOMA COUNTIES

Task Order Wage Determination 6 of 39

Sound & Communications Installer...................$ 29.87 3%+11.95 Technician..................$ 34.01 3%+11.95

SCOPE OF WORK INCLUDES-

SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS

SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above.

EXCLUDES-

Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management systems.

ELEC0180-001 06/01/2010

NAPA AND SOLANO COUNTIES

Rates Fringes

CABLE SPLICER....................$ 45.84 3%+17.91

ELECTRICIAN......................$ 41.71 3%+18.10

ELEC0340-002 12/01/2009

ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN,

NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES

Communications System Sound & Communications Installer...................$ 24.13 3%+10.15 Sound & Communications Technician..................$ 27.75 3%+10.15

SCOPE OF WORK

Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following TV monitoring and surveillance, Task Order Wage Determination 7 of 39 background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.

A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS

Background foreground music Intercom and telephone interconnect systems, Telephone systems, Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide.

B. FIRE ALARM SYSTEMS

Installation, wire pulling and testing

C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems, Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV

D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems Sonar/infrared monitoring equipment

E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO

THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems VSAT Data Systems Data Communication Systems RF and Remote Control Systems Fiber Optic Data Systems WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two

(2) conditions apply:

1. The project involves new or major remodel building trades construction.

2. The conductors for the fire alarm system are installed in conduit.

ELEC0340-003 12/01/2009

ALPINE (West of Sierra Mt. Watershed), AMADOR, BUTTE, COLUSA, EL DORADO (West of Sierra Mt. Watershed), GLENN, LASSEN, NEVADA (West of Sierra Mt. Watershed), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (West of Sierra Mt. Watershed), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES

Task Order Wage Determination 8 of 39

ELECTRICIAN

Remaining area..............$ 38.43 3%+12.45 Sierra Army Depot, Herlong..$ 48.04 3%+12.45 Tunnel work.................$ 40.35 3%+12.45

CABLE SPLICER: Receives 110% of the Electrician basic hourly rate.

ELEC0401-005 12/01/2009

ALPINE (east of the main watershed divide), EL DORADO (east of the main watershed divide), NEVADA (east of the main watershed), PLACER (east of the main watershed divide) and SIERRA (east of the main watershed divide) COUNTIES:

ELECTRICIAN......................$ 35.40 13.02+3%

ELEC0551-004 06/01/2009

MARIN AND SONOMA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 44.00 3%+13.00

ELEC0659-006 01/01/2010

MODOC and SISKIYOU COUNTIES

Rates Fringes

ELECTRICIAN......................$ 29.78 3%+13.30

ELEC0659-008 08/01/2009

MODOC & SISKIYOU COUNTIES

Rates Fringes

Line Construction

(1) Cable Splicer...........$ 46.41 12.39

(2) Lineman, Pole Sprayer, Heavy Line Equipment Man....$ 41.44 12.28

(3) Tree Trimmer............$ 29.12 9.43

(4) Line Equipment Man......$ 35.64 9.86

(5) Powdermen, Jackhammermen...............$ 31.08 9.48

(6) Groundman...............$ 29.01 9.42

Task Order Wage Determination 9 of 39

ELEC1245-004 06/01/2009

ALL COUNTIES EXCEPT MODOC & SISKIYOU

Rates Fringes

LINE CONSTRUCTION

(1) Lineman; Cable splicer..$ 44.47 13.11

(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 35.52 12.07

(3) Groundman...............$ 27.17 11.82

(4) Powderman...............$ 39.71 12.23

HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day

ELEV0008-001 01/01/2010

Rates Fringes

ELEVATOR MECHANIC................$ 54.89 20.035

FOOTNOTE:

PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

ENGI0003-008 07/01/2009

Rates Fringes

Dredging: (DREDGING:

CLAMSHELL & DIPPER DREDGING;

HYDRAULIC SUCTION DREDGING:)

AREA 1:

(1) Leverman...............$ 38.94 22.58

(2) Dredge Dozer; Heavy duty repairman.............$ 33.98 22.58

(3) Booster Pump Operator; Deck Engineer; Deck mate;

Dredge Tender; Winch Operator...................$ 32.86 22.58

(4) Bargeman; Deckhand;

Fireman; Leveehand; Oiler..$ 29.56 22.58

AREA 2:

Task Order Wage Determination 10 of 39

(1) Leverman...............$ 40.94 22.58

(2) Dredge Dozer; Heavy duty repairman.............$ 35.98 22.58

(3) Booster Pump Operator; Deck Engineer; Deck mate;

Dredge Tender; Winch Operator...................$ 34.86 22.58

(4) Bargeman; Deckhand;

Fireman; Leveehand; Oiler..$ 31.56 22.58

AREA DESCRIPTIONS

AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,

NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,

SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,

SUTTER, YOLO, AND YUBA COUNTIES

AREA 2: MODOC COUNTY

THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2

AS NOTED BELOW:

ALPINE COUNTY:

Area 1: Northernmost part Area 2: Remainder

CALAVERAS COUNTY:

Area 1: Remainder Area 2: Eastern part

COLUSA COUNTY:

Area 1: Eastern part Area 2: Remainder

ELDORADO COUNTY:

Area 1: North Central part Area 2: Remainder

FRESNO COUNTY:

Area 1: Remainder Area 2: Eastern part

GLENN COUNTY:

Area 1: Eastern part Area 2: Remainder

LASSEN COUNTY:

Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder

MADERA COUNTY:

Area 1: Except Eastern part Area 2: Eastern part

Task Order Wage Determination 11 of 39

MARIPOSA COUNTY

Area 1: Except Eastern part Area 2: Eastern part

MONTERREY COUNTY

Area 1: Except Southwestern part Area 2: Southwestern part

NEVADA COUNTY:

Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder

PLACER COUNTY:

Area 1: Al but the Central portion Area 2: Remainder

PLUMAS COUNTY:

Area 1: Western portion Area 2: Remainder

SHASTA COUNTY:

Area 1: All but the Northeastern corner Area 2: Remainder

SIERRA COUNTY:

Area 1: Western part Area 2: Remainder

SISKIYOU COUNTY:

Area 1: Central part Area 2: Remainder

SONOMA COUNTY:

Area 1: All but the Northwestern corner Area 2: Remainder

TEHAMA COUNTY:

Area 1: All but the Western border with Mendocino & Trinity Counties Area 2: Remainder

TRINITY COUNTY:

Area 1: East Central part and the Northeastern border with Shasta County Area 2: Remainder

TUOLUMNE COUNTY:

Area 1: Except Eastern part Area 2: Eastern part

ENGI0003-018 06/29/2009

"AREA 1" WAGE RATES ARE LISTED BELOW

"AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1

Task Order Wage Determination 12 of 39

RATES.

SEE AREA DEFINITIONS BELOW

OPERATOR: Power Equipment

(AREA 1:)

GROUP 1.....................$ 37.77 21.69

GROUP 2.....................$ 36.24 21.69

GROUP 3.....................$ 34.76 21.69

GROUP 4.....................$ 33.38 21.69

GROUP 5.....................$ 32.11 21.69

GROUP 6.....................$ 30.79 21.69

GROUP 7.....................$ 29.65 21.69

GROUP 8.....................$ 28.51 21.69

GROUP 8-A...................$ 28.30 21.69

OPERATOR: Power Equipment (Cranes and Attachments -

AREA 1:)

GROUP 1

Cranes.....................$ 38.65 21.69 Oiler......................$ 29.39 21.69 Truck crane oiler..........$ 31.68 21.69

GROUP 2

Cranes.....................$ 36.89 21.69 Oiler......................$ 29.18 21.69 Truck crane oiler..........$ 31.42 21.69

GROUP 3

Cranes.....................$ 35.14 21.69 Hydraulic..................$ 30.79 21.69 Oiler......................$ 28.90 21.69 Truck Crane Oiler..........$ 31.18 21.69 OPERATOR: Power Equipment (Piledriving - AREA 1:)

GROUP 1

Lifting devices............$ 38.99 21.69 Oiler......................$ 29.73 21.69 Truck crane oiler..........$ 32.01 21.69

GROUP 2

Lifting devices............$ 37.17 21.69 Oiler......................$ 29.46 21.69 Truck Crane Oiler..........$ 31.76 21.69

GROUP 3

Lifting devices............$ 35.49 21.69 Oiler......................$ 29.24 21.69 Truck Crane Oiler..........$ 31.47 21.69

GROUP 4.....................$ 33.72 21.69

GROUP 5.....................$ 31.08 21.69

GROUP 6.....................$ 28.85 21.69

OPERATOR: Power Equipment (Steel Erection - AREA 1:)

GROUP 1

Cranes.....................$ 39.62 21.69 Oiler......................$ 30.07 21.69

Task Order Wage Determination 13 of 39

Truck Crane Oiler..........$ 32.30 21.69

GROUP 2

Cranes.....................$ 37.85 21.69 Oiler......................$ 29.80 21.69 Truck Crane Oiler..........$ 32.08 21.69

GROUP 3

Cranes.....................$ 36.37 21.69 Hydraulic..................$ 31.42 21.69 Oiler......................$ 29.58 21.69 Truck Crane Oiler..........$ 31.81 21.69

GROUP 4.....................$ 34.35 21.69

GROUP 5.....................$ 33.05 21.69

OPERATOR: Power Equipment (Tunnel and Underground Work

- AREA 1:)

SHAFTS, STOPES, RAISES:

GROUP 1....................$ 33.87 21.69

GROUP 1-A..................$ 36.34 21.69

GROUP 2....................$ 32.61 21.69

GROUP 3....................$ 31.28 21.69

GROUP 4....................$ 30.14 21.69

GROUP 5....................$ 29.00 21.69

UNDERGROUND:

GROUP 1....................$ 33.77 21.69

GROUP 1-A..................$ 36.24 21.69

GROUP 2....................$ 32.51 21.69

GROUP 3....................$ 31.18 21.69

GROUP 4....................$ 30.04 21.69

GROUP 5....................$ 28.90 21.69

FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Operator of helicopter (when used in erection work);

Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds.

GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu.

yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds.

m.r.c.

GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply;

Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2

cu. yds.; Loader 4 cu. yds. and over; Long reach excavator;

Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track

Task Order Wage Determination 14 of 39 loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour)

GROUP 4: Asphalt plant engineer/box person; Chicago boom;

Combination backhoe and loader up to and including 3/4 cu.

yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar;

Heavy-duty repairperson and/or welder; Lime spreader;

Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller;

Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;

Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment)

GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types);

Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller;

Trenching machine, maximum digging capacity over 5 ft.

depth; Vermeer T-600B rock cutter or similar

GROUP 6: Armor-Coater (or similar); Ballast jack tamper;

Boom- type backfilling machine; Assistant plant engineer;

Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft.

m.r.c.; Drill doctor; Helicopter radio operator;

Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation

Task Order Wage Determination 15 of 39 and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving);

Self- propelled pipeline wrapping machine; Soils & materials tester; Tractor; Self-loading chipper; Concrete barrier moving machine

GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons; Cary lift or similar;

Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant);

Grouting machine operator; Highline cableway signalperson;

Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals);

Self-propelled compactor (without dozer); Signalperson;

Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader

GROUP 8: Bit sharpener; Boiler tender; Box operator;

Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator;

Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self-propelled floating); Ross Carrier (construction site);

Rotomist operator; Self-propelled tape machine; Shuttlecar;

Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson;

Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity)

GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper

ALL CRANES AND ATTACHMENTS

GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons

Task Order Wage Determination 16 of 39

GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under;

Self-propelled boom-type lifting device, over 45 tons;

Tower crane

GROUP 3: Clamshell and dragline up to and including 1 cu.

yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under; Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons;

Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons;

PILEDRIVERS

GROUP 1: Derrick barge pedestal mounted over 100 tons;

Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons

GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu.

yds.; Self-propelled boom-type lifting device over 45 tons;

Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig

GROUP 3: Derrick barge pedestal mounted under 45 tons; Self-propelled boom-type lifting device 45 tons and under;

Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under

GROUP 4: Assistant operator in lieu of assistant to engineer;

Forklift, 10 tons and over; Heavy-duty repairperson/welder

GROUP 5: Deck engineer

GROUP 6: Deckhand; Fire tender

STEEL ERECTORS

GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self-propelled boom-type lifting device over 100 tons

GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane

GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under

GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder

Task Order Wage Determination 17 of 39

GROUP 5: Boom cat

TUNNEL AND UNDERGROUND WORK

GROUP 1-A: Tunnel bore machine operator, 20' diameter or more

GROUP 1: Heading shield operator; Heavy-duty repairperson;

Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator

GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator

GROUP 3: Drill doctor; Mine or shaft hoist

GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman

GROUP 5: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump operator; Slusher operator

AREA DESCRIPTIONS:

POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND

UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors]

AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,

NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,

SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,

SUTTER, YOLO, AND YUBA COUNTIES

AREA 2 - MODOC COUNTY

THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS

NOTED BELOW:

ALPINE COUNTY:

Area 1: Northernmost part Area 2: Remainder

CALAVERAS COUNTY:

Area 1: Except Eastern part Area 2: Eastern part

COLUSA COUNTY:

Area 1: Eastern part Area 2: Remainder

Task Order Wage Determination 18 of 39

DEL NORTE COUNTY:

Area 1: Extreme Southwestern corner Area 2: Remainder

ELDORADO COUNTY:

Area 1: North Central part Area 2: Remainder

FRESNO COUNTY

Area 1: Except Eastern part Area 2: Eastern part

GLENN COUNTY:

Area 1: Eastern part Area 2: Remainder

HUMBOLDT COUNTY:

Area 1: Except Eastern and Southwestern parts Area 2: Remainder

LAKE COUNTY:

Area 1: Southern part Area 2: Remainder

LASSEN COUNTY:

Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder

MADERA COUNTY

Area 1: Remainder Area 2: Eastern part

MARIPOSA COUNTY

Area 1: Remainder Area 2: Eastern part

MENDOCINO COUNTY:

Area 1: Central and Southeastern parts Area 2: Remainder

MONTEREY COUNTY

Area 1: Remainder Area 2: Southwestern part

NEVADA COUNTY:

Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder

PLACER COUNTY:

Area 1: All but the Central portion Area 2: Remainder

PLUMAS COUNTY:

Area 1: Western portion

Task Order Wage Determination 19 of 39

Area 2: Remainder

SHASTA COUNTY:

Area 1: All but the Northeastern corner Area 2: Remainder

SIERRA COUNTY:

Area 1: Western part Area 2: Remainder

SISKIYOU COUNTY:

Area 1: Central part Area 2: Remainder

SONOMA COUNTY:

Area 1: All but the Northwestern corner Area 2: Reaminder

TEHAMA COUNTY:

Area 1: All but the Western border with mendocino & Trinity Counties Area 2: Remainder

TRINITY COUNTY:

Area 1: East Central part and the Northeaster border with Shasta County Area 2: Remainder

TULARE COUNTY;

Area 1: Remainder Area 2: Eastern part

TUOLUMNE COUNTY:

Area 1: Remainder Area 2: Eastern Part

ENGI0003-019 06/29/2009

SEE AREA DESCRIPTIONS BELOW

Rates Fringes

OPERATOR: Power Equipment

(LANDSCAPE WORK ONLY)

GROUP 1

AREA 1.....................$ 28.64 20.53

AREA 2.....................$ 30.64 20.53

GROUP 2

AREA 1.....................$ 25.04 20.53

AREA 2.....................$ 27.04 20.53

GROUP 3

AREA 1.....................$ 20.43 20.53

AREA 2.....................$ 22.43 20.53

GR…