SPECS_VOL2_W91238-10-R-0005.pdf
PDF 9 MB Posted
- Solicitation number
- W91238-10-R-0005
About this file
Specs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment3.pdf | ||
| AM-03_03 30 00 pg 20_3.10.pdf | ||
| Amendment_0002.pdf | ||
| SF30 Amendment2.pdf | ||
| SF30 Amendment1.pdf | ||
| Site Visit Sign-In Sheet.pdf | ||
| DRAW_W91238-10-R-0005.pdf | ||
| General Decision No CO080012 16 Oct 09 CO12.pdf | ||
| Section 00111.pdf | ||
| RFP W91238-10-R-0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS (RFP) VOLUME 2 of 2__
VA - Grand Junction Seismic Corrections, Bldg. 1
GRAND JUNCTION, COLORADO
VOLUME 1 - BID DOCUMENTS (DIVISION 00)
VOLUME 2 - ATTACHMENTS thru TECHNICAL SPECIFICATIONS
RFP NO. W91238-10-R-0005
SPECIFICATION NO. 1679
DRAWING FILE NO. 515-25-008
US ARMY CORPS OF ENGINEERS
Sacramento District _______________________
VA - Grand Junction 1679
VOLUME 2 of 2
Table of Contents (Volume 2 of 2)
ATTACHMENTS
1 Not Used 2 Not Used 3 Not Used 4 Contractor Prepared As-Builts 5 MILCON Project Closeout (Red Zone Meeting) 6 Drawing List
TECHNICAL SPECIFICATIONS
DIVISION 01
01 00 00 General Requirements 01 32 01.00 10 Project Schedule
01 33 00 Submittal Procedures 01 35 26 Governmental Safety Requirements 01 42 00 Sources for Reference Publications 01 45 02.00 10 Quality Control System (QCS) 01 45 04.00 10 Contractor Quality Control 01 50 02.00 10 Temporary Construction Facilities 01 57 20.00 10 Environmental Protection 01 62 35 Recycled / Recovered Materials 01 78 02.00 10 Closeout Submittals
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 02 82 13.13 Glovebag Asbestos Abatement 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 02 82 13.31 Asbestos Transite Abatement
DIVISION 03 – CONCRETE
03 23 00 Pre-Stressing Steel 03 30 00 Cast-in-Place Concrete
DIVISION 04 – MASONRY
NOT USED
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 05 40 00 Cold-Formed Metal Framing 05 50 00 Metal Fabrications 05 58 00 Architectural Metal Connection (Column Cover System) Covers
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 24 00 Exterior Insulation and Finish Systems 07 84 00 Firestopping 07 92 00 Joint Sealants
DIVISION 08 - OPENINGS
NOT USED
DIVISION 09 – FINISHES
09 22 16 Non-Structural Metal Framing 09 26 00 Veneer Plastering 09 29 00 Gypsum Board 09 30 13 Ceramic Tiling 09 51 00 Acoustical Ceilings 09 91 00 Painting
DIVISION 10 – SPECIALTIES
10 14 00 Signage
DIVISION 11 – EQUIPMENT
NOT USED
DIVISION 12 – FURNISHINGS
NOT USED
DIVISION 13 - SPECIAL CONSTRUCTION
NOT USED
DIVISION 14– CONVEYING EQUIPEMENT
DIVISION 21- FIRE SUPPRESSION
21 05 11 Common Work Results for Fire Suppression 21 12 00 Fire-Suppression Standpipes 21 13 13 Wet-Pipe Sprinkler Systems
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 22 11 00 Facility Water Distribution 22 13 00 Facility Sanitary Sewerage 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 22 63 00 Gas Systems for Laboratory and Healthcare Facilities
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC and Steam Generation 23 07 11 HVAC, Plumbing, and Boiler Plant Insulation 23 21 13 Hydronic Piping 23 22 13 Steam and Condensate Heating Piping 23 31 00 HVAC Ducts and Casings 23 37 00 Air Outlets and Inlets
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 05-05M 26 05 21 Low-Voltage Electrical Power Conductors and Cables (600 Volts and Below) 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 36 Cable Trays for Electrical Systems 26 27 26 Wiring Devices 26 51 00 Interior Lighting 26 56 00 Exterior Lighting
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 27 05 26 Grounding and Bonding for Communications Systems 27 05 33 Raceways and Boxes for Communications Systems 27 15 00 Communications Horizontal Cabling 27 52 23 Nurse Call and Code Blue Systems 27 52 31 Security Emergency Call, Duress Alarm, and Telecommunications 27 52 41 Miscellaneous Medical Systems 12-05M
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 11 Requirements for Electronic Safety and Security Installations 28 05 13 Conductors and Cables for Electronic Safety and Security 28 05 33 Raceways and Boxes for Electronic Safety and Security 28 31 00 Fire Detection and Alarm
DIVISION 31 – EARTHWORK
31 62 00 Driven Piles
DIVISION 32 – EXTERIOR IMPROVEMENTS
NOT USED
DIVISION 33 – UTILITIES
NOT USED
DIVISION 34 – TRANSPORTATION
ATTACHMENTS
ATTACHMENT NO. 1
ATTACHMENT NO. 2
ATTACHMENT NO. 3
ATTACHMENT NO. 4
CONTRACTOR PREPARED AS-BUILTS
Preparing As-Built Drawings INSP05L0.DOC Effective 09/13/04 Rev 1
Preparing As-Built Drawings
Scope
This instruction covers preparing high-quality As-Built drawings to show changes made to the project during construction. As-Built drawings are an official record of the project at the time of construction completion. The original "as-designed" contract drawings and specifications are modified to show all additions, deletions and other changes made during construction. Accurate as-built drawings are very important for project operation and maintenance, and future modifications, particularly for plumbing and electrical systems, which are hidden from view.
References − CADD/GIS Technology Center Architectural, Engineering, and Construction
(A/E/C) CADD Standards[http://tsc.wes.army.mil/products/standards/aec/intro.asp]
Definitions.
See the Glossary of Engineering Quality System Terms and Acronyms [REFQ10L0], for definitions.
Contractor Markups - Drawings that are marked and annotated to show the project As-Built and constructed by the contractor. They are part of the working as-built set.
As-Built Drawings - The amended "As-designed" drawings revised to show the project as the contractor built and constructed it. The revisions from Contractor Markups and field inspection notes are transferred to the Final as-built set of drawings. The final as-built drawings include modifications during construction, field requested changes, shop drawing modifications, and contractor designs.
As-Constructed Drawings - These are As-Built Drawings for Civil Works Projects. The term As-Built used in these instructions is synonymous.
Working As-Built
The Contractor shall maintain 2 sets of paper drawings and specifications (marked-up prints) to track changes, additions or deletions from the original design during construction. Working as-built drawings shall be kept current on a weekly basis and at least one paper set of as-built drawings shall be available on the jobsite at all times.
Areas of Concern
There are some general items that need some special checking to ensure that the marked-up prints are complete and accurate. The working as-built shall show, but shall not be limited to, the following:
Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division
Rev 1
(1) The actual location, kinds and sizes of all of existing and new utility lines, especially underground lines within the construction area. Measurements will be shown for all change of direction points and all surface or underground components such as valves, manholes, drop inlets, clean outs, meters, etc. The descriptions of exterior utilities shall include the actual quantity, size, and material of the utility lines. In order that the location of these lines and appurtenances may be determined in the event the surface openings or indicators become covered over or obscured, the as-built drawings shall show, by offset dimensions to two permanently fixed surface features, the end of each run including each change in direction. Valves, splice boxes and similar appurtenances shall be located by dimensioning along the utility run from a reference point. The average depth below the surface of each run shall also be recorded.
(2) The location and dimensions of any changes within the building structure.
(3) Layout and schematic drawings of electrical circuits and piping.
(4) Correct dimensions and details transferred from shop drawings.
(5) Correct grade, elevations, cross section, or alignment of roads, earthwork, structures or utilities if any changes were made from contract plans.
(6) Actual location of anchors, construction and control joints, etc., in concrete.
(7) Changes in location of equipment and architectural features.
(8) Where contract drawings or specifications present options, only the option selected for construction shall be shown on the final as-built prints. Cross out such words and phrases as "optimal requirement," "or equal," etc., and list specifically the items of material provided.
(9) Unusual or uncharted obstructions that are encountered in the contract work area during construction.
(10) Location, extent, thickness, and size of stone protection particularly where it will be normally submerged by water.
(11) Changes in details of design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor; including but not limited to fabrication, erection, installation plans and placing details, pipe sizes, insulation material, dimensions of equipment foundations, etc.
(12) The topography, invert elevations and grades of drainage installed or affected as part of the project construction.
(13) If borrow material for this project is from sources on Government property, or if Government property is used as a spoil area, the Contractor shall furnish a contour map of the final borrow pit/spoil area elevations.
Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division
Rev 1
(14) Systems designed or enhanced by the Contractor, such as HVAC controls, fire alarm, fire sprinkler, and irrigation systems
(15) Changes or modifications that result from the final inspection.
Mark-up Guidelines
The following information is provided to improve the quality of the marked-up prints and thereby facilitate preparation of final as-built drawings. The most important guideline is that the marked-up changes on the prints shall be complete and understandable. Visits to the site by the draftsperson, or visits to the draftsperson by the construction superintendent, can be minimized by providing complete and understandable marked-up prints.
(1) Frequently use written explanations on As-Built drawings to describe changes - do not rely totally on graphic means to convey the revision.
(2) Legibility of lettering and digit values shall be precise and clear when marking prints, and clarify ambiguities concerning the nature and application of change involved.
(3) Wherever a revision is made, make changes to affect related section views, details, legend, profiles, plans and elevation views, schedules, notes and call-out designations, and mark accordingly to avoid conflicting data on all other sheets.
(4) When changes are made, cross out all features, data and captions that relate to that revision.
(5) When changes are required on small-scale drawings and in restricted areas, suggest large-scale inserts be drawn or sketched, with leaders to the location where applicable.
(6) Provide a legend if colors other than the "base" colors of red, green, and blue are used.
Be sure descriptive markings conform to legend symbols shown.
(7) Be sure to add and denote in legend, any additional equipment or material facilities, service lines, etc., incorporated under As-Built Revision if not already shown in legend.
(8) When attached prints (or sketches) are provided with marked-up print, indicate whether:
a. Entire drawing shall be added to contract drawings or
b. Whether the contract drawings shall be changed to agree, or
c. For reference only to further details not required for initial design.
(9) Make the comments on the drawing complete without reference to letters, memo's, or materials that are not also a part of the As-Built. Annotating the drawing, “Per Change Order #42,” means nothing when the actual change order states, “added an additional 12 duplex” outlets or similar statements. The same is true when the drawing is marked, Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division
Rev 1
“changed per COE instructions.” This office and ultimately the using organizations must know what was changed, how it was changed, where the items(s) were relocated to and how the affected connections were altered. Change Orders usually do not provide information as to how the facility was changed, only what was changed.
(10) The markups shall be accomplished on blue or black line prints of the most current originals.
(11) Shop drawings are to be incorporated into the As-Built drawings. They will be provided in electronic CADD file format and conform to the Sacramento District CADD Standards and the A/E/C CADD Standards. Hand drawn or plotted paper shop drawings will not be accepted as submittals.
The hand drawn or plotted paper shop drawings are not usable as original drawings for several reasons.
a. Deleted
b. The drawings are not of an adequate scale or are drawn to no scale and are not transferable to the CORPS drawings due to lack of information.
c. The limited numbers of reproducible shop drawings that have been received have not been on the Corps of Engineers standard sheets sizes making it difficult to convert these drawings to standard COE drawings.
Any drawing provided by non-COE sources will be drawn in CADD. Sheets shall be drawn at the same scale as similar drawings in the set (example: Fire alarm systems shall be drawn to the same scale as the plumbing or electrical drawings). The drawing shall meet the same standards required for the rest of the drawings set. Sheet number, detail number, etc shall tie details and sketches to existing drawings.
FINAL AS-BUILT DRAWINGS
The contractor will transfer the changes from the working as-built marked prints to the original electronic CADD files. Final as-built drawings shall be prepared after the completion of each definable feature of work as listed in the Contractor Quality Control Plan (Foundations, Utilities, Structural Steel, etc., as appropriate for the project). The Resident Engineer and the Contractor will jointly review the working as-built marked prints, printouts from working as-built CADD file drawings, and final as-built drawings for accuracy and completeness, prior to submission of each monthly pay estimate. Monthly review of working as-built CADD printouts shall at minimum cover all sheets revised since the previous review.
DRAFTING STANDARDS
The Corps requires that standard professional engineering drafting practices be utilized in correcting the original electronic CADD drawings to show as-built conditions. In general, the letter styles, line thickness, and scale will be the same as the original drawings. When shop drawings or other sheets are added, they will be drawn in electronic CADD.
Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division
Rev 1
CADD Standards: File Naming Convention will be maintained on all existing CADD files and followed for any new files added. The Contractor shall revise CADD files as-built drawing layers, to show the as-built conditions during the prosecution of the project. All as-built “triangle” changes shall be on a separate single layer, using a single color, with an associated medium pen width.
• Name the layer AS-BUILT for AutoCAD files (DWG).
• MicroStation files (DGN) use:
− Level #63 − Level/Layer Name contains: ANNO-REVS − Level/Layer Description: Revisions
The following specific requirements apply to the preparation of as-built drawings:
The Title Sheet (first sheet): The first sheet will be labeled with the word AS-BUILT. The words CONTRACT NUMBER and the actual contract number will be entered as shown on attachment
1. The contract number contains the Fiscal Year, the letter C (for construction), and the sequence number (example: 96-C-0000). No other work need be done on this sheet unless sheets are being added or deleted from the List of Drawings or other actual changes are made on this sheet. (See Attachment 1.)
The second and subsequent sheets: All the sheets following the title sheet will be labeled with the AS-BUILT stamp. (See Attachment 2.)
Signature representation (CADD files only): All signatures that appear on the approved original design drawings need to be represented on all the electronic as-built files. The format for these are /s/Name (i.e. /s/Raymond Dennis). The only name that does not require the /s/ is the District Commander’s name that appears only on the cover sheet (the title sheet). (See Attachments 1 & 2.)
Revisions Block entries: Those sheets, which have no changes, will only be labeled AS-BUILT as described above. Those sheets which have changes shown on them will have REVISED AS-BUILT entered in the first available space. This will be revision one and a number 1 will be entered in the triangle at the beginning of that line. In the event the sheet has already been revised and a number and revision appear in the revision lines the next sequential number will be used. Normally the first entry is made in the first line. The completed originals CADD file drawings will be reviewed for accuracy and initialed by the Contractor. (See Attachments 2 & 3.)
Marking Revisions: Place an equilateral triangle (3/8" per side) near the area revised for all changes. One triangle may be placed near the table or detail title where several items in a table or detail are changed or completely redrawn. This same method may be used for general revisions to floor plans and system plans (plumbing, electrical, a/c, heating); when a major portion of the drawing is changed, the triangle may be placed near the diagram, detail, section or plans title. A triangle will be placed near each item when only a few items are revised, added or
Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division
Rev 1 deleted. The triangles will contain the same number as the As-Built revision on that sheet. (See Attachment 4.)
Revision Annotations:
Deletion - to show an item was not installed, cross the item out on the drawing along with any associated devices, connecting lines, ducts, pipes etc., including notes and dimensions.
To show a detail is not being used, box the detail and letter NOT USED across the detail. A box will be drawn on the sheet with an X as shown in Attachment 5. The words NOT USED will be in heavy block lettering a minimum of 5/8" high. Place a triangle and revision number inside the box where notes are indicated as not being used.
Notes - draw a line thru the note or line item in a table in lieu of erasing the line item or note. A triangle and number will be placed near the deleted item.
Additions - show a new or additional item or items and associated connections made if the print indicates such connections. A triangle and number will be placed near the new item.
All lettering will conform to the existing lettering on each sheet.
Relocations - draw the item in the new location and erase it from the old location. All connections will be transferred if applicable, such as wiring, piping, and ducts. Revision triangles with appropriate number will be shown at the new and old location.
Drawing continuity: The applicable drawings shall be marked-up when a change was made, although this will not always be the case. Final responsibility for drawing continuity is with the person doing the As-Built. When one floor plan indicates a wall, room, doors etc., has been changed, the same change shall be made on all other applicable drawings. When the change is applicable to only one discipline such as electrical and does not directly affect other discipline sheets, a note may be added to other discipline sheets such as "See sheet _____ for As-Built Conditions.”
Shop drawings: When shop drawings are added to the original contract drawing set they need to be appropriately labeled with the Sacramento District file number, and discipline and sequence sheet number. The Index of Drawings will also need to be revised to show the additional sheet
(s) with the appropriate sheet title. In the case where the shop drawing are smaller than the Corps standard sheet size (i.e. 8.5"x11" or 11"x17" etc.) the sheets will be cut into a standard Corps sheet size border sheet and appropriately labeled. (For additional information refer to Mark-up Guidelines, Shop drawings above.)
Distribution
Archives Unit
Contractor*
Resident Engineer*
Specification Engineer
Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division
Rev 1
Ownership
The Archives Unit [Raymond.E.Dennis@usace.army.mil?Subject=INSP05L0-Preparing As- Built Drawings] is responsible for ensuring that this document is necessary and that it reflects actual practice.
Activity Preface
These tasks are performed whenever changes, additions or deletions from the original "as-designed" contract drawings and specifications are made during construction.
Prior Activity
Creation, Packaging, and Delivery of Project Documents [PROP09L0]
Contractor
1. Print two sets of paper drawings and specifications for working as-built.
The Contractor shall maintain 2 sets of paper drawings and specifications (marked-up prints) to track changes, additions or deletions from the original design during construction.
2. Mark working as-built set to show changes, additions or deletions.
Place an equilateral triangle (3/8" per side) near the area revised for all changes. One triangle may be placed near the table or detail title where several items in a table or detail are changed or completely redrawn. This same method may be used for general revisions to floor plans and system plans (plumbing, electrical, a/c, heating); when a major portion of the drawing is changed, the triangle may be placed near the diagram, detail, section or plans title. A triangle will be placed near each item when only a few items are revised, added or deleted. The triangles will contain the same number as the As-Built revision on that sheet.
(See Attachment 4.)
Changes, additions or deletions will immediately be noted on each of the working as-built set by redline process. No other marks, doodles, notes, or annotations shall be put on these sets of working as-built prints. All changes from the contract plans, which are made in the work, or additional information which might be uncovered in the course of construction will be accurately and neatly recorded as they occur by means of details and notes.
All changes and/or required additions to the paper prints will be clearly identified in color contrasting to black, as follows:
Colors shall be the "base" colors of red, green, and blue. Color code for changes shall be as follows:
(1) Deletions (red) - Deleted graphic items (lines) shall be colored red with red lettering in notes and leaders.
Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division
Rev 1
(2) Additions (Green) - Added items shall be drawn in green with green lettering in notes and leaders.
(3) Special (Blue) - Items requiring special information, coordination, or special detailing or detailing notes shall be in blue.
The working as-built sets will be annotated in as much detail as necessary to clarify exactly what construction changes were performed.
3. Transfer the changes from the working as-built marked prints to the "as-designed" electronic CADD files.
The contractor will transfer the changes from the working as-built marked prints to the original electronic CADD files on a monthly basis. Final as-built drawings shall be prepared after the completion of each definable feature of work as listed in the Contractor Quality Control Plan (Foundations, Utilities, Structural Steel, etc., as appropriate for the project).
If Project feature complete, goto task #4. Otherwise, goto task #2.
4. Submit As-Built drawings for review.
The contractor shall submit the Final As-built conditions on a new CD to the Resident Engineer in the customer specified electronic format as a Government, District Office Approval (G, DO) required submittal.
Resident Engineer
5. Review As-Built drawings.
The Resident Engineer and the Contractor will jointly review the working as-built marked prints, printouts from working as-built CADD file drawings, and final as-built drawings for accuracy and completeness, prior to submission of each monthly pay estimate. Monthly review of working as-built CADD printouts shall at minimum cover all sheets revised since the previous review.
If As-built OK, goto task #7. Otherwise, goto task #6.
6. Note required corrections on submittal and return to Contractor.
Goto task #3.
7. Notify Contractor of submittal acceptance.
If Final Submittal, End of activity; Goto Managing As-Built & As-Constructed Drawings [PROQ08L0]. Otherwise, goto task #2.
Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division
Rev 1
Flow Chart Preparing As-Built Drawings
PROP09L0
Start
Contractor Print two sets of paper drawings & Specs for working as-built. (1)
Contractor Mark working as-built set to show changes, additions or deletions. (2)
Contractor Transfer changes from working as-built marked prints to "as-designed" electronic CADD files. (3)
Proj feature complete?
Contractor Submit As-Built drawings for review.
(4)
Resident Engr Review As-Built drawings. (5)
As-built OK?
Resident Engr Note required corrections on submittal & return to Contractor. (6)
Resident Engr Notify Contractor of submittal acceptance. (7)
Final Submittal?
End
PROQ08L0
A
B
B
A
Y
N
Y
N
Y
N
Copyright © Oracle Corporation, 2002. All rights reserved. Content written by USACE, Sacramento District, Engineering Division
ATTACHMENT NO. 5
MILCON PROJECT CLOSEOUT
(RED ZONE MEETING)
SAMPLE
Red Zone Meeting Checklist
Date:_____________
Contract No.
Description / Location
Contractor Contracting Officer
Action Completion Milestone √
Inspections Fire
Safety Pre-final
Mechanical Test & Balance Commissioning Landscaping Complete Beneficial Occupancy Date (BOD) Furniture Installation Comm Installation As-Built Contract Drawings Provide all O&M manuals, tools, shop drawings, spare parts, etc. provided to customer
Provide Warranty documents to Customer
Contract completion Final Inspection User move-in DD Form 1354, Transfer of Real Property completed & signed
Ribbon cutting DD Form 2626 - Construction Contractor Performance Evaluation
DD Form 2631 – A-E Performance Rated after Construction
Final Payment Completed Release of Claims Return of Unobligated Funds Move Project from CIP to General Ledger
Financial completion
ATTACHMENT NO. 6
Spec #1679
Seismic Corrections, Building 1;
VA Medical Center; Grand Junction, CO - 1
ATTACHMENT 6
LIST OF DRAWINGS
The drawings listed below accompanying this specification form a part of the contract.
VAMC Grand Junction, CO; Seismic Corrections, Building 1 SPEC No. 1679
Drawing No. Title
GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX
G-003 GENERAL SYMBOLS
G-004 GENERAL ABBREVIATIONS
ARCHITECTURAL
AD901 DEMOLITION PHOTOGRAPH I
AD902 DEMOLITION PHOTOGRAPH II
AD903 DEMOLITION PHOTOGRAPH III
AD904 DEMOLITION PHOTOGRAPH IV
AD905 DEMOLITION PHOTOGRAPH V
AD906 DEMOLITION PHOTOGRAPH VI
A-101 FIRST FLOOR PLAN
A-102 TOWER/STAIR PLAN
A-103 TOWER & CONNECTION COVER PLANS
A-201 ELEVATION – WEST TOWER
A-202 ELEVATION – WEST TOWER
A-203 ELEVATION – WEST TOWER
A-204 ELEVATION – EAST TOWER
A-205 ELEVATION – EAST TOWER
A-301 SECTIONS – STEEL CONNECTION COVER
A-401 REFLECTED CEILING PLAN - 1ST FLOOR - WEST
A-402 REFLECTED CEILING PLAN - 1ST FLOOR - EAST
A-403 REFLECTED CEILING PLAN - 2ND FLOOR - WEST
A-404 REFLECTED CEILING PLAN - 2ND FLOOR - EAST
A-405 REFLECTED CEILING PLAN - 3RD FLOOR - WEST
A-406 REFLECTED CEILING PLAN - 3RD FLOOR - EAST
A-407 REFLECTED CEILING PLAN - 4TH FLOOR - WEST
A-408 REFLECTED CEILING PLAN - 4TH FLOOR - EAST
A-409 REFLECTED CEILING PLAN - 5TH FLOOR - WEST
A-410 REFLECTED CEILING PLAN - 5TH FLOOR – EAST
A-501 DETAILS I
A-502 DETAILS II
STRUCTURAL
S-001 STANDARD STRUCTURAL NOTES
S-002 STANDARD CONCRETE DETAILS I
S-003 STANDARD CONCRETE DETAILS II
S-004 STANDARD PILE DETAILS AND SCHEDULE
S-005 STANDARD REINFORCING DETAILS
S-101 FOUNDATION PLAN
S-102 1ST FLOOR FRAMING PLAN
S-103 2ND FLOOR FRAMING PLAN
S-104 3RD FLOOR FRAMING PLAN
S-105 4TH FLOOR FRAMING PLAN
VA Medical Center; Grand Junction, CO - 2
S-106 5TH FLOOR FRAMING PLAN
S-107 ROOF FRAMING PLAN
S-301 TYPICAL FULL SECTION
S-302 TOWER SECTIONS
S-303 STAIR AND WALL SECTION
S-401 FOUNATION PLAN AND SECTION
S-402 TYPICAL TIE BACK SYSTEM FRAMING PLAN
S-403 ALTERNATIVE TIE BACK SYSTEM FRAMING PLAN
S-404 TOWER PLANS I
S-405 TOWER PLANS II
S-501 TIE BACK SYSTEM SECTION AND DETAILS I
S-502 TIE BACK SYSTEM SECTION AND DETAILS II
S-503 TIE BACK SYSTEM SECTION AND DETAILS III
S-504 TIE BACK SYSTEM SECTION AND DETAILS IV
S-505 TIE BACK SYSTEM SECTION AND DETAILS V
S-506 ALTERNATIVE TIE BACK SYSTEM SECTION AND DETAILS I
S-507 ALTERNATIVE TIE BACK SYSTEM SECTION AND DETAILS II
S-508 SECTIONS AND DETAILS I
S-509 SECTIONS AND DETAILS II
MECHANICAL
M-001 MECHANICAL AND PLUMBING SYMBOLS
M-401 ENLARGED PARTIAL 1ST FLOOR MECHANICAL PLAN - WEST
M-402 ENLARGED PARTIAL 1ST FLOOR MECHANICAL PLAN - EAST
M-403 ENLARGED PARTIAL 2ND FLOOR MECHANICAL PLAN - WEST
M-404 ENLARGED PARTIAL 2ND FLOOR MECHANICAL PLAN - EAST
M-405 ENLARGED PARTIAL 3RD FLOOR MECHANICAL PLAN - WEST
M-406 ENLARGED PARTIAL 3RD FLOOR MECHANICAL PLAN - EAST
M-407 ENLARGED PARTIAL 4TH FLOOR MECHANICAL PLAN - WEST
M-408 ENLARGED PARTIAL 4TH FLOOR MECHANICAL PLAN - EAST
M-409 ENLARGED PARTIAL 5TH FLOOR MECHANICAL PLAN - WEST
M-410 ENLARGED PARTIAL 5TH FLOOR MECHANICAL PLAN - EAST
M-411 6TH FLOOR MECHANICAL PLAN
PLUMBING
P-401 ENLARGED PARTIAL 1ST FLOOR PLUMBING PLAN - WEST
P-402 ENLARGED PARTIAL 1ST FLOOR PLUMBING PLAN - EAST
P-403 ENLARGED PARTIAL 2ND FLOOR PLUMBING PLAN - WEST
P-404 ENLARGED PARTIAL 2ND FLOOR PLUMBING PLAN - EAST
P-405 ENLARGED PARTIAL 3RD FLOOR PLUMBING PLAN - WEST
P-406 ENLARGED PARTIAL 3RD FLOOR PLUMBING PLAN - EAST
P-407 ENLARGED PARTIAL 4TH FLOOR PLUMBING PLAN - WEST
P-408 ENLARGED PARTIAL 4TH FLOOR PLUMBING PLAN - EAST
P-409 ENLARGED PARTIAL 5TH FLOOR PLUMBING PLAN - WEST
P-410 ENLARGED PARTIAL 5TH FLOOR PLUMBING PLAN – EAST
P-901 PARTIAL BASEMENT PLAN – WEST & EAST
P-902 WEST BASEMENT PHOTOGRAPHS
P-903 WEST BASEMENT PHOTOGRAPHS
P-904 WEST BASEMENT PHOTOGRAPHS
P-905 EAST BASEMENT PHOTOGRPAHS
P-906 EAST BASEMENT PHOTOGRAPHS
ELECTRICAL
E-001 ELECTRICAL SYMBOLS LEGEND
E-401 PARTIAL 1ST FLOOR ELECTRICAL PLAN - WEST
E-402 PARTIAL 1ST FLOOR ELECTRICAL PLAN - EAST
E-403 PARTIAL 2ND FLOOR ELECTRICAL PLAN - WEST
E-404 PARTIAL 2ND FLOOR ELECTRICAL PLAN - EAST
VA Medical Center; Grand Junction, CO - 3
E-405 PARTIAL 3RD FLOOR ELECTRICAL PLAN - WEST
E-406 PARTIAL 3RD FLOOR ELECTRICAL PLAN - EAST
E-407 PARTIAL 4TH FLOOR ELECTRICAL PLAN - WEST
E-408 PARTIAL 4TH FLOOR ELECTRICAL PLAN - EAST
E-409 PARTIAL 5TH FLOOR ELECTRICAL PLAN - WEST
E-410 PARTIAL 5TH FLOOR ELECTRICAL PLAN - EAST
1-E24 LIGHTING PLAN - SECOND FLOOR - AREA A2 (AS BUILT)
1-E26 POWER & SPECIAL SYSTEMS PLAN – FIRST FLOOR – AREA
A1(AS BUILT)
1-E29 POWER & SPECIAL SYSTEMS PLAN – SECOND FLOOR – AREA
A1(AS BUILT)
1-E30 POWER & SPECIAL SYSTEMS PLAN - SECOND FLOOR- AREA
A2(AS BUILT)
- - - E N D - - -
TECHNICAL SPECIFICATIONS
VA Grand Junction Seismic Corrections, Building 1 1679
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 SCRAP MATERIAL
1.2 WRITTEN GUARANTEES AND GUARANTOR'S LOCAL REPRESENTATIVE
1.3 PRICING OF CONTRACTOR FURNISHED PROPERTY
1.4 TEMPORARY ELECTRIC WIRING
1.4.1 Temporary Power and Lighting
1.4.2 Construction Equipment
1.4.3 Circuit Protection
1.5 UTILITIES NOT SHOWN
1.6 GENERAL SAFETY REQUIREMENTS
1.6.1 General
1.6.2 The Prime Contractor's Superintendent
1.6.3 Job Hazard Analysis
1.6.4 Violations
1.6.5 Elevated Work Areas
1.6.6 Fire Prevention
1.6.7 Record Keeping/Reporting Requirements
1.6.8 Accident Reporting
1.6.9 Monthly Safety Inspections
1.7 PLANNED UTILITY OUTAGES AND STREET CLOSURES
1.8 EXCAVATION PERMITS
1.9 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.10 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1.11 EQUIPMENT DATA FORM
1.12 SPECIAL CONSTRUCTION REQUIREMENTS
1.12.1 Contractor Badges
1.12.2 Construction Security Requirements
1.12.3 Construction Restraints
1.12.4 Operations and Storage Areas
1.12.5 Alterations
1.12.6 Infection Prevention Measures
1.12.7 Disposal, Retention and Recycling
1.12.8 Protection of Existing Vegetation, Structures, Equipemnt, Utilities and Improvements
1.12.9 Restoration
1.12.10 Physical Data
1.12.11 Temporary Use of Mechanical and Electrical Equipment
1.12.12 Temporary Use of Existing Elevators
1.12.13 Occupied and Existing Buildings
1.12.14 Night Work
1.12.15 Safety Plan
1.13 LABOR RATES
1.14 WEEKLY COORDINATION MEETING
1.15 RED ZONE MEETING
1.16 MAJOR PHASE AND FINAL PROJECT COMPLETION
1.17 AFTER AWARD DOCUMENTS
1.18 MONTHLY SAFETY INSPECTION
1.19 ACM ABATEMENT
1.20 EXTRA OBSERVATION PERSONNEL; WORK ON 3rd FLOOR, EAST
PART 2 PRODUCTS (NOT USED)
01 00 00- 1
PART 3 EXECUTION (NOT USED)
-- End of Section Table of Contents --
01 00 00- 2
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 SCRAP MATERIAL
Materials specified to be removed and become the property of the Contractor are designated as scrap, and the Contractor, by signing this contract, hereby acknowledges that he has made due allowance for value, if any, of such scrap in the contract price.
1.2 WRITTEN GUARANTEES AND GUARANTOR'S LOCAL REPRESENTATIVE
Prior to completion of the contract, the Contractor shall obtain and furnish to the Contracting Officer's representative written guarantees for all the equipment and/or appliances furnished under the contract. The Contractor shall furnish with each guarantee: The name, address, and telephone number of the guarantor's representative nearest to the location where the equipment and/or appliances are installed, who, upon request of the Using Service's representative, will honor the guarantee during the guaranty period and will provide the services prescribed by the terms of the guarantee.
1.3 PRICING OF CONTRACTOR FURNISHED PROPERTY
At the request of the Contracting Officer, the Contractor shall promptly furnish and shall cause any subcontractors to furnish, in like manner, unit prices and descriptive data required by the Government for property record purposes of fixtures and equipment furnished and installed by the Contractor.
1.4 TEMPORARY ELECTRIC WIRING
1.4.1 Temporary Power and Lighting
The Contractor shall provide construction power facilities in accordance with the safety requirements of the National Electrical Code NFPA 70 and the SAFETY AND HEALTH REQUIREMENTS MANUAL EM 385-1-1. The Contractor, or his delegated subcontractor, shall enforce all the safety requirements of electrical extensions for the work of all subcontractors. All work shall be accomplished by skilled electrical tradesmen in a workmanlike manner, as approved by the Contracting Officer.
1.4.2 Construction Equipment
In addition to the requirements of EM 385-1-1, SAFETY AND HEALTH REQUIREMENTS MANUAL, all temporary wiring conductors installed for operation of construction tools and equipment shall be either Type TW or THW contained in metal raceways, or may be multi-conductor cord. Temporary wiring shall be secured above the ground or floor in a workmanlike manner and shall not present an obstacle to persons or equipment. Open wiring may only be used outside of buildings, and then only in strict accordance with the provisions of the National Electrical Code.
1.4.3 Circuit Protection
In addition to the present requirements in EM 385-1-1 and the National
01 00 00- 3
Electrical Code, all 15 and 20 ampere receptacle outlets used for obtaining power during construction shall have ground fault circuit interrupters (GFCI) for personnel protection. Block and brick saws shall also be equipped with GFCI. The Contracting Officer may allow an exception to this requirement for circuits for concrete vibrators or circuits operating at other than 60 Hertz normal (in both cases an assured grounding program as described in the National Electrical Code, except utilizing the daily inspection frequency of the grounding means of such equipment, may be permitted). The assured grounding program will not be permitted as a substitute for usage of GFCIs except as described above. All generator powered 15 and 20 ampere, 60 Hertz receptacle outlets shall have GFCIs, and shall be properly grounded. A testing means shall be provided which will impose a measured fault of 5 milliamperes, plus or minus 1 milliampere, and result in tripping the GFCI unit.
1.5 UTILITIES NOT SHOWN
If the Contractor encounters, within the construction limits of the entire project, utilities not shown on the plans and not visible as to the date of this contract and such utilities will interfere with construction operations, he shall immediately notify the Contracting Officer in writing to enable a determination by the Contracting Officer as to the necessity for removal or relocation. If such utilities are removed or relocated as directed by the Contracting Officer, the Contractor shall be entitled to equitable adjustment for any additional pertinent work or delay.
1.6 GENERAL SAFETY REQUIREMENTS
1.6.1 General
The Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, (see Contract Clauses, Section 00700, ACCIDENT PREVENTION) and the Occupational Safety and Health Act (OSHA) Standards for Construction (Title 29, Code of Federal Regulations Part 1926 as revised from time to time);
General Industry Standards (Title 29, Code of Federal Regulations Part 1910 as revised from time to time); and the National Fire Protection Association Codes (NFPA 241) are applicable to this contract. In case of conflict the most stringent requirement of the standards is applicable.
1.6.2 The Prime Contractor's Superintendent
The Prime Contractor's superintendent shall take an active role in enforcing the safety requirements by participation in safety conferences, hazard analysis (see below), tool box meetings, walk through inspections, correction of violations, etc., and including that of the subcontractor's work. The site Superintendent shall have a 30 hour OSHA safety course certification and assure all other contractor employees have attended the 10 hour OSHA training.
1.6.3 Job Hazard Analysis
Based on the construction schedule, the Contractor shall submit a job hazard analysis of each major phase of work prior to entering that phase of activity. The analysis shall include major or high risk hazards, as well as commonly recurring deficiencies that might possibly be encountered for that operation, and shall identify proposed methods and techniques of accomplishing each phase in a safe manner. The Prime Contractor's superintendent shall take active participation in the Job Hazard Analysis, including the subcontractors' work. Prior to start of actual work a meeting shall be held with Prime Contractor, Government, and affected subcontractor to review the Job Hazard Analysis. In addition, job site
01 00 00- 4 meetings shall be held to indoctrinate foreman and workers on details of this analysis.
1.6.4 Violations
If recurring violations and/or gross violation indicate that the safety performance is unsatisfactory, corrective action shall be taken as directed, and at the discretion of the Contracting Officer the retention or some part thereof will be withheld from the progress payment until corrective action has been completed.
1.6.5 Elevated Work Areas
Workers in elevated work areas in excess of 6 feet above an adjoining surface require special safety attention. In addition to the provisions of EM-385-1-1, the following safety measures are required to be submitted to the Contracting Officers Representative. Prior to commencement of work in elevated work areas, the Contractor shall submit drawings depicting all provisions of his positive protection system including, but not limited to, all details of guard rails.
a. Positive protection for workmen engaged in the installation of structural steel and steel joists shall be provided by safety nets, tie-offs, hydraulic manlifts, scaffolds, or other required means. Decking crews must be tied-off or work over nets or platforms not over 6 feet below the work area. Walking on beams and/or girders and climbing of columns is prohibited without positive protection.
b. Perimeter guard rails shall be installed at floor, roof, or wall openings more than 6 feet above an adjoining surface and on roof perimeters. Rails shall be designed to protect all phases of elevated work including, but not limited to, roofing operations and installation of gutters and flashing. Rails around roofs may not be removed until all work on the roof is complete and all traffic on or across the roof ceases. Rails shall be designed by a licensed engineer to provide adequate stability under any anticipated impact loading. As a minimum, the rails shall consist of a top rail at a height of 42 inches, a mid-rail, and a toe board. Use of tie-offs, hydraulic manlifts, scaffolds, or other means of roof edge protection methods may be utilized on small structures such as family housing, prefabricated metal buildings, etc.
1.6.6 Fire Prevention
Twenty-four hours' notice shall be given to the Contracting Officer for coordination with VA personnel prior to conducting any fire hazardous operation. Cutting or welding will be permitted only in areas that are or have been made fire safe. Where possible, all combustibles shall be located at least 35 feet horizontally from the work site. Where such location is impracticable, combustibles shall be protected with fire blankets and/or protective welding screens to prevent slag from running out of the work area. Edges of covers at the floor shall be tight to prevent sparks from going under them. This precaution is also important at overlaps where several covers are used to protect a large pile. The Contractor shall not allow any welding/cutting or open flame operations in facilities that are protected by a wet pipe fire sprinkler or an automatic detection system, if the system is out of service. First priority of work will be to return the suppression/detection system to operational condition. Return the fire detection and/or suppression system back to an
01 00 00- 5 operational status (if possible) during periods that the facility is unoccupied, and at the end of the work day. The Contractor shall post a fire guard for a 24-hour period (or certify to the Contracting Officer that the facility is safe) after welding, cutting, and open flame operations in a facility when: (a) fire detection and suppression system cannot be returned to service; (b) fire detection or suppression systems do not exist. The Contractor is responsible for providing their own appropriate flammable storage containers and for securing their own gas cylinders. Other fire prevention precautions shall be in accordance with the latest National Fire Codes.
1.6.7 Record Keeping/Reporting Requirements
On all contract operations, the Prime Contractor shall be responsible for recording and reporting all accident exposure and experience incident work. (This includes exposure and experience of the prime contractor and his/her sub contractor(s)). As a minimum these records shall include exposure work hours and a log of occupational injuries and illnesses.
(OSHA Form 200 or state equivalent as prescribed by 29 CFR 1904.5) Reference EM 385-1-1, 01.D.04.
1.6.8 Accident Reporting
In addition to the requirements for reporting accidents in accordance with EM 385-1-1, Section 1, the Prime Contractor will submit at the 50 percent point and 100 percent of project completion, a written summary of worker's compensation claims filed by workers on the project. The report will include all subcontractors. The main report covering the Prime Contractor claims will be certified as "correct and true" by the Contractor's compensation insurance carrier. The same certification will be required for subcontractor reports.
1.6.9 Monthly Safety Inspections
A monthly on-site inspection will be made by the insurance carriers of the prime and subcontractors. The Contractor's safety program will be reviewed and a meeting will be held with the Contracting Officer's Representative to discuss the job-site safety. A written report will be made by the Contractor stating the results of the inspection and the actions taken.
1.7 PLANNED UTILITY OUTAGES AND STREET CLOSURES
Utility outages shall be restricted to off-duty hours and weekends (4:30 p.m. to 7:00 a.m.), with the outage duration not to exceed 4 hours.
Streets may be closed during normal working hours with the closure duration as short as possible. All utility outages and street closures shall be scheduled as far in advance as possible with the Contracting Officer and in no case less than 15 days before the outage or closure. The Contractor shall obtain in writing from the Contracting Officer a statement or schedule giving the permissible times of utility outages or road closures for particular installations and the maximum time allowed for such outage.
The Contractor shall strictly observe such schedules and will be held responsible for any violations. The Contractor will be required to submit a VA Utility Shut Down Form, which will be provided after contract award.
1.8 EXCAVATION PERMITS
All excavation permits will be issued to the Contractor from the VA, through the Contracting Officer. The appropriate form, for this request, may be obtained from the Contracting Officer. Processing time required is 14 calendar days, a monthly renewal may be required. Contractor shall
01 00 00- 6 maintain all utility markings. Questions concerning the excavation permit should be directed to the Contracting Officer.
1.9 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the CONTRACT CLAUSE, Section 00700, entitled "DEFAULT (FIXED PRICE CONSTRUCTION)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations.
The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON 5-DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
(22) (17) (13) (08) (05) (03) (01) (02) (03) (05) (12) (22)
c. Upon acknowledgement of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. (ER 415-1-15, 31 OCT 89)
01 00 00- 7
1.10 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
a. Allowable cost for construction and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier shall be based on actual cost data when the Government can determine both ownership and operating costs for each piece of equipment or equipment groups of similar serial and series from the Contractor's accounting records. When both ownership and operating costs cannot be determined from the Contractor's accounting records, equipment costs shall be based upon the applicable provisions of EP 1110-1-8, "Construction Equipment Ownership and Operating Expense Schedule", Region VII.
Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retrospective pricing, the schedule in effect at the time the work was performed shall apply.
b. Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205 36 substantiated by certified copies of paid invoices. Rates for equipment rented from an organization under common control, lease purchase or sale leaseback arrangements will be determined using the schedule except that rental costs leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees are allowable. Costs for major repairs or overhaul are unallowable.
c. When actual equipment costs are proposed and the total amount of the pricing action is over $25,000, cost or pricing data shall be submitted on Standard Form 1411, "Contract Pricing Proposal Cover Sheet". By submitting cost or pricing data, the Contractor grants to the Contracting Officer or an authorizing representative the right to examine those books, records, documents and other supporting data that will permit evaluation of the proposed equipment costs. After price agreement, the Contractor shall certify that the equipment costs or pricing data submitted are accurate, complete and current.
1.11 EQUIPMENT DATA FORM
In conjunction with paragraph, EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE, above the Contractor shall furnish SPK Form 450 for all necessary equipment to perform work requiring adjustment of contract price and shall submit these forms with the modification proposals. A sample form is at the end of this section.
1.12 SPECIAL CONSTRUCTION REQUIREMENTS
1.12.1 Contractor Badges
a. Provide a list of all employees and subcontractor on site, with a copy of their drivers license or other acceptable picture…