AM-03_03 30 00 pg 20_3.10.pdf

PDF 21 KB Posted

Attached to
Seismic Corrections, Bldg 1, VA Medical Center, Grand Junction, CO.
Solicitation number
W91238-10-R-0005
Issued by

About this file

Amendment3 Revised page 03 30 00 - 20

View the file

Other files

File Type Posted
SF30 Amendment3.pdf PDF
Amendment_0002.pdf PDF
SF30 Amendment2.pdf PDF
SF30 Amendment1.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
DRAW_W91238-10-R-0005.pdf PDF
General Decision No CO080012 16 Oct 09 CO12.pdf PDF
SPECS_VOL2_W91238-10-R-0005.pdf PDF
Section 00111.pdf PDF
RFP W91238-10-R-0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Spec #1679

Seismic Corrections, Building 1;

VA Medical Center; Grand Junction, CO 03 30 00 - 20

AM-03

3. Paper: Utilize widest practical width paper and overlap adjacent sheets 50 mm (2 inches). Tightly seal joints with sand, wood planks, pressure-sensitive tape, mastic or glue.

3.10 REMOVAL OF FORMS

A. Remove in a manner to assure complete safety of structure after the following conditions have been met.

1. Where structure as a whole is supported on shores, forms for beams and girder sides, columns, and similar vertical structural members may be removed after 24 hours, provided concrete has hardened sufficiently to prevent surface damage and curing is continued without any lapse in time as specified for exposed surfaces.

2. Take particular care in removing forms of architectural exposed concrete to insure surfaces are not marred or gouged, and that corners and arises are true, sharp and unbroken.

3. Formwork used to form internal void spaces of the seismic towers may be left inside the completed structure.

B. Control Test: Use to determine if the concrete has attained sufficient strength and curing to permit removal of supporting forms. Cylinders required for control tests taken in accordance with ASTM C172, molded in accordance with ASTM C31, and tested in accordance with ASTM C39.

Control cylinders cured and protected in the same manner as the structure they represent. Supporting forms or shoring not removed until strength of control test cylinders have attained at least 70 percent of minimum 28-day compressive strength specified. Exercise care to assure that newly unsupported portions of structure are not subjected to heavy construction or material loading.

3.11 CONCRETE SURFACE PREPARATION

A. Metal Removal: Unnecessary metal items cut back flush with face of concrete members.

B. Patching: Maintain curing and start patching as soon as forms are removed. Do not apply curing compounds to concrete surfaces requiring patching until patching is completed. Use cement mortar for patching of same composition as that used in concrete. Use white or gray Portland cement as necessary to obtain finish color matching surrounding concrete. Thoroughly clean areas to be patched. Cut out honeycombed or otherwise defective areas to solid concrete to a depth of not less than

25 mm (1 inch). Cut edge perpendicular to surface of concrete. Saturate with water area to be patched, and at least 150 mm (6 inches) surrounding before placing patching mortar. Give area to be patched a brush coat of cement grout followed immediately by patching mortar.

Cement grout composed of one part Portland cement, 1.5 parts fine sand, bonding admixture, and water at a 50:50 ratio, mix to achieve consistency of thick paint. Mix patching mortar approximately 1 hour