Design-Build Request For Proposal

Construct Water Treatment Plant

PN 142207, FY2009

Sierra AD, CA.

W91238-09-R-0007

VOLUME 2 of 2 - TECHNICAL SPECIFICATIONS (DIVISION 01 Thru APPENDICES

DISTRIBUTION STATEMENT A

Approved for public release; distribution is unlimited.

L2CTANVM

Typewritten Text

L2CTANVM

Typewritten Text W91238-09-R-0007-0001 Revision 1, 8 January 09

W91238-09-R-0007

TABLE OF CONTENTS

REQUEST FOR PROPOSAL

Construct Water Treatment Plant Sierra AD, CA

VOLUME 2 of 2

DIVISION 01 - General Requirements Sections

01010 Statement of Work 01 32 01.00 Project Schedule 01 33 00 Submittal Procedures 01 33 16 Design After Award 01 35 26 Governmental Safety Requirements 01 45 02.00 Quality Control System (QCS) 01 45 04.00 Contractor Quality Control 01 50 02 Temporary Construction Facilities 01 50 05 General Requirements 01 57 20.00 Environmental Protection 01 62 35 Recycled/Recovered Materials 01 78 02.00 Closeout Submittals

APPENDICES

Appendix A. SIAD WTP Photographs 3-11-08

Appendix B SIAD Water Chemistry Data and Well Data

Appendix C SIAD WTP Drawings

Appendix D Program Basis for SIAD WTP

Appendix E SIAD Contact Information

SIAD WATER TREATMENT PLANT 1628

01010-1 W91238-09-R-0007

SECTION 01010

STATEMENT OF WORK

1.0 PROJECT OBJECTIVES

2.0 SCOPE

2.1 SCOPE

2.2 SITE

2.3 GOVERNEMENT-FURNISHED GOVERNMENT INSTALL EQUIPMENT (GFGI)

2.4 FURNITURE REQUIREMENTS

2.5 ACCIDENT PREVENTION PLAN

2.6 SIAD WATER TREATMENT BACKGROUND

2.7 SIAD WASTEWATER TREATMENT PONDS

2.8 OPTIONAL ITEMS

3.0 FUNCTIONAL AND AREA REQUIREMENTS

3.1 GENERAL REQUIREMENTS

3.2 FUNCTIONAL AND OPERATIONAL REQUIREMENTS

3.3 TECHNICAL REQUIREMENTS

3.4 REFERENCES

4.0 APPLICABLE CRITERIA

4.1 APPLICABLE INDUSTRY CRITERIA

4.2 APPLICABLE MILITARY CRITERIA

4.3 PRECEDENCE

5.0 GENERAL TECHNICAL REQUIREMENTS

5.1 SITE PLANNING AND DESIGN

5.2 SITE ENGINEERING

5.3 ARCHITECTURE AND INTERIOR DESIGN

5.4 STRUCTURAL DESIGN

5.5 THERMAL PERFORMANCE

5.6 PLUMBING

01010-2 W91238-09-R-0007

5.7 ELECTRICAL SYSTEMS

5.8 HEATING, VENTILATING AND AIR CONDITIONING

5.9 ENERGY CONSERVATION

5.10 FIRE PROTECTION

5.11 SUSTAINABLE DESIGN

5.12 CONSTRUCTION AND DEMOLITION (C&D) WASTE MANAGEMENT

5.13 SECURITY (ANTI-TERRORISM STANDARDS)

6.0 PROJECT SPECIFIC REQUIREMENTS

6.1 GENERAL

6.2 APPROVED DEVIATIONS

6.3 FUNCTIONAL PREFERENCES

6.4 CIVIL DESIGN

6.5 SITE ENGINEERING

6.6 ARCHITECTURE

6.7 STRUCTURAL DESIGN

6.8 THERMAL PERFORMANCE

6.9 PLUMBING

6.10 SITE ELECTRICAL SYSTEMS

6.11 FACILITY ELECTRICAL SYSTEMS

6.12 HEATING, VENTILATING AND AIR CONDITIONING

6.13 ENERGY CONSERVATION

6.14 FIRE PROTECTION

6.15 SUSTAINABLE DESIGN

6.16 ENVIRONMENTAL

6.17 PERMITS

6.18 DEMOLITION

6.19 ADDITIONAL FACILITIES

6.20 MAINTENANCE AND OTHER GENERAL REQUIREMENTS

01010-3 W91238-09-R-0007

APPENDICES

A. SIAD WTP Photographs 3-11-08

B. SIAD Water Chemistry Data and Well Data

C. SIAD WTP Drawings

D. Program Basis for SIAD WTP

E. SIAD Contact Information

01010-4 W91238-09-R-0007

1.0 PROJECT OBJECTIVES

The project objective is to design and construct functional drinking water treatment facilities for the Army at Sierra Army Depot (SIAD) that are consistent with the design and construction practices used for civilian sector projects that perform similar functions to the military projects.

It is the Army's objective that these buildings/facilities will have a 25-year useful life before a possible re-use/re-purpose or renovation requirement, to include normal sustainment, restoration, modernization activities. Therefore, the design and construction should provide an appropriate level of quality to ensure the continued use of the facility over that time period with the application of reasonable preventive maintenance and repairs that would be industry-acceptable to a major civilian sector project owner. The site infrastructure will have at least a 50-year life expectancy with industry-accepted maintenance and repair cycles.

The government is required by Public Law 102-486, Executive Order 12902, and Federal Regulations 10 CFR 435 to design and construct facilities in an energy-conserving manner while considering life cycle cost over the life of the facilities.

The project site should be developed for efficiency and to convey a sense of unity or connectivity with the adjacent buildings and with the Installation as a whole.

Requirements stated in this contract are minimums. Innovative, creative, and life cycle cost effective solutions, which meet or exceed these requirements are encouraged. Further, the Offeror is encouraged to seek solutions that will expedite construction (panelization, pre-engineered, etc.) and shorten the schedule. The intent of the Government is to emphasize the placement of funds into functional/operational requirements. Materials and methods should reflect this by choosing the lowest Type of Construction allowed by code for this occupancy/project allowing the funding to be reflected in the quality of systems selected.

2.0 SCOPE

2.1. WATER TREATMENT PLANT

Provide appropriate drinking water treatment facilities in accordance with this contract. This water treatment system is to treat and provide drinking water and is intended to be similar both functionally and technically to similar facilities in the private sector.

A design-build procurement method will be utilized for this work. SIAD utilizes groundwater that contains iron, manganese and uranium above the Federal and State of California requirements. A water treatment system is required to reduce contaminant levels in water to satisfy primary and secondary drinking water requirements.

SIAD prefers the water treatment plant to be typical and utilized successfully in other California locations. The preference is low operating costs; low use of standard water treatment chemicals; no plant operator certification upgrade required; minimum wasting of process/backwash water; and non-proprietary equipment. SIAD desires an estimate of operating costs, operator certification requirements, and wastewater discharge flows to be submitted to Mr. Walt Zinko (SIAD Base Support).

2.2. SITE

Provide all site improvements necessary to support the new building facilities. The Offeror shall design the exterior of the facility to be compatible with the surrounding context. The Offeror’s architectural design development should consider any existing building forms, 01010-5 W91238-09-R-0007 materials, scale, proportions, and organizational layout, and be reflected in the proposal.

Pictures of surrounding architecture are permissible to establish the theme. The Contractor and A-E must certify that they have visited the site before preparing their proposal.

The construction cost limitation is $10,784,015. This amount includes the design effort as well as the construction effort. These costs are presented so that a level of quality can be established and avoid a misunderstanding by the Contractor in cases where they provide a higher cost proposal when a proposal of lesser scope, quality, and performance was funded and required. The Contractor is under no obligation to approach this ceiling.

2.3. GOVERNMENT-FURNISHED GOVERNMENT-INSTALLED EQUIPMENT (GFGI)

Coordinate with Government on GFGI item requirements. Provide suitable structural support, brackets for projectors/VCRs/TVs, all utility connections and space with required clearances for all GFGI items. D-B contractor shall provide a suitable laptop computer compatible with D- B contractor installed SCADA System.

2.4. FURNITURE REQUIREMENTS:

There is no furniture requirement or procurement for this contract. Furniture procurement is not included in this contract.

2.5. ACCIDENT PREVENTION PLAN

An accident prevention plan (APP) shall be submitted and reviewed by the USACE. This shall be submitted, reviewed and approved prior to any fieldwork. The SSHSP shall adhere to Federal OSHA 29 CFR 1910, 1926 and the US Army Corps of Engineers EM 385-1-1 (3 NOV 2003), and California requirements.

2.6. SIAD WATER TREATMENT BACKGROUND

SIAD extracts groundwater from four potable water supply wells (PSW-02, PSW-05, PSW-08, and PSW-09) and distributes the extracted groundwater to SIAD’s facility operations and various public entities including the Title IX houses; West Patton Village; Herlong’s primary, middle, and high school facilities; Susanville Indian Rancheria; Veterans of Foreign Wars;

and private housing on SIAD.

The primary components of the existing drinking water system at SIAD include: potable supply wells, potable water storage reservoir, elevated water storage tanks, a distribution piping network, and instrumentation and controls.

The four potable water supply wells are equipped with a submersible well pump, piping, motor controls, chlorination equipment, polyphosphate addition system, and a pump building.

In addition, Pumps PSW-02 and PSW-08 are equipped with manually operated backup diesel engines to allow these two wells to operate during power outages.

The potable water reservoir at SIAD is a rectangular concrete basin with a cover of ethylenepropylene diene monomer(EPDM). The cover is fixed to the concrete perimeter and is capable of moving up and down as the water level in the basin fluctuates. There are several switches in the reservoir that are used to start and stop the pumps at PSW-02 and PSW-08. There are three pump stations located adjacent to the reservoir and connected to suction lines in the reservoir. These pumps convey water from the reservoir to the elevated storage tankT-133.

01010-6 W91238-09-R-0007

There are three elevated tanks in SIAD’s drinking water system. Each tank has a capacity of approximately 125,000 gallons and is 120 feet high. Tank T-133 is located adjacent to the reservoir and is used to provide pressure to the distribution system. Level switches in T-133 are used to control the operation of the pumping system stations used to fill the Tank T-133 with water from the reservoir. Tanks T-581 and T-595 are located in the northwest area of SIAD and are filled by gravity from T-133. The primary use of T-581 and T-595 is water supply for fire protection.

The SIAD drinking water system includes a network of distribution piping that connects the potable supply wells, reservoir, tanks, and end users (consumers). The distribution system pipelines have diameters varying between 1 and 12 inches and are constructed from a variety of materials, including ductile iron and high density polyethylene (HDPE).

The SIAD drinking water system operates automatically based on water levels measured in the reservoir and in T-133. The well pumps in PSW-02 and PSW-08 receive a run signal when the low level switch in the reservoir is activated and a stop signal when the high level switch in the reservoir is activated. The transfer pumps receive a run signal when the low level switch in T-133 is activated and a stop signal when the high level switch in T-133 is activated.

The current plant operator certification is operator grade of G02.

The approximate maximum flow rates (gallons per minute) are presented here.

Well Approximate Max flow (gpm) Alternative Well Name

PSW-02 900 Well No. 2

PSW-05 550 Well No. 5

PSW-08 800 Well No. 8

PSW-09 550 Well No. 9

2.7. SIAD WASTEWATER TREATMENT PONDS

The wastewater treatment ponds currently are permitted for 160,000 gallons per day. The pipelines to/from these ponds may need repair. The Contractor is encouraged to review the permit, use and site conditions of these ponds and associated lift stations prior to designing the water treatment plant. Modifications to the ponds and their associated permits may be necessary and/or beneficial. However, use of low volume backwash systems is preferable including use of an area in the north open storage area of the Depot to accomplish wastewater disposal (see optional item 5 following).

01010-7 W91238-09-R-0007

2.8. OPTIONAL ITEMS

The following are additional optional items to be evaluated and priced separately. The government may choose to select any and/or all of the items for this RFP.

1. Condition assessment and TV (television video inspection) the waterline from Well 5 to Well 8 and produce a report that documents the findings.

2. Provide appropriate turbidity and pH meters on the drinking water treatment plant(s) waste stream to be able to monitor and record data.

3. Provide an appropriate Supervisory Control and Data Acquisition (SCADA) system for the drinking water system. Documentation and training will be required per the manufacturer’s recommendation.

4. Provide appropriate flow meters on the drinking water treatment plant(s) waste stream to be able to monitor and record data.

5. Evaluate utilizing drinking water treatment plant(s) wastewater for dust suppression for the SIAD Long Term Storage Area. Existing lines would be utilized and plumbed as needed.

Drinking water would need to be provided to buildings in the Special Weapons Area; this could possibly be achieved by installing small reverse osmosis systems at Buildings 670-671 and 672.

01010-8 W91238-09-R-0007

3.0 FUNCTIONAL AND AREA REQUIREMENTS

3.1. GENERAL: THERE IS NO STANDARD ARMY MT PRODUCT LINE ITEM FOR A WATER

TREATMENT PLANT. NOTE IN THIS RFP THAT THE STANDARD MODEL RFP FORMAT

IS FOLLOWED AS PRACTICABLE. REFER TO PARAGRAPH 6 PROJECT SPECIFIC

REQUIREMENTS.

3.1.1. FACILITY RELATIONSHIPS: The facilities shall be oriented to support water treatment and daily operations, and should also be located near the respective wells and associated buildings.

3.1.2. GROSS BUILDING AREA: Gross building area shall be as calculated by IBC, which is the area included within surrounding exterior walls exclusive of vent shafts and courts. Areas of the building not provided with surrounding walls shall be included in the building area if such areas are included within the horizontal projection of the roof or floor above.

3.1.3. FUNCTIONAL SPACES: The space shall be sized to accommodate the required function, comply with code requirements, comply with overall gross area limitations and other requirements of the RFP.

3.1.4. HANDICAPPED ACCESS: These facilities are intended for use by able bodied personnel only, therefore, are not required to meet handicapped accessible requirements.

3.2. FUNCTIONAL AND OPERATIONAL REQUIREMENTS

3.2.1. General: The SIAD water treatment plant facilities are to be completely functional and operational and satisfy all applicable regulations, requirements, and codes.

3.2.2. DESIGN FREEDOM. Note there are no layouts provided in the applicable Army Standard Design for functional arrangements for water treatment facilities.

3.2.3. ARMY STANDARDS: Applicable Army standards for the SIAD Water Treatment project shall be followed.

3.3. TECHNICAL REQUIREMENTS

Site Design: The following site design requirements are applicable to the design of the Water Treatment Facilities:

3.3.1. Architectural Design: Exterior architectural features of the building shall be designed in accordance with the established Installation architectural theme.

3.3.2. Fire Protection: Fire suppression systems will be designed in accordance with the latest edition of UFC 3-600-01; however, the water treatment system shall be classified as mission essential and shall be provided with sprinkler protection regardless of other criteria or code provisions. The facility shall be protected throughout by a complete automatic sprinkler system. The type, function and location of the fire alarm annunciator shall be coordinated with the SIAD Fire Department.

3.3.3. Electrical and Communications:

(1) Receptacles. Power receptacles will be provided per NFPA 70 and in conjunction with the proposed equipment and facilities layouts.

(2) Lighting. Interior lighting controls shall be provided in accordance with ASHRAE 90.1.

Local manual controls shall supplement automatic controls (occupancy sensors) in both

01010-9 W91238-09-R-0007 pump houses (Well # 5 and Well # 8) and Building 92. Occupancy sensor controls shall be provided in restrooms, electrical rooms, telecommunications rooms and similar spaces.

Interior ambient illumination shall provide a generally glare free, high quality lighting environment and conform to IESNA RP-1-04.

(3) Telecommunications Systems. The project's facilities (Building 92) must connect to the Installation’s Outside Telecommunications (voice and data) System. Outside system improvement is not Contractor’s responsibility. All exterior communication system improvements shall be done by DOIM. POC Mr. Mark Paytas @ 530-827-4177.

(4) Telecommunications outlets. Telecommunications outlets will be provided per the I3A technical guide based on functional purpose of the various spaces (as modified by user special operational requirements) within the facility. The telecommunications system will consist of cabling, pathways, supporting structures, and outlets.

3.3.4. Furniture Systems: Not used.

3.4. REFERENCES

(1) Army Regulation 190-11 Physical Security of Arms, Ammunition and Explosives

(2) Army Regulation 190–13 The Army Physical Security Program

(3) Army Regulation 190-51, Security of Unclassified Army Property (Sensitive and Nonsensitive)

(4) Army Regulation 380–5 Information Security Program

(5) Army Regulation 380–19 Information Systems Security

01010-10 W91238-09-R-0007

4.0 APPLICABLE CONSTRUCTION

4.1. APPLICABLE INDUSTRY CRITERIA

Applicable design and construction criteria references are listed in below. Criteria shall be taken from the most current references as of the date of issue of the RFP for Task Order 1 of this IDIQ. This list is not intended to include all criteria that may apply or to restrict design and construction to only those references listed. See also Paragraphs 3 and 6 for additional facility-specific applicable criteria.

International Code Council (ICC) International Building Code (IBC) International Mechanical Code (IMC) International Residential Code (IRC) International Plumbing Code (IPC) International Fuel Gas Code (IFGC) Energy Conservation Code (IEC)

Air Conditioning and Refrigeration Institute (ARI) ARI 310/380 Packaged Terminal Air-Conditioners and Heat Pumps ARI 440 Room Fan-Coil and Unit Ventilator ARI 445 Room Air-Induction Units ARI 880 Air Terminals

Air Movement and Control Association (AMCA) AMCA 210 Laboratory Methods of Testing Fans for Rating

American Architectural Manufacturers Association (AAMA) AAMA 605 Voluntary Specification Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels AAMA 607.1 Voluntary Guide Specifications and Inspection Methods for Clear Anodic

Finishes for Architectural Aluminum AAMA 1503 Voluntary Test Method for Thermal Transmittance and Condensation

Resistance of Windows, Doors, and Glazed Wall Sections American Association of State Highway and Transportation Officials (AASHTO)

Roadside Design Guide [guardrails, roadside safety devices] Standard Specifications for Transportation Materials and Methods of Sampling and

Testing [Road Construction Materials] Standard Specifications for Structural Supports for Highway Signs, Luminaries and

Traffic Signals A Policy of Geometric Design of Highways and Streets Guide for Design of Pavement Structures, Volumes 1 and 2 [pavement design guide]

American Bearing Manufacturers Association (AFBMA) AFBMA Std. 9 Load Ratings and Fatigue Life for Ball Bearings AFBMA Std. 11 Load Ratings and Fatigue Life for Roller Bearings

American Boiler Manufacturers Association (ABMA) ABMA ISEI Industry Standards and Engineering Information

American Concrete Institute, ACI 318, Building Code Requirements for Structural Concrete ACI 315, Details and Detailing of Concrete Reinforcement ACI 530, Building Code Requirements for Masonry Structures

American National Standards Institute 11 (ANSI) ANSI Z21.10.1 Gas Water Heaters Vol. 1, Storage water Heaters with Input Ratings of

75,000 Btu per Hour or less ANSI Z124.3 American National Standard for Plastic Lavatories ANSI Z124.6 Plastic Sinks ANSI Z21.45 Flexible Connectors of Other Than All-Metal Construction for Gas

Appliances

L2CTANVM

Cross-Out

L2CTANVM

Cross-Out

L2CTANVM

Line

L2CTANVM

Line

Line

01010-11 W91238-09-R-0007

ANSI C2 National Electrical Safety Code ANSI/AF&PA NDS-2001 National Design Specification for Wood Construction

American Society of Civil Engineers (ASCE) Minimum Design Loads for Buildings and Other Structures – ASCE 7 Design and Construction of Sanitary and Storm Sewers, Manuals and Reports on

Engineering Practice – No. 37 [sanitary sewer and storm drain design criteria] American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE)

ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings ASHRAE Guideline 1-1996, The HVAC Commissioning Process ASHRAE Hdbk-IP Handbook, Fundamentals I-P Edition ASHRAE Standard 15 Safety Standard for Refrigeration Systems ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality

American Society of Mechanical Engineers International (ASME) ASME BPVC SEC VII Boiler and Pressure Vessel Code: Section VII Recommended

Guidelines for the Care of Power Boilers ASME A17.1 Safety Code for Elevators and Escalators

American Institute of Steel Construction, Load Resistance Factor Design, 3rd Edition American Iron and Steel Institute, North American Specification for the Design of Cold-

Formed Steel Structural Members AISI/COS NASPEC 2001 American Water Works Association (AWWA)

AWWA Standards [standards for water line materials and construction] American Welding Society, Welding Handbook Architectural Woodwork Institute (AWI)

AWI Quality Standards 7th Edition, Version 1.2 Associated Air Balance Council (AABC)

AABC MN-1 National Standards for Testing and Balancing Heating, Ventilating, and Air Conditioning Systems

AABC Associated Air Balance Council Testing and Balance Procedures Builders Hardware Manufacturers Association (BHMA)

ANSI/BHMA A156.4 American National Standards for Door Controls – Closers… Code of Federal Regulations (CFR)

49 CFR 192 Transportation of Natural and Other Gas by Pipeline: Minimum Federal Safety Standards

10 CFR 430 Energy Conservation Program for Consumer Products Consumer Electronics Association

CEA 709.1B Control Network Protocol Specification CEA 709.3 Free-Topology Twisted-Pair Channel Specification CEA 852 Tunneling Component Network Protocols Over Internet Protocol Channels

Electronic Industries Association (EIA) EIA/TIA 568-B Commercial Building Telecommunications Cabling Standards EIA/TIA 569-A Commercial Building Standard for Telecommunications Pathways and

Spaces EIA/TIA 607 Commercial Building Grounding and Bonding Requirements for

Telecommunications Federal Highway Administration (FHWA)

Manual on Uniform Traffic Control Devices for Streets and Highways [signage and pavement markings for streets and highways]

U.S. Architectural and Transportation Barriers Compliance Board ADA Standards for Accessible Design 928 CFR Part 36) Illuminating Engineering Society of North America (IESNA)

IESNA RP-1 Office Lighting IESNA RP-8 Roadway Lighting IESNA Lighting Handbook, Reference and Application

Institute of Electrical and Electronics Engineers Inc. (IEEE) Standard for Use of the International System of Units (SI): the Modern Metric System

01010-12 W91238-09-R-0007

LEED: Leadership in Energy and Environmental Design Green Building Rating System, Version 2.2, as developed by the U.S. Green Building Council (USGBC) LonMark International

LonMark Interoperability Guidelines (available at www.lonmark.org), including:

Application Layer Guidelines, Layer 1-6 Guidelines, and External Interface File (XIF) Reference Guide LonMark Resource Files (available at www.lonmark.org), including Standard Network Variable Type (SNVT) definitions

MBNA-01 Low Rise Building Systems Manual National Association of Corrosion Engineers International (NACE)

NACE RP0169 Control of External Corrosion on Underground or Submerged Metallic Piping Systems

NACE RP0185 Extruded, Polyolefin Resin Coating Systems with Adhesives for Underground or Submerged Pipe

NACE RP0285 Corrosion Control of Underground Storage Tank Systems by Cathodic Protection

NACE RP0286 Electrical Isolation of Cathodically Protected Pipelines National Electrical Manufacturers Association (NEMA) National Environmental Balancing Bureau (NEBB)

NEBB Procedural Standards Procedural Standards for Testing Adjusting Balancing of Environmental Systems

National Fire Protection Association (NFPA) NFPA 10 Standard for Portable Fire Extinguishers NFPA 13 Installation of Sprinkler Systems NFPA 13R Residential Occupancies up to and Including Four Stories in Height

Sprinkler Systems NFPA 20 Installation of Centrifugal Fire Pumps NFPA 24 Standard for the Installation of Private Fire Service Mains and Their

Appurtenances [underground fire protection system design] NFPA 30 Flammable and Combustible Liquids Code NFPA 30A Motor Fuel Dispensing Facilities and Repair Garages NFPA 31 Installation of Oil Burning Equipment NFPA 54 National Fuel Gas Code NFPA 58 Liquefied Petroleum Gas Code NFPA 70 National Electrical Code NFPA 72 National Fire Alarm Code NFPA 80 Standard for Fire Doors and Fire Windows NFPA 90a Installation of Air Conditioning and Ventilating Systems NFPA 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking

Operations NFPA 101: Life Safety Code NFPA 780 Standard for the Installation of Lightning Protection Systems

National Food Code FDA Model Food Code

National Roofing Contractor’s Association NRCA Roofing and Waterproofing Manual

Occupational Safety and Health Administration (OSHA) OSHA Construction Industry Standards, Title 29, Code of Federal Regulations, Part

1926, Safety and Health Regulations for Construction Plumbing and Drainage Institute (PDI)

PDI G 101 Testing and Rating Procedure for Grease Interceptors with Appendix of Sizing and Installation Data

PDI WH201 Water Hammer Arrestors Precast Concrete Institute

PCI Design Handbook – Precast and Prestressed Concrete Sheet Metal and Air Conditioning Contractor’s National Association (SMACNA)

01010-13 W91238-09-R-0007

SMACNA HVAC Duct Construction Standards HVAC Duct Construction Standards - Metal and Flexible

SMACNA Architectural Manual Architectural Sheet Metal Manual SMACNA HVAC TAB HVAC Systems - Testing, Adjusting and Balancing

State/Local Regulations State Department of Transportation Standard Specifications for Highway and Bridge

Construction State/Local Sedimentation and Erosion Control Design Requirements

State/Local Environmental Control Requirements State/Local Storm Water Management Requirements Steel Door Institute (SDI)

ANSI A250.8/SDI 100 Standard Steel Doors and Frames Steel Deck Institute, SDI Diaphragm Design Manual Steel Joist Institute, 41st Edition Catalog of Standard Specifications and Load Tables for Steel Joists and Joist Girders Underwriters Laboratories (UL)

UL 96A Installation Requirements for Lightning Protection Systems UL 300 Standard for Safety for Fire Testing of Fire Extinguishing Systems for

Protection of Restaurant Cooking Areas

Additional Criteria:

AFM 88-10, Volume 5, Water Supply, Water Distribution.

AFM 88-11, Volume1, Sanitary and Industrial Wastewater Collection-Gravity Sewers and

Appurtenances.

AFM 88-11, Volume 2, Sanitary and Industrial Wastewater Collection-Pumping Mains and

Force Mains.

4.2. APPLICABLE MILITARY CRITERIA

The project shall conform to the following criteria. Certain design impacts and features due to these criteria are noted for the benefit of the offeror. However, all requirements of the referenced criteria will be applicable, whether noted or not, unless otherwise specified herein.

Criteria shall be taken from the most current references as of the date of issue of this Task Order RFP.

Energy Policy Act of 2005 (Public Law 109-58)

UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings Unless otherwise specified in Project Specific Requirements, only the minimum protective measures as specified by the current Department of Defense Minimum Antiterrorism Standards for Buildings, UFC 4-010-01, are required for this project. The element of those standards that has the most significant impact on project planning is providing protection against explosives effects. That protection can either be achieved using conventional construction (including specific window requirements) in conjunction with establishing relatively large standoff distances to parking, roadways, and installation perimeters or through building hardening, which will allow lesser standoff distances. Even with the latter, the minimum standoff distances cannot be encroached upon. These setbacks will establish the maximum buildable area. All standards in Appendix B of UFC 4-010-01 must be followed and as many of the recommendations in Appendix C that can reasonably be accommodated should be included. The facility requirements listed in these specifications assume that the minimum standoff distances can be met, permitting conventional construction. Lesser standoff distances (with specific minimums) are not desired, however can be provided, but will require structural hardening for the building. See Project Specific Requirements for

01010-14 W91238-09-R-0007 project specific siting constraints. The following list highlights the major points but the detailed requirements as presented in Appendix B of UFC 4-010-01 must be followed.

Standoff distance from roads, parking and installation perimeter; and/or structural blast mitigation

Blast resistant windows, frames, anchors, supports

Progressive collapse resistance for all facilities 3 stories or higher

Mailrooms have separate HVAC systems and are sealed from rest of building

UFC 4-023-03 Design of Buildings to Resist Progressive Collapse

Options to use tie force method or alternate path design

UFC 3-600-01 Design: Fire Protection Engineering for Facilities

UFC 4-021-01 Design and O&M: Mass Notification Systems Technical Guide for Installation Information Infrastructure Architecture (I3A) http://www.hnd.usace.army.mil/paxspt/isce/pubs.aspx

UFC 3-580-01 (Draft) Telecommunications Bldg Cabling Systems Planning/Design

UFC 1-200-01, Design: General Building Requirements

UFC 3-310-03A, Design: Seismic Design for Buildings

UFC 3-400-01, Design: Energy Conservation

UFC 3-400-02, Design: Engineering Weather Data

UFC 3-410-01FA, Design: Heating, Ventilating, and Air Conditioning

UFC 3-410-02A, Design: Heating, Ventilating, and Air Conditioning (HVAC) Control Systems

UFC 3-420-01, Design: Plumbing

UFC 3-450-01, Design: Noise and Vibration Control

4.3. PRECEDENCE

In the event of conflict between References and/or Applicable Military Criteria, the most stringent requirement will apply, unless otherwise specifically noted in the contract.

01010-15 W91238-09-R-0007

5.0 GENERAL TECHNICAL REQUIREMENTS

This paragraph contains general technical requirements. See also Paragraph 3 for facility-specific technical requirements and Paragraph 6 for Project Specific Requirements.

5.1. SITE PLANNING AND DESIGN

5.1.1. STANDARDS AND CODES: The site planning and design shall conform to APPLICABLE

CRITERIA.

5.1.2. SITE PLANNING OBJECTIVES: Group buildings in configurations that create a sense of community and promote pedestrian use. See Chapters 2, 3, and 6 for additional site planning requirements relating to building functions.

5.1.3. Provide space at dumpster areas for recycling receptacles. Coordinate with SIAD and contracting office on recycling receptacle types, sizes and access requirements and provide space at dumpster areas to accommodate them.

5.1.4. Exterior Signage: Provide exterior signage and building numbers to match existing. Re-use of existing signs is authorized. in accordance with SIAD Design Guide.

5.1.5. Existing Utilities: Limited base utilities maps and capacities for this site are included as part of this RFP. See chapter 6 for more detailed information. The Contractor is to verify utility and capacities information pertinent to this RFP.

5.2. SITE ENGINEERING

5.2.1. STANDARDS AND CODES: The site engineering shall conform to APPLICABLE CRITERIA.

5.2.2. SOILS: A report has not been prepared that provides raw data for the project site. The Contractor’s team shall include a licensed geotechnical engineer to develop earthwork and foundation recommendations and design parameters on which to base the Contractor’s proposal. If any additional subsurface investigation or laboratory analysis is required to better characterize the site or develop the final design, it shall be performed subsequent to the award under the direction of a licensed geotechnical engineer and shall be the full responsibility of the Contractor. There will be no separate payment for the cost of additional tests.

A final geotechnical evaluation report shall be prepared by the contractor’s licensed geotechnical engineer and submitted along with the first foundation design submittal. This report shall summarize the subsurface conditions; provide recommendations for the design of appropriate foundations, floor slabs, retaining walls, embankments, and pavements. The Contractor’s geotechnical report shall recommend the type foundation system to be used, lateral load resistance capacities for foundation systems, allowable bearing elevations for footings, grade beams, slabs, etc. An assessment of post-construction settlement potential including total and differential shall be provided. Recommendations regarding lateral earth pressures (active, at-rest, passive) to be used in the design of retaining walls shall be provided. The report shall include the recommended spectral accelerations and Site Class for seismic design along with an evaluation of any seismic hazards and recommendations for mitigation, if required. Calculations shall be included to support the recommendations for bearing capacity, settlement, and pavement sections. Supporting documentation shall be included for all recommended design parameters such as Site Class, shear strength, earth pressure coefficients, friction factors, subgrade modulus, California Bearing Ratio (CBR), etc.

In addition, the report shall provide earthwork recommendations, expected frost penetration, expected groundwater levels, recommendations for dewatering and groundwater control, and the possible presence of any surface or subsurface features that may affect the construction

L2CTANVM

Line

Cross-Out

01010-16 W91238-09-R-0007 of the project such as sinkholes, boulders, shallow rock, old fill, old structures, soft areas, or unusual soil conditions.

The DB Contractor and the professional geotechnical engineer consultant shall certify in writing that the design of the project has been developed consistent with the Contractor’s final geotechnical report. The certification shall be stamped by the consulting professional geotechnical engineer and shall be submitted with the first design submission. If revisions are made to the initial design submission, a new certification shall be provided with the final design submission.

5.2.3. Design procedures and materials shall conform to one of the following 1) the USACE Pavement Transportation Computer Assisted Structural Engineering (PCASE) PROGRAM, 2) American Association of State Highway and Transportation Officials (AASHTO) or, 3) the applicable state Department of Transportation standards in which the project is located. See Section DESIGN AFTER AWARD for geotechnical report required information. Provide underdraining systems for pavement designs over cohesive soil subgrades. Regardless of the pavement design, a minimum flexible pavement section shall consist of 3 inches of asphalt and 8 inches of base. Roads shall be designed with a life expectance of 25 years with normal maintenance. Pavement markings and traffic signage shall comply with the Installation requirements and with the Manual on Uniform Traffic Control Devices. The only road work required in this solicitation will consist of gravel access driveways.

5.2.4. Parking Requirements

All handicap POV parking lots shall meet the ADA Accessibility Guidelines for accessible parking spaces. There are no parking lots required in this solicitation.

Parking spaces should be 9 ft by 18 ft.

5.2.5. UTILITIES: See chapter 6 for specific information on ownership of utilities and utility requirements. Meter all utilities (gas, water, electric) to each facility. For Government-owned utilities, install meters that have wireless data transmission capability as well as have a continuous manual reading option. All meters will be capable of at least hourly data logging and transmission and provide consumption data for gas, water, and electricity. Gas and electric meters will also provide demand readings based on consumption over a maximum of any 15-minute period. Configure all meters to transmit at least daily even if no receiver for the data is currently available at the time of project acceptance. For privatized utilities, coordinate with the privatized utility(ies) for the proper meter base and meter installation.

5.2.6. PERMITS: The CONTRACTOR shall be responsible for obtaining all permits (local, state and federal) required for design and construction of all site features and utilities.

5.3. ARCHITECTURE AND INTERIOR DESIGN

5.3.1. STANDARDS AND CODES: The architecture and interior design shall conform to

APPLICABLE CRITERIA.

5.3.2. GENERAL: Overall architectural goal is to provide a functional, quality, visually appealing facility that is a source of pride for the installation and delivered within the available budget and schedule.

5.3.3. BUILDING EXTERIOR: Design buildings to enhance or compliment the visual environment of the Installation. Where appropriate, reflect a human scale to the facility. Building entrance should be architecturally defined and easily seen. When practical, exterior materials, roof forms, and detailing shall be compatible with the surrounding development and adjacent

01010-17 W91238-09-R-0007 buildings on the Installation and follow locally established architectural themes. Use durable materials that are easy to maintain. Exterior colors shall conform to the SIAD Design Guide.

5.3.3.1. Building Numbers: Each building shall have exterior signage permanently attached on two faces of the building indicating the assigned building number or address.

Building number signage details and locations shall conform to the SIAD Design Guide.

5.3.4. BUILDING INTERIOR

5.3.4.1. Space Configuration: Arrange spaces in an efficient and functional manner.

5.3.4.2. Surfaces: Appearance retention is the top priority for building and furniture related finishes. Provide low maintenance, easily cleaned room finishes that are commercially standard for the facility occupancy specified, unless noted otherwise.

5.3.4.3. Color: The color, texture and pattern selections for the finishes of the building shall provide an aesthetically pleasing, comfortable, easily maintainable and functional environment for the occupants. Coordination of the building colors and finishes is necessary for a cohesive design. Color selections shall be appropriate for the building type. The use of color, texture and pattern shall be used to path or way find through the building. Trendy colors that will become dated shall be limited to non-permanent finishes such as carpet and paint. Finishes should be selected with regards to aesthetics, maintenance, durability, life safety and image. Limit the number of similar colors for each material. Color of Ceramic and porcelain tile grout shall be medium range color to help hide soiling. Plastic laminate and solid surface materials shall have patterns that are mottled, flecked or speckled. Finish colors of fire extinguisher cabinets, receptacle bodies and plates, fire alarms / warning lights, emergency lighting, and other miscellaneous items shall be coordinated with the building interior. Color of equipment items on ceilings (speakers, smoke detectors, grills, etc.) shall match the ceiling color.

5.3.4.4. Circulation: Circulation schemes must support easy way finding within the building.

5.3.4.5. Signage: Provide interior signage for overall way finding and life safety requirements.

A comprehensive interior plan shall be from one manufacturer and shall include the following sign types: Directional Signs; Room Identification Signs; Building Service Signs; Regulatory Signs; Official and Unofficial Signs, and Visual Communication Boards. Use of emblems or logos may also be incorporated into the signage plan.

5.3.4.6. Window Treatment: Treatment shall be provided in all exterior windows or locations where control of day light coming in windows or privacy at night is required. Uniformity of window covering color and material shall be maintained to the maximum extent possible within a building.

5.3.5. COMPREHENSIVE INTERIOR DESIGN

5.3.5.1. Comprehensive Interior Design (CID): CID includes the Structural Interior Design (SID) and the Furniture, Fixtures and Equipment (FF&E) Design. SID requires the accommodation of required FF&E within the building and the design, selection and coordination of interior finish materials that are integral to or attached to the building structure. The SID provides basic space planning for anticipated FF&E requirements in conjunction with the functional layout of the building and design issues such as life safety, privacy, acoustics, lighting, ventilation, and accessibility. Completion of a SID involves the selection and specification of applied finishes for the building’s interior features including, but not limited to, walls, floors, ceilings, trims, doors, windows, L2CTANVM

Cross-Out

L2CTANVM

Cross-Out

L2CTANVM

Line

01010-18 W91238-09-R-0007 window treatments, built-in furnishings and installed equipment, lighting, and signage.

The SID package will include furniture floor plans, finish schedules, finish samples and any supporting interior elevations, details or plans necessary to communicate the building finish design and build out. The FF&E includes the design, selection, specification, color coordination and procurement documentation of the required items necessary to meet the functional, operational, sustainability, and aesthetic needs of the facility. The FF&E package will include placement plans, ordering and finish information on all freestanding furnishings and accessories, and cost estimates and will be coordinated with the Structural Interior Design (SID) interior finish materials. The selection of furniture style, function and configuration will be coordinated with the defined requirements. Examples of FF&E items are workstations, seating, files, tables, beds, wardrobes, draperies and accessories as well as markerboards, tackboards, and presentation screens. Criteria for furniture selection will include function and ergonomic considerations, maintenance, durability, sustainability, comfort and cost.

Structural Interior Design (SID) is required for all facility types. FF&E package is required as indicated in Paragraphs 2 and 3.

5.3.5.2. Color, Surface and Signage: Provide a signage package if not provided for in the buildings’ overall signage package.

5.4. STRUCTURAL DESIGN

5.4.1. STANDARDS AND CODES: The structural design shall conform to APPLICABLE CRITERIA.

5.4.1.1. GENERAL: The structural system needs to be compatible with the intended functions and components that allows for future flexibility and reconfigurations of the interior space. It is essential that the ability to remove equipment for maintenance and sufficient space for equipment access without removal be provided.

5.5. THERMAL PERFORMANCE

5.5.1. STANDARDS AND CODES: Building construction shall conform to APPLICABLE CRITERIA.

5.5.2. BUILDING ENVELOPE SEALING PERFORMANCE REQUIREMENT. Clearly identify all air barrier components of each envelope assembly on construction documents and detail the joints, interconnections and penetrations of any air barrier components.

5.5.2.1. Performance Criteria and Substantiation: Demonstrate performance of the continuous air barrier for the opaque building envelope by the following tests:

(a) Test the completed building and demonstrate that the air leakage rate of the building envelope does not exceed 0.25 cfm/ft2 at a pressure differential of 0.3” w.g.

(75 Pa) in accordance with ASTM’s E779 (2003) and E-1827-96 (2002). Accomplish test using either pressurization or depressurization or both. Do not test the building until verifying that the continuous air barrier is in place and installed without failures in accordance with installation instructions so that repairs to the continuous air barrier, if needed to comply with the required air leakage rate, can be done in a timely manner.

(b) Test the completed building using Infrared Thermography testing. Use infrared cameras with a resolution of 0.1 deg C or better. Perform testing on the building envelope in accordance with ISO 6781:1983 and ASTM C1060-90 (1997).

(c) Notify the Government at least three working days prior to the tests to provide the Government the opportunity to witness the tests. Provide the Government written test results confirming the results of all tests.

01010-19 W91238-09-R-0007

5.6. PLUMBING

5.6.1. STANDARDS AND CODES: The plumbing system shall conform to APPLICABLE

CRITERIA.

5.7. ELECTRICAL SYSTEMS

5.7.1. STANDARDS AND CODES: The electrical systems for all facilities shall conform to

APPLICABLE CRITERIA.

5.7.2. MATERIALS AND EQUIPMENT: Materials, equipment and devices shall, as a minimum, meet the requirements of Underwriters Laboratories (UL) where UL standards are established for those items. Wiring for branch circuits shall be copper. Motors larger than one-half horsepower shall be three phase. All electrical systems shall be pre-wired and fully operational unless otherwise indicated. Wall mounted electrical devices (power receptacles and communication outlets) shall have matching colors, mounting heights and faceplates.

5.7.3. POWER SERVICE: Primary service from the base electrical distribution system to the pad-mounted transformer and secondary service from the transformer to the building service electrical equipment room shall be underground. See paragraph 6 for additional site electrical requirements.

5.7.3.1. Spare Capacity: Provide 10% space for future circuit breaker in all panelboards serving residential areas of buildings and 15% spaces in all other panelboards.

5.7.4. TELECOMMUNICATION SERVICE: The project’s facilities Building 92 must connect to the Installation telecommunications (voice and data) system through the existing outside plant (OSP) telecommunications underground infrastructure cabling system per I3A guidance.

Connection to the OSP cabling system (for Building 92) shall be from building’s main cross connect located in the telecommunications room and\or telephone closet.

5.7.5. LIGHTING: Lighting shall comply with the recommendations of the Illumination Engineering Society of North America (IESNA).

5.7.5.1. Interior Lighting: Interior lighting shall utilize electronic ballast and energy efficient fluorescent lamps with a Color Rendering Index (CRI) of 85 or higher and a Correlated Color Temperature of 4100K. Fluorescent lamps shall be the low mercury type qualifying as non-hazardous waste upon disposal. Surface mounted fixtures shall not be used on acoustical tile ceilings. An un-switched fixture with emergency ballast shall be provided at the entrance to each vault.

5.7.6. TELECOMMUNICATION SYSTEM: All building telecommunications cabling systems (BCS) shall conform to APPLICABLE CRITERIA to include I3A Technical Guide and the UFC 3-580- 01 (Draft) Telecommunications Bldg Cabling Systems Planning/Design.. An acceptable BCS encompasses, but is not limited to, copper and fiber optic (FO) entrance cable, termination equipment, copper and fiber backbone cable, copper and fiber horizontal distribution cable, workstation outlets, racks, cable management, patch panels, cable tray, cable ladder, conduits, grounding, and labeling.

5.7.7. LIGHTNING PROTECTION SYSTEM: A lightning protection system carrying a U.L. Master Label Certification shall be provided where recommended by the Lightning Risk Assessment of NFPA 780, Annex L.

01010-20 W91238-09-R-0007

5.8. HEATING, VENTILATING, AND AIR CONDITIONING

5.8.1. STANDARDS AND CODES: The HVAC system shall conform to APPLICABLE CRITERIA.

5.8.2. DESIGN CONDITIONS. Design shall be based on weather data from ASHRAE Handbook – Fundamentals (current edition), Design conditions for Herlong, CA: cooling: 1 percentile, heating: 99.6 percentile. Indoor design conditions shall conform to Table 5-1. Indoor air quality shall conform with the current ASHRAE Standard 62.1 and OSHA requirements.

TABLE 5-1 – INDOOR DESIGN DATA

Heating

Indoor Design Temperature 70°F

Unoccupied Space Design Temperature 55°F

Cooling

Indoor Design Temperature 75°F

5.8.2.1. To prevent mold formation in buildings, air conditioning systems must be designed to maintain space humidity at reasonable levels. Include the following considerations in the design of the air conditioning systems. Avoid over sizing of cooling equipment.

Design single zone systems and multi-zone systems to maintain an indoor design condition of 50% relative humidity. Size cooling coils for the greater of the cooling load calculated at the design dry bulb temperature condition or the design humidity condition. Where fan coil units are used, provide a non-permeable wall covering behind the unit. Provide ventilation air from a separate dedicated air handling unit. Do not condition outside air through fan coil units. Avoid the use of direct expansion cooling coils in air handling units with constant running fans that handle outside air.

5.8.3. BUILDING AUTOMATION SYSTEM. The Building Automation System (BAS) and UMCS/EMCS shall not be required for this project.

5.8.4. TESTING, ADJUSTING AND BALANCING. Testing and balancing of air and hydronic systems shall be accomplished by a firm certified for testing and balancing by the Associated Air Balance Council (AABC), National Environmental Balancing Bureau (NEBB), Testing and Balancing Bureau (TABB). TAB shall be performed in accordance with the requirements of the standard under which the TAB Firm’s qualifications are approved, i.e., AABC MN-I, NEBB TABES, or SMACNA HVACTAB unless otherwise specified herein. All recommendations and suggested practices contained in the TAB Standard shall be considered mandatory.