B.08.03 W9123726QA0640001 SF 30.pdf
PDF 4 MB Posted
- Attached to
- Office Roof Replacement Deer Creek Lake
- Solicitation number
- W9123726QA064
About this file
This is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract issued by the U.S. Army Corps of Engineers (USACE), Huntington District, on July 22, 2026. The modification applies to Contract/Order Number W9123726QA064 with an effective date of July 22, 2026. The amendment addresses Correction of line items and deliverables for a roofing and vent repair project at an office building.
The modification revises two Contract Line Item Numbers (CLINs). CLIN 0001 changes the scope from removal of the existing roof with disposal to include installation of a new roof while also completely removing the existing roof with disposal, as described in the Statement of Work. CLIN 0003 changes from removal and installation of a large bay vent with testing for functionality and leaks to removal of the large bay vent only, with repair using like materials to ensure the repair is safe and structurally sound, overlapped to bear upon structural members and secured with mechanical fasteners. All work includes furnishing labor, materials, equipment, supervision, and incidentals. The contract references three attachments: Statement of Work (dated June 30, 2026), Drawings (dated June 30, 2026), and Wage Determination (dated June 30, 2026). The amendment was signed by Contracting Officer Danielle Roar on July 23, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.08.03 W9123726QA0640001.pdf | ||
| A.03.09 Deer Creek Lake Office Roof Replacement Roof Diagram Labeled.pdf | ||
| B.08.02 W9123726QA064.pdf | ||
| A.02.16 SOW INSTRUCTIONS.docx | DOCX document | |
| B.04.20 Davis Bacon Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO
Description Contractor to furnish all labor, materials, equipment, supervision, and incidentals necessary to completely remove the existing roof from the office building along with disposal, as described in the Statement of Work.
Contractor to furnish all labor, materials, equipment, supervision, and incidentals necessary to install a new roof while also completely removing the existing roof from the office building along with disposal, as described in the Statement of Work.
INFORMATION FROM TO
Description Contractor to furnish all labor, materials, equipment, supervision, and incidentals necessary for the removal and installation of the large bay vent from the roof of the office building. Contractor shall also test vent for functionality and leaks after installation.
Contractor to furnish all labor, materials, equipment, supervision, and incidentals necessary for the removal of the large bay vent from the roof of the office building.
Contractor shall repair with like materials to ensure the repair is safe and structurally sound, overlapped to bear upon structural members and secured with mechanical fasteners, as described in the statement of work.
W9123726QA0640001
Section J - List of Attachments
The attachments table has changed from:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 SOW Statement of Work 30 Jun 2026 Attach ment
No
0002 Drawings Drawings 30 Jun 2026 Attach ment
No
0003 Wage Determination
Wage Determination 30 Jun 2026 Attach ment
No
To:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 SOW Statement of Work 30 Jun 2026 Attach ment
No
0002 Drawings Drawings 30 Jun 2026 Attach ment
No
0003 Wage Determination
Wage Determination 30 Jun 2026 Attach ment
No
W9123726QA0640001
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0001 |
| EffDate: 22 JUL 2026 |
| ReqNo: |
| ProjNo: 9655AT |
| IssCode: W91237 |
| AdmCode: |
| IssuedBy: W072 ENDIST HUNTINGTON |
KO CONTRACTING OFFICE, 502 EIGHTH STREET
HUNTINGTON, WV 25701-5000
UNITED STATES
BRADLEY ADKINS, EMAIL: BRADLEY.D.ADKINS@USACE.ARMY.MIL TELEPHONE: 304-399-5270
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W9123726QA064 |
| SolDate: 20 JUL 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Correction of line items and deliverables. |
| ContNameTitle: |
| CoNameTitle: DANIELLE ROAR |
| ContDate: |
| CODate: 23 JUL 2026 |