Solicitation Amendment W9123721R0003 0002.pdf

PDF 684 KB Posted

Attached to
Fabrication and Rehabilitation of Lock and Dam Structural Operating Equipment
Solicitation number
W91237-21-R-0003
Issued by

About this file

This document consists of an amendment to a solicitation for an Indefinite Delivery Indefinite Quantity contract for Fabrication and Rehabilitation of Lock and Dam Structural Operating Equipment. The scope of work includes fabricating and rehabilitating structural operating equipment for locks and dams, which may involve welding, machining, painting and other tasks. The solicitation seeks proposals for labor rates for project managers, quality control managers, and non-destructive testing technicians. Pricing is also required for the fabrication of sample bulkhead projects. The amendment provides additional questions and answers regarding the scope and pricing requirements. It clarifies that field work is not included in the IDIQ contract. Offerors need only propose pricing for the categories of labor involved in their proposals. The contract will have a one-year base period and four one-year options, with labor rates remaining fixed over the life of the contract. Proposals are due by the date and time specified in each delivery order request.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above referenced solicitation is hereby amended as follow s:

1. The Statement of Work and Price Breakout Schedules have been modif ied. See highlighted changes.

2. Additional questions have been answ ered and are attached.

All other terms and conditions of the solicitation remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123721R0003

X 9B. DATED (SEE ITEM 11)

28-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-May-2021

CODE

USACE, CONTRACTING DIVISION

ANDREA SKEAN, 502 8TH STREET

HUNTINGTON WV 25701

W91237 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123721R0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTION & ANSWERS

FABRICATION IDIQ QUESTIONS

1. In regards to Section B – Supplies or Services and Prices

a. Price Schedule for IDIQ– If an offeror does not participate in field activities, is pricing required for items numbered 0001 through 4004?

Addressed by amendment. Field activities not part of IDIQ contract.

b. Notes for Contracting Line Item (CLIN) Schedule – Sentence 3. Is the intent that the hourly rate for each category of labor shall remain fixed as quoted for the life of the MATOC regardless of the number of hours in the period?

Each category of labor shall remain fixed as quoted for the life of the contract.

c. Notes for Contracting Line Item (CLIN) Schedule – Sentence 4. Is the intent of the Government to award each resultant order based on the number of man hours quoted or the extended amount?

Amount

d. Notes for Contracting Line Item (CLIN) Schedule – Second paragraph. Is it the intent of the Government for each Delivery Order request to have a MATOC awardee provide vendor quotes for raw materials, subcontractor quotes for outsources material and labor, and labor hour quotes for each CLIN? If this is the intent, what will be the evaluation criteria?

No. This is just a materials cost.

e. Due the extensive level of detail that would be required per d. above, what is the anticipated time that will be allowed to prepare a quotation? How long will the Government require to evaluate and make an award?

The amount of time given to prepare a quotation and evaluate to make an award will vary depending on the complexity of the work. Each RFP letter will have the date/time due for proposals. It also has a statement that if an extension is needed the contractor can make a request in writing.

f. Price Schedule – BBF Bulkheads – Is pricing in this section purely for fabrication?

This is for fabrication and delivery to the project. Offloading of delivery truck to be accomplished by the Government.

g. Price Schedule – BBF Bulkheads – Does the Government require pricing for each category listed in each Item? If so, what are categories Project Manager, Superintendent, and Site Safety Officer includes as these are normally associated with site work as opposed to off site work in a fabricators facility?

No. You only need to list the category if that category is involved in the proposal for that specific delivery order. You may have a proposal that none of the categories in the base contract are applicable.

h. Price Schedule – BBF Bulkheads – As a Small Business Contractor, internal price estimates and costing are not broken down as identified in the solicitation. Estimates are prepared and broken down into three categories only. Fabrication Labor, Machining Labor, and Materials (including outsourced labor). Would this breakdown be considered acceptable?

Yes.

2. The scope of the resultant MATOC as defined in Section 2, paragraph C-2.0 is defined as “consists of furnishing all labor and equipment necessary to fabricate and/or rehabilitate structural operating equipment…”

a. Will offers be considered if a Company does not do field work?

Yes. Field work is removed via amendment.

b. If an offeror is a build to print fabricator with all of the other qualifications but does not do field work, is off-loading of fabricated equipment at site a requirement.

Whether or not off-loading is required will be specifically identified on each individual delivery order.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

PRICE SCHEDULE - BBF BULKHEADS

SEED PROJECT: BBF BULKHEADS FABRICATION

ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

0001 Final “As-Built” Documents

Project Manager ____ hrs $_____________ $_____________

CQC Manager ____ hrs $_____________ $_____________

NDT Tester ____ hrs $_____________ $_____________

Welders ____ hrs $_____________ $_____________

Machinists ____ hrs $_____________ $_____________

Laborers ____ hrs $_____________ $_____________

Total for Item 1 $_____________

Fabrication of One (1) Upper Selective Withdrawal Intake Bulkhead

Project Manager ____ hrs $_____________ $_____________

CQC Manager ____ hrs $_____________ $_____________

NDT Tester ____ hrs $_____________ $_____________

Welders ____ hrs $_____________ $_____________

Machinists ____ hrs $_____________ $_____________

Materials and Supplies $_____________

Total for Item 2 $_____________

Fabrication of One (1) Lower Selective Withdrawal Intake Bulkhead

Project Manager ____ hrs $_____________ $_____________

CQC Manager ____ hrs $_____________ $_____________

NDT Tester ____ hrs $_____________ $_____________

Welders ____ hrs $_____________ $_____________

Machinists ____ hrs $_____________ $_____________

Total for Item 3 $_____________

Fabrication of Six (6) Dog-Off Hook Assemblies

Project Manager ____ hrs $_____________ $_____________

CQC Manager ____ hrs $_____________ $_____________

NDT Tester ____ hrs $_____________ $_____________

Welders ____ hrs $_____________ $_____________

Machinists ____ hrs $_____________ $_____________

Total for Item 4 $_____________

0005 Shipment & Delivery

Project Manager ____ hrs $_____________ $_____________

CQC Manager ____ hrs $_____________ $_____________

NDT Tester ____ hrs $_____________ $_____________

Welders ____ hrs $_____________ $_____________

Machinists ____ hrs $_____________ $_____________

Total for Item 5 $_____________

TOTAL PRICE FOR BBF BULKHEADS FABRICATION: _____________________

PRICE SCHEDULE FOR IDIQ

PRICE SCHEDULE

Offeror’s Name: ______________________________________________

BASE PERIOD: DATE OF AWARD- 31 MAY 2022

ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

0001 Project Manager 984 hrs $_____________ $_____________

0002 CQC Manager 300 hrs $_____________ $_____________

0003 NDT Tester 130 hrs $_____________ $_____________

Base Total

OPTION PERIOD ONE: 1 JUNE 2022- 31 MAY 2023

ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

1001 Project Manager 984 hrs $_____________ $_____________

1002 CQC Manager 300 hrs $_____________ $_____________

1003 NDT Tester 130 hrs $_____________ $_____________

Option Period One Total

OPTION PERIOD TWO: 1 JUNE 2023- 31 MAY 2024

2001 Project Manager 984 hrs $_____________ $_____________

2002 CQC Manager 300 hrs $_____________ $_____________

2003 NDT Tester 130 hrs $_____________ $_____________

Option Period Two

OPTION PERIOD THREE: 1 JUNE 2024- 31 MAY 2025

3001 Project Manager 984 hrs $_____________ $_____________

3002 CQC Manager 300 hrs $_____________ $_____________

3003 NDT Tester 130 hrs $_____________ $_____________

Option Period Three

OPTION PERIOD FOUR: 1 JUNE 2025- 31 MAY 2026

4001 Project Manager 984 hrs $_____________ $_____________

4002 CQC Manager 300 hrs $_____________ $_____________

4003 NDT Tester 130 hrs $_____________ $_____________

Option Period Four

BASE PLUS FOUR OPTION PERIODS TOTAL $________________

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

This is an Indefinite Delivery-Indefinite Quantity Contract. All quantities listed in Price Breakout Schedule are estimates only and are not guaranteed. They are to be used only as an aid in preparing your price proposal.

The hourly rate proposed on this price breakout schedule will become binding upon award of the life of the MATOC Contract and must be used on each subsequent delivery order. Adherence to these rates will be reviewed through submission of supporting documentation with each delivery order proposal.

Each delivery order shall include, as a minimum, a Price Breakout Schedule with items included herein and any other items required to complete the work described in the issued Scope of Work. These costs shall include, but are not limited to, labor, equipment, materials, overhead, and profit. All vendor or subcontractor quotes shall be provided to the Contracting Officer as supporting documents to the cost proposals. The Government may request detailed pricing breakdowns as needed for each delivery order.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

SECTION C - DESCRIPTION/SPECIFICATIONS

SECTION 1 - GENERAL REQUIREMENTS

C-1.1 Character and Extent of Work. The Contractor shall perform all or part of the work described in SECTION 2 -TECHNICAL REQUIREMENTS and more specifically identified in Delivery Orders, when and as ordered in writing, by the Contracting Officer during the period of the Contract. In performing work that is ordered, the Contractor shall provide all supervision necessary to insure the required end product. The general procedural guide for assignment of work and performance of work under this contract is as follows:

(1) Contractors will be furnished a Scope of Work and will be requested to submit a proposal based upon the line items listed in the Price Schedule. This is a multiple award contract therefore delivery orders will be awarded competitively and may be based on factors such as price, method, and delivery schedule.

The Government reserves the right to negotiate with contractors, if necessary.

(2) A Delivery order (DD 1155) will be issued in the agreed upon amount. The Delivery order will include a Scope of Work to be performed; any associated drawings and the required completion date.

(4) During the prosecution of the work, the Contractor shall provide adequate supervision to assure accuracy, quality, completeness and timely progression of the work.

C-1.2 Payment. Invoices shall be submitted in accordance with Paragraph H.5. The total price for each delivery order will include all costs associated with performing the scope of work including overhead, profit and labor.

No other payment will be made to the contractor other than the awarded delivery order price.

C-1.3 Pricing.

a. The Contractor shall include costs for Project Manager, CQC Manager, and NDT Tester in their proposal.

b. Service wage categories will be provided per delivery order.

c. The Contractor will provide a list of supplies and materials that will be needed per delivery order.

Supplies and materials will be negotiated as a lump sum item on each delivery order. The Contractor shall provide an itemized material list which specifies quantities and unit price to the Contracting Officer prior to negotiations. The itemized list shall be in sufficient detail to allow for an analysis of all costs and profit associated in completing the work. Supplies and materials may include such items as steel, hardware, welding supplies, and painting supplies.

d. Outside Supply/Fabrication purchased directly for the job will be negotiated as a lump sum item on each delivery order, as required. The Contractor shall provide an itemized list which specifies quantities and unit price to the Contracting Officer prior to any negotiations. This itemized list shall be in sufficient detail to allow for an analysis of all costs and profit associated in completing the work.

e. The Contractor will provide a list of equipment that will be needed per delivery order. Equipment for this contract may include but not limited to the following: cranes, forklifts lathes, welding machines, saw cutting machines, etc.

f. The Contractor will include all shipping and freight charges per delivery order.

SECTION 2 - TECHNICAL REQUIREMENTS

C-2.0 Technical Specifications. The work to be performed under this contract consists of furnishing all labor and equipment necessary to fabricate and/or rehabilitate structural operating equipment for the Huntington District of the U.S. Army Corps of Engineers and other Districts within the Great Lakes and Ohio River Division.

C-2.1 Qualifications of Structural Steel Fabricator. The fabricating plant and fabricator must be certified under the AISC (American Institute of Steel Construction) Quality Certification Program, with one of the following certifications and with a Fracture Critical Endorsement (F), Category CBR: Major Bridge Fabrication, IBR:

Certified Bridge Fabricator - Intermediate, ABR: Certified Bridge Fabricator - Advanced or HYD: Certified Hydraulic Fabricator at time of proposal and throughout the contract period. The fabricator or fabrication plant must possess five 5 years documented experience on projects of similar scope. Similar scope means projects of similar size and similar amounts of welding and detail types. Submit copies of the AISC certificate indicating that the fabrication plant meets the specified structural steelwork category and documented experience.

C-2.2 Fabrication and Rehabilitation. The rehabilitation work shall be performed in the shop and may include, but is not limited to such items as welding structural cracks and defects, replacing bushings, machining shafts and bushings, installing sleeves on shafts, sandblasting to white metal, painting, replacing bolted on rubber seals.

The fabrication work shall be performed in the shop and may include, but is not limited to welding members together, fabricating items in accordance with drawings and specifications, cutting and drilling rubber seals, bolting members together, sandblasting, and painting. The contractor shall comply with all environmental laws and regulations.

C-2.3 Materials. The Contractor is to provide all materials necessary to perform a specific “Scope of Work” unless identified in the individual delivery order. The Contractor shall provide all materials, supplies, safety equipment required by OSHA, and when on Government property, and Corps of Engineers Safety Manual EM385-1-1 to accomplish the necessary Scope of Work (e.g. welding electrode rod, grinding disks, goggles, respirators, etc.). Drawings for each item of work will be provided when the "scope of work" is issued for a proposed delivery order.

C-2.4 Transportation. Transportation of fabricated items, items to be rehabilitated, and rehabilitated items shall be the responsibility of the Contractor unless otherwise specified in the individual delivery order. If required, the Contractor shall supply a tractor trailer to pick up/deliver items from any Government facility and transport them to the Contractor's facility.

C-2.5 Mobilization and Demobilization. The Contractor may be required to perform off site work, as needed, on Corps of Engineers project sites within the Huntington District of the Corps of Engineers.

These work requirements will include remote site rehabilitation of structural operating equipment at Corps of Engineers project sites within the Huntington District. Typical work requirements will require operation such as cutting, welding, sand blasting and painting. The “Scope of Work” will specify the location in which the work will be performed, along with a list of equipment the contractor shall provide. This list of equipment will identify the major items only. Support equipment and tools such as air hoses, hand tools, side grinders, welding leads, cutting torches, etc. shall be the responsibility of the Contractor unless otherwise stated in the delivery order.

The Contractor shall provide a detailed list of miscellaneous other equipment, specific usage charges and/or rental rates for each to the Contracting Officer as part of their proposal.

Mobilization and Demobilization of equipment to a specific project work site will be based on the specific “Scope of Work” detailed in the individual delivery order. The Contractor shall provide a detailed outline of the charges included for mobilization and demobilization to the Contracting Officer as part of their proposal.

C-2.5 Travel. The Government will pay travel according to the Department of Defense Civilian Personnel Joint Travel Regulations for the Contractor’s employees where travel is required by the “delivery order”. The Contractor shall provide a work schedule detailing the number of employees, anticipated travel days, estimated private operator mileage (POV) and any other anticipated travel cost prior to delivery order negotiation. Travel charges will be negotiated as a lump sum when deemed necessary by the delivery order.

C-2.6 Load and Unload. Unless otherwise stated, the contractor shall be responsible for l o a d i n g a n d unloading all items fabricated or rehabilitated under this contract. This includes loading and unloading items at the Government facilities as well as the Fabricator’s facilities.

C-2.7 Applicable Publications. The Contractor shall perform technical work in accordance with applicable publications. They include, but are not limited to:

INDUSTRIAL STANDARDS AND CODES (latest Editions):

National Electrical Code American Welding Society Codes American Institute of Steel Construction American Society for Testing and Materials OSHA Safety Standards

C-2.8 Contractor's work and responsibility shall include, but not be limited to, all planning, programming, administration and management necessary to assure that all work performed is in accordance with the contract and all applicable laws, regulations, codes, or directives. Contractor shall ensure that all work meets or exceeds tolerances specified in this contract or delivery order, individual delivery order, or included in referenced documents.

C-2.9 Quality Control. The Contractor shall establish a quality control program to assure the requirements of the contract are provided as specified. This program must be approved by the Contracting Officer prior to commencement of work under this contract. The program shall include, but not be limited to the following:

(1) An inspection system covering all the work stated in the contract specifications specifying areas to be inspected on either a scheduled or unscheduled basis and the individuals who shall do the inspection.

(2) A method of identifying deficiencies in the quality of work performed before the level of performance is unacceptable.

(3) A file of all inspections conducted by the Contractor and the corrective actions taken. This documentation shall be made available to the Government representative inspecting the work on site.

SECURITY REQUIREMENTS

All Contractors and subcontractor employee(s) working on any contract who require access in and/or around any Huntington District facilities, projects, owned or leased facility/space shall receive authorization to be on site at these areas based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12).

The Huntington District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on any contract based upon the results of the background investigation provided by the Huntington District Security Management Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Huntington District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.

FOR ALL CONTRACTS 1-YEAR AND SUBSEQUENT OPTION YEARS:

Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Huntington District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted unescorted access in or on District facilities.

The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working,

(2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) Security Information Sheet on each employee working on site must be submitted directly to the Huntington District Security Management Office.

The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.

Contractors shall have background checks completed for their employees annually in the case of Contracts with option periods. For instance, if the employee was cleared in May of 2018, they shall be cleared again in May of 2019. It is the Contractor’s responsibility to ensure that each employee’s security is up to date. Failure to comply may lead to possible removal from the project/jobsite.

The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Huntington District USACE Security Management Office for background purposes.

FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC)

The documents listed below are required:

SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). FD 258, Contractor Fingerprint Card (one card for digital prints, two for ink prints) (NOTE: a trained/qualified individual must take prints, ORI block on the FD 258 must be USOPM000Z) (Contractor Fingerprint Cards (FD-258) may be obtained by Contracting Division by contacting the Huntington District Security Management Office).

Contractor shall report any changes in personnel, or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.

Following submission of paperwork, the Huntington District Security Management Office will conduct an initial criminal check based upon the information provided. If there are no issues, the Huntington District Security Management Office will make recommendations to the PCO or their Designated Representative. The Huntington District Security Management Office cannot give approval due to unfavorable report(s). The Huntington District Security Management Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derogatory information. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise the Contractor of the decision.

PRE-BID MEETINGS

Any Contractor or sub contractor who plans to attend a pre-bid site visit to any Huntington District facilities, projects, owned or leased facility/spaces must be vetted by having a background investigation conducted by the Security Management Office prior to the site visit. Information for the background investigation must contain the following: a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State). It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.

FOREIGN NATIONALS

The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters staff to complete. All Foreign Nationals must be cleared 30 to 45 days in advance of any site visit, tour or work on USACE owned/leased property. All Foreign Nationals must comply with the following paragraph:

In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.

In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Huntington District Security Management Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work. A scanned copy of a valid passport must be sent to the Security Management Office in order to formally request a visit to any Huntington District facilities, projects, owned or leased facility/spaces.

Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, Engineering or Army regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.

The Contractor shall contact the Huntington District Security Management Office by phone, letter, or email at the following numbers/addresses:

CELRH-SM

502 Eighth Street Huntington, WV 25701

Scott E. Grandon, phone (304) 399-5661; email scott.e.grandon@usace.army.mil Stephen R. Curry, phone (304) 399-5695; email stephen.r.curry@usace.army.mil Matthew D. Green, phone (304) 399-5294; email matthew.d.green@usace.army.mil Sandra L. Hardwick, phone (304) 399-5612; email sandra.l.hardwick@usace.army.mil

AT/OPSEC Requirements. The following shall be accomplished by the contractor before any work will be ordered:

1. Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

2. Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.

Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

U.S. Department of Labor Veterans employment: www.vets.gov/ Federal veteran employment information: www.fedshirevets.gov/index.aspx Veterans’ Employment and Training Service (VETS): http://www.dol.gov/vets/ Veterans Opportunity to Work (VOW) Program: http://benefits.va.gov/vow/ U.S. Army Warrior Transition Command Employment Index:

https://wct.army.mil/modules/employers/e1-hireOurSoldiers.html Hiring Our Heroes initiative: www.uschamberfoundation.org/hiring-our-heroes

Guide to Hiring Veterans:

https://obamawhitehouse.archives.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf

(End of Summary of Changes)