B.08.03 W9123721Q0079 P00001 Amendment.pdf

PDF 357 KB Posted

Attached to
Walhonding Mowing and Maintenance Services Federal contract opportunity
Solicitation number
W9123721Q0079
Issued by
Department of the Army Corps of Engineers Engineering District Huntington

View the file

Other files for this federal contract opportunity

Other files attached to Walhonding Mowing and Maintenance Services, newest first.
File Type Posted
A.03.09 Walhonding Exhibits.pdf PDF
B.08.02 W9123721Q0079.pdf PDF
A.02.11 PWS.pdf PDF
A.03.09 WAL Exhibits.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This Solicitation is Modif ied as follow s:

1.) Changes to the price breakout schedule. Line items 0068, 1068, 2068, 3068, and 4068 "Surveying Aid" has been removed.

1. CONTRACT ID CODE PAGE OF PAGES

1 19

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123721Q0079

X 9B. DATED (SEE ITEM 11)

30-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Sep-2021

CODE

USACE, CONTRACTING DIVISION

DANIELLE MULLINS, 502 8TH STREET

HUNTINGTON WV 25701

W91237 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123721Q0079

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

PRICE BREAKOUT SCHEDULE

BASE YEAR - CONTRACT PERIOD - DATE OF AWARD THRU 31 DECEMBER 2022

Item # Description Est. Quant. Unit U/P Unit Total

Section C-2

CMB

0001 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 0002 Mowing Level 1 - Area B - Dam 6 Ea. $ $ 0003 Mowing Level 1 - Dike 1 6 Ea. $ $ 0004 Mowing Level 1 - Dike 2 6 Ea. $ $ 0005 Mowing Level 1 - Pavonia 4 Ea. $ $

0006 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 0007 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 0008 Mowing Level 2 - Dike 1 2 Ea. $ $ 0009 Mowing Level 2 - Dike 2 2 Ea. $ $ 0010 Mowing Level 2 - Pavonia 2 Ea. $ $

0011 Raking Grass - Per acre 2 Ac. $ $ 0012 Raking Leaves - Per acre 2 Ac. $ $

PHC

0013 Mowing Level 1 - Area A - Office/PUA 11 Ea. $ $ 0014 Mowing Level 1 - Area B - Dam 6 Ea. $ $ 0015 Mowing Level 1 - Area C - Spillway 6 Ea. $ $

0016 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 0017 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 0018 Mowing Level 2 - Area C - Spillway 2 Ea. $ $

0019 Raking Grass - Per acre 2 Ac. $ $ 0020 Raking Leaves - Per acre 2 Ac. $ $

MOL

0021 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 0022 Mowing Level 1 - Area B - Upstream Blanket 6 Ea. $ $ 0023 Mowing Level 1 - Area C - Down Stream blanket 6 Ea. $ $ 0024 Mowing Level 1 - Area D - Dam Slopes 6 Ea. $ $ 0025 Mowing Level 1 - Dike 1 4 Ea. $ $ 0026 Mowing Level 1 - Dike 2 4 Ea. $ $

0027 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 0028 Mowing Level 2 - Area B - Upstream Blanket 2 Ea. $ $ 0029 Mowing Level 2 - Area C - Down Stram Blanket 2 Ea. $ $ 0030 Mowing Level 2 - Area D - Dam Slopes 2 Ea. $ $ 0031 Mowing Level 2 - Dike 1 2 Ea. $ $ 0032 Mowing Level 2 - Dike 2 2 Ea. $ $

0033 Raking Grass - Per acre 2 Ac. $ $ 0034 Raking Leaves - Per acre 2 Ac. $ $

MKW

0035 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 0036 Mowing Level 1 - Area B - Downstream/ Dam 6 Ea. $ $ 0037 Mowing Level 1 - Area C - Upstream/ Dam 6 Ea. $ $ 0038 Mowing Level 1 - Area D - Spillway 6 Ea. $ $ 0039 Weeding Flower Beds 4 Ea. $ $

0040 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 0041 Mowing Level 2 - Area B - Downstream/ Dam 2 Ea. $ $ 0042 Mowing Level 2 - Area C - Upstream/ Dam 2 Ea. $ $ 0043 Mowing Level 2 - Area D - Spillway 2 Ea. $ $

0044 Raking Grass - Per acre 2 Ac. $ $ 0045 Raking Leaves - Per acre 2 Ac. $ $

NBN

0046 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 0047 Mowing Level 1 - Area B - Dam 8 Ea. $ $ 0048 Mowing Level 1 - Area C - Spillway 3 Ea. $ $

0049 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 0050 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 0051 Mowing Level 2 - Area C - Spillway 2 Ea. $ $

0052 Raking Grass - Per acre 2 Ac. $ $ 0053 Raking Leaves - Per acre 2 Ac. $ $

SECTION C-2 - Subtotal: $

SECTION C-3

CMB

0054 Level 1 - Standard Cleaning 100 Ea. $ $ 0055 Level 2 - Deep Cleaning 2 Ea. $ $

0056 Level 1 - Standard Cleaning 100 Ea. $ $ 0057 Level 2 - Deep Cleaning 2 Ea. $ $

SECTION C-3 - Subtotal $

SECTION C-4

Walhonding Administrative Office

0058 Level 1 - Standard Cleaning 48 Ea. $ $ 0059 Level 2 - Deep Cleaning 2 Ea. $ $ 0060 Carpet Cleaning/Soil Guard 2 Ea. $ $

Maintenance Office - MKW, PHC, MOL, CMB 0062 Level 1 - Standard Cleaning 8 Ea. $ $ 0063 Level 2 - Deep Cleaning 2 Ea. $ $ 0064 Carpet Cleaning/Soil Guard 2 Ea. $ $

SECTION C-4 - Subtotal $

SECTION C-5

0066 General Maintenance Worker 300 Hr. $ $

0067 Grounds Maintenance Laborer 400 Hr. $ $

0069 Electrician 48 Hr. $ $

0070 Carpenter 60 Hr. $ $

0071 Backhoe/ Endloaer and Operator (Backhow with minimum spec: 50hp, 18" Backhoe bucket and 1 cu.yd.

front endloader

200 Hr. $ $

0072 Dozer and Operator (John Deere 450) or track driven dozer with minimum 70 HP and 8' blade

100 Hr. $ $

0073 Dump Truck and Operator (2-5 ton) 100 Hr. $ $

0074 Tractor and Operator(Farm-type 4x4 Tractor with minimum specs: 30 hp, rotary mower, 12 inch auger, farm type plow, 6 ft disc and 6 ft bucket loader)

160 Hr. $ $

0075 Grader and Operator (Caterpillar D-12) or equivelant 80 Hr. $ $

0076 Trencher and Operator (Trencher with minimum specs:

45ho, capable of cutting a trench 48" deep , 6" wide

80 Hr. $ $

0077 Truck and Opertor (Full Size 4'x8' bed 1/2 ton or larger)

180 Hr. $ $

0078 Chainsaw and Operator (Gas Powered 16" blade minimum)

40 Hr. $ $

0079 Aerial Lift Truck and Operator (30ft. Reach Minimum) altec AT 200 or Equivelant)

20 Hr. $ $

0080 Tree Chipper and Operator (trailered, automatic feeder, able to chip minimum 6 inch log, gas or diesel Powered)

100 Hr. $ $

0081 Excavator and Operator with clamshell bucket(175HP minimum Kobelco sk 250 or equiveleant)

120 Hr. $ $

0082 Boat and Operator (14-25ft workboat 10-60hp) 20 Hr. $ $

0083 Skid steer Loader and Operator (Minimum 45hp with attachements to include but not limit to, 12 inch auger, 68" box scraper, 60" bucket and angle broom)

120 Hr. $ $

0084 Skid steer loader and operator with forrestry head attachment and equipment (Minimum size to run Forrestry head effectively)

120 Hr. $ $

0085 CAT 324 Long Reach Excavator with operator, or equivelant, 75' reach with transport and permits

500 Hr. $ $

0086 Offroad dump vehicle and Operator 5-8 Ton - 4x4 120 Hr. $ $

0087 Excavator/ Heavy Equipment and Operator 120 Hr. $ $

SECTION C-5 - Subtotal $

BASE PERIOD TOTAL $

OPTION YEAR ONE - CONTRACT PERIOD - JANUARY 1 2023 - DECEMBER 31 2023

Section C-2

CMB

1001 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 1002 Mowing Level 1 - Area B - Dam 6 Ea. $ $ 1003 Mowing Level 1 - Dike 1 6 Ea. $ $ 1004 Mowing Level 1 - Dike 2 6 Ea. $ $ 1005 Mowing Level 1 - Pavonia 4 Ea. $ $

1006 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 1007 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 1008 Mowing Level 2 - Dike 1 2 Ea. $ $ 1009 Mowing Level 2 - Dike 2 2 Ea. $ $ 1010 Mowing Level 2 - Pavonia 2 Ea. $ $

1011 Raking Grass - Per acre 2 Ac. $ $ 1012 Raking Leaves - Per acre 2 Ac. $ $

1013 Mowing Level 1 - Area A - Office/PUA 11 Ea. $ $ 1014 Mowing Level 1 - Area B - Dam 6 Ea. $ $ 1015 Mowing Level 1 - Area C - Spillway 6 Ea. $ $

1016 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 1017 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 1018 Mowing Level 2 - Area C - Spillway 2 Ea. $ $

1019 Raking Grass - Per acre 2 Ac. $ $ 1020 Raking Leaves - Per acre 2 Ac. $ $

1021 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 1022 Mowing Level 1 - Area B - Upstream Blanket 6 Ea. $ $ 1023 Mowing Level 1 - Area C - Down Stream blanket 6 Ea. $ $ 1024 Mowing Level 1 - Area D - Dam Slopes 6 Ea. $ $ 1025 Mowing Level 1 - Dike 1 4 Ea. $ $ 1026 Mowing Level 1 - Dike 2 4 Ea. $ $

1027 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 1028 Mowing Level 2 - Area B - Upstream Blanket 2 Ea. $ $ 1029 Mowing Level 2 - Area C - Down Stram Blanket 2 Ea. $ $ 1030 Mowing Level 2 - Area D - Dam Slopes 2 Ea. $ $ 1031 Mowing Level 2 - Dike 1 2 Ea. $ $ 1032 Mowing Level 2 - Dike 2 2 Ea. $ $

1033 Raking Grass - Per acre 2 Ac. $ $ 1034 Raking Leaves - Per acre 2 Ac. $ $

1035 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 1036 Mowing Level 1 - Area B - Downstream/ Dam 6 Ea. $ $ 1037 Mowing Level 1 - Area C - Upstream/ Dam 6 Ea. $ $ 1038 Mowing Level 1 - Area D - Spillway 6 Ea. $ $ 1039 Weeding Flower Beds 4 Ea. $ $

1040 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 1041 Mowing Level 2 - Area B - Downstream/ Dam 2 Ea. $ $ 1042 Mowing Level 2 - Area C - Upstream/ Dam 2 Ea. $ $ 1043 Mowing Level 2 - Area D - Spillway 2 Ea. $ $

1044 Raking Grass - Per acre 2 Ac. $ $ 1045 Raking Leaves - Per acre 2 Ac. $ $

1046 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 1047 Mowing Level 1 - Area B - Dam 8 Ea. $ $ 1048 Mowing Level 1 - Area C - Spillway 3 Ea. $ $

1049 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 1050 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 1051 Mowing Level 2 - Area C - Spillway 2 Ea. $ $

1052 Raking Grass - Per acre 2 Ac. $ $ 1053 Raking Leaves - Per acre 2 Ac. $ $

SECTION C-2 - Subtotal $

CMB

1054 Level 1 - Standard Cleaning 100 Ea. $ $ 1055 Level 2 - Deep Cleaning 2 Ea. $ $

1056 Level 1 - Standard Cleaning 100 Ea. $ $ 1057 Level 2 - Deep Cleaning 2 Ea. $ $

SECTIONC-4

Walhonding Administrative Office

1058 Level 1 - Standard Cleaning 48 Ea. $ $ 1059 Level 2 - Deep Cleaning 2 Ea. $ $ 1060 Carpet Cleaning/Soil Guard 2 Ea. $ $

1062 Level 1 - Standard Cleaning 8 Ea. $ $ 1063 Level 2 - Deep Cleaning 2 Ea. $ $ 1064 Carpet Cleaning/Soil Guard 2 Ea. $ $

1066 General Maintenance Worker 300 Hr. $ $ 1067 Grounds Maintenance Laborer 400 Hr. $ $ 1069 Electrician 48 Hr. $ $ 1070 Carpenter 60 Hr. $ $ 1071 Backhoe/ Endloaer and Operator (Backhow with minimum spec: 50hp, 18" Backhoe bucket and 1 cu.yd.

front endloader

200 Hr. $ $

1072 Dozer and Operator (John Deere 450) or track driven dozer with minimum 70 HP and 8' blade

100 Hr. $ $

1073 Dump Truck and Operator (2-5 ton) 100 Hr. $ $

1074 Tractor and Operator(Farm-type 4x4 Tractor with minimum specs: 30 hp, rotary mower, 12 inch auger, farm type plow, 6 ft disc and 6 ft bucket loader)

160 Hr. $ $

1075 Grader and Operator (Caterpillar D-12) or equivelant 80 Hr. $ $ 1076 Trencher and Operator (Trencher with minimum specs:

45ho, capable of cutting a trench 48" deep , 6" wide 80 Hr. $ $

1077 Truck and Opertor (Full Size 4'x8' bed 1/2 ton or larger)

180 Hr. $ $

1078 Chainsaw and Operator (Gas Powered 16" blade minimum)

40 Hr. $ $

1079 Aerial Lift Truck and Operator (30ft. Reach Minimum) altec AT 200 or Equivelant)

20 Hr. $ $

1080 Tree Chipper and Operator (trailered, automatic feeder, able to chip minimum 6 inch log, gas or diesel Powered)

100 Hr. $ $

1081 Excavator and Operator with clamshell bucket(175HP minimum Kobelco sk 250 or equiveleant)

120 Hr. $ $

1082 Boat and Operator (14-25ft workboat 10-60hp) 20 Hr. $ $ 1083 Skid steer Loader and Operator (Minimum 45hp with attachements to include but not limit to, 12 inch auger, 68" box scraper, 60" bucket and angle broom)

120 Hr. $ $

1084 Skid steer loader and operator with forrestry head attachment and equipment (Minimum size to run Forrestry head effectively)

120 Hr. $ $

1085 CAT 324 Long Reach Excavator with operator, or equivelant, 75' reach with transport and permits

500 Hr. $ $

1086 Offroad dump vehicle and Operator 5-8 Ton - 4x4 120 Hr. $ $ 1087 Excavator/ Heavy Equipment and Operator 120 Hr. $ $

OPTION YEAR ONE TOTAL $

OPTION YEAR TWO - CONTRACT PERIOD - JANUARY 1 2024 - DECEMBER 31 2024

SECTION C-2

CMB

2001 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 2002 Mowing Level 1 - Area B - Dam 6 Ea. $ $ 2003 Mowing Level 1 - Dike 1 6 Ea. $ $ 2004 Mowing Level 1 - Dike 2 6 Ea. $ $ 2005 Mowing Level 1 - Pavonia 4 Ea. $ $

2006 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 2007 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 2008 Mowing Level 2 - Dike 1 2 Ea. $ $

2009 Mowing Level 2 - Dike 2 2 Ea. $ $ 2010 Mowing Level 2 - Pavonia 2 Ea. $ $

2011 Raking Grass - Per acre 2 Ac. $ $ 2012 Raking Leaves - Per acre 2 Ac. $ $

2013 Mowing Level 1 - Area A - Office/PUA 11 Ea. $ $ 2014 Mowing Level 1 - Area B - Dam 6 Ea. $ $ 2015 Mowing Level 1 - Area C - Spillway 6 Ea. $ $

2016 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 2017 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 2018 Mowing Level 2 - Area C - Spillway 2 Ea. $ $

2019 Raking Grass - Per acre 2 Ac. $ $ 2020 Raking Leaves - Per acre 2 Ac. $ $

2021 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 2022 Mowing Level 1 - Area B - Upstream Blanket 6 Ea. $ $ 2023 Mowing Level 1 - Area C - Down Stream blanket 6 Ea. $ $ 2024 Mowing Level 1 - Area D - Dam Slopes 6 Ea. $ $ 2025 Mowing Level 1 - Dike 1 4 Ea. $ $ 2026 Mowing Level 1 - Dike 2 4 Ea. $ $

2027 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 2028 Mowing Level 2 - Area B - Upstream Blanket 2 Ea. $ $ 2029 Mowing Level 2 - Area C - Down Stram Blanket 2 Ea. $ $ 2030 Mowing Level 2 - Area D - Dam Slopes 2 Ea. $ $ 2031 Mowing Level 2 - Dike 1 2 Ea. $ $ 2032 Mowing Level 2 - Dike 2 2 Ea. $ $

2033 Raking Grass - Per acre 2 Ac. $ $ 2034 Raking Leaves - Per acre 2 Ac. $ $

2035 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 2036 Mowing Level 1 - Area B - Downstream/ Dam 6 Ea. $ $ 2037 Mowing Level 1 - Area C - Upstream/ Dam 6 Ea. $ $ 2038 Mowing Level 1 - Area D - Spillway 6 Ea. $ $ 2039 Weeding Flower Beds 4 Ea. $ $

2040 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 2041 Mowing Level 2 - Area B - Downstream/ Dam 2 Ea. $ $ 2042 Mowing Level 2 - Area C - Upstream/ Dam 2 Ea. $ $ 2043 Mowing Level 2 - Area D - Spillway 2 Ea. $ $

2044 Raking Grass - Per acre 2 Ac. $ $

2045 Raking Leaves - Per acre 2 Ac. $ $

2046 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 2047 Mowing Level 1 - Area B - Dam 8 Ea. $ $ 2048 Mowing Level 1 - Area C - Spillway 3 Ea. $ $

2049 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 2050 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 2051 Mowing Level 2 - Area C - Spillway 2 Ea. $ $

2052 Raking Grass - Per acre 2 Ac. $ $ 2053 Raking Leaves - Per acre 2 Ac. $ $

CMB

2054 Level 1 - Standard Cleaning 100 Ea. $ $ 2055 Level 2 - Deep Cleaning 2 Ea. $ $

PHC

2056 Level 1 - Standard Cleaning 100 Ea. $ $ 2057 Level 2 - Deep Cleaning 2 Ea. $ $

Walhonding Administrative Office

2058 Level 1 - Standard Cleaning 48 Ea. $ $ 2059 Level 2 - Deep Cleaning 2 Ea. $ $ 2060 Carpet Cleaning/Soil Guard 2 Ea. $ $

2062 Level 1 - Standard Cleaning 8 Ea. $ $ 2063 Level 2 - Deep Cleaning 2 Ea. $ $ 2064 Carpet Cleaning/Soil Guard 2 Ea. $ $

2066 General Maintenance Worker 300 Hr. $ $ 2067 Grounds Maintenance Laborer 400 Hr. $ $ 2069 Electrician 48 Hr. $ $ 2070 Carpenter 60 Hr. $ $ 2071 Backhoe/ Endloaer and Operator (Backhow with minimum spec: 50hp, 18" Backhoe bucket and 1 cu.yd.

front endloader

200 Hr. $ $

2072 Dozer and Operator (John Deere 450) or track driven dozer with minimum 70 HP and 8' blade

100 Hr. $ $

2073 Dump Truck and Operator (2-5 ton) 100 Hr. $ $ 2074 Tractor and Operator(Farm-type 4x4 Tractor with minimum specs: 30 hp, rotary mower, 12 inch auger, farm type plow, 6 ft disc and 6 ft bucket loader)

160 Hr. $ $

2075 Grader and Operator (Caterpillar D-12) or equivelant 80 Hr. $ $

2076 Trencher and Operator (Trencher with minimum specs:

45ho, capable of cutting a trench 48" deep , 6" wide

80 Hr. $ $

2077 Truck and Opertor (Full Size 4'x8' bed 1/2 ton or larger)

180 Hr. $ $

2078 Chainsaw and Operator (Gas Powered 16" blade minimum)

40 Hr. $ $

2079 Aerial Lift Truck and Operator (30ft. Reach Minimum) altec AT 200 or Equivelant)

20 Hr. $ $

2080 Tree Chipper and Operator (trailered, automatic feeder, able to chip minimum 6 inch log, gas or diesel Powered)

100 Hr. $ $

2081 Excavator and Operator with clamshell bucket(175HP minimum Kobelco sk 250 or equiveleant)

120 Hr. $ $

2082 Boat and Operator (14-25ft workboat 10-60hp) 20 Hr. $ $ 2083 Skid steer Loader and Operator (Minimum 45hp with attachements to include but not limit to, 12 inch auger, 68" box scraper, 60" bucket and angle broom)

120 Hr. $ $

2084 Skid steer loader and operator with forrestry head attachment and equipment (Minimum size to run Forrestry head effectively)

120 Hr. $ $

2085 CAT 324 Long Reach Excavator with operator, or equivelant, 75' reach with transport and permits

500 Hr. $ $

2086 Offroad dump vehicle and Operator 5-8 Ton - 4x4 120 Hr. $ $ 2087 Excavator/ Heavy Equipment and Operator 120 Hr. $ $

OPTION PERIOD TWO TOTAL $

OPTION YEAR THREE - CONTRACT PERIOD - JANUARY 1 2025 - DECEMBER 31 2025

SECTION C-2

CMB

3001 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 3002 Mowing Level 1 - Area B - Dam 6 Ea. $ $ 3003 Mowing Level 1 - Dike 1 6 Ea. $ $ 3004 Mowing Level 1 - Dike 2 6 Ea. $ $

3005 Mowing Level 1 - Pavonia 4 Ea. $ $

3006 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 3007 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 3008 Mowing Level 2 - Dike 1 2 Ea. $ $ 3009 Mowing Level 2 - Dike 2 2 Ea. $ $ 3010 Mowing Level 2 - Pavonia 2 Ea. $ $

3011 Raking Grass - Per acre 2 Ac. $ $ 3012 Raking Leaves - Per acre 2 Ac. $ $

3013 Mowing Level 1 - Area A - Office/PUA 11 Ea. $ $ 3014 Mowing Level 1 - Area B - Dam 6 Ea. $ $ 3015 Mowing Level 1 - Area C - Spillway 6 Ea. $ $

3016 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 3017 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 3018 Mowing Level 2 - Area C - Spillway 2 Ea. $ $

3019 Raking Grass - Per acre 2 Ac. $ $ 3020 Raking Leaves - Per acre 2 Ac. $ $

3021 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 3022 Mowing Level 1 - Area B - Upstream Blanket 6 Ea. $ $ 3023 Mowing Level 1 - Area C - Down Stream blanket 6 Ea. $ $ 3024 Mowing Level 1 - Area D - Dam Slopes 6 Ea. $ $ 3025 Mowing Level 1 - Dike 1 4 Ea. $ $ 3026 Mowing Level 1 - Dike 2 4 Ea. $ $

3027 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 3028 Mowing Level 2 - Area B - Upstream Blanket 2 Ea. $ $ 3029 Mowing Level 2 - Area C - Down Stram Blanket 2 Ea. $ $ 3030 Mowing Level 2 - Area D - Dam Slopes 2 Ea. $ $ 3031 Mowing Level 2 - Dike 1 2 Ea. $ $ 3032 Mowing Level 2 - Dike 2 2 Ea. $ $

3033 Raking Grass - Per acre 2 Ac. $ $ 3034 Raking Leaves - Per acre 2 Ac. $ $

3035 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 3036 Mowing Level 1 - Area B - Downstream/ Dam 6 Ea. $ $ 3037 Mowing Level 1 - Area C - Upstream/ Dam 6 Ea. $ $ 3038 Mowing Level 1 - Area D - Spillway 6 Ea. $ $ 3039 Weeding Flower Beds 4 Ea. $ $

3040 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $

3041 Mowing Level 2 - Area B - Downstream/ Dam 2 Ea. $ $ 3042 Mowing Level 2 - Area C - Upstream/ Dam 2 Ea. $ $ 3043 Mowing Level 2 - Area D - Spillway 2 Ea. $ $

3044 Raking Grass - Per acre 2 Ac. $ $ 3045 Raking Leaves - Per acre 2 Ac. $ $

3046 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 3047 Mowing Level 1 - Area B - Dam 8 Ea. $ $ 3048 Mowing Level 1 - Area C - Spillway 3 Ea. $ $

3049 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 3050 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 3051 Mowing Level 2 - Area C - Spillway 2 Ea. $ $

3052 Raking Grass - Per acre 2 Ac. $ $ 3053 Raking Leaves - Per acre 2 Ac. $ $

CMB

3054 Level 1 - Standard Cleaning 100 Ea. $ $ 3055 Level 2 - Deep Cleaning 2 Ea. $ $

PHC

3056 Level 1 - Standard Cleaning 100 Ea. $ $ 3057 Level 2 - Deep Cleaning 2 Ea. $ $

3058 Level 1 - Standard Cleaning 48 Ea. $ $ 3059 Level 2 - Deep Cleaning 2 Ea. $ $ 3060 Carpet Cleaning/Soil Guard 2 Ea. $ $

3062 Level 1 - Standard Cleaning 8 Ea. $ $ 3063 Level 2 - Deep Cleaning 2 Ea. $ $ 3064 Carpet Cleaning/Soil Guard 2 Ea. $ $

3066 General Maintenance Worker 300 Hr. $ $ 3067 Grounds Maintenance Laborer 400 Hr. $ $ 3069 Electrician 48 Hr. $ $

3070 Carpenter 60 Hr. $ $ 3071 Backhoe/ Endloaer and Operator (Backhow with minimum spec: 50hp, 18" Backhoe bucket and 1 cu.yd.

front endloader

200 Hr. $ $

3072 Dozer and Operator (John Deere 450) or track driven dozer with minimum 70 HP and 8' blade

100 Hr. $ $

3073 Dump Truck and Operator (2-5 ton) 100 Hr. $ $ 3074 Tractor and Operator(Farm-type 4x4 Tractor with minimum specs: 30 hp, rotary mower, 12 inch auger, farm type plow, 6 ft disc and 6 ft bucket loader)

160 Hr. $ $

3075 Grader and Operator (Caterpillar D-12) or equivelant 80 Hr. $ $

3076 Trencher and Operator (Trencher with minimum specs:

45ho, capable of cutting a trench 48" deep , 6" wide

80 Hr. $ $

3077 Truck and Opertor (Full Size 4'x8' bed 1/2 ton or larger)

180 Hr. $ $

3078 Chainsaw and Operator (Gas Powered 16" blade minimum)

40 Hr. $ $

3079 Aerial Lift Truck and Operator (30ft. Reach Minimum) altec AT 200 or Equivelant)

20 Hr. $ $

3080 Tree Chipper and Operator (trailered, automatic feeder, able to chip minimum 6 inch log, gas or diesel Powered)

100 Hr. $ $

3081 Excavator and Operator with clamshell bucket(175HP minimum Kobelco sk 250 or equiveleant)

120 Hr. $ $

3082 Boat and Operator (14-25ft workboat 10-60hp) 20 Hr. $ $ 3083 Skid steer Loader and Operator (Minimum 45hp with attachements to include but not limit to, 12 inch auger, 68" box scraper, 60" bucket and angle broom)

120 Hr. $ $

3084 Skid steer loader and operator with forrestry head attachment and equipment (Minimum size to run Forrestry head effectively)

120 Hr. $ $

3085 CAT 324 Long Reach Excavator with operator, or equivelant, 75' reach with transport and permits

500 Hr. $ $

3086 Offroad dump vehicle and Operator 5-8 Ton - 4x4 120 Hr. $ $ 3087 Excavator/ Heavy Equipment and Operator 120 Hr. $ $

OPTION PERIOD THREE TOTAL $

OPTION YEAR FOUR - CONTRACT PERIOD - JANUARY 1 2026 - DECEMBER 31 2026

SECTION C-2

CMB

4001 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 4002 Mowing Level 1 - Area B - Dam 6 Ea. $ $ 4003 Mowing Level 1 - Dike 1 6 Ea. $ $ 4004 Mowing Level 1 - Dike 2 6 Ea. $ $ 4005 Mowing Level 1 - Pavonia 4 Ea. $ $

4006 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 4007 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 4008 Mowing Level 2 - Dike 1 2 Ea. $ $ 4009 Mowing Level 2 - Dike 2 2 Ea. $ $ 4010 Mowing Level 2 - Pavonia 2 Ea. $ $

4011 Raking Grass - Per acre 2 Ac. $ $ 4012 Raking Leaves - Per acre 2 Ac. $ $

4013 Mowing Level 1 - Area A - Office/PUA 11 Ea. $ $ 4014 Mowing Level 1 - Area B - Dam 6 Ea. $ $ 4015 Mowing Level 1 - Area C - Spillway 6 Ea. $ $

4016 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 4017 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 4018 Mowing Level 2 - Area C - Spillway 2 Ea. $ $

4019 Raking Grass - Per acre 2 Ac. $ $ 4020 Raking Leaves - Per acre 2 Ac. $ $

4021 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 4022 Mowing Level 1 - Area B - Upstream Blanket 6 Ea. $ $ 4023 Mowing Level 1 - Area C - Down Stream blanket 6 Ea. $ $ 4024 Mowing Level 1 - Area D - Dam Slopes 6 Ea. $ $ 4025 Mowing Level 1 - Dike 1 4 Ea. $ $ 4026 Mowing Level 1 - Dike 2 4 Ea. $ $

4027 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 4028 Mowing Level 2 - Area B - Upstream Blanket 2 Ea. $ $ 4029 Mowing Level 2 - Area C - Down Stram Blanket 2 Ea. $ $ 4030 Mowing Level 2 - Area D - Dam Slopes 2 Ea. $ $ 4031 Mowing Level 2 - Dike 1 2 Ea. $ $ 4032 Mowing Level 2 - Dike 2 2 Ea. $ $

4033 Raking Grass - Per acre 2 Ac. $ $ 4034 Raking Leaves - Per acre 2 Ac. $ $

4035 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 4036 Mowing Level 1 - Area B - Downstream/ Dam 6 Ea. $ $ 4037 Mowing Level 1 - Area C - Upstream/ Dam 6 Ea. $ $

4038 Mowing Level 1 - Area D - Spillway 6 Ea. $ $ 4039 Weeding Flower Beds 4 Ea. $ $

4040 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 4041 Mowing Level 2 - Area B - Downstream/ Dam 2 Ea. $ $ 4042 Mowing Level 2 - Area C - Upstream/ Dam 2 Ea. $ $ 4043 Mowing Level 2 - Area D - Spillway 2 Ea. $ $

4044 Raking Grass - Per acre 2 Ac. $ $ 4045 Raking Leaves - Per acre 2 Ac. $ $

4046 Mowing Level 1 - Area A - Office/ PUA 11 Ea. $ $ 4047 Mowing Level 1 - Area B - Dam 8 Ea. $ $ 4048 Mowing Level 1 - Area C - Spillway 3 Ea. $ $

4049 Mowing Level 2 - Area A - Office/ PUA 1 Ea. $ $ 4050 Mowing Level 2 - Area B - Dam 2 Ea. $ $ 4051 Mowing Level 2 - Area C - Spillway 2 Ea. $ $

4052 Raking Grass - Per acre 2 Ac. $ $ 4053 Raking Leaves - Per acre 2 Ac. $ $

CMB

4054 Level 1 - Standard Cleaning 100 Ea. $ $ 4055 Level 2 - Deep Cleaning 2 Ea. $ $

PHC

4056 Level 1 - Standard Cleaning 100 Ea. $ $ 4057 Level 2 - Deep Cleaning 2 Ea. $ $

4058 Level 1 - Standard Cleaning 48 Ea. $ $ 4059 Level 2 - Deep Cleaning 2 Ea. $ $ 4060 Carpet Cleaning/Soil Guard 2 Ea. $ $

4062 Level 1 - Standard Cleaning 8 Ea. $ $ 4063 Level 2 - Deep Cleaning 2 Ea. $ $ 4064 Carpet Cleaning/Soil Guard 2 Ea. $ $

4066 General Maintenance Worker 300 Hr. $ $ 4067 Grounds Maintenance Laborer 400 Hr. $ $ 4069 Electrician 48 Hr. $ $ 4070 Carpenter 60 Hr. $ $ 4071 Backhoe/ Endloaer and Operator (Backhow with minimum spec: 50hp, 18" Backhoe bucket and 1 cu.yd.

front endloader

200 Hr. $ $

4072 Dozer and Operator (John Deere 450) or track driven dozer with minimum 70 HP and 8' blade

100 Hr. $ $

4073 Dump Truck and Operator (2-5 ton) 100 Hr. $ $ 4074 Tractor and Operator(Farm-type 4x4 Tractor with minimum specs: 30 hp, rotary mower, 12 inch auger, farm type plow, 6 ft disc and 6 ft bucket loader)

160 Hr. $ $

4075 Grader and Operator (Caterpillar D-12) or equivelant 80 Hr. $ $

4076 Trencher and Operator (Trencher with minimum specs:

45ho, capable of cutting a trench 48" deep , 6" wide

80 Hr. $ $

4077 Truck and Opertor (Full Size 4'x8' bed 1/2 ton or larger)

180 Hr. $ $

4078 Chainsaw and Operator (Gas Powered 16" blade minimum)

40 Hr. $ $

4079 Aerial Lift Truck and Operator (30ft. Reach Minimum) altec AT 200 or Equivelant)

20 Hr. $ $

4080 Tree Chipper and Operator (trailered, automatic feeder, able to chip minimum 6 inch log, gas or diesel Powered)

100 Hr. $ $

4081 Excavator and Operator with clamshell bucket(175HP minimum Kobelco sk 250 or equiveleant)

120 Hr. $ $

4082 Boat and Operator (14-25ft workboat 10-60hp) 20 Hr. $ $ 4083 Skid steer Loader and Operator (Minimum 45hp with attachements to include but not limit to, 12 inch auger, 68" box scraper, 60" bucket and angle broom)

120 Hr. $ $

4084 Skid steer loader and operator with forrestry head attachment and equipment (Minimum size to run Forrestry head effectively)

120 Hr. $ $

4085 CAT 324 Long Reach Excavator with operator, or equivelant, 75' reach with transport and permits

500 Hr. $ $

4086 Offroad dump vehicle and Operator 5-8 Ton - 4x4 120 Hr. $ $ 4087 Excavator/ Heavy Equipment and Operator 120 Hr. $ $

OPTION PERIOD FOUR TOTAL $

(End of Summary of Changes)

TOTAL BASE AND ALL OPTIONS $

File details come from the government source that posted it. Updated .