Exhibit G.pdf
PDF 125 KB Posted
- Solicitation number
- W91237-21-Q-0008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9123721Q0008-0003.pdf | ||
| W9123721Q0008-0002.pdf | ||
| Exhibit C_Revised.pdf | ||
| Exhibit A.pdf | ||
| Exhibit J.pdf | ||
| Exhibit B.pdf | ||
| Exhibit K.pdf | ||
| Exhibit L.pdf | ||
| Exhibit O.pdf | ||
| List of Exhibits.pdf | ||
| Exhibit M.pdf | ||
| Exhibit P.pdf | ||
| W9123721Q0008-0001.pdf | ||
| Exhibit N.pdf | ||
| Exhibit D.pdf | ||
| Exhibit E.pdf | ||
| Exhibit F.pdf | ||
| Exhibit I.pdf | ||
| Exhibit Q.pdf | ||
| Exhibit H.pdf | ||
| Exhibit C.pdf | ||
| W9123721Q0008.pdf | ||
| Exhibits A-Q.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT G
QUALITY CONTROL PLAN
CONTRACTOR QUALITY CONTROL PLAN (OUTLINE)
1. INSPECTION OF SERVICES. Define the method of Inspection for each service in the contract including, but not limited to: the individual(s) who shall inspect the service (Quality Control Inspectors); when or with what frequency inspections shall be performed (e.g. at the completion of each task, etc.); and a copy of the Contractor’s inspection forms or other documents identifying the specific tasks involved in the service which shall be inspected.
2. DEFICIENCIES AND CORRECTIVE ACTION. Explain the procedures for identifying deficiencies in the quality of services provided and methods of correction, before the level of performance is unacceptable.
3. RECORDS. Define the method for maintaining records of inspections and records of corrective actions taken, the individual(s) responsible for the records, and the location where the records shall be kept.
4. QUALITY CONTROL INSPECTORS. A consolidated list of authorized Quality Control Inspectors.
5. CONTRACTOR REPRESENTATIVES. A list of names and phone numbers of authorized Contractor Representatives.
6. SECURITY. Define and explain the procedures and safeguards which shall be used to protect all equipment, materials, supplies, tools, and other resources provided by the Government to the Contractor including; but not limited to, Contractor audit procedures and inventory systems, if appropriate. Examples of procedures and safeguards include:
a. All pilferable materials shall be kept under constant surveillance and shall be collected at the end of each business day and secured under lock.
b. Keys shall be removed from all vehicles and equipment when not in use.
c. All gates and doors which were opened to allow Contractor personnel access for work shall be closed and locked. Only authorized Contractor personnel or Government personnel shall be permitted to enter secured areas. The COR or his/her representative shall be informed immediately if any unauthorized person enters a secured area.
File details come from the government source that posted it. Updated .