A.03.09 Plans & Specification Revisions.pdf
PDF 9 MB Posted
- Attached to
- Massillon Levee Repair Federal contract opportunity
- Solicitation number
- W9123720B0005
About this file
This amendment to the solicitation modifies requirements for a project to repair erosion damage to the Massillon Levee in Massillon, Ohio. Key changes include requiring the quality control manager to have a minimum of ten years' experience in related work, restricting lane closures on access roads to daytime hours on weekdays, and providing existing asphalt and limestone details for reference. Additional revisions specify the contractor is responsible for annual permit fees and fines through project completion and the post-construction monitoring period. The drawings were also updated to include final inspection and as-built drawings, and to note access road locations are for information only.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04.01 Abstract of Bids.pdf | ||
| B.07.01 Pre-Bid Questions & Answers.docx | DOCX document | |
| B.08.02 W9123720B0005 0002.pdf | ||
| B.08.02 W9123720B0005 0001.pdf | ||
| A.03.09 Plans.pdf | ||
| B.08.02 W9123720B0005.pdf | ||
| A.03.09 Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation W9123720B0005 Amendment 0002
SECTION 01 45 00.00 40 - CONTRACTOR QUALITY CONTROL
1. Page 4, Para 3.2.1. Delete the second sentence in its entirety and replace with the following:
“The CQC System Manager shall be an experienced construction engineer with a minimum of ten years’ experience in related work.”
SECTION 01 50 00 – TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
2. Page 9, Para. 3.4.1.a. After the second sentence add the following:
“Lane closure is restricted to one lane closed with approved traffic control between the hours of 7 a.m. and 5 p.m.
Monday through Friday. All lanes must be open between 5 p.m. and 7 a.m. Maintenance of Traffic Plan shall be approved by the City of Massillon.”
3. Page 14, Para. 3.10. Add the following new sentence before the last sentence:
“The following existing walking/bike path asphalt section details are provided for information only: Width - 10 feet, Thickness - 2.5 inches after compaction (Normally 2.75 inches installed rolled to 2.5), Type - ODOT type 404. The surface is to be rolled and compacted. The existing walking/bike path limestone section details are provided for information only and is appended to the end of this section.”
4. Append to the end of this section “Limestone Section”.
This is enclosed as Enclosure No. 1.
SECTION 01 57 20.00 10 – ENVIRONMENTAL PROTECTION
5. Page 4, Para. 1.3.1.1. Add the following to the end of this paragraph:
“The Government will obtain a Section 402 National Pollutant Discharge Elimination System (NPDES) Permit. The Ohio EPA Facility Permit Number will be provided prior to Notice to Proceed. The Contractor shall submit a "Co-Permittee Notice of Intent for coverage Under Ohio EPA Storm
Solicitation W9123720B0005 Amendment 0002
Water Construction General Permit", Form EPA 4496, to the Ohio EPA a minimum of fourteen (14) calendar days prior to the start of construction. A copy of the approval shall be provided to the Contracting Officer within 14 calendar days of receipt from the Ohio Environmental Protection Agency. The Contractor shall be responsible for paying all fees associated with environmental permits after award, including any annual fees, permit termination expenses, or fines through the end of the project and associated environmental reclamation monitoring periods.”
6. Page 4, Para. 1.3.1.1. Add the following to the end of this paragraph:
“The SWPPP will be provided to the Contractor prior to Notice to Proceed.”
SECTION 32 92 19 – SEEDING
7. Page 9, Para. 3.5. Delete the first sentence in its entirety and replace with the following:
“The areas to be seeded are the areas disturbed during the grading for the template installation.”
DRAWINGS
8. The following drawing is hereby revised to indicate the following change and are enclosed as Enclosure No. 2:
a. Drawing No. GI001. This drawing was changed to add the FIO drawings.
b. Drawing Nos. CS108 thru CS113 and Drawing No.
CS501. These drawings are added for information only. Access roads are currently under construction and their locations have been provided for information only. The Contractor is not required to use these locations.
005 ISolicitation W9123720B0 Amendment 0002 MASS01
Enclosure No. 1 31 August 2020
005 ISolicitation W9123720B0 Amendment 0002 MASS01
Enclosure No. 1 31 August 2020
IN
D
E X
M L
H
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
T U
S C
A R
A W
A S R
IV
R
L
V E
E T
O E R
E P
A
IR
M A
S S
IL
L O
N L
P P
M A
S S
IL
L O
N
O H
T L
N
H U
N T
IN
G T
O N
W E
S T V
IR
G
IN
IA
H U
N T
IN
G T
O N D
IS
T R
IC
T
C M
Q
GI001
C E
L R
H -M
A L -L
V T
O E
R
G I0
.d g n
M W
C
R
E V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
A U
G
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
Enclsoure No. 2 31 August 2020 ig ita lly s ig ne d by at th ew
W . C la rk
, P .E
D at e:
0.
.2
:0
2:
-0
4'
Enclosure N
o. 2
31 August 2020 h1ecdcmq Information Only ita lly s ig ne th ew
W . C la rk
, P .E
D at e:
0.
.2
:0
3:
Enclosure N
o. 2
31 August 2020 ita lly s ig ne th ew
W . C la rk
, P .E
D at e:
0.
.2
:0
4:
Enclosure N
o. 2
31 August 2020 ita lly s ig ne th ew
W . C la rk
, P .E
D at e:
0.
.2
:0
7:
Enclosure N
o. 2 31 August 2020 ita lly s ig ne th ew
W . C la rk
, P .E
D at e:
0.
.2
:0
8:
Enclosure N
o. 2
31 August 2020 ita lly s ig ne th ew
W . C la rk
, P .E
D at e:
0.
.2
:1
0:
Enclosure N
o. 2
31 August 2020 ita lly s ig ne th ew
W . C la rk
, P .E
D at e:
0.
.2
:1
1:
Enclosure N
o. 2
31 August 2020
File details come from the government source that posted it. Updated .