A.03.09_Exhibits_2_of_4.pdf

PDF 6 MB Posted

Attached to
Maitenance Services for Fishtrap Lake Federal contract opportunity
Solicitation number
W91237-19-T-0056
Issued by
Department of the Army Corps of Engineers Engineering District Huntington

About this file

Exhibits 2 of 4

View the file

Other files for this federal contract opportunity

Other files attached to Maitenance Services for Fishtrap Lake, newest first.
File Type Posted
B.08.03_W9123719T0056-0002.pdf PDF
B.08.03_W9123719T0056-0001.pdf PDF
A.03.09_Exhibits_3_of_4.pdf PDF
A.03.09_Exhibits_1_of_4.pdf PDF
B.08.02_W9123719T0056_-_Final.pdf PDF
A.03.09_Exhibits_4_of_4.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Description Yes No N/A

9. Plans (Programs, Procedures) required by the Safety Manual

a. Fatigue Management Plan (01.A.20)

b. Emergency response plans:

(1) Procedures & Test (01.E.01)

(2) Spill Plans (01.E.01, 06.A.02)

(3) Fire Fighting Plan (01.E.01; 19.A)

(4) Posting of Emergency Telephone Numbers (01.E.05)

(5) Man overboard/abandon ship (19.A.04)

(6) Medical Support. Outline on-site medical support and off-site medical arrangements including rescue and medical duties for those employees who are to perform them, and the name(s) of on-site Contractor personnel trained in first aid and CPR. A minimum of two employees shall be certified in CPR and first-aid per shift/site (Section 03.A; 03.D)

c. Plan for prevention of alcohol and drug abuse (01.C.02)

d. Site Sanitation Plan (Section 02.B)

e. Medical Support Plan, (03.A.01; 03.A.06; 03.D)

f. Bloodborne Pathogen Plan (03.A.05)

g. Exposure Control Plan (03.A.05)

h. Site Layout Plan (04.A)

i. Access/Haul road Plan (04.B)

j. Hearing Conservation Program (05.C)

k. Respiratory Protection Plan (05.G)

l. Health Hazard Control Program (06.A)

m. Process Safety Management Plan (06.B.04)

n. Lead Abatement Plan (06.C & Specs)

o. Asbestos Abatement Plan (06.C & Specs)

p. Radiation Safety Program (06.F)

q. Abrasive Blasting Plan (06.I)

r. Heat/Cold Stress Monitoring Plan (06.J)

s. Indoor Air Quality Management Plan (06.L)

t. Mole Remediation Plan (06.L.04)

u. Chromium (VI) Exposure Evaluation (06.M)

v. Crystalline Silica Assessment (06.N)

w. Lighting Evaluation (07.A)

x. Lighting Plan for Night Operations (07.A.09)

CESO Form A-02 Sep 13

Form A-02 U.S. Army Corps of Engineers

Accident Prevention Plan Checklist (cont’d)

Date of Inspection

Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans may include but not be limited to:

Remarks (Any NO or N/A item)

Item Description Yes No N/A

9. Plans (Programs, Procedures) continued.

y. Traffic Control Plan (08.C.05)

z. Fire Prevention Plan (09.A.01)

aa. Wild Land Fire Management Plan (09.L)

bb. Arc Flash Hazard Analysis (11.B)

cc. Assured Equipment Grounding Control Program (AEGCP), (11.D.05, App D)

dd. Hazardous Energy Control Plan, (12.A.01)

ee. Standard Pre-Lift Plan (LHE) (16.A.03, 16.L.15)

ff. Critical Lift Plan – LHE (16.H)

gg. Naval Architectural Analysis (16.L)

hh. Contingency Plan for Severe Weather (19.A.03)

ii. Man Overboard/Abandon Ship (19.A.04)

jj. Float Plan (19.F.04)

kk. Fall Protection Program, (21.D);

ll. Demolition/Renovation Plan (to include engineering survey), (23.A.02)

mm. Rope Access Program, (24.H.02)

nn. Excavation/Trenching Plan, (25.A.01)

oo. Underground construction fire prevention and protection Plan, (26.D.01)

pp. Compressed Air Plan, (26.I.01)

qq. Formwork and Shoring Erection and Removal plan, (27.C)

rr. PreCast Concrete Plan, (27.D) ss Lift. slab plans, (27.E)

tt. Masonry Bracing Plan, (27.F.01)

uu. Steel Erection Plan, (28.B)

vv. Explosives Safety Site Plan (ESSP) (29.A)

ww. Blasting Plan, (29.A; 26.J)

xx. Underwater Dive Operations Plan, (30.A.14, 16, )

yy. Tree Felling/Maintenance Program, (31.A)

zz. Aircraft/Airfield Construction Safety & Phasing Plan, (32.A.02) aaa. Site Safety and Health Plan (HTRW), (33.B) bbb. Confined Space Entry Program, (34.A.06, 07)

10. Risk Management Processes. Detailed project-specific hazards shall be identified and controls provided via Activity Hazard CESO Form A-02 Sep 13

Form A-02 U.S. Army Corps of Engineers

Accident Prevention Plan Checklist (cont’d)

Date of Inspection

Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans may include but not be limited to:

Remarks (Any NO or N/A item)

Other Remarks:

CESO Form A-02 Sep 13

A.03.09 Exhibit L.pdf
YBC - 2020-2024 Maint Svs Ct Section J Exhibit B.pdf
Exhibit B Cover Page
Dam Site_Abutments_Riprap Mowing and Cleaning Limits
Dam Site_Abutments_Riprap Mowing and Cleaning Limits
Downstream Area Mowing and Cleaning
Environmental Trail Mowing and Cleaning Limits
I.O._Area_Maint_Vol Mowing and Cleaning Limits
Rich Creek Mowing and Cleaning Limits
YBC - 2020-2024 Maint Svs Ct Section J Exhibit H.pdf
Exhibit H
Quality Assurance Surveillance Plan
Exhibit H
Table of Contents
SECTION IV. Performance Requirements Summary Table
See next page.
YBC - 2020-2024 Maint Svs Ct Section J Exhibit K.pdf
Exhibit K YBC Maintenance Service Contract 2020
2773
YBC - 2020-2024 Maint Svs Ct Section J Exhibit L.pdf
Exhibit L YBC Maintenance Service Contract 2020
Example Task Order
YBC MOWINGS
YBC - 2020-2024 Maint Svs Ct Section J Exhibit L.pdf
Exhibit L YBC Maintenance Service Contract 2020
Example Task Order
YBC MOWINGS
YBC - 2020-2024 Maint Svs Ct Section J Exhibit M.pdf
Exhibit M YBC Maintenance Service Contract 2020
CELRH 2770
YBC - 2020-2024 Maint Svs Ct Section J Exhibit N.pdf
Exhibit N YBC Maintenance Service Contract 2020
1104
YBC - 2020-2024 Maint Svs Ct Section J Exhibit O.pdf
Exhibit O YBC Maintenance Service Contract 2020
2880
DATE:
94: Off
95: Off
96: Off
97: Off
98: Off
99: Off
101: Off
102: Off
103: Off
104: Off
105: Off
106: Off
107: Off
108: Off
109: Off
110: Off
111: Off
112: Off
113: Off
114: Off
115: Off
116: Off
117: Off
118: Off
119: Off
120: Off
121: Off
122: Off
123: Off
124: Off
125: Off
126: Off
127: Off
128: Off
129: Off
130: Off
131: Off
132: Off
133: Off
134: Off
135: Off
136: Off
137: Off
138: Off
139: Off
140: Off
141: Off
142: Off
143: Off
144: Off
145: Off
146: Off
147: Off
148: Off
149: Off
150: Off
151: Off
152: Off
153: Off
154: Off
155: Off
156: Off
157: Off
158: Off
159: Off
160: Off
161: Off
162: Off
163: Off
164: Off
165: Off
166: Off
167: Off
168: Off
169: Off
170: Off
171: Off
172: Off
173: Off
174: Off
175: Off
t32:
t33:
t34:
t35:
t36:
t37:
t38:
t40:
t41:
t42:
t43:
t44:
t45:
t46:
t47:
176: Off
177: Off
178: Off
t48:
t49:
t50:
t51:
t52:
t53:
t54:
t55:
t56:
t57:
t58:
179: Off
180: Off
181: Off
t59:
t60:
t61:
182: Off
183: Off
184: Off
t62:
185: Off
186: Off
187: Off
188: Off
189: Off
190: Off
191: Off
192: Off
193: Off
194: Off
195: Off
196: Off
197: Off
198: Off
199: Off
200: Off
201: Off
202: Off
203: Off
204: Off
205: Off
206: Off
207: Off
208: Off
209: Off
210: Off
211: Off
212: Off
213: Off
214: Off
215: Off
216: Off
217: Off
218: Off
219: Off
220: Off
221: Off
222: Off
270: Off
223: Off
224: Off
225: Off
226: Off
227: Off
228: Off
229: Off
230: Off
231: Off
232: Off
233: Off
234: Off
235: Off
236: Off
237: Off
238: Off
239: Off
240: Off
241: Off
242: Off
243: Off
244: Off
245: Off
246: Off
247: Off
248: Off
249: Off
250: Off
251: Off
252: Off
253: Off
254: Off
255: Off
256: Off
257: Off
258: Off
259: Off
260: Off
261: Off
262: Off
263: Off
264: Off
265: Off
266: Off
267: Off
268: Off
t63:
t64:
t65:
t66:
t67:
t68:
t69:
t70:
t71:
269: Off
271: Off
t72:
t73:
t74:
t75:
t76:
t77:
t78:
t79:
t80:
272: Off
273: Off
274: Off
t81:
t82:
t83:
t84:
t85:
t86:
t87:
t88:
t89:
t90:
t91:
276: Off
277: Off
278: Off
t92:
t93:
Other Remarks:

File details come from the government source that posted it.