A.03.09_Exhibits_1_of_4.pdf

PDF 7 MB Posted

Attached to
Maitenance Services for Fishtrap Lake Federal contract opportunity
Solicitation number
W91237-19-T-0056
Issued by
Department of the Army Corps of Engineers Engineering District Huntington

About this file

Exhibits 1 of 4

View the file

Other files for this federal contract opportunity

Other files attached to Maitenance Services for Fishtrap Lake, newest first.
File Type Posted
B.08.03_W9123719T0056-0002.pdf PDF
B.08.03_W9123719T0056-0001.pdf PDF
A.03.09_Exhibits_3_of_4.pdf PDF
B.08.02_W9123719T0056_-_Final.pdf PDF
A.03.09_Exhibits_2_of_4.pdf PDF
A.03.09_Exhibits_4_of_4.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT DESCRIPTION

A Items to be delivered at least one week prior to Pre-Work

CONTRACT

REFERENCE

C-1.6 Conference

B Mowing and Cleaning Maps C-2.14, C-2.2, C-3.1, C- 3.2g, C-5.5

C Approximate Quantities by Area C-3.1

D Accident Prevention Plan (APP) Outline C-1.6 d

E Partial listing of Safety Requirements C-2.12

F Safety Forms OSAH Form 300; Accident Investigation

C-1.9 d Report ENG 3394

G Quality Control Plan C-1.6a; C1.18

H Quality Assurance Plan (QASP) C-1.19

I Sample Work Schedule C-1.21

J Sample Invoice None

K Government Furnished Equipment List C-1.24 a

L Task Order C-1.3, C-1.27

M Job Request Form, CELRH 2770 C-1.33

N Contract Discrepancy Form, CELRH 1104 C-1.16

0 Contractor Equipment & Inspection Forms 2880 C-1.25 d, 2.13b p Vehicle Operations CELRH 2796, CELRH 2813, ENG

C-1.24a Form 4900-R, ENG Form 4866

Q Inspection Forms: CELRH 2788, ·2773-2, 2773-3, 2773-5, C-3.2k

2773-10, & CELRH 2790

Item Description Yes No N/A

1. Signature sheet

a. Includes the name, signature, and title of the Plan Preparer (Qualified person, i.e. corporate safety staff person, QC )

b. Includes the name, signature, and title of the Plan Approver (e.g. owner, company president, regional vice president ) (HTRW activities require approval of a Certified Industrial Hygienist, a Certified Safety Professional may approve the plan for operations involving UST removal where contaminants are known to be petroleum, oils, or lubricants).

c. Includes the name(s), signature(s), and title(s) for Plan Concurrence (provide concurrence of other applicable corporate and project personnel (contractor)) (e.g. Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional, project

QC. )

2. Background information

a. Includes the Contractor Name.

b. Includes the Contract Number.

c. Includes the Project Name.

d. Includes the Brief Project Description.

e. Includes the Location of the Project (map).

f. Includes the Contractor Accident Experience (Copy of OSHA

g. Includes the Listing of Phases of Work and Hazardous Activities Requiring an Activity Hazard Analyses (AHA).

3. Statement of Safety and Health Policy. Includes a copy of the corporate safety policy. (In addition to the corporate policy statement, a copy of the corporate safety program may provide a portion of the information required by the accident prevention

4. Responsibilities and Lines of Authorities

a. Includes the identification and job responsibilities of personnel responsible for safety - at both corporate and project level – including their resumes.

b. Includes the lines of authority.

CESO Form A-02 Sep 13

Remarks (Any NO or N/A item)

Form A-02 U.S. Army Corps of Engineers

Accident Prevention Plan Checklist

Date of Inspection

Location (Plant or Facility) Contract Number

Contractor Name Project Name

Inspector Name (Print) Inspector Signature

This checklist serves as a guide only, it does not replace or eliminate the need to comply with the requirements set forth in Engineering Manual 385-1-1, Safety and Health Requirements Manual, dated XX Sept 2014. The references included in this checklist correspond to the applicable sections of EM 385-1-1.

Item Description Yes No N/A

5. Training

a. Includes the list of subjects to be discussed with employees at safety indoctrination.

b. Includes the list of mandatory training and certifications applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, diver, vehicle operator, HAZWOPER training and certification, PPE ) and any requirements for periodic retraining / recertification.

c. Includes the identity requirements for emergency response training.

d. Includes the outline requirements (who attends, when given, who will conduct, etc. ) for supervisory and employee safety

6. Safety and Health Inspections

a. Includes the name(s) of individual(s) responsible for conducting safety inspections. (e.g., PM, safety professional, QC, supervisors, employees )

b. Includes proof of inspector's training / qualifications.

c. Indicates when inspections will be conducted.

d. Furnished sample forms upon which inspections will be recorded.

e. Indicates deficiency tracking system and follow-up procedures.

f. Includes the names of competent and / or qualified person(s) and proof of competency / qualification to meet specific OSHA competent / qualified person(s) requirements.

g. Includes any external inspections / certifications which may be required. (e.g., US Coast Guard )

7. Safety and Health Expectations, Incentive Programs, and Compliance

a. Includes the company's written safety program goals, objectives, and accident experience goals.

b. Includes a brief description of the company's safety incentive programs (if any ).

c. Includes the policies and procedures regarding noncompliance with safety requirements (to include disciplinary actions for violation of safety requirements).

d. Includes the written company procedures for holding managers and supervisors accountable for safety.

8. Mishap Reporting

a. The plan identifies how, when, and who shall complete the Exposure data (man-hours worked).

b. The plan identifies how, when, and who shall complete mishap investigations, reports, and logs.

c. The plan identifies how, when, and who shall make immediate notification of major mishaps.

CESO Form A-02 Sep 13

Remarks (Any NO or N/A item)

Form A-02 U.S. Army Corps of Engineers

Accident Prevention Plan Checklist (cont’d)

Date of Inspection

A.03.09 Exhibit L.pdf
YBC - 2020-2024 Maint Svs Ct Section J Exhibit B.pdf
Exhibit B Cover Page
Dam Site_Abutments_Riprap Mowing and Cleaning Limits
Dam Site_Abutments_Riprap Mowing and Cleaning Limits
Downstream Area Mowing and Cleaning
Environmental Trail Mowing and Cleaning Limits
I.O._Area_Maint_Vol Mowing and Cleaning Limits
Rich Creek Mowing and Cleaning Limits
YBC - 2020-2024 Maint Svs Ct Section J Exhibit H.pdf
Exhibit H
Quality Assurance Surveillance Plan
Exhibit H
Table of Contents
SECTION IV. Performance Requirements Summary Table
See next page.
YBC - 2020-2024 Maint Svs Ct Section J Exhibit K.pdf
Exhibit K YBC Maintenance Service Contract 2020
2773
YBC - 2020-2024 Maint Svs Ct Section J Exhibit L.pdf
Exhibit L YBC Maintenance Service Contract 2020
Example Task Order
YBC MOWINGS
YBC - 2020-2024 Maint Svs Ct Section J Exhibit L.pdf
Exhibit L YBC Maintenance Service Contract 2020
Example Task Order
YBC MOWINGS
YBC - 2020-2024 Maint Svs Ct Section J Exhibit M.pdf
Exhibit M YBC Maintenance Service Contract 2020
CELRH 2770
YBC - 2020-2024 Maint Svs Ct Section J Exhibit N.pdf
Exhibit N YBC Maintenance Service Contract 2020
1104
YBC - 2020-2024 Maint Svs Ct Section J Exhibit O.pdf
Exhibit O YBC Maintenance Service Contract 2020
2880
LOCATION:
CONTRACT NUMBER:
CONTRACTOR:
PROJECT:
INSPECTOR:
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
8: Off
9: Off
10: Off
11: Off
12: Off
t1:
t2:
t3:
t4:
13: Off
14: Off
15: Off
t5:
16: Off
17: Off
18: Off
19: Off
20: Off
21: Off
22: Off
23: Off
24: Off
25: Off
26: Off
27: Off
28: Off
29: Off
30: Off
31: Off
32: Off
33: Off
34: Off
35: Off
36: Off
37: Off
38: Off
39: Off
t6:
t7:
t8:
t9:
t10:
t11:
t12:
t13:
DATE:
40: Off
41: Off
42: Off
43: Off
44: Off
45: Off
46: Off
47: Off
48: Off
49: Off
50: Off
51: Off
52: Off
53: Off
54: Off
55: Off
56: Off
57: Off
58: Off
59: Off
60: Off
61: Off
62: Off
63: Off
64: Off
65: Off
66: Off
67: Off
68: Off
69: Off
70: Off
71: Off
72: Off
73: Off
74: Off
75: Off
76: Off
77: Off
78: Off
79: Off
80: Off
81: Off
82: Off
83: Off
84: Off
85: Off
86: Off
87: Off
88: Off
89: Off
90: Off
91: Off
92: Off
93: Off
t14:
t15:
t16:
t17:
t18:
t19:
t20:
t21:
t22:
t23:
t24:
t25:
t26:
t27:
t28:
t29:
t30:
t31:

File details come from the government source that posted it.