A.07.23_W9123718B0002.pdf
PDF 2 MB Posted
- Attached to
- Demolition Services Federal contract opportunity
- Solicitation number
- W91237-18-B-0002
About this file
W9123718B0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.01.11_Synopsis_of_Award-signed.pdf | ||
| B.01.02_Abstract_of_Bids.pdf | ||
| A.07.24_W9123718B0002_0001.pdf | ||
| A.07.14_Questions_&_Answers_-_FBO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 10:00 AM local time 01 May 2018
X
A X B X C
D
EX
X G F 119 - 128
129 - 131 X H 132
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 132
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W91237 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
LRH District Office, Room 419 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
ALLISON PACK
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 33
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT
PACKAGING AND MARKING
34 - 66 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 69 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 70 - 108 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
109 - 118
PART II - CONTRACT CLAUSES
USACE, CONTRACTING BRANCH
ALLISON PACK, 502 8TH STREET
HUNTINGTON WV 25701
304-399-5046
304-399-5281FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
W81F8E60835264
5. DATE ISSUED
28 Mar 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W9123718B0002
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 Job Base Period
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise noted in the Performance Work Statment, required to perform environmental remediation and demolition services for the Huntington District. All work shall be completed in accordance with the Performance Work Statement and conditions of the contract. The not-to-exceed amount for this contract of $1,950,000.00 includes all option periods.
FOB: Destination
PURCHASE REQUEST NUMBER: W81F8E60835264
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 Job OPTION Option Period 1
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise noted in the Performance Work Statment, required to perform environmental remediation and demolition services for the Huntington District. All work shall be completed in accordance with the Performance Work Statement and conditions of the contract. The not-to-exceed amount for this contract of $1,950,000.00 includes all option periods.
UNIT UNIT PRICE MAX AMOUNT
0003 Job OPTION Option Period 2
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise noted in the Performance Work Statment, required to perform environmental remediation and demolition services for the Huntington District. All work shall be completed in accordance with the Performance Work Statement and conditions of the contract. The not-to-
UNIT UNIT PRICE MAX AMOUNT
0004 Job OPTION Option Period 3
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise noted in the Performance Work Statment, required to perform environmental remediation and demolition services for the Huntington District. All work shall be completed in accordance with the Performance Work Statement and conditions of the contract. The not-to-
UNIT UNIT PRICE MAX AMOUNT
0005 Job OPTION Option Period 4
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise noted in the Performance Work Statment, required to perform environmental remediation and demolition services for the Huntington District. All work shall be completed in accordance with the Performance Work Statement and conditions of the contract. The not-to-
BID SCHEDULE
Demolition and Environmental Remediation Services for the Great Lakes and Ohio River Division
Bid Schedule
BASE YEAR
Bid Item
DESCRIPTION UNIT QTY U/P Bid Item Estimated Price
0001 Backhoe & Endloader, Wheel 1 CY, 24"
Bucket, 70HP
HR 120
0001A Standby on Each Item HR 24 0001B Mob and Demob LS EA 1 0001C 0 to 100 Miles MI 50 0001D Over 100 Miles MI 100 0002 Dozer, 70HP w/blade & Winch HR 40
0002A Standby on Each Item HR 4 0002B Mob and Demob LS EA 1 0002C 0 to 100 Miles MI 50 0002D Over 100 Miles MI 200 0003 Dozer, 140 HP w/Blade & Winch HR 45
0003A Standby on Each Item HR 36 0003B Mob and Demob LS EA 2 0003C 0 to 100 Miles MI 50 0003D Over 100 Miles MI 200 0004 Dozer, 285HP w/Blade & Winch HR 70
0004A Standby on Each Item HR 36 0004B Mob and Demob LS EA 2 0004C 0 to 100 Miles MI 50 0004D Over 100 Miles MI 200 0005 Tracked Endloader, 70HP HR 80
0005A Standby on Each Item HR 8 0005B Mob and Demob LS EA 1 0005C 0 to 100 Miles MI 50 0005D Over 100 Miles MI 200 0006 Tracked Endloader, 95HP HR 80
0006A Standby on Each Item HR 8 0006B Mob and Demob LS EA 1 0006C 0 to 100 Miles MI 50 0006D Over 100 Miles MI 200 0007 Tracked Endloader, 190HP HR 40
0007A Standby on Each Item HR 4
0007B Mob and Demob LS EA 1 0007C 0 to 100 Miles MI 50 0007D Over 100 Miles MI 200 0008 Rubber Tired Endloader, 80HP HR 40
0008A Standby on Each Item HR 4 0008B Mob and Demob LS EA 1 0008C 0 to 100 Miles MI 50 0008D Over 100 Miles MI 200 0009 Rubber Tired Endloader, 130HP HR 120
0009A Standby on Each Item HR 12 0009B Mob and Demob LS EA 1 0009C 0 to 100 Miles MI 50 0009D Over 100 Miles MI 200 0010 Rubber Tired Endloader, 375HP HR 120
0010A Standby on Each Item HR 12 0010B Mob and Demob LS EA 1 0010C 0 to 100 Miles MI 50 0010D Over 100 Miles MI 200 0011 Tracked Backhoe Endloader, 58HP HR 40
0011A Standby on Each Item HR 4 0011B Mob and Demob LS EA 1 0011C 0 to 100 Miles MI 50 0011D Over 100 Miles MI 200 0012 Excavator, Crawler 125HP to 140HP w/Thumb
HR 300
0012A Standby on Each Item HR 100 0012B Mob and Demob LS EA 2 0012C 0 to 100 Miles MI 50 0012D Over 100 Miles MI 200 0013 Excavator, Crawler 250HP w/Thumb HR 650
0013A Standby on Each Item HR 300 0013B Mob and Demob LS EA 2 0013C 0 to 100 Miles MI 50 0013D Over 100 Miles MI 200 0014 Single Axle Truck Dump HR 320
0014A Standby on Each Item HR 32 0014B Mob and Demob LS HR 2 0014C 0 to 100 Miles MI 50 0014D Over 100 Miles MI 200 0015 Tandem Axle Dump HR 2500
0015A Standby on Each Item HR 250 0015B Mob and Demob LS EA 9 0015C 0 to 100 Miles MI 50 0015D Over 100 Miles MI 200 0016 Tri-Axle Dump HR 80
0016A Standby on Each Item HR 8 0016B Mob and Demob LS EA 2 0016C 0 to 100 Miles MI 50 0016D Over 100 Miles MI 200
0017 Chainsaws HR 920 0018 Rubber Tired, Loader .5CY, 36HP HR 500
0018A Standby on Each Item HR 50 0018B Mob and Demob LS EA 6 0018C 0 to 100 Miles MI 50 0018D Over 100 Miles MI 200 0019 Tractor and Lowboy HR 240
0019A Standby on Each Item HR 5 0019B Mob and Demob LS EA 1 0019C 0 to 100 Miles MI 50 0019D Over 100 Miles MI 200 0020 Wood Chipper HR 50
0020A Standby on Each Item HR 5 0020B Mob and Demob LS EA 1 0020C 0 to 100 Miles MI 50 0020D Over 100 Miles MI 200 0021 Grader, 150 HP, articulated frame, with ripper/scarifier
HR 50
0021A Standby on Each Item HR 5 0021B Mob and Demob LS EA 1 0021C 0 to 100 Miles MI 50 0021D Over 100 Miles MI 200 0022 Two-Ton Flatbed HR 220
0022A Standby on Each Item HR 5 0022B Mob and Demob LS EA 1 0022C 0 to 100 Miles MI 50 0022D Over 100 Miles MI 200 0023 Mini-Excavator w/ 12" bucket, 55 HP HR 240
0023A Standby on Each Item HR 10 0023B Mob and Demob LS EA 1 0023C 0 to 100 Miles MI 50 0023D Over 100 Miles MI 200 0024 Concrete Saw, 36" Blade, Belt Drive HR 100
0024A Standby on Each Item HR 10 0024B Mob and Demob LS EA 1 0024C 0 to 100 Miles MI 50 0024D Over 100 Miles MI 200 0025 Water Truck HR 350
0025A Standby on Each Item HR 100 0025B Mob and Demob LS EA 1 0025C 0 to 100 Miles MI 50 0025D Over 100 Miles MI 200 0026 Miscellaneous Equipment, Materials and Fees To Be Negotiated Per Work
Order
LABOR - WEST VIRGINIA Service Wages
0032A SUPERVISORY CONSTRUCTION REP.* HR 20
0033A QUALITY ASSURANCE REP. I* HR 20
0033B QUALITY ASSURANCE REP. II* HR 20
0033C QUALITY ASSURANCE REP. III* HR 20
0034A SAFETY MANAGER HR 20
0035A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
0035B REGISTERED PROFESSIONAL
ENGINEER - STRUCTURAL
HR 20
LABOR - KENTUCKY Service Wages
0041A SUPERVISORY CONSTRUCTION REP.* HR 20
0042A QUALITY ASSURANCE REP. I* HR 20
0042B QUALITY ASSURANCE REP. II* HR 20
0042C QUALITY ASSURANCE REP. III* HR 20
0043A SAFETY MANAGER HR 20
0044A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
0044B REGISTERED PROFESSIONAL
LABOR - OHIO Service Wages
0050A SUPERVISORY CONSTRUCTION REP.* HR 20
0051A QUALITY ASSURANCE REP. I* HR 20
0051B QUALITY ASSURANCE REP. II* HR 20
0051C QUALITY ASSURANCE REP. III* HR 20
0052A SAFETY MANAGER HR 20
0053A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
0053B REGISTERED PROFESSIONAL
0059A SUPERVISORY CONSTRUCTION REP.* HR 20
0060A QUALITY ASSURANCE REP. I* HR 20
0060B QUALITY ASSURANCE REP. II* HR 20
0060C QUALITY ASSURANCE REP. III* HR 20
0061A SAFETY MANAGER HR 20
0062A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
0062B REGISTERED PROFESSIONAL
0068A SUPERVISORY CONSTRUCTION REP.* HR 20
0069A QUALITY ASSURANCE REP. I* HR 20
0069B QUALITY ASSURANCE REP. II* HR 20
0069C QUALITY ASSURANCE REP. III* HR 20
0070A SAFETY MANAGER HR 20
0071A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
0071B REGISTERED PROFESSIONAL
LABOR - VIRGINIA Service Wages
0077A SUPERVISORY CONSTRUCTION REP.* HR 20
0078A QUALITY ASSURANCE REP. I* HR 20
0078B QUALITY ASSURANCE REP. II* HR 20
0078C QUALITY ASSURANCE REP. III* HR 20
0079A SAFETY MANAGER HR 20
0080A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
0080B REGISTERED PROFESSIONAL
0086A SUPERVISORY CONSTRUCTION REP.* HR 20
0087A QUALITY ASSURANCE REP. I* HR 20
0087B QUALITY ASSURANCE REP. II* HR 20
0087C QUALITY ASSURANCE REP. III* HR 20
0088A SAFETY MANAGER HR 20
0089A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
0089B REGISTERED PROFESSIONAL
TOTAL BASE YEAR:
OPTION YEAR ONE
1001 Backhoe & Endloader, Wheel 1 CY, 24"
HR 240
1001A Standby on Each Item HR 24 1001B Mob and Demob LS EA 1 1001C 0 to 100 Miles MI 50 1001D Over 100 Miles MI 200 1002 Dozer, 70HP w/blade & Winch HR 40
1002A Standby on Each Item HR 4 1002B Mob and Demob LS EA 1 1002C 0 to 100 Miles MI 50 1002D Over 100 Miles MI 200 1003 Dozer, 140 HP w/Blade & Winch HR 300
1003A Standby on Each Item HR 36 1003B Mob and Demob LS EA 2 1003C 0 to 100 Miles MI 50 1003D Over 100 Miles MI 200 1004 Dozer, 285HP w/Blade & Winch HR 300
1004A Standby on Each Item HR 36 1004B Mob and Demob LS EA 2 1004C 0 to 100 Miles MI 50 1004D Over 100 Miles MI 200 1005 Tracked Endloader, 70HP HR 240
1005A Standby on Each Item HR 8 1005B Mob and Demob LS EA 1 1005C 0 to 100 Miles MI 50 1005D Over 100 Miles MI 200 1006 Tracked Endloader, 95HP HR 240
1006A Standby on Each Item HR 8 1006B Mob and Demob LS EA 1 1006C 0 to 100 Miles MI 50 1006D Over 100 Miles MI 200 1007 Tracked Endloader, 190HP HR 275
1007A Standby on Each Item HR 4 1007B Mob and Demob LS EA 1 1007C 0 to 100 Miles MI 50 1007D Over 100 Miles MI 200 1008 Rubber Tired Endloader, 80HP HR 200
1008A Standby on Each Item HR 4 1008B Mob and Demob LS EA 1 1008C 0 to 100 Miles MI 50 1008D Over 100 Miles MI 200 1009 Rubber Tired Endloader, 130HP HR 120
1009A Standby on Each Item HR 12 1009B Mob and Demob LS EA 1
1009C 0 to 100 Miles MI 50 1009D Over 100 Miles MI 200 1010 Rubber Tired Endloader, 375HP HR 120
1010A Standby on Each Item HR 12 1010B Mob and Demob LS EA 1 1010C 0 to 100 Miles MI 50 1010D Over 100 Miles MI 200 1011 Tracked Backhoe Endloader, 58HP HR 40
1011A Standby on Each Item HR 4 1011B Mob and Demob LS EA 1 1011C 0 to 100 Miles MI 50 1011D Over 100 Miles MI 200 1012 Excavator, Crawler 125HP to 140HP w/Thumb
HR 300
1012A Standby on Each Item HR 100 1012B Mob and Demob LS EA 2 1012C 0 to 100 Miles MI 50 1012D Over 100 Miles MI 200 1013 Excavator, Crawler 250HP w/Thumb HR 650
1013A Standby on Each Item HR 300 1013B Mob and Demob LS EA 2 1013C 0 to 100 Miles MI 50 1013D Over 100 Miles MI 200 1014 Single Axle Truck Dump HR 320
1014A Standby on Each Item HR 32 1014B Mob and Demob LS HR 2 1014C 0 to 100 Miles MI 50 1014D Over 100 Miles MI 200 1015 Tandem Axle Dump HR 2500
1015A Standby on Each Item HR 250 1015B Mob and Demob LS EA 9 1015C 0 to 100 Miles MI 50 1015D Over 100 Miles MI 200 1016 Tri-Axle Dump HR 80
1016A Standby on Each Item HR 8 1016B Mob and Demob LS EA 2 1016C 0 to 100 Miles MI 50 1016D Over 100 Miles MI 200 1017 Chainsaws HR 920 1018 Rubber Tired, Loader .5CY, 36HP HR 500
1018A Standby on Each Item HR 50 1018B Mob and Demob LS EA 6 1018C 0 to 100 Miles MI 50 1018D Over 100 Miles MI 200 1019 Tractor and Lowboy HR 240
1019A Standby on Each Item HR 5 1019B Mob and Demob LS EA 1 1019C 0 to 100 Miles MI 50 1019D Over 100 Miles MI 200
1020 Wood Chipper HR 50 1020A Standby on Each Item HR 5 1020B Mob and Demob LS EA 1 1020C 0 to 100 Miles MI 50 1020D Over 100 Miles MI 200 1021 Grader, 150 HP, articulated frame, with ripper/scarifier
HR 50
1021A Standby on Each Item HR 5 1021B Mob and Demob LS EA 1 1021C 0 to 100 Miles MI 50 1021D Over 100 Miles MI 200 1022 Two-Ton Flatbed HR 220
1022A Standby on Each Item HR 5 1022B Mob and Demob LS EA 1 1022C 0 to 100 Miles MI 50 1022D Over 100 Miles MI 200 1023 Mini-Excavator w/ 12" bucket, 55 HP HR 240
1023A Standby on Each Item HR 10 1023B Mob and Demob LS EA 1 1023C 0 to 100 Miles MI 50 1023D Over 100 Miles MI 200 1024 Concrete Saw, 36" Blade, Belt Drive HR 100
1024A Standby on Each Item HR 10 1024B Mob and Demob LS EA 1 1024C 0 to 100 Miles MI 50 1024D Over 100 Miles MI 200 1025 Water Truck HR 350
1025A Standby on Each Item HR 100 1025B Mob and Demob LS EA 1 1025C 0 to 100 Miles MI 50 1025D Over 100 Miles MI 200 1026 Miscellaneous Equipment, Materials and Fees To Be Negotiated Per Work
1032A SUPERVISORY CONSTRUCTION REP.* HR 20
1033A QUALITY ASSURANCE REP. I* HR 20
1033B QUALITY ASSURANCE REP. II* HR 20
1033C QUALITY ASSURANCE REP. III* HR 20
1034A SAFETY MANAGER HR 20
1035A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
1035B REGISTERED PROFESSIONAL
1041A SUPERVISORY CONSTRUCTION REP.* HR 20
1042A QUALITY ASSURANCE REP. I* HR 20
1042B QUALITY ASSURANCE REP. II* HR 20
1042C QUALITY ASSURANCE REP. III* HR 20
1043A SAFETY MANAGER HR 20
1044A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
1044B REGISTERED PROFESSIONAL
1050A SUPERVISORY CONSTRUCTION REP.* HR 20
1051A QUALITY ASSURANCE REP. I* HR 20
1051B QUALITY ASSURANCE REP. II* HR 20
1051C QUALITY ASSURANCE REP. III* HR 20
1052A SAFETY MANAGER HR 20
1053A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
1053B REGISTERED PROFESSIONAL
1059A SUPERVISORY CONSTRUCTION REP.* HR 20
1060A QUALITY ASSURANCE REP. I* HR 20
1060B QUALITY ASSURANCE REP. II* HR 20
1060C QUALITY ASSURANCE REP. III* HR 20
1061A SAFETY MANAGER HR 20
1062A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
1062B REGISTERED PROFESSIONAL
1068A SUPERVISORY CONSTRUCTION REP.* HR 20
1069A QUALITY ASSURANCE REP. I* HR 20
1069B QUALITY ASSURANCE REP. II* HR 20
1069C QUALITY ASSURANCE REP. III* HR 20
1070A SAFETY MANAGER HR 20
1071A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
1071B REGISTERED PROFESSIONAL
1077A SUPERVISORY CONSTRUCTION REP.* HR 20
1078A QUALITY ASSURANCE REP. I* HR 20
1078B QUALITY ASSURANCE REP. II* HR 20
1078C QUALITY ASSURANCE REP. III* HR 20
1079A SAFETY MANAGER HR 20
1080A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
1080B REGISTERED PROFESSIONAL
1086A SUPERVISORY CONSTRUCTION REP.* HR 20
1087A QUALITY ASSURANCE REP. I* HR 20
1087B QUALITY ASSURANCE REP. II* HR 20
1087C QUALITY ASSURANCE REP. III* HR 20
1088A SAFETY MANAGER HR 20
1089A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
1089B REGISTERED PROFESSIONAL
TOTAL OPTION YEAR ONE
OPTION YEAR TWO
2001 Backhoe & Endloader, Wheel 1 CY, 24"
HR 240
2001A Standby on Each Item HR 24 2001B Mob and Demob LS EA 1 2001C 0 to 100 Miles MI 50 2001D Over 100 Miles MI 200 2002 Dozer, 70HP w/blade & Winch HR 40
2002A Standby on Each Item HR 4 2002B Mob and Demob LS EA 1 2002C 0 to 100 Miles MI 50 2002D Over 100 Miles MI 200 2003 Dozer, 140 HP w/Blade & Winch HR 300
2003A Standby on Each Item HR 36 2003B Mob and Demob LS EA 2 2003C 0 to 100 Miles MI 50 2003D Over 100 Miles MI 200 2004 Dozer, 285HP w/Blade & Winch HR 300
2004A Standby on Each Item HR 36 2004B Mob and Demob LS EA 2 2004C 0 to 100 Miles MI 50 2004D Over 100 Miles MI 200 2005 Tracked Endloader, 70HP HR 240
2005A Standby on Each Item HR 8 2005B Mob and Demob LS EA 1 2005C 0 to 100 Miles MI 50 2005D Over 100 Miles MI 200 2006 Tracked Endloader, 95HP HR 240
2006A Standby on Each Item HR 8 2006B Mob and Demob LS EA 1 2006C 0 to 100 Miles MI 50 2006D Over 100 Miles MI 200 2007 Tracked Endloader, 190HP HR 275
2007A Standby on Each Item HR 4 2007B Mob and Demob LS EA 1 2007C 0 to 100 Miles MI 50 2007D Over 100 Miles MI 200 2008 Rubber Tired Endloader, 80HP HR 200
2008A Standby on Each Item HR 4 2008B Mob and Demob LS EA 1 2008C 0 to 100 Miles MI 50 2008D Over 100 Miles MI 200 2009 Rubber Tired Endloader, 130HP HR 120
2009A Standby on Each Item HR 12
2009B Mob and Demob LS EA 1 2009C 0 to 100 Miles MI 50 2009D Over 100 Miles MI 200 2010 Rubber Tired Endloader, 375HP HR 120
2010A Standby on Each Item HR 12 2010B Mob and Demob LS EA 1 2010C 0 to 100 Miles MI 50 2010D Over 100 Miles MI 200 2011 Tracked Backhoe Endloader, 58HP HR 40
2011A Standby on Each Item HR 4 2011B Mob and Demob LS EA 1 2011C 0 to 100 Miles MI 50 2011D Over 100 Miles MI 200 2012 Excavator, Crawler 125HP to 140HP w/Thumb
HR 300
2012A Standby on Each Item HR 100 2012B Mob and Demob LS EA 2 2012C 0 to 100 Miles MI 50 2012D Over 100 Miles MI 200 2013 Excavator, Crawler 250HP w/Thumb HR 650
2013A Standby on Each Item HR 300 2013B Mob and Demob LS EA 2 2013C 0 to 100 Miles MI 50 2013D Over 100 Miles MI 200 2014 Single Axle Truck Dump HR 320
2014A Standby on Each Item HR 32 2014B Mob and Demob LS HR 2 2014C 0 to 100 Miles MI 50 2014D Over 100 Miles MI 200 2015 Tandem Axle Dump HR 2500
2015A Standby on Each Item HR 250 2015B Mob and Demob LS EA 9 2015C 0 to 100 Miles MI 50 2015D Over 100 Miles MI 200 2016 Tri-Axle Dump HR 80
2016A Standby on Each Item HR 8 2016B Mob and Demob LS EA 2 2016C 0 to 100 Miles MI 50 2016D Over 100 Miles MI 200 2017 Chainsaws HR 920 2018 Rubber Tired, Loader .5CY, 36HP HR 500
2018A Standby on Each Item HR 50 2018B Mob and Demob LS EA 6 2018C 0 to 100 Miles MI 50 2018D Over 100 Miles MI 200 2019 Tractor and Lowboy HR 240
2019A Standby on Each Item HR 5 2019B Mob and Demob LS EA 1 2019C 0 to 100 Miles MI 50
2019D Over 100 Miles MI 200 2020 Wood Chipper HR 50
2020A Standby on Each Item HR 5 2020B Mob and Demob LS EA 1 2020C 0 to 100 Miles MI 50 2020D Over 100 Miles MI 200 2021 Grader, 150 HP, articulated frame, with ripper/scarifier
HR 50
2021A Standby on Each Item HR 5 2021B Mob and Demob LS EA 1 2021C 0 to 100 Miles MI 50 2021D Over 100 Miles MI 200 2022 Two-Ton Flatbed HR 220
2022A Standby on Each Item HR 5 2022B Mob and Demob LS EA 1 2022C 0 to 100 Miles MI 50 2022D Over 100 Miles MI 200 2023 Mini-Excavator w/ 12" bucket, 55 HP HR 240
2023A Standby on Each Item HR 10 2023B Mob and Demob LS EA 1 2023C 0 to 100 Miles MI 50 2023D Over 100 Miles MI 200 2024 Concrete Saw, 36" Blade, Belt Drive HR 100
2024A Standby on Each Item HR 10 2024B Mob and Demob LS EA 1 2024C 0 to 100 Miles MI 50 2024D Over 100 Miles MI 200 2025 Water Truck HR 350
2025A Standby on Each Item HR 100 2025B Mob and Demob LS EA 1 2025C 0 to 100 Miles MI 50 2025D Over 100 Miles MI 200 2026 Miscellaneous Equipment, Materials and Fees To Be Negotiated Per Work
2032A SUPERVISORY CONSTRUCTION REP.* HR 20
2033A QUALITY ASSURANCE REP. I* HR 20
2033B QUALITY ASSURANCE REP. II* HR 20
2033C QUALITY ASSURANCE REP. III* HR 20
2034A SAFETY MANAGER HR 20
2035A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
2035B REGISTERED PROFESSIONAL
2041A SUPERVISORY CONSTRUCTION REP.* HR 20
2042A QUALITY ASSURANCE REP. I* HR 20
2042B QUALITY ASSURANCE REP. II* HR 20
2042C QUALITY ASSURANCE REP. III* HR 20
2043A SAFETY MANAGER HR 20
2044A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
2044B REGISTERED PROFESSIONAL
2050A SUPERVISORY CONSTRUCTION REP.* HR 20
2051A QUALITY ASSURANCE REP. I* HR 20
2051B QUALITY ASSURANCE REP. II* HR 20
2051C QUALITY ASSURANCE REP. III* HR 20
2052A SAFETY MANAGER HR 20
2053A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
2053B REGISTERED PROFESSIONAL
2059A SUPERVISORY CONSTRUCTION REP.* HR 20
2060A QUALITY ASSURANCE REP. I* HR 20
2060B QUALITY ASSURANCE REP. II* HR 20
2060C QUALITY ASSURANCE REP. III* HR 20
2061A SAFETY MANAGER HR 20
2062A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
2062B REGISTERED PROFESSIONAL
2068A SUPERVISORY CONSTRUCTION REP.* HR 20
2069A QUALITY ASSURANCE REP. I* HR 20
2069B QUALITY ASSURANCE REP. II* HR 20
2069C QUALITY ASSURANCE REP. III* HR 20
2070A SAFETY MANAGER HR 20
2071A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
2071B REGISTERED PROFESSIONAL
2077A SUPERVISORY CONSTRUCTION REP.* HR 20
2078A QUALITY ASSURANCE REP. I* HR 20
2078B QUALITY ASSURANCE REP. II* HR 20
2078C QUALITY ASSURANCE REP. III* HR 20
2079A SAFETY MANAGER HR 20
2080A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
2080B REGISTERED PROFESSIONAL
2086A SUPERVISORY CONSTRUCTION REP.* HR 20
2087A QUALITY ASSURANCE REP. I* HR 20
2087B QUALITY ASSURANCE REP. II* HR 20
2087C QUALITY ASSURANCE REP. III* HR 20
2088A SAFETY MANAGER HR 20
2089A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
2089B REGISTERED PROFESSIONAL
TOTAL OPTION YEAR TWO
OPTION YEAR THREE
3001 Backhoe & Endloader, Wheel 1 CY, 24"
HR 240
3001A Standby on Each Item HR 24 3001B Mob and Demob LS EA 1 3001C 0 to 100 Miles MI 50 3001D Over 100 Miles MI 200 3002 Dozer, 70HP w/blade & Winch HR 40
3002A Standby on Each Item HR 4 3002B Mob and Demob LS EA 1 3002C 0 to 100 Miles MI 50 3002D Over 100 Miles MI 200 3003 Dozer, 140 HP w/Blade & Winch HR 300
3003A Standby on Each Item HR 36 3003B Mob and Demob LS EA 2 3003C 0 to 100 Miles MI 50 3003D Over 100 Miles MI 200 3004 Dozer, 285HP w/Blade & Winch HR 300
3004A Standby on Each Item HR 36 3004B Mob and Demob LS EA 2 3004C 0 to 100 Miles MI 50 3004D Over 100 Miles MI 200 3005 Tracked Endloader, 70HP HR 240
3005A Standby on Each Item HR 8 3005B Mob and Demob LS EA 1 3005C 0 to 100 Miles MI 50 3005D Over 100 Miles MI 200 3006 Tracked Endloader, 95HP HR 240
3006A Standby on Each Item HR 8 3006B Mob and Demob LS EA 1 3006C 0 to 100 Miles MI 50 3006D Over 100 Miles MI 200 3007 Tracked Endloader, 190HP HR 275
3007A Standby on Each Item HR 4 3007B Mob and Demob LS EA 1 3007C 0 to 100 Miles MI 50 3007D Over 100 Miles MI 200 3008 Rubber Tired Endloader, 80HP HR 200
3008A Standby on Each Item HR 4 3008B Mob and Demob LS EA 1 3008C 0 to 100 Miles MI 50 3008D Over 100 Miles MI 200 3009 Rubber Tired Endloader, 130HP HR 120
3009A Standby on Each Item HR 12 3009B Mob and Demob LS EA 1
3009C 0 to 100 Miles MI 50 3009D Over 100 Miles MI 200 3010 Rubber Tired Endloader, 375HP HR 120
3010A Standby on Each Item HR 12 3010B Mob and Demob LS EA 1 3010C 0 to 100 Miles MI 50 3010D Over 100 Miles MI 200 3011 Tracked Backhoe Endloader, 58HP HR 40
3011A Standby on Each Item HR 4 3011B Mob and Demob LS EA 1 3011C 0 to 100 Miles MI 50 3011D Over 100 Miles MI 200 3012 Excavator, Crawler 125HP to 140HP w/Thumb
HR 300
3012A Standby on Each Item HR 100 3012B Mob and Demob LS EA 2 3012C 0 to 100 Miles MI 50 3012D Over 100 Miles MI 200 3013 Excavator, Crawler 250HP w/Thumb HR 650
3013A Standby on Each Item HR 300 3013B Mob and Demob LS EA 2 3013C 0 to 100 Miles MI 50 3013D Over 100 Miles MI 200 3014 Single Axle Truck Dump HR 320
3014A Standby on Each Item HR 32 3014B Mob and Demob LS HR 2 3014C 0 to 100 Miles MI 50 3014D Over 100 Miles MI 200 3015 Tandem Axle Dump HR 2500
3015A Standby on Each Item HR 250 3015B Mob and Demob LS EA 9 3015C 0 to 100 Miles MI 50 3015D Over 100 Miles MI 200 3016 Tri-Axle Dump HR 80
3016A Standby on Each Item HR 8 3016B Mob and Demob LS EA 2 3016C 0 to 100 Miles MI 50 3016D Over 100 Miles MI 200 3017 Chainsaws HR 920 3018 Rubber Tired, Loader .5CY, 36HP HR 500
3018A Standby on Each Item HR 50 3018B Mob and Demob LS EA 6 3018C 0 to 100 Miles MI 50 3018D Over 100 Miles MI 200 3019 Tractor and Lowboy HR 240
3019A Standby on Each Item HR 5 3019B Mob and Demob LS EA 1 3019C 0 to 100 Miles MI 50 3019D Over 100 Miles MI 200
3020 Wood Chipper HR 50 3020A Standby on Each Item HR 5 3020B Mob and Demob LS EA 1 3020C 0 to 100 Miles MI 50 3020D Over 100 Miles MI 200 3021 Grader, 150 HP, articulated frame, with ripper/scarifier
HR 50
3021A Standby on Each Item HR 5 3021B Mob and Demob LS EA 1 3021C 0 to 100 Miles MI 50 3021D Over 100 Miles MI 200 3022 Two-Ton Flatbed HR 220
3022A Standby on Each Item HR 5 3022B Mob and Demob LS EA 1 3022C 0 to 100 Miles MI 50 3022D Over 100 Miles MI 200 3023 Mini-Excavator w/ 12" bucket, 55 HP HR 240
3023A Standby on Each Item HR 10 3023B Mob and Demob LS EA 1 3023C 0 to 100 Miles MI 50 3023D Over 100 Miles MI 200 3024 Concrete Saw, 36" Blade, Belt Drive HR 100
3024A Standby on Each Item HR 10 3024B Mob and Demob LS EA 1 3024C 0 to 100 Miles MI 50 3024D Over 100 Miles MI 200 3025 Water Truck HR 350
3025A Standby on Each Item HR 100 3025B Mob and Demob LS EA 1 3025C 0 to 100 Miles MI 50 3025D Over 100 Miles MI 200 3026 Miscellaneous Equipment, Materials and Fees To Be Negotiated Per Work
3032A SUPERVISORY CONSTRUCTION REP.* HR 20
3033A QUALITY ASSURANCE REP. I* HR 20
3033B QUALITY ASSURANCE REP. II* HR 20
3033C QUALITY ASSURANCE REP. III* HR 20
3034A SAFETY MANAGER HR 20
3035A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
3035B REGISTERED PROFESSIONAL
3041A SUPERVISORY CONSTRUCTION REP.* HR 20
3042A QUALITY ASSURANCE REP. I* HR 20
3042B QUALITY ASSURANCE REP. II* HR 20
3042C QUALITY ASSURANCE REP. III* HR 20
3043A SAFETY MANAGER HR 20
3044A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
3044B REGISTERED PROFESSIONAL
3050A SUPERVISORY CONSTRUCTION REP.* HR 20
3051A QUALITY ASSURANCE REP. I* HR 20
3051B QUALITY ASSURANCE REP. II* HR 20
3051C QUALITY ASSURANCE REP. III* HR 20
3052A SAFETY MANAGER HR 20
3053A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
3053B REGISTERED PROFESSIONAL
3059A SUPERVISORY CONSTRUCTION REP.* HR 20
3060A QUALITY ASSURANCE REP. I* HR 20
3060B QUALITY ASSURANCE REP. II* HR 20
3060C QUALITY ASSURANCE REP. III* HR 20
3061A SAFETY MANAGER HR 20
3062A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
3062B REGISTERED PROFESSIONAL
3068A SUPERVISORY CONSTRUCTION REP.* HR 20
3069A QUALITY ASSURANCE REP. I* HR 20
3069B QUALITY ASSURANCE REP. II* HR 20
3069C QUALITY ASSURANCE REP. III* HR 20
3070A SAFETY MANAGER HR 20
3071A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
3071B REGISTERED PROFESSIONAL
3077A SUPERVISORY CONSTRUCTION REP.* HR 20
3078A QUALITY ASSURANCE REP. I* HR 20
3078B QUALITY ASSURANCE REP. II* HR 20
3078C QUALITY ASSURANCE REP. III* HR 20
3079A SAFETY MANAGER HR 20
3080A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
3080B REGISTERED PROFESSIONAL
3086A SUPERVISORY CONSTRUCTION REP.* HR 20
3087A QUALITY ASSURANCE REP. I* HR 20
3087B QUALITY ASSURANCE REP. II* HR 20
3087C QUALITY ASSURANCE REP. III* HR 20
3088A SAFETY MANAGER HR 20
3089A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
3089B REGISTERED PROFESSIONAL
TOTAL OPTION YEAR THREE
OPTION YEAR FOUR
4001 Backhoe & Endloader, Wheel 1 CY, 24"
HR 240
4001A Standby on Each Item HR 24 4001B Mob and Demob LS EA 1 4001C 0 to 100 Miles MI 50 4001D Over 100 Miles MI 200 4002 Dozer, 70HP w/blade & Winch HR 40
4002A Standby on Each Item HR 4 4002B Mob and Demob LS EA 1 4002C 0 to 100 Miles MI 50 4002D Over 100 Miles MI 200 4003 Dozer, 140 HP w/Blade & Winch HR 300
4003A Standby on Each Item HR 36 4003B Mob and Demob LS EA 2 4003C 0 to 100 Miles MI 50 4003D Over 100 Miles MI 200 4004 Dozer, 285HP w/Blade & Winch HR 300
4004A Standby on Each Item HR 36 4004B Mob and Demob LS EA 2 4004C 0 to 100 Miles MI 50 4004D Over 100 Miles MI 200 4005 Tracked Endloader, 70HP HR 240
4005A Standby on Each Item HR 8 4005B Mob and Demob LS EA 1 4005C 0 to 100 Miles MI 50 4005D Over 100 Miles MI 200 4006 Tracked Endloader, 95HP HR 240
4006A Standby on Each Item HR 8 4006B Mob and Demob LS EA 1 4006C 0 to 100 Miles MI 50 4006D Over 100 Miles MI 200 4007 Tracked Endloader, 190HP HR 275
4007A Standby on Each Item HR 4 4007B Mob and Demob LS EA 1 4007C 0 to 100 Miles MI 50 4007D Over 100 Miles MI 200 4008 Rubber Tired Endloader, 80HP HR 200
4008A Standby on Each Item HR 4 4008B Mob and Demob LS EA 1 4008C 0 to 100 Miles MI 50 4008D Over 100 Miles MI 200 4009 Rubber Tired Endloader, 130HP HR 120
4009A Standby on Each Item HR 12
4009B Mob and Demob LS EA 1 4009C 0 to 100 Miles MI 50 4009D Over 100 Miles MI 200 4010 Rubber Tired Endloader, 375HP HR 120
4010A Standby on Each Item HR 12 4010B Mob and Demob LS EA 1 4010C 0 to 100 Miles MI 50 4010D Over 100 Miles MI 200 4011 Tracked Backhoe Endloader, 58HP HR 40
4011A Standby on Each Item HR 4 4011B Mob and Demob LS EA 1 4011C 0 to 100 Miles MI 50 4011D Over 100 Miles MI 200 4012 Excavator, Crawler 125HP to 140HP w/Thumb
HR 300
4012A Standby on Each Item HR 100 4012B Mob and Demob LS EA 2 4012C 0 to 100 Miles MI 50 4012D Over 100 Miles MI 200 4013 Excavator, Crawler 250HP w/Thumb HR 650
4013A Standby on Each Item HR 300 4013B Mob and Demob LS EA 2 4013C 0 to 100 Miles MI 50 4013D Over 100 Miles MI 200 4014 Single Axle Truck Dump HR 320
4014A Standby on Each Item HR 32 4014B Mob and Demob LS HR 2 4014C 0 to 100 Miles MI 50 4014D Over 100 Miles MI 200 4015 Tandem Axle Dump HR 2500
4015A Standby on Each Item HR 250 4015B Mob and Demob LS EA 9 4015C 0 to 100 Miles MI 50 4015D Over 100 Miles MI 200 4016 Tri-Axle Dump HR 80
4016A Standby on Each Item HR 8 4016B Mob and Demob LS EA 2 4016C 0 to 100 Miles MI 50 4016D Over 100 Miles MI 200 4017 Chainsaws HR 920 4018 Rubber Tired, Loader .5CY, 36HP HR 500
4018A Standby on Each Item HR 50 4018B Mob and Demob LS EA 6 4018C 0 to 100 Miles MI 50 4018D Over 100 Miles MI 200 4019 Tractor and Lowboy HR 240
4019A Standby on Each Item HR 5 4019B Mob and Demob LS EA 1 4019C 0 to 100 Miles MI 50
4019D Over 100 Miles MI 200 4020 Wood Chipper HR 50
4020A Standby on Each Item HR 5 4020B Mob and Demob LS EA 1 4020C 0 to 100 Miles MI 50 4020D Over 100 Miles MI 200 4021 Grader, 150 HP, articulated frame, with ripper/scarifier
HR 50
4021A Standby on Each Item HR 5 4021B Mob and Demob LS EA 1 4021C 0 to 100 Miles MI 50 4021D Over 100 Miles MI 200 4022 Two-Ton Flatbed HR 220
4022A Standby on Each Item HR 5 4022B Mob and Demob LS EA 1 4022C 0 to 100 Miles MI 50 4022D Over 100 Miles MI 200 4023 Mini-Excavator w/ 12" bucket, 55 HP HR 240
4023A Standby on Each Item HR 10 4023B Mob and Demob LS EA 1 4023C 0 to 100 Miles MI 50 4023D Over 100 Miles MI 200 4024 Concrete Saw, 36" Blade, Belt Drive HR 100
4024A Standby on Each Item HR 10 4024B Mob and Demob LS EA 1 4024C 0 to 100 Miles MI 50 4024D Over 100 Miles MI 200 4025 Water Truck HR 350
4025A Standby on Each Item HR 100 4025B Mob and Demob LS EA 1 4025C 0 to 100 Miles MI 50 4025D Over 100 Miles MI 200 4026 Miscellaneous Equipment, Materials and Fees To Be Negotiated Per Work
4032A SUPERVISORY CONSTRUCTION REP.* HR 20
4033A QUALITY ASSURANCE REP. I* HR 20
4033B QUALITY ASSURANCE REP. II* HR 20
4033C QUALITY ASSURANCE REP. III* HR 20
4034A SAFETY MANAGER HR 20
4035A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
4035B REGISTERED PROFESSIONAL
4041A SUPERVISORY CONSTRUCTION REP.* HR 20
4042A QUALITY ASSURANCE REP. I* HR 20
4042B QUALITY ASSURANCE REP. II* HR 20
4042C QUALITY ASSURANCE REP. III* HR 20
4043A SAFETY MANAGER HR 20
4044A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
4044B REGISTERED PROFESSIONAL
4050A SUPERVISORY CONSTRUCTION REP.* HR 20
4051A QUALITY ASSURANCE REP. I* HR 20
4051B QUALITY ASSURANCE REP. II* HR 20
4051C QUALITY ASSURANCE REP. III* HR 20
4052A SAFETY MANAGER HR 20
4053A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
4053B REGISTERED PROFESSIONAL
4059A SUPERVISORY CONSTRUCTION REP.* HR 20
4060A QUALITY ASSURANCE REP. I* HR 20
4060B QUALITY ASSURANCE REP. II* HR 20
4060C QUALITY ASSURANCE REP. III* HR 20
4061A SAFETY MANAGER HR 20
4062A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
4062B REGISTERED PROFESSIONAL
4068A SUPERVISORY CONSTRUCTION REP.* HR 20
4069A QUALITY ASSURANCE REP. I* HR 20
4069B QUALITY ASSURANCE REP. II* HR 20
4069C QUALITY ASSURANCE REP. III* HR 20
4070A SAFETY MANAGER HR 20
4071A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
4071B REGISTERED PROFESSIONAL
4077A SUPERVISORY CONSTRUCTION REP.* HR 20
4078A QUALITY ASSURANCE REP. I* HR 20
4078B QUALITY ASSURANCE REP. II* HR 20
4078C QUALITY ASSURANCE REP. III* HR 20
4079A SAFETY MANAGER HR 20
4080A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
4080B REGISTERED PROFESSIONAL
4086A SUPERVISORY CONSTRUCTION REP.* HR 20
4087A QUALITY ASSURANCE REP. I* HR 20
4087B QUALITY ASSURANCE REP. II* HR 20
4087C QUALITY ASSURANCE REP. III* HR 20
4088A SAFETY MANAGER HR 20
4089A REGISTERED PROFESSIONAL
ENGINEER - CIVIL
HR 20
4089B REGISTERED PROFESSIONAL
TOTAL OPTION YEAR FOUR
GRAND TOTAL
NOTE 1: (CLINS 0026, 1026, 2026, 3026, 4026): PRICE TO BE NEGOTIATED ON EACH TASK
ORDER
NOTE 2: Bid prices shall include overhead, profit, and transportation. Per diem will not be paid on any work within the boundaries of the Huntington District. Labor Wage Rates include Basic Hourly Rate Plus Fringes.
NOTE 3: Bid prices for labor and equipment are applicable to the Prime Contractor, as well as the Sub-Contractor.
The Government may reject a bid as non-responsive, if it materially and mathematically unbalanced as to price for any offered items or combination of offered items. A bid is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.
The Government will evaluate bids for award purposes by adding the total price for all CLINs, including all options.
ALL BIDDERS ARE REQUIRED TO FILL OUT THE BID SCHEDULE ABOVE.
ALL LINE ITEMS ON THE BID SCHEDULE SHALL BE FILLED OUT, INCLUDING UNIT PRICES
AND TOTAL AMOUNTS.
ALL LINE ITEMS MUST BE FILLED OUT OR THE BID WILL BE DEEMED NON-RESPONSIVE.
BIDDERS ARE INSTRUCTED TO ENTER A DOLLAR AMOUNT ON EACH LINE ITEM OR THE
BIDDER MUST PUT A “NO CHARGE (N/C)’ NOTATION ON THE LINE ITEM.
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
The solicitation consists of the following sections:
Section A – Solicitation/Contract Form Section B – Supplies or Services and Prices Section C – Descriptions and Specifications Section E – Inspection and Acceptance Section F – Deliveries or Performance Section G- Contract Administration Data Section H- Special Contract Requirements Section I- Contract Clauses Section J- List of Documents, Exhibits, and Other Attachments Section K- Representations, Certifications and Other Statements of Offerors Section L- Instructions, Conditions and Notice of Bidders Section M- Evaluation Factors for Award
INSTRUCTIONS TO BIDDERS
BID OPENING
The bid opening will be held at US Army Corps of Engineers, 502 8th Street, Room #419, Huntington, WV 25701. For date and time of Bid Opening, see block 9 on Standard Form 33. Upon arrival, Contractors must check in with the Security Desk and have them contact Allison Lewis at ext.
5046 to submit bid and be escorted to the room for the Bid Opening.
QUESTIONS
Technical questions must be received in the Huntington District Office no later than April 17, 2018, 1:00
pm. EST. Questions will not be accepted after this date. Questions are to be emailed to Allison.Lewis@usace.army.mil
PRICE BASIS
Bidders are advised that only bids submitted on a firm-fixed price basis will be considered, and that bids submitted on any other than firm-fixed price basis will be rejected.
Bid price alterations, i.e., crossed-out or white-out changes on the bid will not be accepted unless the change (s) is/are initialed by the person authorized to sign bid package.
BID QUANTITIES
Bids for less than specified quantities of each item in the Schedule will not be considered. Failure to submit a unit price for each item where required in the Schedule will be considered as a material deviation from the requirements of the solicitation, and the bid will be rejected. (FAR 14.201-5)
ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by the bidders:
(1) Obviously misplaced decimal points will be corrected;
(2) In case of discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of Job and extended price will be corrected; and
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidders intends their bid to be evaluated on the basis of unit prices, extensions, and totals arrived at by resolution of arithmetic discrepancies as provided above and bid will be so reflected on the abstract of bids.
ADDITIONAL INSTRUCTIONS
I. BIDS MUST SET FORTH FULL, ACCURATE AND COMPLETE INFORMATION AS REQUIRED BY
THIS INVITATION FOR BID (INCLUDING ATTACHMENTS). THE PENALTY FOR MAKING FALSE
STATEMENTS IN BIDS IS PRESCRIBED IN 18 U.S.C. 1001.
II. THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS DOES NOT ACCEPT BIDS BY FACSIMILE
TRANSMISSIONS AND/OR EMAIL.
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
DEMOLITION AND ENVIRONMENTAL REMEDIATION
SERVICES CONTRACT FOR
HUNTINGTON DISTRICT, U.S. ARMY CORPS OF ENGINEERS
SECTION C-1 – GENERAL
C-1 TECHNICAL CONTRACT REQUIREMENTS
C-1.1 TYPICAL WORK REQUIREMENTS
C-1.2 MISCELLANEOUS EQUIPMENT, MATERIALS, AND FEES
C-1.3 TIME OF PERFORMANCE
C-1.4 MOBILIZATION AND DEMOBILIZATION
C-1.5 MULTIPLE WORK SITES
C-1.6 RESPONSE TIME
C-1.7 MILEAGE
C-1.8 INCLUSION OF LABOR
C-1.9 AS-BUILT DRAWINGS
C-1.10 CONTRACT CORRESPONDENCE
C-1.11 SITE SPECIFIC SUPPLEMENTAL PLANS
C-1.12 UTILITY DAMAGE
C-1.13 PERMITS
C-1.14 START WORK NOTIFICATION
C-1.15 TOTAL PROPOSAL BREAKDOWN
C-1.16 SUBMISSION OF MONTHLY PROGRESS PAYMENTS
C-1.17 TRAFFIC CONTROL PLAN
C-1.18 SUBMITTAL REGISTER
C-1.19 CHANGES IN SPECIFICATION
C-1.20 TECHNICAL CRITERIA
C-1.21 DEFINITIONS
C-1.22 PERFORMANCE OF WORK
C-1.23 ACTIVITIES TO BE PERFORMED
C-1.24 TYPICAL WORK PLAN ACTIVITIES AND/OR REQUIREMENTS
C-1.25 INSPECTION REQUIREMENT
C-1.26 TESTING
C-1.27 WORK PLAN PROPOSAL REQUIREMENTS
DEMOLITION AND ENVIRONMENTAL REMEDIATION
SECTION C-2 – DEMOLITION/REMEDIATION
C-2 DEMOLITION OF STRUCTURES SPECIFICATION.
C-2.1 PROTECTION
C-2.2 SITE RESTORATION
C-2.3 PRODUCTS
C-2.4 ENVIRONMENTAL PROTECTION
C-2.5 CONTROLLED SUBSTANCE
C-2.6 PROTECTION OF LAND RESOURCES
C-2.7 PROTECTION OF WATER RESOURCES
C-3 SECURITY REQUIREMENTS
PERFORMANCE WORK STATEMENT
C-1 TECHNICAL CONTRACT REQUIREMENTS
OBJECTIVE: The primary objective of this contract is to provide site survey, work plan(s) and/or specifications, maintenance, repair, and/or rehabilitation (MRR), selected environmental remediation services to Government owned properties, installations and facilities, and sponsor owned properties located anywhere within the geographical boundaries of the Great Lakes and Ohio River Division, U.S. Army Corps of Engineers. The Contractor shall be required to perform/manage all facets of the work such as surveying the problem, recommending a solution and correction of the problem in a timely manner. The Contractor shall maintain the capability to provide quick response for this work. Work requirements shall vary from site to site.
The Government will issue Task Orders on DD Form 1155. Examples of work that may be required by this contract include, but are not limited to: river and stream bank erosion protection, clearing and snagging of streams, demolition of structures and restoration of cleared areas, and various other projects within the boundaries of the Huntington District. Materials that will be incorporated into the work (i.e. stone, filter fabric, filter fabric pins) will either be supplied by the Government or ordered from the Contractor. See Sections titled “TASK ORDERS.” Individual Task Orders will specify which party will supply these materials. Materials, supplies, tools, equipment, fuel, and vehicles (i.e. welding rods, bulldozers, foreman vehicle, hand tools such as wrenches, hack saws, etc.) required to perform the work in accordance with these contract documents and any issued Task Orders must be provided by the Contractor.
Responsibilities of the Contractor shall include, but not be limited to, all planning, programming, administration, coordination, and management to ensure that all work is performed in accordance with all laws, regulations, codes or directives. The work shall be of high quality and contracted for at a fair & reasonable price, and performed in a diligent manner with a minimum number of change orders. The ability to: survey and identify deficiencies; plan and document the work required to correct deficiencies; provide incidental engineering services; estimate the cost of the work; obtain subcontracts or perform the work with the Contractor’s own work forces; and manage the work effort while insuring quality, environmental stewardship, and safety are paramount to the success of this contract. It is not critical that the Contractor be prepared to execute all the work under this contract with its own workforce. The Contractor must perform such work in order to manage the work throughout the Great Lakes and Ohio River Division in a cost effective, diligent, and quality manner while meeting project schedules, requirements, and/or deadlines. Contractor shall be responsible for all sub-contracted work (including suppliers, etc.) ensuring that all sub-contracted work performed meets or exceeds the requirements of the contract and/or any Task Orders written against the contract. Contractor and/or sub-contractor’s (including suppliers, etc.) shall be properly licensed, insured, and bonded in accordance with applicable local, state, and federal laws, regulations, codes and/or directives for where the work is located.
The Contractor shall be responsible for ensuring that the work performed meets or exceeds the requirements of the contract and any Task Orders written against the contract. The Contractor shall perform all related Contractor administrative services necessary to perform the work, such as quality control, contractor financial control, use of Residential Management System (RMS)/Quality Control System (QCS) software and maintenance of accurate and complete records and files. Also included in the Contractor's area of responsibility is establishing and executing a Contractor Quality Control, Environmental, and Safety Program to ensure that all work is performed in strict accordance with the contract and all health, safety and environmental laws, regulations, codes and directives (including EM385-1-1 w/ updates); to protect the general public, as well as Contractor and Government employees.
The State of West Virginia requires all contractors working in the state to have a West Virginia State License.
Contact the West Virginia Department of Labor, Charleston, West Virginia., telephone number (304) 558-7890 for details. Contractor shall be responsible for verifying, obtaining, and complying with state licensing requirements for work in other states. Contractor shall price such requirements in their quote for the subject contract work.
The Contractor shall, in an accurate and timely manner, prepare all reports, forms, permits, etc., as required in this contract. A partial list of these reports, forms, permits, etc. can be viewed as follows:
Contractor Discrepancy Report, Contractor portions only Contractor Invoice Contractor Work Schedule Quality Control Reports
C-1.1 TYPICAL WORK REQUIREMENTS: In order to meet the objectives of this contract, the Contractor must provide expertise in certain areas in order to accomplish the required work. Disciplines and related work requirements may include, but are not limited to:
1 Electrical. Electrical distribution and network balancing (aerial and underground), transmission lines, poles (telephone and power), towers, ducts, raceways, conduits, tubing, connectors, wires, cable, cable trays, outlet boxes, cabinets and enclosures, supports, fiber optics cable and equipment, manholes, concrete pads, insulators, lightning arrestors, transformers, capacitors, switches, relays, fuses, grounding, lightning protection, cathodic protection, service entrances, panel boards, circuit breakers, motor control centers, special equipment/systems, targeting systems, resistance heating, starters, uninterrupted power supplies (UPS), beacons, batteries, generators, solar systems, receptacles, lighting fixtures, lamps, ballasts, equipment connections, special outlets, disconnect switches, splices, terminations, control systems, security systems, IDS, utilities monitoring and control systems (UMCS), and similar microprocessor environmental control systems, audio and visual communication systems, telephone systems, instrumentation systems, and fire detection and alarm systems.
2 Environmental. Industrial and sanitary sewers, waste treatment facilities, septic tanks with drains, portable toilets wells, water treatment facilities, water distribution systems, potable and fire water supplies (including wells, piping, pumps, valves, sprinklers, water use analyses, leakage analysis, and hazardous waste analyses, and disposal of waste products.
3 Mechanical. Heating, ventilation and air-conditioning (HVAC) systems and components, chillers, refrigerants, cooling towers, air handling equipment, energy conservation, heat transfer surfaces, furnaces, air distribution, valves, pumps and associated piping and ducts; conveying systems, elevators, dumbwaiters, moving walks, box conveyors, hoists and cranes, lifts, escalators with associated electrical and hydraulic controls; incinerators, boilers, material handling systems, dryers, steam lines, transient tubes, shredders, plumbing fixtures, special equipment/systems, sterilization systems, fuel distribution (i.e. propane, natural gas, and slurries), petroleum oil lubricants (POL), storage tanks for fuel, gas, water, and sewage, piping systems, fire suppression (water, chemical, and gas), fuel use and leak analyses, sterilizers, compressed air production and distribution systems, medical and industrial gas distribution systems, exhaust systems, steam systems, pipe insulation, and plumbing systems involving water, solids, and hazardous waste.
4 Safety. Life safety, fire protection systems, industrial hygiene, inflammatory gases, medical safety and hygiene, asbestos and/or lead based paint evaluation and removal/encapsulation, blast distances, failure mode and effective analyses (FMEA), Occupational Safety and Hazards Act (OSHA) and American Disability Act (ADA) evaluations.
5 Structural. Structural design and analysis of building systems and ancillary structures (concrete, masonry, steel, etc.), foundations, underwater structures, reinforced concrete, equipment mounting, shock isolation reinforced masonry, wood, steel joists, steel decks, structural steel frame systems, steel bracing, seismic design and evaluations, steel connections, non-building structures, welding procedures, detailing of structural components and hardened (protective) structures. Non-building structures such as elevated tanks, vertical tanks on ground, horizontal tanks, retaining walls and buried structures.
Anchorage and support of mechanical and electrical equipment. Applications of industry building codes and standards.
6 Systems. Quality control, operations and maintenance (O&M) manuals and procedures both preventative and breakdown, training, human factors engineering, upgrade assessments, equipment inventories and O&M documentation to obtain support, energy system surveys, O&M training efforts to support the
MRR, System/equipment and life safety repair and maintenance efforts for existing systems/equipment, logistical support, accreditation surveys.
7) Other Requirements. Asbestos and/or lead based paint abatement may be required during equipment/systems remediation.