REQUEST FOR PROPOSAL - MAINTENANCE SERVICES AT EAST LYNN LAKE WV.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AmendmentPreproposal.pdf | ||
| 2013_-_2017_East_Lynn_Lake_Maintenance_Services_Contract_(Exhibits).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 04:30 PM local time 27 Dec 2012
X
A X B X C
D
EX
X G F 230 - 245
246 - 260 X H 261 - 264
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 264
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W91237 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 2 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Contracting Office conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 26
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
27 - 99 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
100 - 101 102 - 103
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 104 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 105 - 118 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
119 - 228
PART II - CONTRACT CLAUSES
USACE, CONTRACTING DIVISION
KAREN L. SIMMONS, 502 8TH STREET
HUNTINGTON WV 25701-2070
(304)399-5182
(304399-5281FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
26 Nov 2012
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W91237-13-R-0004
Section B - Supplies or Services and Prices
BID SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
BASE CONTRACT PERIOD - DATE OF CONTRACT AWARD - 31 DECEMBER 2013
ITEM DESCRIPTION QUANTITY U/M U/P AMOUNT
SECTION C-2 - BUILDING, FACILITIES, MECHANICAL, ELECTRICAL, WATER AND SEWER SYSTEMS
WINTERIZATION
0001 OVERLOOK AREA 1 EA___________.___ _______________.___
0002 BELOW DAM AREA 1 EA __________.___ _______________.___
0003 LAKESIDE PICNIC AREA 1 EA __________.___ _______________.___
0004 LAKESIDE LAUNCH RAMP AREA 1 EA __________.___ _______________.___
0005 LICK CREEK AREA 1 EA __________.___ _______________.___
0006 EAST FORK AREA 1 EA __________.___ _______________.___
0007 EAST FORK CAMPGROUND (AREA 1) 1 EA __________.___ _______________.___
0008 EAST FORK CAMPGROUND (AREA 2) 1 EA __________.___ _______________.___
0009 EAST FORK CAMPGROUND (AREA 3) 1 EA __________.___ _______________.___
0010 EAST FORK CAMPGROUND (AREA 4) 1 EA __________.___ _______________.___
0011 EAST FORK CAMPGROUND (AREA 5) 1 EA __________.___ _______________.___
0012 EAST FORK CAMPGROUND (AREA 6) 1 EA __________.___ _______________.___
SPRING OPENING
0013 OVERLOOK AREA 1 EA __________.___ _______________.___
0014 BELOW DAM AREA 1 EA __________.___ _______________.___
0015 LAKESIDE PICNIC AREA 1 EA __________.___ _______________.___
0016 LAKESIDE LAUNCH RAMP AREA 1 EA __________.___ _______________.___
0017 LICK CREEK AREA 1 EA __________.___ _______________.___
0018 EAST FORK AREA 1 EA __________.___ ______________.___
0019 EAST FORK CAMPGROUND (AREA 1) 1 EA __________.___ _______________.___
0020 EAST FORK CAMPGROUND (AREA 2) 1 EA __________.___ _______________.___
0021 EAST FORK CAMPGROUND (AREA 3) 1 EA __________.___ _______________.___
0022 EAST FORK CAMPGROUND (AREA 4) 1 EA __________.___ _______________.___
0023 EAST FORK CAMPGROUND (AREA 5) 1 EA __________.___ _______________.___
0024 EAST FORK CAMPGROUND (AREA 6) 1 EA __________.___ _______________.___
ALL OTHER BID ITEMS COVERED IN SECTION C-15 - GENERAL
SECTION C-2 - SUBTOTAL.................................................................................................$__________________.___
SECTION C-3 - GRASS MOWING AND MAINTENANCE OF LANDSCAPED AREAS
0025 BELOW DAM AREA 10 EA __________.___ _______________.___
0026 DAMSITE 10 EA __________.___ _______________.___
0027 OFFICE AREA 10 EA __________.___ _______________.___
0028 OVERLOOK AREA 10 EA __________.___ _______________.___
0029 LAKESIDE AREA 10 EA __________.___ _______________.___
0030 LICK CREEK AREA 10 EA __________.___ _______________.___
0031 EAST FORK AREA 10 EA __________.___ _______________.___
0032 EAST FORK CAMPGROUND (AREA 1) 10 EA __________.___ _______________.___
0033 EAST FORK CAMPGROUND (AREA 2) 10 EA __________.___ _______________.___
0034 EAST FORK CAMPGROUND (AREA 3) 10 EA __________.___ _______________.___
0035 EAST FORK CAMPGROUND (AREA 4) 10 EA __________.___ _______________.___
0036 EAST FORK CAMPGROUND (AREA 5) 10 EA __________.___ ______________.___
0037 EAST FORK CAMPGROUND (AREA 6) 10 EA __________.___ ______________.___
0038 SPILLWAY, ACCESS ROADS, FIELDS AND OUTFLOW STRIP 2 EA _________.___ _______________.___
0039 ACCESS ROADS AND FACILITY AREA 2 EA __________.___ ______________.___
0040 RAKING 1 AC __________.__ ______________.___
SECTION C-3 - SUBTOTAL.....................................................................................................$________________.___
SECTION C-4 - CLEANING SERVICES, RECREATION AREAS
BELOW DAM
0041 LEVEL 1 1 DA __________.___ _______________.___
0042 LEVEL 2 150 DA __________.___ _______________.___
0043 LEVEL 3 1 DA _ _________.___ _______________.___
SPILLWAY, ACCESS ROADS, FIELDS AND OUTFLOW STRIP
0044 LEVEL 3 30 DA __________.___ _______________.___
DAMSITE
0045 LEVEL 3 150 DA __________.___ _______________.___
OVERLOOK AREA
0046 LEVEL 1 1 DA __________.___ _______________.___
0047 LEVEL 2 150 DA __________.___ _______________.___
0048 LEVEL 3 1 DA __________.___ _______________.___
LAKESIDE LAUNCH RAMP AREA
0049 LEVEL 1 1 DA __________.___ _______________.___
0050 LEVEL 2 150 DA __________.___ _______________.___
0051 LEVEL 3 1 DA __________.___ _______________.___
LAKESIDE PICNIC AREA
0052 LEVEL 1 1 DA __________.___ _______________.___
0053 LEVEL 2 130 DA __________.___ _______________.___
0054 LEVEL 3 1 DA __________.___ _______________.___
LICK CREEK AREA
0055 LEVEL 1 1 DA __________.___ _______________.___
0056 LEVEL 2 150 DA __________.___ _______________.___
0057 LEVEL 3 1 DA __________.___ _______________.___
EAST FORK AREA
0058 LEVEL 1 1 DA . .___
0059 LEVEL 2 160 DA __________.___ _______________.___
0060 LEVEL 3 1 DA __________.___ _______________.___
EAST FORK CAMPGROUND (AREA 1)
0061 LEVEL 1 1 DA __________.___ _______________.___
0062 LEVEL 2 160 DA __________.___ _______________.___
EAST FORK CAMPGROUND (AREA 2)
0063 LEVEL 1 1 DA __________.___ _______________.___
0064 LEVEL 2 160 DA __________.___ _______________.___
EAST FORK CAMPGROUND (AREA 3)
0065 LEVEL 1 1 DA __________.___ _______________.___
0066 LEVEL 2 160 DA __________.___ _______________.___
EAST FORK CAMPGROUND (AREA 4)
0067 LEVEL 1 1 DA __________.___ _______________.___
0068 LEVEL 2 130 DA __________.___ _______________.___
EAST FORK CAMPGROUND (AREA 5)
0069 LEVEL 1 1 DA __________.___ _______________.___
0070 LEVEL 2 130 DA __________.___ _______________.___
EAST FORK CAMPGROUND (AREA 6)
0071 LEVEL 1 1 DA __________.___ _______________.___
0072 LEVEL 2 130 DA __________.___ _______________.___
0073 TRAILS 5 EA __________.___ _______________.___
0074 EXTRA RESTROOM CLEANING 5 EA __________.___ _______________.___
0075 EXTRA PICNIC SHELTER CLEANING 1 EA __________.___ _______________.___
SECTION C-4 - SUBTOTAL......................................................................................................$________________.___
SECTION C-5 - GUARDRAILS, SIGNS, BARRICADES, BUMPERS, CURBS, AND POSTS
ALL BID ITEMSD COVERED IN SECTION C-15 - GENERAL
SECTION C-6 – MAINTENANCE/ REPAIR OF ROADS, PARKING AREAS, PULL OFFS, AND LAUNCHING RAMPS
ALL BID ITEMS COVERED IN SECTION C-15 - GENERAL
SECTION C-7 - DRIFT, DEBRIS, AND TRASH REMOVAL
0076 COMBUSTIBLE DRFIT REMOVAL 100 CY _________.___ __________________
0077 NON-COMBUSTIBLE DRFIT REMOVAL 50 CY _____________ __________________
SECTION C-7 - SUBTOTAL......................................................................................................$________________.___
SECTION C-8 – Not Used
SECTION C-9 - JANITORIAL AND POLICING SERVICE FOR OFFICE/SHOP COMPLEX AND ENVIRONMENTAL
INTERPRETIVE CENTER
0078 OFFICE/SHOP COMPLEX 60 DA __________.___ _______________.___
0079 EXTRA OFFICE/SHOP COMPLEX 1 DA __________.___ _______________.___
SECTION C-9 - SUBTOTAL......................................................................................................$________________.___
SECTION C-10 - NATURAL RESOURCE MANAGEMENT
0080 PICNIC TABLE BOARD REPLACEMENT 100 EA __________.___ _______________.___
ALL OTHER BID ITEMS COVERED UNDER SECTION C-15 - GENERAL
SECTION C-10 - SUBTOTAL....................................................................................................$________________.___
SECTION C-11 - BEACH AND SWIM BUOY MAINTENANCE
0081 INSTALLATION OF BUOY SAFETY LINE 1 EA __________.___ _______________.___
0082 REMOVAL OF BUOY SAFETY LINE 1 EA __________.___ _______________.___
ALL OTHER WORK COVERED UNDER SECTION C-15 - GENERAL
SECTION C-11 - SUBTOTAL................................................................................................$ .
SECTION C-12 - PARK ATTENDANT – Not Used
SECTION C-13 - WILDLIFE SUPPRESSION AND DISASTERS - Not Used
ALL BID ITEMS COVERED UNDER SECTION C-15 - GENERAL
SECTION C-14 - MAINTENANCE OF NAVIGATION AIDS
SECTION C-15 - GENERAL
0083 GENERAL MAINTENANCE WORKER 1000 HR __________.___ _______________.___
0084 GROUNDS MAINTENANCE LABORER 1500 HR __________.___ _______________.___
0085 ELECTRICIAN 100 HR _________.___ _______________.___
0086 PLUMBER 50 HR _________.___ _______________.___
0087 CARPENTER 50 HR _________.___ _______________.___
0088 DOZER OPERATOR (CASE 450 OR EQUIVALENT) 10 HR __________.___ ______________.___
0089 BOAT OPERATOR (16-40 FT. WORKBOAT, 10 TO 100 HP) 100 HR _________.___ ______________.___
0090 20” CHAIN SAW AND OPERATOR 100 HR _________.___ ______________.___
0091 DUMP TRUCK AND OPERATOR (2 Ton minimum) 50 HR _________.___ ______________.___
0092 TRACTOR OPERATOR (FORD 3000 OR EQUIVALENT 50 HR _________.___ ______________.___
WITH ATTACHMENTS)
0093 BACKHOE/ENDLOADER OPERATOR 100 HR __________.___ _____________.___
0094 WELDER OPERATOR (200 AMP OR LARGER) 10 HR __________.___ ______________.___
0095 TRUCK AND OPERATOR (1/2 TON OR LARGER) 200 HR _________.___ _______________.___
0096 NEGOTIATED WORK 1 JB FOR SUM 0. 00
0097 GUARANTEED AMOUNT 1 LS $6,000.00
SECTION C-15 - SUBTOTAL....................................................................................................$________________.___
TOTAL BASE PERIOD ……….…………………………………………………………………….$________________.___
NOTE TO OFFERORS. UNIT PRICE NOT REQUIRED FOR ALL WORK COVERED UNDER SECTIONS 2, 5, 6, 10, AND 11. PRICES WILL BE NEGOTIATED AT THE TIME SERVICES ARE REQUIRED BASED ON THE "PR. HR."
QUOTE FOR THE TYPE CLASSIFICATION SHOWN UNDER SECTION C-15 NEEDED TO PERFORM THE WORK.
OPTION YEAR 1 - 1 JANUARY 2014- 31 DECEMBER 2014
1001 OVERLOOK AREA 1 EA__________.___ _______________.___
1002 BELOW DAM AREA 1 EA __________.___ _______________.___
1003 LAKESIDE PICNIC AREA 1 EA __________.___ _______________.___
1004 LAKESIDE LAUNCH RAMP AREA 1 EA __________.___ _______________.___
1005 LICK CREEK AREA 1 EA __________.___ _______________.___
1006 EAST FORK AREA 1 EA __________.___ _______________.___
1007 EAST FORK CAMPGROUND (AREA 1) 1 EA __________.___ _______________.___
1008 EAST FORK CAMPGROUND (AREA 2) 1 EA __________.___ _______________.___
1009 EAST FORK CAMPGROUND (AREA 3) 1 EA __________.___ _______________.___
1010 EAST FORK CAMPGROUND (AREA 4) 1 EA __________.___ _______________.___
1011 EAST FORK CAMPGROUND (AREA 5) 1 EA __________.___ _______________.___
1012 EAST FORK CAMPGROUND (AREA 6) 1 EA __________.___ _______________.___
1013 OVERLOOK AREA 1 EA __________.___ _______________.___
1014 BELOW DAM AREA 1 EA __________.___ _______________.___
1015 LAKESIDE PICNIC AREA 1 EA __________.___ ______________.___
1016 LAKESIDE LAUNCH RAMP AREA 1 EA __________.___ ______________.___
1017 LICK CREEK AREA 1 EA __________.___ _______________.___
1018 EAST FORK AREA 1 EA __________.___ _______________.___
1019 EAST FORK CAMPGROUND (AREA 1) 1 EA __________.___ _______________.___
1020 EAST FORK CAMPGROUND (AREA 2) 1 EA __________.___ _______________.___
1021 EAST FORK CAMPGROUND (AREA 3) 1 EA __________.___ _______________.___
1022 EAST FORK CAMPGROUND (AREA 4) 1 EA __________.___ _______________.___
1023 EAST FORK CAMPGROUND (AREA 5) 1 EA __________.___ _______________.___
1024 EAST FORK CAMPGROUND (AREA 6) 1 EA __________.___ _______________._
SECTION C-2 - SUBTOTAL.................................................................................................$__________________.___
1025 BELOW DAM AREA 10 EA __________.___ _______________.___
1026 DAMSITE 10 EA __________.___ _______________.___
1027 OFFICE AREA 10 EA __________.___ _______________.___
1028 OVERLOOK AREA 10 EA __________.___ _______________.___
1029 LAKESIDE AREA 10 EA __________.___ _______________.___
1030 LICK CREEK AREA 10 EA __________.___ ______________.___
1031 EAST FORK AREA 10 EA __________.___ _______________.___
1032 EAST FORK CAMPGROUND (AREA 1) 10 EA __________.___ _______________.___
1033 EAST FORK CAMPGROUND (AREA 2) 10 EA __________.___ _______________.___
1034 EAST FORK CAMPGROUND (AREA 3) 10 EA __________.___ ______________.___
1035 EAST FORK CAMPGROUND (AREA 4) 10 EA __________.___ _______________.___
1036 EAST FORK CAMPGROUND (AREA 5) 10 EA __________.___ ______________.___
1037 EAST FORK CAMPGROUND (AREA 6) 10 EA __________.___ ______________.___
1038 SPILLWAY, ACCESS ROADS, FIELDS AND OUTFLOW STRIP 2 EA _________.___ _______________.___
1039 ACCESS ROADS AND FACILITY AREA 2 EA __________.___ ______________.___
1040 RAKING 1 AC __________.__ ______________.___
SECTION C-3 - SUBTOTAL.....................................................................................................$________________.___
1041 LEVEL 1 1 DA __________.___ _______________.___
1042 LEVEL 2 150 DA __________.___ _______________.___
1043 LEVEL 3 1 DA _________.___ ______________.___
1044 LEVEL 3 30 DA __________.___ _______________.___
1045 LEVEL 3 150 DA __________.___ _______________.___
1046 LEVEL 1 1 DA __________.___ ______________.___
1047 LEVEL 2 150 DA __________.___ ______________.___
1048 LEVEL 3 1 DA __________.___ ______________.___
1049 LEVEL 1 1 DA __________.___ _______________.___
1050 LEVEL 2 150 DA __________.___ ______________.___
1051 LEVEL 3 1 DA __________.___ ______________.___
1052 LEVEL 1 1 DA __________.___ _______________.___
1053 LEVEL 2 150 DA __________.___ _______________.___
1054 LEVEL 3 1 DA __________.___ _______________.___
1055 LEVEL 1 1 DA __________.___ _______________.___
1056 LEVEL 2 150 DA __________.___ _______________.___
1057 LEVEL 3 1 DA __________.___ _______________.___
1058 LEVEL 1 1 DA . .___
1059 LEVEL 2 150 DA __________.___ _______________.___
1060 LEVEL 3 1 DA __________.___ _______________.___
1061 LEVEL 1 1 DA __________.___ _______________.___
1062 LEVEL 2 160 DA __________.___ _______________.___
1063 LEVEL 1 1 DA __________.___ _______________.___
1064 LEVEL 2 160 DA __________.___ _______________.___
1065 LEVEL 1 1 DA __________.___ _______________.___
1066 LEVEL 2 130 DA __________.___ _______________.___
1067 LEVEL 1 1 DA __________.___ _______________.___
1068 LEVEL 2 130 DA __________.___ _______________.___
1069 LEVEL 1 1 DA __________.___ _______________.___
1070 LEVEL 2 130 DA __________.___ _______________.___
1071 LEVEL 1 1 DA __________.___ _______________.___
1072 LEVEL 2 130 DA __________.___ _______________.___
1073 TRAILS 5 EA __________.___ _______________.___
1074 EXTRA RESTROOM CLEANING 1 EA __________.___ _______________.___
1075 EXTRA PICNIC SHELTER CLEANING 1 EA __________.___ _______________.___
SECTION C-4 - SUBTOTAL......................................................................................................$________________.___
1076 COMBUSTIBLE DRFIT REMOVAL 100 CY _________.___ ___________________
1077 NON-COMBUSTIBLE DRFIT REMOVAL 50 CY _____________ ___________________
SECTION C-7 - SUBTOTAL......................................................................................................$________________.___
1078 OFFICE/SHOP COMPLEX 60 DA __________.___ _______________.___
1079 EXTRA OFFICE/SHOP COMPLEX 1 DA __________.___ _______________.___
SECTION C-9 - SUBTOTAL......................................................................................................$________________.___
1080 PICNIC TABLE BOARD REPLACEMENT 100 EA __________.___ _______________.___
SECTION C-10 - SUBTOTAL....................................................................................................$________________.___
1081 INSTALLATION OF BUOY SAFETY LINE 1 EA __________.___ _______________.___
1082 REMOVAL OF BUOY SAFETY LINE 1 EA __________.___ _______________.___
SECTION C-11 - SUBTOTAL................................................................................................$ .
SECTION C-13 - WILDLIFE SUPPRESSION AND DISASTERS – Not Used
1083 GENERAL MAINTENANCE WORKER 1000 HR __________.___ _______________.___
1084 GROUNDS MAINTENANCE LABORER 1500 HR __________.___ _______________.___
1085 ELECTRICIAN 100 HR _________.___ _______________.___
1086 PLUMBER 50 HR _________.___ _______________.___
1087 CARPENTER 50 HR _________.___ _______________.___
1088 DOZER OPERATOR (CASE 450 OR EQUIVALENT) 10 HR __________.___ _______________.___
1089 BOAT OPERATOR (16-40 FT. WORKBOAT, 10 TO 100 HP) 100 HR _________.___ _______________.___
1090 20” CHAIN SAW AND OPERATOR 100 HR _________.___ _______________.___
1091 DUMP TRUCK AND OPERATOR (2 Ton minimum) 50 HR _________.___ _______________.___
1092 TRACTOR OPERATOR (FORD 3000 OR EQUIVALENT 50 HR __________.___ _______________.___
WITH ATTACHMENTS)
1093 BACKHOE/ENDLOADER OPERATOR 100 HR __________.___ ____________.___
1094 WELDER OPERATOR (200 AMP OR LARGER) 10 HR __________.___ ______________.___
1095 TRUCK AND OPERATOR (1/2 TON OR LARGER) 200 HR _________.___ ______________.___
1096 NEGOTIATED WORK 1 JB FOR SUM 0. 00
1097 GUARANTEED AMOUNT 1 LS $3,000.00
SECTION C-15 - SUBTOTAL....................................................................................................$________________.___
TOTAL BASE PERIOD AND OPTION PERIOD ONE……….……………………………………….$________________.___
NOTE TO OFFERORS. UNIT PRICE NOT REQUIRED FOR ALL WORK COVERED UNDER SECTIONS 2, 5, 6, 10, AND 11. PRICES WILL BE NEGOTIATED AT THE TIME SERVICES ARE REQUIRED BASED ON THE "PR. HR."
QUOTER FOR THE TYPE CLASSIFICATION SHOWN UNDER SECTION C-15 NEEDED TO PERFORM THE WORK.
BASIC CONTRACT PERIOD
OPTION YEAR 2 - 1 JANUARY 2015- 31 DECEMBER 2015
2001 OVERLOOK AREA 1 EA__________.___ _______________.___
2002 BELOW DAM AREA 1 EA __________.___ _______________.___
2003 LAKESIDE PICNIC AREA 1 EA __________.___ _______________.___
2004 LAKESIDE LAUNCH RAMP AREA 1 EA __________.___ _______________.___
2005 LICK CREEK AREA 1 EA __________.___ _______________.___
2006 EAST FORK AREA 1 EA __________.___ _______________.___
2007 EAST FORK CAMPGROUND (AREA 1) 1 EA __________.___ _______________.___
2008 EAST FORK CAMPGROUND (AREA 2) 1 EA __________.___ _______________.___
2009 EAST FORK CAMPGROUND (AREA 3) 1 EA __________.___ _______________.___
2010 EAST FORK CAMPGROUND (AREA 4) 1 EA __________.___ _______________.___
2011 EAST FORK CAMPGROUND (AREA 5) 1 EA __________.___ _______________.___
2012 EAST FORK CAMPGROUND (AREA 6) 1 EA __________.___ _______________.___
2013 OVERLOOK AREA 1 EA __________.__ _______________.___
2014 BELOW DAM AREA 1 EA __________.___ _______________.___
2015 LAKESIDE PICNIC AREA 1 EA __________.___ _______________.___
2016 LAKESIDE LAUNCH RAMP AREA 1 EA __________.___ _______________.___
2017 LICK CREEK AREA 1 EA __________.___ _______________.___
2018 EAST FORK AREA 1 EA __________.___ _______________.___
2019 EAST FORK CAMPGROUND (AREA 1) 1 EA __________.___ _______________.___
2020 EAST FORK CAMPGROUND (AREA 2) 1 EA __________.___ _______________.___
2021 EAST FORK CAMPGROUND (AREA 3) 1 EA __________.___ _______________.___
2022 EAST FORK CAMPGROUND (AREA 4) 1 EA __________.___ _______________.___
2023 EAST FORK CAMPGROUND (AREA 5) 1 EA __________.___ _______________.___
2024 EAST FORK CAMPGROUND (AREA 6) 1 EA __________.___ _______________.___
SECTION C-2 - SUBTOTAL.................................................................................................$__________________.___
2025 BELOW DAM AREA 10 EA __________.___ _______________.___
2026 DAMSITE 10 EA __________.___ _______________.___
2027 OFFICE AREA 10 EA __________.___ _______________.___
2028 OVERLOOK AREA 10 EA __________.___ _______________.___
2029 LAKESIDE AREA 10 EA __________.___ _______________.___
2030 LICK CREEK AREA 10 EA __________.___ ______________.___
2031 EAST FORK AREA 10 EA __________.___ _______________.___
2032 EAST FORK CAMPGROUND (AREA 1) 10 EA __________.___ _______________.___
2033 EAST FORK CAMPGROUND (AREA 2) 10 EA __________.___ _______________.___
2034 EAST FORK CAMPGROUND (AREA 3) 10 EA __________.___ ______________.___
2035 EAST FORK CAMPGROUND (AREA 4) 10 EA __________.___ _______________.___
2036 EAST FORK CAMPGROUND (AREA 5) 10 EA __________.___ ______________.___
2037 EAST FORK CAMPGROUND (AREA 6) 10 EA __________.___ ______________.___
2038 SPILLWAY, ACCESS ROADS, FIELDS AND OUTFLOW STRIP 2 EA _________.___ _______________.___
2039 ACCESS ROADS AND FACILITY AREA 2 EA __________.___ ______________.___
2040 RAKING 1 AC __________.__ ______________.___
SECTION C-3 - SUBTOTAL.....................................................................................................$________________.___
2041 LEVEL 1 1 DA __________.___ _______________.___
2042 LEVEL 2 150 DA __________.___ ______________.___
2043 LEVEL 3 1 DA _________.___ _______________.___
2044 LEVEL 3 30 DA __________.___ _______________.___
2045 LEVEL 3 150 DA __________.___ ______________.___
2046 LEVEL 1 1 DA __________.___ ______________.___
2047 LEVEL 2 150 DA __________.___ ______________.___
2048 LEVEL 3 1 DA __________.___ _______________.___
2049 LEVEL 1 1 DA __________.___ _______________.___
2050 LEVEL 2 150 DA __________.___ _______________.___
2051 LEVEL 3 1 DA __________.___ _______________.___
2052 LEVEL 1 1 DA __________.___ _______________.___
2053 LEVEL 2 150 DA __________.___ _______________.___
2054 LEVEL 3 1 DA __________.___ _______________.___
2055 LEVEL 1 1 DA __________.___ _______________.___
2056 LEVEL 2 150 DA __________.___ _______________.___
2057 LEVEL 3 1 DA __________.___ _______________.___
2058 LEVEL 1 4 DA . .____
2059 LEVEL 2 150 DA __________.___ _______________.___
2060 LEVEL 3 10 DA __________.___ _______________.___
2061 LEVEL 1 1 DA __________.___ _______________.___
2062 LEVEL 2 160 DA __________.___ ______________.___
2063 LEVEL 1 1 DA __________.___ _______________.___
2064 LEVEL 2 160 DA __________.___ _______________.___
2065 LEVEL 1 1 DA __________.___ _______________.___
2066 LEVEL 2 160 DA __________.___ _______________.___
2067 LEVEL 1 1 DA __________.___ _______________.___
2068 LEVEL 2 130 DA __________.___ _______________.___
2069 LEVEL 1 1 DA __________.___ _______________.___
2070 LEVEL 2 130 DA __________.___ _______________.___
2071 LEVEL 1 1 DA __________.___ _______________.___
2072 LEVEL 2 130 DA __________.___ _______________.___
2073 TRAILS 5 EA __________.___ _______________.___
2074 EXTRA RESTROOM CLEANING 1 EA __________.___ _______________.___
2075 EXTRA PICNIC SHELTER CLEANING 1 EA __________.___ _______________.___
SECTION C-4 - SUBTOTAL......................................................................................................$________________.___
2076 COMBUSTIBLE DRFIT REMOVAL 100 CY _________.___ ____________________
2077 NON-COMBUSTIBLE DRFIT REMOVAL 50 CY _____________ ____________________
SECTION C-7 - SUBTOTAL......................................................................................................$________________.___
ALL BID ITEMS COVERED IN SECTION C-15 – GENERAL
2078 OFFICE/SHOP COMPLEX 60 DA __________.___ _______________.___
2079 EXTRA OFFICE/SHOP COMPLEX 1 DA __________.___ _______________.___
SECTION C-9 - SUBTOTAL......................................................................................................$________________.___
2080 PICNIC TABLE BOARD REPLACEMENT 100 EA _________.___ _______________.___
SECTION C-10 - SUBTOTAL....................................................................................................$________________.___
2081 INSTALLATION OF BUOY SAFETY LINE 1 EA __________.___ _______________.___
2082 REMOVAL OF BUOY SAFETY LINE 1 EA __________.___ _______________.___
SECTION C-11 - SUBTOTAL................................................................................................$ .
SECTION C-12 - PARK ATTENDANT- Not Used
2083 GENERAL MAINTENANCE WORKER 1000 HR __________.___ _______________.___
2084 GROUNDS MAINTENANCE LABORER 1500 HR __________.___ _______________.___
2085 ELECTRICIAN 100 HR _________.___ _______________.___
2086 PLUMBER 50 HR _________.___ _______________.___
2087 CARPENTER 50 HR __________.___ _______________.___
2088 DOZER OPERATOR (CASE 450 OR EQUIVALENT) 10 HR __________.___ ________________.___
2089 BOAT OPERATOR (16-40 FT. WORKBOAT, 10 TO 100 HP) 100 HR _________.___ ______________.___
2090 20” CHAIN SAW AND OPERATOR 100 HR _________.___ _______________.___
2091 DUMP TRUCK AND OPERATOR (2 Ton minimum) 50 HR _________.___ _______________.___
2092 TRACTOR OPERATOR (FORD 3000 OR EQUIVALENT 50 HR _________.___ _______________.___
WITH ATTACHMENTS)
2093 BACKHOE/ENDLOADER OPERATOR 100 HR __________.___ ____________.___
2094 WELDER OPERATOR (200 AMP OR LARGER) 10 HR __________.___ ______________.___
2095 TRUCK AND OPERATOR (1/2 TON OR LARGER) 200 HR _________.___ _______________.___
2096 NEGOTIATED WORK 1 JB FOR SUM 0. 00
2097 GUARANTEED AMOUNT 1 LS $3,000.00
SECTION C-15 - SUBTOTAL....................................................................................................$________________.___
TOTAL OPTION BASE PERIOD, OPTION PERIOD ONE AND TWO…………………….$________________.___
OPTION YEAR 3 - 1 JANUARY 2016 - 31 DECEMBER 2016
3001 OVERLOOK AREA 1 EA__________.__ _______________.___
3002 BELOW DAM AREA 1 EA __________.___ _______________.___
3003 LAKESIDE PICNIC AREA 1 EA __________.___ _______________.___
3004 LAKESIDE LAUNCH RAMP AREA 1 EA __________.___ _______________.___
3005 LICK CREEK AREA 1 EA __________.__ _______________.___
3006 EAST FORK AREA 1 EA __________.___ _______________.___
3007 EAST FORK CAMPGROUND (AREA 1) 1 EA __________.___ _______________.___
3008 EAST FORK CAMPGROUND (AREA 2) 1 EA __________.___ _______________.___
3009 EAST FORK CAMPGROUND (AREA 3) 1 EA __________.___ _______________.___
3010 EAST FORK CAMPGROUND (AREA 4) 1 EA __________.___ _______________.___
3011 EAST FORK CAMPGROUND (AREA 5) 1 EA __________.___ _______________.___
3012 EAST FORK CAMPGROUND (AREA 6) 1 EA __________.___ _______________.___
3013 OVERLOOK AREA 1 EA __________.__ _______________.___
3014 BELOW DAM AREA 1 EA __________.___ _______________.___
3015 LAKESIDE PICNIC AREA 1 EA __________.___ _______________.___
3016 LAKESIDE LAUNCH RAMP AREA 1 EA __________.___ _______________.___
3017 LICK CREEK AREA 1 EA __________.___ _______________.___
3018 EAST FORK AREA 1 EA __________.___ _______________.___
3019 EAST FORK CAMPGROUND (AREA 1) 1 EA __________.___ _______________.___
3020 EAST FORK CAMPGROUND (AREA 2) 1 EA __________.___ _______________.___
3021 EAST FORK CAMPGROUND (AREA 3) 1 EA __________.___ _______________.___
3022 EAST FORK CAMPGROUND (AREA 4) 1 EA __________.___ _______________.___
3023 EAST FORK CAMPGROUND (AREA 5) 1 EA __________.___ _______________.___
3024 EAST FORK CAMPGROUND (AREA 6) 1 EA __________.___ _______________.___
SECTION C-2 - SUBTOTAL.................................................................................................$__________________.___
3025 BELOW DAM AREA 10 EA __________.___ _______________.___
3026 DAMSITE 10 EA __________.___ _______________.___
3027 OFFICE AREA 10 EA __________.___ _______________.___
3028 OVERLOOK AREA 10 EA __________.___ _______________.___
3029 LAKESIDE AREA 10 EA __________.___ _______________.___
3030 LICK CREEK AREA 10 EA __________.___ ______________.___
3031 EAST FORK AREA 10 EA __________.___ _______________.___
3032 EAST FORK CAMPGROUND (AREA 1) 10 EA __________.___ _______________.___
3033 EAST FORK CAMPGROUND (AREA 2) 10 EA __________.___ _______________.___
3034 EAST FORK CAMPGROUND (AREA 3) 10 EA __________.___ _______________.___
3035 EAST FORK CAMPGROUND (AREA 4) 10 EA __________.__ _______________.___
3036 EAST FORK CAMPGROUND (AREA 5) 10 EA __________.___ ______________.___
3037 EAST FORK CAMPGROUND (AREA 6) 10 EA __________.___ ______________.___
3038 SPILLWAY, ACCESS ROADS, FIELDS AND OUTFLOW STRIP 2 EA _________.___ _______________.___
3039 ACCESS ROADS AND FACILITY AREA 2 EA __________.___ ______________.___
3040 RAKING 1 AC __________.__ _ _____________.___
SECTION C-3 - SUBTOTAL.....................................................................................................$________________.___
3041 LEVEL 1 1 DA __________.___ _______________.___
3042 LEVEL 2 150 DA __________.___ _______________.___
3043 LEVEL 3 1 DA _________.___ _______________.___
3044 LEVEL 3 30 DA __________.___ _______________.___
3045 LEVEL 3 150 DA __________.___ _______________.___
3046 LEVEL 1 1 DA __________.___ _______________.___
3047 LEVEL 2 150 DA __________.___ _______________.___
3048 LEVEL 3 1 DA __________.___ _______________.___
3049 LEVEL 1 1 DA __________.___ _______________.___
3050 LEVEL 2 150 DA __________.___ _______________.___
3051 LEVEL 3 1 DA __________.___ _______________.___
3052 LEVEL 1 1 DA __________.___ _______________.___
3053 LEVEL 2 150 DA __________.___ _______________.___
3054 LEVEL 3 1 DA __________.___ _______________.___
3055 LEVEL 1 1 DA __________.___ _______________.___
3056 LEVEL 2 150 DA __________.___ _______________.___
3057 LEVEL 3 1 DA __________.___ _______________.___
3058 LEVEL 1 1 DA . .__
3059 LEVEL 2 150 DA __________.___ _______________.___
3060 LEVEL 3 1 DA __________.___ _______________.___
3061 LEVEL 1 1 DA __________.___ _______________.___
3062 LEVEL 2 160 DA __________.___ _______________.___
3063 LEVEL 1 1 DA __________.___ _______________.___
3064 LEVEL 2 160 DA __________.___ _______________.___
3065 LEVEL 1 1 DA __________.___ _______________.___
3066 LEVEL 2 160 DA __________.___ _______________.___
3067 LEVEL 1 1 DA __________.___ ______________.___
3068 LEVEL 2 130 DA __________.___ _______________.___
3069 LEVEL 1 1 DA __________.___ _______________.___
3070 LEVEL 2 130 DA __________.___ _______________.___
3071 LEVEL 1 1 DA __________.___ _______________.___
3072 LEVEL 2 130 DA __________.___ _______________.___
3073 TRAILS 5 EA __________.___ _______________.___
3074 EXTRA RESTROOM CLEANING 1 EA __________.___ _______________.___
3075 EXTRA PICNIC SHELTER CLEANING 1 EA __________.___ _______________.___
SECTION C-4 - SUBTOTAL......................................................................................................$________________.___
ALL BID ITEMS COVERED IN SECTION C-15 – GENERAL
3076 COMBUSTIBLE DRFIT REMOVAL 100 CY _________.___ _________________
3077 NON-COMBUSTIBLE DRFIT REMOVAL 50 CY _____________ __________________
SECTION C-7 - SUBTOTAL......................................................................................................$________________.___
3078 OFFICE/SHOP COMPLEX 60 DA __________.___ _______________.___
3079 EXTRA OFFICE/SHOP COMPLEX 1 DA __________.___ _______________.___
SECTION C-9 - SUBTOTAL......................................................................................................$________________.___
3080 PICNIC TABLE BOARD REPLACEMENT 100 EA __________.___ _______________.___
SECTION C-10 - SUBTOTAL....................................................................................................$________________.___
3081 INSTALLATION OF BUOY SAFETY LINE 1 EA __________.___ _______________.___
3082 REMOVAL OF BUOY SAFETY LINE 1 EA __________.___ _______________.___
SECTION C-11 - SUBTOTAL................................................................................................$ .
ALL BID ITEMS COVERED UNDER SECTION C-15 – GENERAL
3083 GENERAL MAINTENANCE WORKER 1000 HR __________.___ _______________.___
3084 GROUNDS MAINTENANCE LABORER 1500 HR __________.___ _______________.___
3085 ELECTRICIAN 100 HR _________.___ _______________.___
3086 PLUMBER 50 HR _________.___ _______________.___
3087 CARPENTER 50 HR _________.___ _______________.___
3088 DOZER OPERATOR (CASE 450 OR EQUIVALENT) 10 HR __________.___ ________________.___
3089 BOAT OPERATOR (16-40 FT. WORKBOAT, 10 TO 100 HP) 100 HR _________.___ _______________.___
3090 20” CHAIN SAW AND OPERATOR 100 HR _________.___ ______________.___
3091 DUMP TRUCK AND OPERATOR (2 TON minimum) 50 HR _________.___ ______________.___
3092 TRACTOR OPERATOR (FORD 3000 OR EQUIVALENT 50 HR _________.___ ______________.___
WITH ATTACHMENTS)
3093 BACKHOE/ENDLOADER OPERATOR 100 HR __________.___ ____________.___
3094 WELDER OPERATOR (200 AMP OR LARGER) 10 HR __________.___ ______________.___
3095 TRUCK AND OPERATOR (1/2 TON OR LARGER) 200 HR _________.___ _______________.___
3096 NEGOTIATED WORK 1 JB FOR SUM 0. 00
3097 GUARANTEED AMOUNT 1 LS $3,000.00
SECTION C-15 - SUBTOTAL....................................................................................................$________________.___
TOTAL BASE PERIOD, OPTION PERIOD ONE, TWO AND THREE………………………………$________________.___
OPTION YEAR 4 - 1 JANUARY 2017- 31 DECEMBER 2017
4001 OVERLOOK AREA 1 EA__________.__ _______________.___
4002 BELOW DAM AREA 1 EA __________.___ _______________.___
4003 LAKESIDE PICNIC AREA 1 EA __________.___ _______________.___
4004 LAKESIDE LAUNCH RAMP AREA 1 EA __________.___ _______________.___
4005 LICK CREEK AREA 1 EA __________.___ _______________.___
4006 EAST FORK AREA 1 EA __________.___ _______________.___
4007 EAST FORK CAMPGROUND (AREA 1) 1 EA __________.___ _______________.___
4008 EAST FORK CAMPGROUND (AREA 2) 1 EA __________.___ _______________.___
4009 EAST FORK CAMPGROUND (AREA 3) 1 EA __________.___ _______________.___
4010 EAST FORK CAMPGROUND (AREA 4) 1 EA __________.___ _______________.___
4011 EAST FORK CAMPGROUND (AREA 5) 1 EA __________.___ _______________.___
4012 EAST FORK CAMPGROUND (AREA 6) 1 EA __________.___ _______________.___
4013 OVERLOOK AREA 1 EA __________.___ _______________.___
4014 BELOW DAM AREA 1 EA __________.___ _______________.___
4015 LAKESIDE PICNIC AREA 1 EA __________.___ _______________.___
4016 LAKESIDE LAUNCH RAMP AREA 1 EA __________.___ _______________.___
4017 LICK CREEK AREA 1 EA __________.___ _______________.___
4018 EAST FORK AREA 1 EA __________.___ _______________.___
4019 EAST FORK CAMPGROUND (AREA 1) 1 EA __________.___ _______________.___
4020 EAST FORK CAMPGROUND (AREA 2) 1 EA __________.___ _______________.___
4021 EAST FORK CAMPGROUND (AREA 3) 1 EA __________.___ _______________.___
4022 EAST FORK CAMPGROUND (AREA 4) 1 EA __________.___ _______________.___
4023 EAST FORK CAMPGROUND (AREA 5) 1 EA __________.___ _______________.___
4024 EAST FORK CAMPGROUND (AREA 6) 1 EA __________.___ _______________.___
SECTION C-2 - SUBTOTAL.................................................................................................$__________________.___
4025 BELOW DAM AREA 10 EA __________.___ ________________.___
4026 DAMSITE 10 EA __________.___ ________________.___
4027 OFFICE AREA 10 EA __________.___ ________________.___
4028 OVERLOOK AREA 10 EA __________.___ _______________.___
4029 LAKESIDE AREA 10 EA __________.___ _______________.___
4030 LICK CREEK AREA 10 EA __________.___ ______________.___
4031 EAST FORK AREA 10 EA __________.___ _______________.___
4032 EAST FORK CAMPGROUND (AREA 1) 10 EA __________.___ _______________.___
4033 EAST FORK CAMPGROUND (AREA 2) 10 EA __________.___ _______________.___
4034 EAST FORK CAMPGROUND (AREA 3) 10 EA __________.___ ______________.___
4035 EAST FORK CAMPGROUND (AREA 4) 10 EA __________.___ _______________.___
4036 EAST FORK CAMPGROUND (AREA 5) 10 EA __________.___ ______________.___
4037 EAST FORK CAMPGROUND (AREA 6) 10 EA __________.___ ______________.___
4038 SPILLWAY, ACCESS ROADS, FIELDS AND OUTFLOW STRIP 2 EA _________.___ _______________.___
4039 ACCESS ROADS AND FACILITY AREA 2 EA __________.___ ______________.___
4040 RAKING 1 AC __________.__ _____________.___
SECTION C-3 - SUBTOTAL.....................................................................................................$________________.___
4041 LEVEL 1 1 DA __________.___ _______________.___
4042 LEVEL 2 150 DA __________.___ _______________.___
4043 LEVEL 3 1 DA _________.___ _______________.___
4044 LEVEL 3 30 DA __________.___ _______________.___
4045 LEVEL 3 150 DA __________.___ _______________.___
4046 LEVEL 1 1 DA __________.___ _______________.___
4047 LEVEL 2 150 DA __________.___ _______________.___
4048 LEVEL 3 1 DA __________.___ _______________.___
4049 LEVEL 1 1 DA __________.___ _______________.___
4050 LEVEL 2 150 DA __________.___ _______________.___
4051 LEVEL 3 1 DA __________.___ _______________.___
4052 LEVEL 1 1 DA __________.___ _______________.___
4053 LEVEL 2 150 DA __________.___ _______________.___
4054 LEVEL 3 1 DA __________.___ _______________.___
4055 LEVEL 1 1 DA __________.___ _______________.___
4056 LEVEL 2 150 DA __________.___ _______________.___
4057 LEVEL 3 1 DA __________.___ _______________.___
4058 LEVEL 1 1 DA . .____
4059 LEVEL 2 150 DA __________.___ _______________.___
4060 LEVEL 3 1 DA __________.___ _______________.___
4061 LEVEL 1 1 DA __________.___ _______________.___
4062 LEVEL 2 150 DA __________.___ _______________.___
4063 LEVEL 1 1 DA __________.___ _______________.___
4064 LEVEL 2 160 DA __________.___ _______________.__
4065 LEVEL 1 1 DA __________.___ _______________.___
4066 LEVEL 2 160 DA __________.___ _______________.___
4067 LEVEL 1 1 DA __________.___ _______________.___
4068 LEVEL 2 130 DA __________.___ _______________.___
4069 LEVEL 1 1 DA __________.___ _______________.___
4070 LEVEL 2 130 DA __________.___ _______________.___
4071 LEVEL 1 1 DA __________.___ _______________.___
4072 LEVEL 2 130 DA __________.___ _______________.___
4073 TRAILS 5 EA __________.___ _______________.___
4074 EXTRA RESTROOM CLEANING 1 EA __________.___ _______________.___
4075 EXTRA PICNIC SHELTER CLEANING 1 EA __________.___ _______________.___
SECTION C-4 - SUBTOTAL......................................................................................................$________________.___
4076 COMBUSTIBLE DRFIT REMOVAL 100 CY _________.___ __________________
4077 NON-COMBUSTIBLE DRFIT REMOVAL 50 CY _____________ __________________
SECTION C-7 - SUBTOTAL......................................................................................................$________________.___
4078 OFFICE/SHOP COMPLEX 60 DA __________.___ _______________.___
4079 EXTRA OFFICE/SHOP COMPLEX 1 DA __________.___ _______________.___
SECTION C-9 - SUBTOTAL......................................................................................................$________________.___
4080 PICNIC TABLE BOARD REPLACEMENT 100 EA __________.___ ________________.___
SECTION C-10 - SUBTOTAL....................................................................................................$________________.___
4081 INSTALLATION OF BUOY SAFETY LINE 1 EA __________.___ ________________.___
4082 REMOVAL OF BUOY SAFETY LINE 1 EA __________.___ ________________.___
SECTION C-11 - SUBTOTAL................................................................................................$ .
ALL BID ITEMS COVERED UNDER SECTION C-15 – GENERAL
4083 GENERAL MAINTENANCE WORKER 1000 HR __________.___ _______________.___
4084 GROUNDS MAINTENANCE LABORER 1500 HR __________.___ _______________.___
4085 ELECTRICIAN 100 HR _________.___ _______________.___
4086 PLUMBER 50 HR _________.___ _______________.___
4087 CARPENTER 50 HR _________.___ _______________.___
4088 DOZER OPERATOR (CASE 450 OR EQUIVALENT) 10 HR __________.___ _______________.___
4089 BOAT OPERATOR (16-40 FT. WORKBOAT, 10 TO 100 HP) 100 HR _________.___ _______________.___
4090 20” CHAIN SAW AND OPERATOR 100 HR _________.___ _______________.___
4091 DUMP TRUCK AND OPERATOR (2 Ton minimum) 50 HR _________.___ _______________.___
4092 TRACTOR OPERATOR (FORD 3000 OR EQUIVALENT 50 HR _________.___ ______________.___
WITH ATTACHMENTS)
4093 BACKHOE/ENDLOADER OPERATOR 100 HR __________.___ ____________.___
4094 WELDER OPERATOR (200 AMP OR LARGER) 10 HR __________.___ ______________.___
4095 TRUCK AND OPERATOR (1/2 TON OR LARGER) 200 HR _________.___ _______________.___
4096 NEGOTIATED WORK 1 JB FOR SUM 0. 00
4097 GUARANTEED AMOUNT 1 LS $3,000.00
SECTION C-15 - SUBTOTAL....................................................................................................$________________.___
TOTAL BASE PERIOD, OPTION PERIOD ONE, TWO, THREE AND FOUR…………….…….$________________.___
NOTES:
The Government reserves the right to place orders for items or compbinations of items not in excess of $1,500,000.00 during the entire contract period. The Government guarantees to order $6,000.00 against the base period of this Contract and $3,000.00 for each option period, if exercised.
Section C - Descriptions and Specifications
SPECIFICATIONS
EAST LYNN LAKE
Maintenance Service Contract
Table of Contents
SECTION C-1
DESCRIPTION/SPECIFICATION
SECTION C-1 General
C-1.1 BACKGROUND
C-1.2 SCOPE OF WORK
C-1.3 TASK ORDERS
C-1.4 NEGOTIATION
C-1.5 WORKING HOURS
C-1.6 PERMITS AND LICENSES
C-1.7 IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES
C-1.8 SAFETY AND SECURITY REQUIREMENTS
C-1.9 ACCIDENT REPORTING
C-1.10 DAMAGE REPORTS
C-1.11 CONTRACT EMPLOYEES' CONDUCT AND COMPETENCY
C-1.12 DAMAGE OR LOSS OF CONTRACTORS SUPPLIES AND PROPERTY
C-1.13 SUPERVISION
C-1.14 ENVIRONMENTAL PROGRAM
C-1.15 CONTRACT DISCREPANCY REPORT (CDR)
C-1.16 MORNING MEETINGS
C-1.17 QUALITY CONTROL
C-1.18 QUALITY ASSURANCE
C-1.19 DEFICIENCIES
C-1.20 CONTRACTOR WORK SCHEDULES
C-1.21 EMERGENCY WORK
C-1.22 INTERRUPTIONS TO SYSTEMS
C-1.23 GOVERNMENT FURNISHED MATERIALS AND EQUIPMENT
C-1.24 CONTRACTOR FURNISHED ITEMS
C-1.25 SAFEGUARDING GOVERNMENT PROPERTY
C-1.26 MINIMUM MANPOWER REQUIREMENTS
C-1.27 MINIMUM PERSONNEL QUALIFICATIONS
C-1.28 OTHER CONTRACTS
C-1.29 INCLEMENT WEATHER AND HOLIDAY WORK
C-1.30 APPLICABLE PUBLICATIONS
C-1.31 PREWORK CONFERENCE
C-1.32 REPORTS
C-1.33 HOURLY BIDS
C-1.34 DEFINITIONS
SECTION C-2
BUILDINGS, FACILITIES, MECHANICAL, ELECTRICAL,
WATER: SEWAGE SYSTEMS
C-2.1 GENERAL
C-2.2 WORK TO BE PERFORMED
C-2.3 PLAN FOR WINTERIZATION OF RECREATION AREAS
C-2.4 PLAN FOR SPRING OPENING OF RECREATION AREAS
C-2.5 TESTING GFCI BREAKERS AND/OR RECEPTACLES
C-2.6 REPLACING GFCI BREAKERS AND/OR RECEPTACLES
C-2.7 EQUIPMENT LIST
SECTION C-3
GRASS MOWING AND MAINTENANCE OF
LANDSCAPED AREAS
C-3.1 SCOPE OF WORK
C-3.2 GENERAL
C-3.3 MOWING OPERATIONS
C-3.4 MOWING CYCLE
C-3.5 PRUNING
C-3.6 PLANTING OR REPLACING PLANTS
C-3.7 TREE AND BRUSH CUTTING
C-3.8 ACCESS ROAD CLEARING
C-3.9 SERVICE EQUIPMENT
C-3.10 SERVICE AREAS
SECTION C-4
CLEANING SERVICES, RECREATION AREAS
C-4.1 SCOPE OF WORK
C-4.2 GENERAL
C-4.3 SERVICE EQUIPMENT
C-4.4 SPECIAL PROVISIONS
C-4.5 SUPPLIES TO BE FURNISHED BY THE CONTRACTOR
C-4.6 SUPPLIES TO BE FURNISHED BY THE GOVERNMENT
C-4.7 SERVICE AREAS
SECTION C-5
GUARDRAILS, SIGNS, BARRICADES, BUMPERS,
CURBS AND POSTS
C-5.1 GENERAL
C-5.2 WORK TO BE PERFORMED
C-5.3 SCHEDULE OF WORK
C-5.4 LOCATION OF THE WORK
C-5.5 EQUIPMENT LIST
SECTION C-6
MAINTENANCE AND REPAIR OF ROADS, PARKING
AREAS, PULL-OFFS AND LAUNCHING RAMPS
C-6.1 GENERAL
C-6.2 WORK TO BE PERFORMED
C-6.3 SCHEDULE OF WORK
C-6.4 LOCATION OF WORK
C-6.5 EQUIPMENT LIST
SECTION C-7
DRIFT DEBRIS AND TRASH REMOVAL
C-7.1 GENERAL
C-7.2 WORK TO BE PERFORMED
C-7.3 SCHEDULE OF WORK
C-7.4 SPECIAL REQUIREMENTS
C-7.5 PREVENTION OF LANDSCAPE DEFACEMENT
C-7.6 RESTORATION OF LANDSCAPE DAMAGE
C-7.7 MEASUREMENT METHOD FOR PAYMENT
C-7.8 EQUIPMENT LIST
SECTION C-8
Reserved
SECTION C-9
JANITORIAL AND POLICING SERVICES
C-9.1 SCOPE OF WORK
C-9.2 SERVICE AREAS
C-9.3 GENERAL
C-9.4 DEFICIENCIES
C-9.5 SUPPLIES TO BE FURNISHED BY THE CONTRACTOR
C-9.6 ITEMS TO BE FURNISHED BY THE GOVERNMENT
C-9.7 SERVICE EQUIPMENT
C-9.8 SPECIAL PROVISIONS
SECTION C-10
NATURAL RESOURCES MANAGEMENT
C-10.1 GENERAL
C-10.2 WORK TO BE PERFORMED
C-10.3 EQUIPMENT LIST
SECTION 11
BEACH AND SWIM BUOY MAINTENANCE
C-11.1 GENERAL.
C-11.2 WORK TO BE PERFORMED
C-11.3 LOCATION OF WORK
C-11.4 SCHEDULE OF WORK
C-11.5 MISC WORK ITEMS
C-11.6 EQUIPMENT LIST
SECTION C-12
PARK ATTENDANT
Reserved
SECTION C-13
WILDFIRE SUPPRESSION AND DISASTERS
Reserved
SECTION C-14
MAINTENANCE OF NAVIGATION AIDS
C-14.1 GENERAL
C-14.2 WORK TO BE PERFORMED
C-14.3 SCHEDULE OF WORK
C-14.4 LOCATION OF WORK
C-14.5 SPECIAL PROVISIONS
C-14.6 DETAILED DESCRIPTION - NAVIGATION AIDS
C-14.7 EQUIPMENT LIST
SECTION C-15
GENERAL BID ITEMS
C-15 GENERAL
DESCRIPTION/SPECIFICATIONS
SECTION C-1
General
C-1.1 BACKGROUND. East Lynn Lake is located on the East Fork of Twelvepole
Creek three miles east of East Lynn, West Virginia on State Route 37 in Wayne
County, West Virginia. The project purposes served are flood damage reduction, recreation, water quality control, and fish and wildlife enhancement.
Approximate annual visitation to Corps operated recreation areas is 450,000.
C-1.2 SCOPE OF WORK. The Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform the operation and maintenance services at the East Lynn Lake project, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical
Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference. Award of a contract does not guarantee that the
Government will order all of the types of services listed under the contract from the Contractor. The Government reserves the right to perform any portion of the services listed.
The quantities listed in the bid schedule are approximate and are provided as information only to assist in preparation of bids. They are not guaranteed and the actual quantities may be more or less than shown. Variation in these estimated quantities shall not be justification for modification of the contract or request for additional payment.
Contractor's work and responsibility shall include, but shall not be limited to, all planning, programming, administration and management necessary to assure that all services provided are conducted in accordance with the contract and all applicable laws, regulations, codes, or directives.
Contractor shall ensure that all work meets or exceeds critical reliability rates or tolerances specified or included in referenced documents. Contractor shall perform all related Contractor administrative services necessary to perform the work such as supply, procurement, quality control, Contractor financial control, and maintenance of accurate and complete records and files.
It is emphasized that the work described in this contract is a critical part of the Corps mission. Much of the work described will be performed in public recreation areas. The Corps is committed to "Customer Care" and providing quality professional service. Failure of a Contractor to perform required work, to perform in a timely manner, or to perform quality work could risk public health and safety and result in the following problems:
a. Falls, snakebites, and reduced use and enjoyment of recreation facilities from lack of mowing.
b. Falls, cuts, infections, and accumulated animal feces from beaches not being cleaned and inspected.
c. Unsafe boating and limiting of lake surface recreation from a lack of drift removal.
d. Closed recreation areas from inoperable water, sewage and electrical systems.
e. Closed parking areas and road closures from lack of maintenance and repair.
f. Destroyed forests and natural areas from lack of emergency response capability.
g. Closed campgrounds, beaches and parks from lack of operators.
h. Significant dollar…