A.01.04 Released Solicitation Amendment 0001_21B5010.pdf

PDF 470 KB Posted

Attached to
USCG Sector Field Office Eastern Shore Maintenance Dredging Project Federal contract opportunity
Solicitation number
W9123621B5010
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This document contains an amendment to a solicitation for maintenance dredging services. The solicitation is for dredging approximately 11,000 cubic yards of material from the boat basin, access channel and mooring area at the U.S. Coast Guard Sector Field Office Eastern Shore to maintain safe navigation and operational depths. The dredged material will be transported via dump truck to a designated upland placement site approximately two miles away. The amendment provides responses to bidder questions, updates the wage determination, and notes that the anticipated award date is the end of July with notice to proceed dependent on bonds.

View the file

Other files for this federal contract opportunity

Other files attached to USCG Sector Field Office Eastern Shore Maintenance Dredging Project, newest first.
File Type Posted
A.01.25 ABSTRACT OF OFFERORS_Page 2.pdf PDF
A.01.25 ABSTRACT OF OFFERORS_Page 3.pdf PDF
B.01.02 ABSTRACT OF OFFERORS Page 1.pdf PDF
A.01.04 Released Solicitation Amendment 0002_21B5010.pdf PDF
A.01.25 USCG SFO Eastern Shore facility layout.pdf PDF
A.01.13 USCG SFO Eastern Shore Plan Drawings Final March 2021.pdf PDF
A.01.13 USCG SFO Eastern Shore Specs. Final March 2021.pdf PDF
D.01.04 Released Solicitation_W9123621B5010.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W9123621B5010 USCG Sector Field Office Maintenance Dredging is hereby amended as follow s:

1. Wage Determination VA20210055 01/01/2021 is hereby deleted and replaced w ith VA20210023 dated 01/01/2021

2. Please see continuation page for full Amendment breakout.

Contracting POC: Jack Bass (757) 201-7385 Jack.B.Bass@usace.army.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123621B5010

X 9B. DATED (SEE ITEM 11)

05-May-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-May-2021

CODE

USACE, NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123621B5010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

W9123621B5010 USCG Eastern Shore Maintenance Dredging is hereby amended as follows:

1. The below bidder Inquiries received via ProjNet and corresponding Government responses are hereby incorporated:

Bidder Inquiry number 9226360 I was wondering if there was going to be a pre-bid meeting or a site showing of the DMP and the USCG station? If no meeting is planned how do we arrange to visit the USCG Station to check out the site access?

Government Response to Bidder Inquiry number 9226360: The Government does not intend to host a pre-bid meeting for the Curtis Merritt Upland Area or the USCG Station. The upland area can be viewed from the Mariner's Memorial along the south end of the harbor complex. USCG Station Chincoteague is a secured base installation.

Please see attached facility layout map.

Bidder Inquiry number 9226367 Is there a preferred laydown area and transfer location at the USCG Station for placing the material into the dump trucks? Nothing was designated on the plans.

Government Response to Bidder Inquiry number 9226367: It's the contractor's responsibility to coordinate a construction laydown area outside of the USCG Station Chincoteague's facility. The recommended construction access point at USCG Station Chincoteague is through the south gate and egress point through the north gate. The dredged material transfer location is situated at the end of the bulkhead adjacent to the finger piers.

Bidder Inquiry number 9226496 Are there any resources for this site which would require any of the three listed T.O.Y. (Time of Year) restrictions to be implemented for this project? Or more simply put what if any T.O.Y restrictions are associated for with this project?

Government Response to Inquiry number 9226496: There are no Time of Year restrictions for this project.

Bidder Inquiry number 9226571 When is the anticipated award date and NTP date?.

Government Response to Inquiry number 9226571: Current anticipated award date is at the end of July. Issuance of NTP is dependent upon when the awarded contractor submits payment and performance bonds. Notice to Proceed will be issued via modification

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGE DETERMINATION

"General Decision Number: VA20210023 01/01/2021 Superseded General Decision Number:

VA20200023

State: Virginia

Construction Types: Heavy (Heavy and Sewer and Water Line)

Counties: Accomack, Essex, King George, Lancaster, Middlesex, Northampton, Northumberland, Richmond and Westmoreland Counties in Virginia.

HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines) Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)- (60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021

SUVA2010-024 09/01/2010

Rates Fringes

CARPENTER........................$ 11.82 0.58

CEMENT MASON/CONCRETE FINISHER...$ 11.00 1.02

ELECTRICIAN $

LABORERS

18.21 3.11

Common or General $ 9.65 1.20 Flagger $ 7.25

Pipelayer $ 13.11 2.50

POWER EQUIPMENT OPERATOR:

Backhoe $

12.85

1.22

Bulldozer $ 18.00

Crane $ 20.63 7.28 Excavator $ 12.28 1.97 Loader $ 12.67 1.13

TRUCK DRIVER

Dump Truck $

10.54

0.53

Off the Road Truck $ 16.50

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking.

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana.

2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data.

EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter?

This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and

Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution

4.) All decisions by the Administrative Review Board are final.

======== END OF GENERAL DECISION