ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
USACE NAO-CT
803 Front Street Norfolk, VA 23510
Craney Island Earthwork IDIQ
Full Mobilization and Demobilization
Partial Demobilizations and Remobilizations
Placement of Fill material on Dikes
Placement of additional fill material
Gradation tasting at the CI Borrow Areas
Surveying at CI Dike Raising Areas
Grubbing and Clearing
Hydroseeding
Refurbishment of Shoreline Protection
Miscellaneous Eartwork Job less than $10K
Misc. Steel work at Existing Spillbox Structur
Misc. Steel work at Existing Spillbox Structur
Replc of Damaged Corrugated Metal Pipe each each cy cy each lf acres acres tons cy lf lf lf
750,000
120,000
133,800
1,800
21,000
117,521.00
91,724.00
15.23
14.70
202.00
2.65
6,901.00
4,872.00
111.00
23.00
114.00
123.00
310.80
352,563.00
550,344.00
11,422,500.00
1,764,000.00
60,600.00
354,570.00
828,120.00
365,400.00
199,800.00
483,000.00
95,760.00
5,535.00
186,480.00
450,000.00
135,000.00
11,250,000.00
1,800,000.00
112,500.00
167,250.00
450,000.00
281,250.00
337,500.00
315,000.00
630,000.00
33,750.00
187,500.00
150,000.00
22,500.00
15.00
15.00
375.00
1.25
3,750.00
3,750.00
187.50
15.00
750.00
750.00
312.50
100,000.00
9,000.00
9.00
9.00
125.00
3.10
7,000.00
3,900.00
250.00
11.00
997.00
1,175.00
1,200.00
300,000.00
54,000.00
6,750,000.00
1,080,000.00
37,500.00
414,780.00
840,000.00
292,500.00
450,000.00
231,000.00
837,480.00
52,875.00
720,000.00
W9123621B5007 1 2
Eartha D. Garrett - Contracting Officer
Anike Group Inc Carolina Marine Structures
20% 20%
Yes (Amendment 0001 & 0002) Yes (Amendment 0001 & 0002)
GARRETT.EARTHA.D.1
045443074
Digitally signed by
GARRETT.EARTHA.D.1045443074
Date: 2021.02.17 14:09:35 -05'00'
02/12/202101/11/2021
02/17/2021
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
USACE NAO-CT
803 Front Street Norfolk, VA 23510
Craney Island Earthwork IDIQ
0014 Replc of Damaged Timber Weir Boards
TOTAL EVALUATED PRICE
each60
29.00
16,670,412.00
1,740.00
16,670,412.00
30,000.00
16,179,750.00
500.00
16,179,750.00
1,000.00
12,120,135.00
60,000.00
12,120,135.00
W9123621B5007 1 2
Anike Group Inc Carolina Marine Structures
20% 20%
Yes (Amendment 0001 & 0002) Yes (Amendment 0001 & 0002)
02/12/202101/11/2021
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use addit ional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
W9123621B5007
Craney Island Earthwork IDIQ
20% 20% 20%
Yes (Amendment 0001 & 0002) Yes (Amendment 0001 & 0002) Yes (Amendment 0001 & 0002) Yes(Amendment 0001 & 0001
83,250.00138.75100,000.00166.00135,000.00225.00180,000.00300.00lf60013
73,437.301,631.946,750.00150.00112,500.002,500.0058,500.001,300.00lf4512
1,473,124.001,753.72126,000.00150.00525,000.00625.001,092,000.001,300.00lf84011
181,650.008.652,835,000.00135.00315,000.0015.00556,500.0026.50cy21,00010
160,308.0089.06207,000.00115.00225,000.00125.00234,000.00130.00tons1,8009
198,624.752,648.33367,500.004,900.00217,500.002,900.00335,100.004,468.00acres758
192,000.001,600.00378,000.003,150.00288,000.002,400.00440,520.003,671.00acres1207
81,618.000.6160,210.000.45133,800.001.00479,004.003.58lf6
137,439.00458.1330,000.00100.0097,500.00325.0055,500.00185.00each3005
918,000.007.65660,000.005.50990,000.008.251,600,800.0013.34cy4
5,737,500.007.654,125,000.005.506,187,500.008.258,775,000.0011.70cy3
533,400.0088,900.0043,800.007,300.0030,000.005,000.0092,448.0015,408.00each62
3 each 444,478.00 1,333,434.00 335,000.00 1,005,000.00 35,000.00 105,000.00 590,733.33 1,772,199.99
3 4
Coastal Design and Construction
Dredgit Corporation Keraman Construction Company Oak Hill Contractors
750,000
120,000
133,800
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use addit ional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
20% 20% 20% 20%
Yes (Amendment 0001 & 0002) Yes (Amendment 0001 & 0002)
C. AMENDMENTS ACKNOWLEDGED
Yes(Amendment 0001 & 0002
11,667,051.849,542,760.0010,282,80015,250,806TEP
60 each 300.00 18,000.00 350.00 21,000.00 230.00 13,600.00 2,075.00 124,500.00
Coastal Design and Construction
Dredgit Corporation Keraman Construction Company Oak Hill Contractors
Yes (Amendment 0001 & 0002)