This document provides details on an amendment to a solicitation for maintenance dredging services at the Craney Island Rehandling Basin. The key project details include:

  • The solicitation is being amended to update the contract requirements section to incorporate a revised wage determination and add FAR Clause 52.244-2 regarding subcontracts. Bidders must acknowledge any amendments prior to the response deadline.

  • The scope of work involves maintenance dredging and dredge-related marine work to comply with EM 385-1-1 safety standards. Bidders participating in the Dredging Contractors of America safety program can submit alternative documentation in lieu of a full accident prevention plan.

  • The prevailing federal wage determination is VA20210001 dated January 1, 2021.

  • Insurance requirements include workers compensation, employer's liability, general liability, motor vehicle liability, vessel collision liability, and proof of all required policies must be provided prior to commencement of work.

  • Performance evaluations will be conducted using DD Form 2626 and contractors will be advised of any unsatisfactory ratings.

  • The solicitation number is W9123621B5004 and is being conducted by the Department of the Army Corps of Engineers Norfolk District for maintenance dredging at the Craney Island Rehandling Basin. The amended solicitation and all related documents are attached for bidder reference.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This solicitation is amended in order to update the 'Contract Requriements' found in section 00 72 00, to incorporate the updated Wage Determination, and to add FAR Clause 52.244-2 - Subcontracts to the solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jan-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123621B5004

X 9B. DATED (SEE ITEM 11)

31-Dec-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jan-2021

CODE

USACE, NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123621B5004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been added by reference:

52.244-2 Subcontracts JUN 2020

The following have been modified:

CONTRACT REQUIREMENTS

1. QUANTITY OF MATERIAL

Should the total quantity of material to be paid for and actually placed under this contract exceed the quantity from the Bidding Schedule, additional time will be allowed at the rate of one day for each 9,500 cubic yards in excess of the estimated quantity.

2. DREDGING AND DREDGE RELATED MARINE WORK

The Contractor shall comply with the provisions of EM 385-1-1. If the Contractor is a currently accepted participant in the Dredging Contractors of America (DCA)/United States Army Corps of Engineers (USACE) Dredging Safety Management Program (DSMP), as determined by the DCA/USACE Joint Committee, and holds a current valid Certificate of Compliance for both the Contractor Program and the Dredge(s) to be used to perform the work under this contract, the Contractor may, in lieu of the submission of an Accident Prevention Plan (APP)

a. Make available for review, upon request, the Contractor’s current Safety Management System (SMS) documentation,

b. Submit to the Contracting Officer the current valid Company Certificate of Compliance for its SMS,

c. Submit the current dredge(s) Certificate of Compliance based on third party audit, and submit for review and acceptance, site-specific addenda to the SMS as specified in the solicitation.

3. DEPARTMENT OF LABOR WAGE DECISION (CONSTRUCTION)

Any contract awarded as a result of this solicitation will be subject to the U.S. Department of Labor Wage Decision(s) Number VA20210001, dated 01/01/2021.

4. REQUIRED INSURANCE:

The contractor shall procure and maintain during the entire period of performance under this contract, the following minimum insurance:

TYPE AMOUNT

Workers Compensation As required by State law Employer's Liability $100,000 per person

General Liability $500,000 per occurrence Motor Vehicle Liability (For each motor vehicle):

Bodily injury or death $200,000 per person

$500,000 per occurrence Property damage $20,000 per occurrence Vessel collision liability and $500,000 per occurrence Protection and Indemnity $200,000 per person

$200,000 property damage per occurrence

Prior to commencement of work hereunder, the contractor shall furnish to the Contracting Officer a certificate or written statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed and in no event less than 30 days after written notice thereof to the Contracting Officer.

5. PERFORMANCE OF WORK BY CONTRACTOR:

Bidder’s attention is directed to FAR 52.236-1, "Performance of Work by Contractor." Contractor is required to furnish a description of the work which will be performed by his own organization, (e.g., earthwork, paving, etc.), the percentage of the total work this represents, and the estimated cost thereof. Such description of work to be performed by the contractor's own organization shall be provided to the Contracting Officer within 10 days of contract award.

6. PERFORMANCE EVALUATION OF CONTRACTOR:

As a minimum, the Contractor's performance will be evaluated upon final acceptance of the work. However, interim evaluations may be prepared at any time during contract performance when determined to be in the best interest of the Government. The format for the evaluation will be DD Form 2626, and the Contractor will be rated either "Outstanding," "Satisfactory," or "Unsatisfactory" in the areas of Contractor Quality Control, Timely Performance, Effectiveness of Management, Compliance with Labor Standards, and Compliance with Safety Standards. The Contractor will be advised on any unsatisfactory rating, either in an individual element or in the overall rating, prior to completing the evaluation; all contractor comments will be made a part of the official record. In compliance with DOD FAR Supplement 236.201, Performance Evaluation Reports will be available to all DOD Contracting Offices for their future use in determining contractor responsibility.

CONTRACTORS CPARS POC:

Name Phone Email

7. ACCIDENT PREVENTION PLAN:

In accordance with the clause entitled "Accident Prevention," the contractor will not be allowed to commence work on the job site until an acceptable accident prevention plan has been submitted. The contractor will receive official notification of the acceptance of his accident prevention plan.

8. IDENTIFICATION OF CORRESPONDENCE:

All correspondence and data submitted by the contractor under this contract shall reference the contract number.

9. INVOICING

INVOICES SHALL BE SENT TO THE FOLLOWING:

U.S. Army Engineer District, Norfolk

Invoices shall be submitted by ENG93, as required by Contract requirements, and cc’d to the COR, Jason Flowers at Jason.R.Flowers@usace.army.mil.

Contracting POC: Raven Sasser, 757-201-7136, Raven.D.Sasser@usace.army.mil.

WAGE DETERMINATION

"General Decision Number: VA20210001 01/01/2021

Superseded General Decision Number: VA20200001

State: Virginia

Construction Type: Heavy Dredging

Counties: Virginia Statewide.

DREDGING CONSTRUCTION PROJECTS (Excluding HOPPER DREDGING)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021

* ENGI0025-004 10/01/2020

STATEWIDE

Rates Fringes

Dredging: (Includes Clamshell Dredges, Hyrdraulic Dredges 20"" and over: Tug Boats) CLASS A1.................... $ 41.42 18.31+a+b CLASS A2.................... $ 36.91 18.31+a+b CLASS B1.................... $ 35.82 18.31+a+b CLASS B2.................... $ 33.72 18.31+a+b CLASS C1.................... $ 32.80 18.21+a+b CLASS C2.................... $ 31.74 18.21+a+b CLASS D..................... $ 26.37 18.11+a+b

CLASSIFICATIONS:

CLASS A1: Deck Captain; Mechanical Dredge Operator, Leverman, Licensed Tug Operator over 1000 HP.

CLASS A2: Crane Operator (360 swing).

CLASS B1: Derrick Operator (180 swing), Spider/Spill Barge Operator, Engineer, Electrician, Chief Welder, Chief Mate, Fill Placer, Operator II, Maintenance Engineer, Licensed Boat Operator, Licensed Crew Boat Operator.

CLASS B2: Certified Welder.

CLASS C1: Mate, Drag Barge Operator, Assistant Fill Placer, Welder, Steward. CLASS C2: Boat Operator.

CLASS D: Oiler, Deckhand, Shoreman, Rodman, Scowman, Cook, Messman, Porter/Janitor.

INCENTIVE PAY: (Add to Hourly Rate) Operator (NCCCO License/Certification) $1.80 Licensed Tug Operator over 1000 HP (Assigned as Master) (USCG licensed Master of Towing Vessels (MOTV) $1.80; Licensed Boat Operator (Assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80 Oiler (QMED and Tankerman endorsement (USCG) $1.80; All classifications (Tankerman endorsement only) USCG $1.55; Deckhand or Mate (AB with Lifeboatman endorsement (USCG) $1.80; All classifications (lifeboatman endorsement only (USCG) $1.55; Welder (ABS certification) $1.55

FOOTNOTES APPLICABLE TO ABOVE CRAFTS:

a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s Birthday, Memorial Day, Good Friday, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day

b. VACATION: Eight percent (8%) of the straight time rate, multiplied by the total hours worked.

SUVA1994-008 11/01/1994

Rates Fringes

Dipper Dredges Deckhand.................... $ 9.50 2.96+a Engineer.................... $ 14.04 2.96+a Handyman.................... $ 9.50 2.96+a Launchman................... $ 10.12 2.96+a Mate........................ $ 12.39 2.96+a Oiler....................... $ 10.12 2.96+a Operator.................... $ 14.59 2.96+a Rodman...................... $ 9.50 2.96+a Scowman..................... $ 9.63 2.96+a Welder...................... $ 12.78 2.96+a

Drill Boats Blaster..................... $ 13.69 2.96+a Driller..................... $ 13.69 2.96+a Engineer.................... $ 14.18 2.96+a

Hydraulic Dredges Under 20"" Carpenter................... $ 13.14 2.96+a Deckhand.................... $ 9.50 2.96+a Derrick Operator............ $ 13.20 2.96+a Electrician................. $ 13.45 2.96+a Engineer.................... $ 14.18 2.96+a Handyman.................... $ 9.50 2.96+a Janitor/Porter.............. $ 9.50 2.96+a Leverman.................... $ 14.53 2.96+a Mate........................ $ 12.39 2.96+a

Messman..................... $ 9.32 2.96+a Night Cook.................. $ 9.50 2.96+a Oiler....................... $ 10.12 2.96+a Rodman...................... $ 9.50 2.96+a Second Cook................. $ 9.50 2.96+a Shoreman.................... $ 9.32 2.96+a Spider Barge Operator....... $ 12.97 2.96+a Spill Barge Operator........ $ 12.97 2.96+a Steward..................... $ 10.42 2.96+a Tug Deckhand................ $ 9.50 2.96+a Tug Master.................. $ 12.29 2.96+a Tug Mate.................... $ 11.76 2.96+a Welder...................... $ 12.78 2.96+a

Steward Department (On Dipper Dredges) Cook........................ $ 9.27 2.96+a Mess Cook................... $ 8.74 2.96+a Messman and Janitor......... $ 8.61 2.96+a

Tug Boats (Tending Dipper Dredges) Assistant Engineer.......... $ 11.75 2.96+a Cook........................ $ 9.63 2.96+a Deckhand.................... $ 9.37 2.96+a Engineer.................... $ 12.96 2.96+a Tug Master.................. $ 13.16 2.96+a Tug Mate.................... $ 11.87 2.96+a

FOOTNOTES APPLICABLE TO ALL ABOVE CRAFTS:

a. PAID HOLIDAYS AND VACATION: New Year's Day, Memorial Day, Independence Day, Good Friday, Labor Day, Thanksgiving Day, and Christmas Day; plus vacation contribution of 7% of straight time pay for all hours worked.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH- 0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

(End of Summary of Changes)

File details come from the government source that posted it. Updated .