Section_J_Location_Specifications.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
DoDEA Preventative Maintenance & Repair (Stewart/Jackson/Laurel Bay)
Solicitation number
W9123619R0021
Issued by

About this file

Section J Location Specs

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Laural Bay

DoDEA Americas SC - LAURAL BAY FACILITIES1234
FACILITY NAME:

Author: Author:

Insert School or Facility Name (e.g. schools, maint BLD, DSO, etc)Elliott ESBolden ES/MSMaintenance - WarehouseCSO
INSTALLATION:

Author: Author:

Installation NameLaurel Bay Housing AreaLaurel Bay Housing AreaLaurel Bay Housing AreaLaurel Bay Housing Area
ADDRESS:

Author: Author:

Facility Address and/or building #Bldg 1635, Laurel Bay Housing Area, SCBld 1523, Laurel Bay Housing Area, SCBldg 1544, Luarel Bay Housing Area, SCBldg 1620, Laurel Bay Housing Area, SC
FACILITY USE:

Author: Author:

Indicated grades of students at school and/or any other major facility uses (e.g. VocEd, IT Hub, etc)Grades 1-2Grades 3-8NANA
PERMANENT GROSS SQUARE FOOTAGE:

Author: Author:

GSF of permanent structure67,85654,3121,00016,962140,130
STUDENT POPULATION:

Author: Author:

Student population for FY15475390NANA
KITCHEN?

Author: Author:

Indicate whether the facility has a kitchenYesYesNoNo
CAFETERIA?

Author: Author:

Indicate whether the facility has a cafeteriaYesYesNoNo
MULTIPURPOSE ROOM/AUDITORIUM?

Author: Author:

Indicate whether the facility has a multipurpose roomYesYesNoNo
GYMNASIUM?

Author: Author:

Indicate whether the facility has a gymYesYesNoNo
MAJOR MECHANICL SYSTEMS:

Author: Author:

Indicate the major HVAC system type (e.g. rooftop units with gas-fired heating, constant vs variable volume, split system Acs, air handlers with hydronic heating and cooling, chiller plants, boilers, etc)Split system heat pumpsWall hung & split system heat pumpsWall hung heat pumpChiller & wall hung heat pumps
PRIMARY TYPE OF CONSTRUCTION:

Author: Author:

Indicate the primary type of construction of the building (CMU exterior, wood structure, metal roof, EPDM, modified bitumen roof, sloped, flat,CMU building with metal roofCMU building with flexible membrane roofMetal building with metal roofCMU building with modified bitumen roof
YEAR OF CONSTRUCTION:

Author: Author:

Indicate the year of constuction of the building, plus any additions, or renovations.20041962/200219851985/1987
PREVENTATIVE MAINTENANCE SECTIONS
Section C-3 (Mech)YesYesYesYes
Section C-4 (DDC)YesYesYesYes
Section C-5 (Plumbing)NoNoNoNo
Section C-6 (Electrical)NoNoNoNo
Section C-7 (Kitchen Equipment)YesYesYesYes
Section C-8 (Roof Systems & Site)NoNoNoNo
Section C-9 (Building Systems)NoNoNoNo
Section C-10 (Fire Alarm & Suppression)NoNoNoNo
Section C-11 (Playgrounds)YesYesYesYes

Ft Jackson

DoDEA Americas SC-FT JACKSON FACILITIES56
FACILITY NAME:

Author: Author:

Insert School or Facility Name (e.g. schools, maint BLD, DSO, etc)Pierce Terrace ES (NEW)Pinckney ES
INSTALLATION:

Author: Author:

Installation NameFort JacksonFort Jackson
ADDRESS:

Author: Author:

Facility Address and/or building #Bldg 5715, Fort Jackson, SCBldg 5900, Fort Jackson, SC
FACILITY USE:

Author: Author:

Indicated grades of students at school and/or any other major facility uses (e.g. VocEd, IT Hub, etc)Grades PK-2Grades 2-6
PERMANENT GROSS SQUARE FOOTAGE:

Author: Author:

GSF of permanent structure76,74481,422158,166
STUDENT POPULATION:

Author: Author:

Student population for FY15325475
KITCHEN?

Author: Author:

Indicate whether the facility has a kitchenYesYes
CAFETERIA?

Author: Author:

Indicate whether the facility has a cafeteriaYesYes
MULTIPURPOSE ROOM/AUDITORIUM?

Author: Author:

Indicate whether the facility has a multipurpose roomYesYes
GYMNASIUM?

Author: Author:

Indicate whether the facility has a gymNoYes
MAJOR MECHANICL SYSTEMS:

Author: Author:

Indicate the major HVAC system type (e.g. rooftop units with gas-fired heating, constant vs variable volume, split system Acs, air handlers with hydronic heating and cooling, chiller plants, boilers, etc)Roof mounted gas packs and split system heat pumpsChiller
PRIMARY TYPE OF CONSTRUCTION:

Author: Author:

Indicate the primary type of construction of the building (CMU exterior, wood structure, metal roof, EPDM, modified bitumen roof, sloped, flat,CMU building with standing seam metal roof w/ areas of low slope membraneCMU building with metal roof
YEAR OF CONSTRUCTION:

Author: Author:

Indicate the year of constuction of the building, plus any additions, or renovations.2019-201986
PREVENTATIVE MAINTENANCE SECTIONS
Section C-3 (Mech)YesYes
Section C-4 (DDC)YesYes
Section C-5 (Plumbing)NoNo
Section C-6 (Electrical)NoNo
Section C-7 (Kitchen Equipment)YesYes
Section C-8 (Roof Systems & Site)NoNo
Section C-9 (Building Systems)NoNo
Section C-10 (Fire Alarm & Suppression)NoNo
Section C-11 (Playgrounds)YesYes

SC-Stewart

DoDEA Americas SC-STEWART FACILITIES789DoDEA Americas SC-STEWART FACILITIES101112DoDEA Americas SC-STEWART FACILITIES1314
FACILITY NAME:

Author: Author:

Insert School or Facility Name (e.g. schools, maint BLD, DSO, etc) Diamond ES (new) Kessler ES Murray ES FACILITY NAME:

Author: Author:

Insert School or Facility Name (e.g. schools, maint BLD, DSO, etc) Maintenance CSO ISS training Bldg. FACILITY NAME:

Author: Author:

Insert School or Facility Name (e.g. schools, maint BLD, DSO, etc)DRMO WarehouseIT (telecom data)
INSTALLATION:

Author: Author:

Installation Name Fort Stewart Fort Stewart Fort Stewart INSTALLATION:

Author: Author:

Installation Name Fort Stewart Fort Stewart Fort Stewart INSTALLATION:

Author: Author:

Installation NameFort StewartFort Stewart
ADDRESS:

Author: Author:

Facility Address and/or building # 2493 Hero Road, Fort Stewart, GA Bldg 7560, Fort Stewart, GA Bldg 7155, Fort Stewart, GA ADDRESS:

Author: Author:

Facility Address and/or building # Brittin Campus Bldg 7395, Fort Stewart, GA Bldg 5605, Fort Stewart, GA Bldg 5601, Fort Stewart, GA ADDRESS:

Author: Author:

Facility Address and/or building #Bldg 5604, Fort Stewart, GABldg 7393, Fort Stewart, GA
FACILITY USE:

Author: Author:

Indicated grades of students at school and/or any other major facility uses (e.g. VocEd, IT Hub, etc) Author: Author:

Insert School or Facility Name (e.g. schools, maint BLD, DSO, etc) Grades PK-5 Grades PK-6 Grades PK-5 FACILITY USE:

Author: Author:

Indicated grades of students at school and/or any other major facility uses (e.g. VocEd, IT Hub, etc) NA NA NA FACILITY USE:

Author: Author:

Indicated grades of students at school and/or any other major facility uses (e.g. VocEd, IT Hub, etc)NANA
PERMANENT GROSS SQUARE FOOTAGE:

Author: Author:

GSF of permanent structure Author: Author:

Installation Name 122,077 75,612 80,000 PERMANENT GROSS SQUARE FOOTAGE:

Author: Author:

GSF of permanent structure 2,709 5,451 2,662 PERMANENT GROSS SQUARE FOOTAGE:

Author: Author:

GSF of permanent structure4,0814,530285,849
STUDENT POPULATION:

Author: Author:

Student population for FY15 Author: Author:

Facility Address and/or building # 700 494 450 STUDENT POPULATION:

Author: Author:

Student population for FY15 STUDENT POPULATION:

Author: Author:

Student population for FY15

KITCHEN?

Author: Author:

Indicate whether the facility has a kitchen Author: Author:

Indicated grades of students at school and/or any other major facility uses (e.g. VocEd, IT Hub, etc) Yes Yes Yes KITCHEN?

Author: Author:

Indicate whether the facility has a kitchen Kitchenette Kitchenette KITCHEN?

Author: Author:

Indicate whether the facility has a kitchenKitchenetteKitchenette
CAFETERIA?

Author: Author:

Indicate whether the facility has a cafeteria Author: Author:

Insert School or Facility Name (e.g. schools, maint BLD, DSO, etc) Author: Author:

GSF of permanent structure Yes Yes Yes CAFETERIA?

Author: Author:

Indicate whether the facility has a cafeteria CAFETERIA?

Author: Author:

Indicate whether the facility has a cafeteria

MULTIPURPOSE ROOM/AUDITORIUM?

Author: Author:

Indicate whether the facility has a multipurpose room Author: Author:

Installation Name Author: Author:

Student population for FY15 Yes Yes Yes MULTIPURPOSE ROOM/AUDITORIUM?

Author: Author:

Indicate whether the facility has a multipurpose room MULTIPURPOSE ROOM/AUDITORIUM?

Author: Author:

Indicate whether the facility has a multipurpose room

GYMNASIUM?

Author: Author:

Indicate whether the facility has a gym Author: Author:

Facility Address and/or building # Author: Author:

Indicate whether the facility has a kitchen No Yes Yes GYMNASIUM?

Author: Author:

Indicate whether the facility has a gym GYMNASIUM?

Author: Author:

Indicate whether the facility has a gym

MAJOR MECHANICL SYSTEMS:

Author: Author:

Indicate the major HVAC system type (e.g. rooftop units with gas-fired heating, constant vs variable volume, split system Acs, air handlers with hydronic heating and cooling, chiller plants, boilers, etc) Author: Author:

Indicated grades of students at school and/or any other major facility uses (e.g. VocEd, IT Hub, etc) Author: Author:

Indicate whether the facility has a cafeteria Chiller/PTAC and split system heat pumps Chiller Chiller MAJOR MECHANICL SYSTEMS:

Author: Author:

Indicate the major HVAC system type (e.g. rooftop units with gas-fired heating, constant vs variable volume, split system Acs, air handlers with hydronic heating and cooling, chiller plants, boilers, etc) Wall hung heat pump Split system & wall hung heat pumps Split system & wall hung heat pumps MAJOR MECHANICL SYSTEMS:

Author: Author:

Indicate the major HVAC system type (e.g. rooftop units with gas-fired heating, constant vs variable volume, split system Acs, air handlers with hydronic heating and cooling, chiller plants, boilers, etc)Split system & wall hung heat pumpsSplit system & wall hung heat pumps
PRIMARY TYPE OF CONSTRUCTION:

Author: Author:

Indicate the primary type of construction of the building (CMU exterior, wood structure, metal roof, EPDM, modified bitumen roof, sloped, flat, Author: Author:

GSF of permanent structure Author: Author:

Indicate whether the facility has a multipurpose room CMU building with metal roof CMU building with metal roof CMU building with metal roof PRIMARY TYPE OF CONSTRUCTION:

Author: Author:

Indicate the primary type of construction of the building (CMU exterior, wood structure, metal roof, EPDM, modified bitumen roof, sloped, flat, Metal building with metal roof Metal building with metal roof Metal building with metal roof PRIMARY TYPE OF CONSTRUCTION:

Author: Author:

Indicate the primary type of construction of the building (CMU exterior, wood structure, metal roof, EPDM, modified bitumen roof, sloped, flat,Metal building with metal roofMetal building with metal roof
YEAR OF CONSTRUCTION:

Author: Author:

Indicate the year of constuction of the building, plus any additions, or renovations.

Author: Author:

Student population for FY15 Author: Author:

Indicate whether the facility has a gym Author: Author:

Indicate whether the facility has a kitchen Author: Author:

Indicate the major HVAC system type (e.g. rooftop units with gas-fired heating, constant vs variable volume, split system Acs, air handlers with hydronic heating and cooling, chiller plants, boilers, etc) Author: Author:

Indicate whether the facility has a cafeteria Author: Author:

Indicate the primary type of construction of the building (CMU exterior, wood structure, metal roof, EPDM, modified bitumen roof, sloped, flat, Author: Author:

Indicate whether the facility has a multipurpose room 2017 2009 2014 YEAR OF CONSTRUCTION:

Author: Author:

Indicate the year of constuction of the building, plus any additions, or renovations.

Author: Author:

Indicate whether the facility has a gym Author: Author:

Indicate the major HVAC system type (e.g. rooftop units with gas-fired heating, constant vs variable volume, split system Acs, air handlers with hydronic heating and cooling, chiller plants, boilers, etc) Author: Author:

Indicate the primary type of construction of the building (CMU exterior, wood structure, metal roof, EPDM, modified bitumen roof, sloped, flat, 1989 1984/1987 1984/1987 YEAR OF CONSTRUCTION:

Author: Author:

Indicate the year of constuction of the building, plus any additions, or renovations.1984/19871989
PREVENTATIVE MAINTENANCE SECTIONSPREVENTATIVE MAINTENANCE SECTIONSPREVENTATIVE MAINTENANCE SECTIONS
Section C-3 (Mech)YesYesYesSection C-3 (Mech)YesYesYesSection C-3 (Mech)YesYes
Section C-4 (DDC)YesYesYesSection C-4 (DDC)YesYesYesSection C-4 (DDC)YesYes
Section C-5 (Plumbing)NoNoNoSection C-5 (Plumbing)NoNoNoSection C-5 (Plumbing)NoNo
Section C-6 (Electrical)NoNoNoSection C-6 (Electrical)NoNoNoSection C-6 (Electrical)NoNo
Section C-7 (Kitchen Equipment)YesYesYesSection C-7 (Kitchen Equipment)YesYesYesSection C-7 (Kitchen Equipment)YesYes
Section C-8 (Roof Systems & Site)NoNoNoSection C-8 (Roof Systems & Site)NoNoNoSection C-8 (Roof Systems & Site)NoNo
Section C-9 (Building Systems)NoNoNoSection C-9 (Building Systems)NoNoNoSection C-9 (Building Systems)NoNo
Section C-10 (Fire Alarm & Suppression)NoNoNoSection C-10 (Fire Alarm & Suppression)NoNoNoSection C-10 (Fire Alarm & Suppression)NoNo
Section C-11 (Playgrounds)YesYesYesSection C-11 (Playgrounds)YesYesYesSection C-11 (Playgrounds)YesYes

File details come from the government source that posted it.