19-B-0029_Amendment__0004.pdf

PDF 178 KB Posted

Attached to
DLA Truck Canopy Construction Federal contract opportunity
Solicitation number
W9123619B0029
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to DLA Truck Canopy Construction, newest first.
File Type Posted
IFB_Abstract_of_Offerors_Truck_Canopyfinal.pdf PDF
Viking_attachment.pdf PDF
19-B-0029__Amendment_0003.pdf PDF
19-B-0029_Amendment_0002.pdf PDF
19-B-0029_Amendment_1.pdf PDF
19-B-0029_Truck_Canopy.pdf PDF
TRUCK_CANOPY_AT_BUILDING_98_DSCR_BCOES_Specifications_20190328.pdf PDF
BCOES_Truck_Canopy_98_Drawings_20190328.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

DLA Truck Canopy Solicitation Richmond, VA

The purpose of this Amendment is to:

1. Provide f inal ProjNet responses.

2. Provide attachment titled "Viking attachment", in response to Inquiry 8226340.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123619B0029

X 9B. DATED (SEE ITEM 11)

14-Sep-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Oct-2019

CODE

USA ENGINEER DISTRICT, NORFOLK

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123619B0029

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

FINAL PROJNET RESPONSES

Amendment 0004 is issued to provide the following:

1. To provide final ProjNet responses.

2. The following provide responses to all ProjNet inquiries:

8191859 Inquiry: On the drawings an specifications it has FOUO documents are usually on secured website, password protected and have an NDA to sign. Does the general contractor need to submit an NDA before sharing documentation with the subcontracting community. The RFP documentation does not say this is a FOUO project.

Please provide the NDA documentation if this is definitely a FOUO project and who should it be emailed to.

Response: General Contractors may share the drawings and specs relative to this project with the subcontracting community only if for the intention of receiving a proposal.

8212315 Inquiry: Is it acceptable to use fire retardant poly sheeting for the dust partition between phases I & II or must a gwb partition be constructed?

Response: See note 3 Sheet SA101 Contractor shall install a dust control partition, meeting EM 385-1-1 and NFPA 241, from floor to ceiling, in the location shown or at the direction of the contracting officer’s representative for work in the immediate area.

8212318 Inquiry: Is there an ACM report available for the building? In particular, have the steel beams that we are tying into been tested for lead based paint?

Response: Bid as show (we did not complete any testing and there is not a report of which I am aware)

8212324 Inquiry: Is there a specification or Basis-of-Design available for the type of bird netting desired on the project? If so, can you please provide?

Response: Bid as show in detail 4 on SA103

8212570 Inquiry: Is there an ACM report available for the building? In particular, have the steel beams that we are tying into been tested for lead based paint?

Response: Bid as show

8212571 Inquiry: Is there a specification or Basis-of-Design available for the type of bird netting desired on the project? If so, can you please provide?

Response: Bid as show in detail 4 on SA103.

8226340 Inquiry: Per drawing F-001 General notes 5 said to “Modify the existing wet-pipe sprinkler system to protect the area under the canopy. Provide dry barrel extended coverage sidewall heads suitable for angled mounting. Basis of design: Viking VK25X3 or VK-27X3.The Viking dry extended coverage sidewall that were use for the basis of design can only be installed under a ceiling that is smooth or flat.

2. Steel supplier will NOT quote a price that is good for 90 days because of steel prices float on the market conditions more than any other commodity. I can only get 30 day price from suppliers. Can we quote a price based on an approved index and adjust at award based on the index?

Response: Please see attached VK25X3 and VK27X3 that both show installation at an angle.

Response: This is a firm fixed price contract, no adjustments can be made.

8227885 Inquiry: Did not see sprinkler attached referenced by ACOE for response by Kevin C.

Response: I will send attachment as email.

W9123619B0029

(End of Summary of Changes)

File details come from the government source that posted it.