FBO_Craney_Island_Aerial_Herbicide_Bid_Schedule_with_PWS.PDF
PDF 73 KB Posted
- Attached to
- Aerial Herbicide Treatment Craney Island VA
- Solicitation number
- W9123618Q0020
About this file
Bid Schedule Craney Island VA
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
Aerial application of herbicide is necessary for the upkeep of the Craney Island Dredged Material Management Area in
Portsmouth, Virginia. Habitat (or equivalent) herbicide treatment is requested at the rate of 6 pints per acre as directed by the Contracting Officer (this will be a single treatment up to 500 acres with a minimum of 250 acres).
Further details and requirements can be found in the attached performance work statement (PWS).
Item No. Supplies/Services Quantity Unit Unit Price Amount
Total Price
Company Name:
Address: DUNS:
City: CAGE:
State: TIN:
Phone: POC Name:
Email: Website:
0001 Apply Habitat or equivalent herbicide at the rate of 6 pints per acre as directed by the Contracting Officer. (250 acre minimum for any one application)
Acres
PWS
Aerial Herbicide Treatment at Craney Island
Aerial application of herbicide is necessary for the upkeep of the Craney Island Dredged Material Management Area in Portsmouth Virginia.
a. Apply Habitat (or equivalent) herbicide at the rate of 6 pints per acre as directed by the Contracting Officer. (this will be a single treatment up to 500 acres with a minimum of 250 acres)
The performance period will be a single treatment conducted between the dates of Sept 1 and Nov 30 2018.
The intent of this contract is turn-key ordering of herbicide treatment. As such, the contractor will be expected to obtain all legally required permits licenses etc, obtain and maintain all chemicals and equipment, and provide their own airport or landing area to conduct operations.
Note:
Under no circumstance will the contractor be permitted to operate on Federal property for loading or unloading.
Award of this contract is in no way a guarantee of work as the work is ordered off the contract as necessary. It is the responsibility of the contractor to determine if they wish to purchase products ahead of time however the government shall not be held financially liable for any unused chemicals purchased by the contractor.
| Herbicide A19_BidSchedule |
| PWS 2018 Craney Island Aerial Herbicide Treatment |
File details come from the government source that posted it.